Plan
• Introduction
• Structured Methods– Data Flow Modelling– Data Modelling– Relational Data Analysis
• Feasibility
• Maintenance
![Page 3: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/3.jpg)
Ten Guidelines1. Don’t expect to get it right first time – draw one to throw away*2. Draw a Document Flow Diagram to establish the context3. Check that you have identified all input and output document flows4. Always draw a context diagram – it clarifies the context5. Read through the system description noting candidate processes and data stores6. Identify the External Entity that ‘starts’ the whole system process7. Build the diagram one process at a time adding data stores as required8. For each process identify the main output, all inputs and other outputs9. For each process clearly mark any data flows that go to, or come from, nowhere10. Once the processes are complete check through your work and tidy up loose ends11. Check each process for consistency (what comes out must have gone in)12. Check against the context for consistency
(* But don’t throw it away)
![Page 4: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/4.jpg)
Remember
• Primary Output– What is the result of the process completing its job?
Where does it go?
• Inputs– What information does the process need in order to
do its job? Where doe sit come from?
• Other outputs– What information is required by other processes?
![Page 5: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/5.jpg)
Remember
• Check for consistency against Context
• Check that what comes out went in
• Check that all necessary detail has been included– I.E. show your diagram to a manager/end
user of the existing system
![Page 6: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/6.jpg)
Example Context (Big John’s)
Delivery Note
Purchase Order
Payment
Purchase Invoice
Sales Invoice
Sales Order
Sales Delivery Note
Payment
bwholesaler
Big John’s Store
aretailer
Supply goods to retailer by ordering from wholesaler
![Page 7: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/7.jpg)
Example (Big Johns)
![Page 8: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/8.jpg)
Group by Function
• Lejk and Deeks suggest grouping processes by Function
• This often makes the diagram less complex
![Page 9: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/9.jpg)
Example (Big Johns)
![Page 10: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/10.jpg)
DFD Levelling
• DFDs are a communication tool– They should be easy to follow for both skilled systems
analyst and customer
• Too much detail adds complication– but detail is necessary
• Levelling is a way of achieving detail without adding complication– Different diagrams show different levels of abstraction
![Page 11: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/11.jpg)
DFD Levelling
(Lejk and Deeks, 2002)
![Page 12: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/12.jpg)
Level 1 Diagram
(Lejk and Deeks, 2002)
![Page 13: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/13.jpg)
Level 2 Diagram for Process 1
(Lejk and Deeks, 2002)
![Page 14: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/14.jpg)
Level 2 Diagram for Process 4
(Lejk and Deeks, 2002)
![Page 15: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/15.jpg)
How many levels do we need?
(Lejk and Deeks, 2002)
![Page 16: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/16.jpg)
Guidelines
• A large number of Data Flows into a process?– Certainly indicates lower level of details– Maybe should split the process
• Large number of processes (more than 7)?– Should merge processes at current level– Implies lower level detail
![Page 17: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/17.jpg)
How do we know when to stop?
• Each Process will have a description
• Size of Description?– DeMarco estimates that a 1-page “mini-spec”
is sufficient detail– Also suggests basing decision on number of
inputs and outputs• Inputs/outputs• Overall number
![Page 18: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/18.jpg)
Elementary Process Descriptions
• Used to describe the processes
• One is required for every process
• May be developed using:– Structured English– Decision Trees/Tables– Flow Charts
![Page 19: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/19.jpg)
Structured English
• Normal text is too ambiguous or too verbose
• Has three logical constructs– Sequence– Selection– Iteration
![Page 20: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/20.jpg)
Sequence
• A list of actions performed in logical order– Example
1. Go to lecture room2. Find seat at back3. Read paper4. Check watch5. Listen to lecturer (5 mins max)6. Check watch7. Check watch8. Yawn9. Leave
![Page 21: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/21.jpg)
Selection
• Used where there is a selection of possible actions and that taken depends on the truth value of a condition
• IF…THEN…ELSE
• CASE
![Page 22: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/22.jpg)
Selection Example
– IF (have pen AND can be bothered)– THEN write notes– ELSE read newspaper
• Make sure process has appropriate outputs for each alternative action
![Page 23: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/23.jpg)
Iteration
• When a set of actions is repeated a number of times, this number being determined by the truth value of a condition
• REPEAT…UNTIL
• WHILE
• FOR each
![Page 24: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/24.jpg)
Iteration Example
REPEAT1. Draw on Desk
2. Check watch
3. Yawn
UNTIL Lecture Finished
![Page 25: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/25.jpg)
Problems
• There is a danger that we can get too formal• Remember that this is supposed to aid
communication• There may be a need to write in structured
English and then convert that into more regular English
• There is a trade-off between formality and understandability
• Try developing EPDs for Big John’s Store
![Page 26: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/26.jpg)
Current Physical System
• We now have a model of the current physical system which is:– Complete– Accurate– Clear
• We now have to think about the system purely in terms of its process
![Page 27: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/27.jpg)
Structured Analysis + Design
Existing System ERD
Repository
Existing Physical
System DFD
New System ERD
Repository
New Logical System DFD
Convert to Logical View
User Requirements
Technical Options +
Constraints
New Physical System
![Page 28: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/28.jpg)
Logicalisation – why?
• Systems Evolve over time– Some processes become redundant, but are
still present– Ad-hoc development causes processes to
become tightly coupled– Some Process descriptions depend on
hardware
• These factors obscure our view of the system
![Page 29: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/29.jpg)
Logicalisation – why?
• Logicalisation helps to view the system without these factors
• We can now see the wood not the trees
![Page 30: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/30.jpg)
Logicalisation – how? (1)
• Rationalise Data Flows– Replace documents with data
• Examples– Delivery Note Delivery Details– Delivery Note (copy) Delivery Details
![Page 31: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/31.jpg)
Logicalisation – how? (2)
• Rationalise Data Stores– Remove duplication of data– Remove or rename stores that hold physical
documents
• Examples– Orders, Invoices and Delivery Notes– In trays are good candidates for removal
![Page 32: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/32.jpg)
Logicalisation – how? (3)
• Rationalise Processes– Remove people and places– Change experts into external entities– Remove processes that simply move data
around within themselves
![Page 33: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/33.jpg)
Logicalisation – how? (4)
• Reconstruct DFD– Lower level processes will be radically
different– These changes must be reflected at top level– New external entities may have been
introduced• effect the context of the system
![Page 34: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/34.jpg)
Level 1 Diagram - Physical
(Lejk and Deeks, 2002)
![Page 35: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/35.jpg)
Level 1 Diagram - Logical
![Page 36: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/36.jpg)
Structured Analysis + Design
Existing System ERD
Repository
Existing Physical
System DFD
New System ERD
Repository
New Logical System DFD
Convert to Logical View
User Requirements
Technical Options +
Constraints
New Physical System
![Page 37: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/37.jpg)
References
• Whiteley, D. (2004) Introduction to Information Systems, Palgrave, 2004.
• Lejk, M. and D. Deeks (2002) Systems Analysis Techniques, Addison Wesley 2002
• Mason, D. and L. Willcocks (1994), Systems Analysis, Systems Design, Alfred Waller, 1994.
![Page 38: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/38.jpg)
References
• Yeates, D. and T. Wakefield (2004) Systems Analysis and Design, FT/Prentice Hall 2004
• Gane, C. and T. Sarson (1979) Structured Systems Analysis, Prentice Hall, 1979
• Eva, M (1994) SSADM Version 4: A users guide, McGraw hill, 1994
![Page 39: Data Flow Modelling II. Plan Introduction Structured Methods –Data Flow Modelling –Data Modelling –Relational Data Analysis Feasibility Maintenance](https://reader030.vdocuments.us/reader030/viewer/2022032523/56649d785503460f94a5b4e8/html5/thumbnails/39.jpg)
References
• DeMarco, T. (1979) Structured Analysis and System Specification, Yourdon, 1979
• Royce, W. (1970) Managing the development of large software systems, In: Proceedings of IEEE WESCON, 1970 pp1-9.