data consideration
DESCRIPTION
EBM calculation notesTRANSCRIPT
1. ARR (absolute risk reduction) = EER (Experimental Event Rate)- CER (Control Event Rate)
2. NNT (Number needed to treat)= 1/ARR3. Confidence interval (CI): see if the CI is within +-25% interval4. LHH (likelihood of being helped and harmed, LHH)= (1/NNT): (1/NNH)
5. 6. 7. 8. 9. 10.