Introduction
Internal Temperature Setpoints – CIBSE Guide A
External Temperatures – ASHRAE handbookFinalised heating, cooling and electrical load
Building Sustainability
Data Centre DesignAlternative Energy Sources
Solar, Biomass, Wind, Heat Pump Combined Heat and Power
Electric VehiclesSmart MeteringTriple GlazingLighting Design
Ventilation
Importance of Ventilation
Ventilation types considered: Natural Mechanical Mixed Mode
Only occupied rooms were ventilated
Air Conditioning Plant
Air conditioning plant considered: Local Centralised Partially Centralised
Centralised systems considered: Variable Air Volume Displacement Ventilation Constant Volume
Reasons for selection of VAV
Diffusers
Location Suspended Ceiling
Selection Method Room Dimensions Comfort Criteria Flow rate
Swirl Diffusers Uniform air flow
Ducts and Fans
Ducts sized based on flow rateFans sized using index circuit
Equal Pressure Drop methodKitchen and Basement ventilation
Separate extract systemInsulation around ducts
CHP
Sokratherm GG140 Compact CHP UnitRunning from October – April each yearElectrical Savings Versus Grid: €38,500Heating Savings Versus a Boiler: €23,150Payback Period: 5.44
years
Cooling Control
Cooling control similar to heating control, except with chillers instead of the heating supply.
Highest cooling demand shall be catered for.VAV will reduce air supply.Trace Heating.
Energy use is kept to a minimum by use of EC pumps and fans
Transformer Sizing
Max Electrical Load: 650kVATransformer Sized: 800kVA3 Phase Delta/Star ConnectionSiemens GEAFOL: Cast-Resin Insulation
Self Extinguishing Low Maintenance
Summer Design: Worst Case Cooling Design for Coolest Room Ambient Temperature: 34oC
Winter Design: Worst Case Heating Design for Warmest Room Ambient Temperature: -34oC
Psychrometric Analysis
Free Cooling
Kyoto Cooling Air HandlerCapital Cost: €153000Cooling Power of: 90kWFull Load Power Requirement: 45kW
Unfeasible Option
Datacentre System
Hot Aisle: Cold AisleRecirculated Air OnlyConstant Volume
Maximum 2 OccupantsMaintains Setpoint During Possibility of Server
Fault
Lighting & Safety Strategy
Everyday Lighting
Emergency Lighting
Escape Routes
Fire Detection & Suppression System
Emergency Lights & Escape Route
Ceiling Mounted
DIALux Escape Route Emergency
Lights
Requirements 1 lux on route 0.5 at Edges
Heat Detection & Fire Suppression
Heat Detectors 12m Apart 5m from Walls
Fire Suppression Water Mist System Foam System in Basement
(TGD F) Break Glass Units Smoke Control System
Building Regulations Check
Full Compliance with the Irish Building Regulations.
Sound All air diffusers selected to meet noise limits Sound attenuators provided for:
Call Centres Conference Room Meeting Room Training Room
Building Regulations Check
Ventilation Sufficient fresh air provided for all occupants Special attention given to toilets, kitchen & canteen. Filtration to remove dust from supply air Dedicated extraction system for basement
Conservation of Energy Insulated floors, external walls & internal partitions BMS setup to minimise energy consumption
Building Regulations Check
Fire Safety 2 means of escape for all occupants
One fire-rated lift for evacuation of disabled occupants
5 fire compartments (each floor plus basement)
Two extraction fans in basement plus foam suppression system
External hard standings required for fire services
Conclusions
Most efficient ventilation system to be installed
All internal conditions in accordance with guidelines
CHP chosen as the most economical power source
Comfortable & efficient lighting
Complies with all Building Regulations.