Our mission is to add value to the projects entrusted to us. We work side by side with the client from briefing up to the testing phase finishing with the end product.
We help the client to define his objectives, with options and alternative scenarios.We do not settle for second best and we like working with demanding clients.
CONTENTS
• Company Background
About us The three brands Strengths
• Insightful Solutions
Approach Sustainability Structure Services Clients
• Activities for Data Center
Proposed Activities for Data Center New Constructions - Site Selections New Constructions - Permits New Constructions - Design & Works Direction Existing Site
• Data Center Experience
ABOUT US
Lombardini22 is a leading architecture and engineering company,
a dynamic laboratory, a space open to contamination and the
territory, which generates curiosity and energy around it. It is
an international and multidisciplinary group of professionals,
addressing the real estate market with an approach based on
the full involvement of the client in leadership and control of the
project and the inspired interaction of diverse skills.
Lombardini22 operates with three brands: L22, DEGW and FUD.
THE THREE BRANDS
L22 is dedicated to architectural design and engineering for major
international clients on major projects in the Retail, Office and Hotel -
Residential markets. A company that has earned a prominent place in the
panorama of Italian designers and today is also active abroad, especially
in the Mediterranean area.
DEGW Italia helps large companies design workspaces. It is a leader in
the strategic consulting on ways of working and the interaction between
physical space and business performance. Thanks to its experience,
DEGW Italia provides a valuable contribution to understanding the
relationship between people, work processes and designing spaces to
improve business results: People, Place, Performance.
FUD Brand Making Factory completes the offer by L22 and DEGW Italia
in the field of Physical Branding and Communication Design from 2014.
FUD was born in 2010 developing communication and brand design
projects in a very distinctive style: thinking horizontally in partnership with
the client, niftily moving vertically towards the right branding solution. FUD
covered everything from the initial business project and concept to the
communication strategy, production phase and final product.
People and expertise
• Lombardini22 is a group with more than 140 architects, engineers,
consultants, graphic designers and staff. Professionals specialized in the
corporate, retail and hospitality sectors.
• Reliability of the project management and 360° service (a single consultant
for architecture, interior design, M&E and cost control) are the strengths
of Lombardini22.Multicultural team with strong service orientation and international knowledge
• The secret is the presence of different disciplines, working in synergy on
integrated design to achieve the goal.360° Service - One consultant for
architecture, interior design, M&E, cost contro
• A multicultural, service oriented team with international experience combined with knowledge and mutual respect are the driving force of the company’s development.
140
11785
32
ARCHITECTS
STAFF
P E O P L E
E N G I N E E R S6 GRAPHIC DESIGNERS
PA R T N E R S
+
APPROACH
Lombardini22 make complex issues simple. We help clients to
capitalize on a vital dynamic: the relationship between people and
the design of physical place, to enhance performance.
Lombardini22 values an integrated and multidisciplinary approach
to projects thanks to an international team of professionals and a
rich variety of skills and expertise.
Lombardini22 helps to deliver tangible and sustainable business
value, through rigorous and clearly structured evidence and
through an ability to really listen to the aspirations, strategic needs
and practical commercial concerns of our clients.
sistema "edificio—impianti"
best practice
carbon footprint
brief
ingegneria impiantisticacertificazione
protocolli
Green Building Council ItaliaProgettazioneintegrativa
LEED
SUSTAINABILITY
• Lombardini22 has designed the first building certified LEED Platinum in Italy and is designing more than 500.000 sqm of buildings that will obtain a LEED certification.
• Lombardini22 is a member of the GBC Italia and of US GBC and has 3 LEED AP.
• Lombardini22 develops energy modelling of buildings through Equest, IES-VE, EPLUS software certified by ASHRAE / LEED.
• Lombardini22 is specialized in design of Data Center and its professionals have obtained the ATD qualification (Accredited Tier Disegner) certified by Uptime Institute.
• “We are designers and we develop templates with cognition: it’s our profession”
STRUCTURE
Quality
Paolo Facchini - Chairman
Franco Guidi - Managing Director
Adolfo Suarez Marco Amosso Alessandro Adamo Roberto Cereda Paolo Facchini
Administration
ARCHITECTURE
Retail and Hospitality
ARCHITECTURE
Urban & Building Design
WORKPLACE
Consultancy and Design
ENGINEERING
M&E service - Sustainability
HEALTH & SAFETY SERVICES
Permission Requirements
Human Resources
D’Alessio - Ferrara
BRANDING
Communication Design
SERVICES MARKETS
Architecture
Building DesignInterior Design
Education
Hospitality
Residential
Retail & Leisure
Retail ParkShopping Center
Outlet
Commercial
Business ParkMixed Use
Office Building
Healthcare
Consulting
Graphic Design & CommunicationHealth & Safety
UrbanismEngineering
MEPEnvironmentalSustainability
SERVICES
CLIENTS
PROPOSED ACTIVITIES FOR DATA CENTER
Lombardini22 works in cooperation with the customer. All
activities that are carried out are based on the acquisition of
requirements and information necessary for the exchange of
experiences and the sharing of knowledge. Goals and strategy
to achieve them are established together with the customer.
Lombardini22 is specialized in Data Center design and its
professionals have obtained the ATD qualification (Accredited Tier
Designer) certified by Uptime Institute.
Lombardini22 provides specific services dedicated to Data Center
for:
· new construction
· existing site
NEW CONSTRUCTIONS - SITE SELECTION
• Administrative existing condition analisys & preliminary contact with local Authorities
• Site compatibility analisys (risk analisys: seismic, flood, acoustic, geological, environmental, electromagnetic, airport adjacence and/or sensible target, etc.)
• Site accessibility analisys, roads and services Provider (power & communication).
• Preliminary Feasibility Study & Budget Plan
NEW CONSTRUCTIONS - PERMITS
• Building permits
• Preliminary M&E Design and Italian Law 10/91
• Fire prevention Design and submission to Fire Brigade
• Forecasted acoustic impact analisys
• Italian Tax practise for energy production, diesel storage, etc.
• Sanitary authorization
• Plumbing connection and other services practise
• Environmental pollution practise
• Land & Building cadastral practise
NEW CONSTRUCTIONS - DESIGN & WORKS DIRECTION
• Feasibility Study & Budget Plan
• Energy model & CFD
• Site topographic survey
• Landscape / structural / civil / architectural / MEP Design, from
preliminary to detail accuracy level
• Health & Safety Coordinator during Design and Construction phases
• Tender Documents
• Works Direction with weekly report
• Cost Control, Quantity Surveyoir & Works Progression control
• Test & Commissioning & IST
• LEED & BREEAM Certifications
NEW CONSTRUCTIONS -
EXISTING SITES
• Site analisys to evaluate possible critical systems
• Possible existing permit issues solution
• Energy audit
• Refurbishment Designs for energy efficiency improvement and/or expansion
• Health & Safety Coordinator during Design and Construction phases
• Tender Documents
• Works Direction with weekly report
• Cost Control, Quantity Surveyoir & Works Progression control
• Test & Commissioning & IST
HP ENTERPRISE SERVICES
Lombardini22 is designing for HP one of the more sophisticated
versions of Data Center, and among the largest in Europe, it is
a fortress of prefabricated reinforced concrete organized into
quadrants of 500 square meters each, for an expansion of up to
2,000 square meters. The flexibility and scalability of activation
of the quadrants, which is essential for the modulation of
investments in timely response to market demand, make this an
innovative Data Center.
Client: HP Enterprise Services
Location: Inverno PV – Italy
Area: 2.000 sqm
End of works: On going
Services: M&E, Civil and Structural Design, Integrated Fire Prevention
THE FLEXIBLE DATA CENTER
• Four quadrants 2000 sqm total available space
• Independently fitted out by Quadrant from Cold Shell
• Each quadrant redundancy N+1 Tier 3
THE FLEXIBLE DATA CENTER KEY FACTS
• Data Hall Size expandable to a total of 2000 sqm
• Two independent MV supplies available
• Tier Level 3
• Mechanical Configuration N+1
• Electrical Configuration N+1
• Server racks would be dual feed @ 100% rating of power supplies
• Room IT load = 1500 W/sqm
• Mechanical & Electrical system provision for each quadrant would be standalone
20 km
30 km
Cooling units # 1 to 3 Power Generators # 1
PCM – UPS module # 1
Quadrant 1
Core building + tech rooms
PCM – UPS module # 2
Power Generators # 2
SINGLE QUADRANT SYSTEMS N+1 REDUNDANCY
THE FLEXIBLE DATA CENTER – SINGLE QUADRANT SYSTEMS AND FUNCTIONS LAYOUT
HP INVERNO REFURBISHMENT
Energy improvement and plant engineering for the data center
Winter overall. Coordination for the replacement of the unit
Hydronic and development of transformation from Tier 2 to Tier 3
Site.
Client: HP Enterprise Services
Location: Inverno PV – Italy
IT room area: 1.400 smq
Power: 3MW
Services: Reconstruction air conditioning plant and fire suppression plant, Interventions to improve energy efficiency, M&E, Works Management
HP CERNOVA NEW DATA CENTER
Client: HP Enterprise Services
Location: Milan – Italy
Area: 1.000 sqm
End of works: 2012
Services: M&E, Engineering Design
ALCATEL–LUCENT LAB
L22 designed the complete M&E Services for the new Alcatel
Lucent Headquarter. Specific attention to the 4500 sqm of Labs
and Research Areas with a Power Load requirement of 1.5 kW /
sqm.
Client: Alcatel–Lucent
Location: Vimercate MB – Italy
Area: 33.000 sqm
End of Works: On going
Services: Mechanical and Electrical Design, Brief, Space Planning, Interior Design, Workplace Change Management, Artistic Director
BCC SOLUTION
Identify, analyze, optimize. These are the steps that have made
energy efficiency upgrading for the BCC Solution head office a
successful case study. The objective of Lombardini22 and BCC is
to analyze the energy consumption of the data center and office
spaces. Based on the data collected, Lombardini22 develops the
best plant design for reducing consumption and costs, enabling
significant savings in resources.
Client: BCC Solution Spa
Location: Rome – Italy
Area: 5.000 sqm
Estimated costs: 120.000 €
Estimated savings: 140.000 € per year
Services: Energy analysis and mechanical and electrical design
VERIZON
Italian IDC. 10 MW power load.
Initial installation 2001 per phases up to 2011.
Client: Verizon
Location: Pero, MI – Italy
Area: 10.000 smq
End of Works: 2011
Classification: TIER 3
Services: Civil, M&E, Work Supervision
COST MODEL
• Costs based on tenders received May 2012
• Initial construction 500sqm Nett Technical + 500sqm Cold shell only + Administration core
• Final Construction 2000sqm Nett technical + Administration Core
COAST INITIAL CONSTRUCTION FINAL CONSTRUCTION Cost/sqm Nett Tech Cost/MW Cost/sqm Nett Tech Cost/MW
Civil and Strctural 1.500€/sqm
MEP 2.800€/sqm
Plant & Equipment (Procured directly by client) 3.200€/sqm
Site Upgrades - Power 800.000€
NESTLÉ
Design of the new Nestle headquarters CED under construction in
Milano Fiori, Milan.
Client: Nestlè
Location: Milan – Italy
IT room area: 140 smq
Power: 2x250kVA
L22 Service: CED Design, IT System, Coordination
DEGW Service: Execution planning, General Construction Supervision
STATE STREET BANK
Plant design construction of the new headquarters in Milan and
general coordination site offices, MER and SER.
Client: State Street Bank
Location: Milan – Italy
IT Room area: 100 smq
Power: 2x120kVA
L22 Service: New Construction
DEGW Service: Construction Design, Works Management
NOKIA SIEMENS NETWORKS
L22 develops the M&E design as part of the NSN HQ
Refurbishment, including laboratories CED. DEGW Italia is
developing the consolidation project and moving of the different
locations to the Head quarters of Cassina Plaza of approximately
1,000 people. DEGW Italia has adapted the international
guidelines to the Italian reality. The NSN Modern Office provides
a concept of sharing, more common in the world than in Italy and
should be coordinated. Therefore three ways of working has been
introduced and explained, defined by the mobility of the persons:
Mobile, Campus Mobile, Desk-Based. DEGW Italia is dealing
with the whole Change Management project, which in addition
to classic interviews with persons responsible for functions and
customer departments, provides the preparation of a series of
communication tools to spread the new concept of using space
to the entire staff.
Client: Nokia Siemens Network
Location: Cassina De’Pecchi MI – Italy
Area: 14.000 sqm
L22 Services: M&E Design
DEGW Services: Brief Space Planning, Interior Design, Workplace Change Management, Construction Management
LIVELLO COPERTURA
PIANO/FLOOR 3
PIANO/FLOOR 2
PIANO/FLOOR 1
PIANO/FLOOR 0
CD_3CD_2CD_1
LIVELLO COPERTURA
PIANO/FLOOR 3
PIANO/FLOOR 2
PIANO/FLOOR 1
PIANO/FLOOR 0
CD_3CD_2CD_1
LIVELLO COPERTURA
PIANO/FLOOR 3
PIANO/FLOOR 2
PIANO/FLOOR 1
PIANO/FLOOR 0
CD_3CD_2CD_1
LIVELLO COPERTURA
PIANO/FLOOR 3
PIANO/FLOOR 2
PIANO/FLOOR 1
PIANO/FLOOR 0
CD_3CD_2CD_1
Armadio - 42 HE
TIPICO ARMADIO IT ROOM
Dorsale OtticaDa LAN Room
Armadio - 42 HE
Apparati attivi 48 porte (Esclusi dalla fornitura)
Passacavi
Passacavi
PassacaviPermutatore ottico 24 pos. 12x2xSCPassacavi
Apparati attivi 48 porte (Esclusi dalla fornitura)
Passacavi
Passacavi
Passacavi
Passacavi
Passacavi
Passacavi
PassacaviPatch panel 24 prese RJ45 cat.6 utenze dati di piano
PassacaviPermutatore rame dorsale fonia (25 coppie)
Dorsale Fonia a PABXad armadi di semipiano
PARTE PASSIVA
Bretelle Ottiche SC-SC
Striscia di alimentazione completa di spezzonedi cavo FG7OM1, 3G4, terminato su spina mobile CEE 309 2P+T
Patch panel 24 prese RJ45 cat.6 utenze dati di piano
Patch panel 24 prese RJ45 cat.6 utenze dati di piano
Patch panel 24 prese RJ45 cat.6 utenze dati di piano
Patch panel 24 prese RJ45 cat.6 utenze dati di piano
Patch panel 24 prese RJ45 cat.6 utenze dati di piano
PassacaviPatch panel 24 prese RJ45 cat.6 utenze dati di piano
PassacaviPatch panel 24 prese RJ45 cat.6 utenze dati di piano
PassacaviPatch panel 24 prese RJ45 cat.6 utenze dati di piano
PassacaviPatch panel 24 prese RJ45 cat.6 utenze dati di piano
TIPICO ARMADIO IT ROOMPARTE ATTIVA
Passacavi
Apparati attivi 48 porte (Esclusi dalla fornitura)
Passacavi
Apparati attivi 48 porte (Esclusi dalla fornitura)
Apparati attivi 48 porte (Esclusi dalla fornitura)
8 coppie 25 coppie telefonico
ALLESTIMENTO VALIDO PER LOCALI IT: PIANO SECONDO CD01, CD02, CD03 E PIANO TERZO CD02
Armadio - 42 HE
TIPICO ARMADIO IT ROOM
Dorsale OtticaDa LAN Room
Armadio - 42 HE
Passacavi
PassacaviPermutatore ottico 24 pos. 12x2xSCPassacavi
Apparati attivi 48 porte (Esclusi dalla fornitura)
Passacavi
Passacavi
Passacavi
Passacavi
Passacavi
Passacavi
PassacaviPatch panel 24 prese RJ45 cat.6 utenze dati di piano
PassacaviPermutatore rame dorsale fonia (25 coppie)
Dorsale Fonia a PABXad armadi di semipiano
PARTE PASSIVA
Bretelle Ottiche SC-SC
Striscia di alimentazione completa di spezzonedi cavo FG7OM1, 3G4, terminato su spina mobile CEE 309 2P+T
Patch panel 24 prese RJ45 cat.6 utenze dati di piano
Patch panel 24 prese RJ45 cat.6 utenze dati di piano
Patch panel 24 prese RJ45 cat.6 utenze dati di piano
Patch panel 24 prese RJ45 cat.6 utenze dati di piano
Patch panel 24 prese RJ45 cat.6 utenze dati di piano
PassacaviPatch panel 24 prese RJ45 cat.6 utenze dati di piano
PassacaviPatch panel 24 prese RJ45 cat.6 utenze dati di piano
TIPICO ARMADIO IT ROOMPARTE ATTIVA
Passacavi
Apparati attivi 48 porte (Esclusi dalla fornitura)
Passacavi
Apparati attivi 48 porte (Esclusi dalla fornitura)
Apparati attivi 48 porte (Esclusi dalla fornitura)
4 coppie 25 coppie telefonico
ALLESTIMENTO VALIDO PER LOCALI IT: PIANO PRIMO CD01, CD02 E TERZO CD03
AlimentazioneElettrica daQ.E. UPS
AlimentazioneElettrica daQ.E. UPS
Armadio - 42 HE
TIPICO ARMADIO IT ROOM
Dorsale OtticaDa LAN Room
Armadio - 42 HE
PassacaviPermutatore ottico 24 pos. 12x2xSCPassacavi
Passacavi
Passacavi
Passacavi
Passacavi
Passacavi
Passacavi
PassacaviPatch panel 24 prese RJ45 cat.6 utenze dati di piano
PassacaviPermutatore rame dorsale fonia (25 coppie)
Dorsale Fonia a PABXad armadi di semipiano
PARTE PASSIVA
Bretelle Ottiche SC-SC
Striscia di alimentazione completa di spezzonedi cavo FG7OM1, 3G4, terminato su spina mobile CEE 309 2P+T
Patch panel 24 prese RJ45 cat.6 utenze dati di piano
Patch panel 24 prese RJ45 cat.6 utenze dati di piano
Patch panel 24 prese RJ45 cat.6 utenze dati di piano
Patch panel 24 prese RJ45 cat.6 utenze dati di piano
Patch panel 24 prese RJ45 cat.6 utenze dati di piano
TIPICO ARMADIO IT ROOMPARTE ATTIVA
Passacavi
Apparati attivi 48 porte (Esclusi dalla fornitura)
Passacavi
Apparati attivi 48 porte (Esclusi dalla fornitura)
Apparati attivi 48 porte (Esclusi dalla fornitura)
4 coppie 25 coppie telefonico
ALLESTIMENTO VALIDO PER LOCALI IT: PIANO PRIMO CD03 E TERZO CD01
AlimentazioneElettrica daQ.E. UPS
Passacavi
Armadio - 42 HE
TIPICO ARMADIO IT ROOM
Dorsale OtticaDa LAN Room
Armadio - 42 HE
PassacaviPermutatore ottico 24 pos. 12x2xSCPassacavi
Passacavi
Passacavi
Passacavi
Passacavi
PassacaviPatch panel 24 prese RJ45 cat.6 utenze dati di piano
PassacaviPermutatore rame dorsale fonia (25 coppie)
Dorsale Fonia a PABXad armadi di semipiano
PARTE PASSIVA
Bretelle Ottiche SC-SC
Striscia di alimentazione completa di spezzonedi cavo FG7OM1, 3G4, terminato su spina mobile CEE 309 2P+T
Patch panel 24 prese RJ45 cat.6 utenze dati di piano
Patch panel 24 prese RJ45 cat.6 utenze dati di piano
Patch panel 24 prese RJ45 cat.6 utenze dati di piano
TIPICO ARMADIO IT ROOMPARTE ATTIVA
Passacavi
Apparati attivi 48 porte (Esclusi dalla fornitura)
Passacavi
Apparati attivi 48 porte (Esclusi dalla fornitura)
Apparati attivi 48 porte (Esclusi dalla fornitura)
2 coppie 25 coppie telefonico
ALLESTIMENTO VALIDO PER LOCALI IT: PIANO TERRA CD01
AlimentazioneElettrica daQ.E. UPS
Passacavi
(*) I CAVI E LE INFRASTRUTTURE PER LA RETE FONIASONO DA CONSIDERARSI OPZIONALI.NSN SI RISERVA DI VALUTARE L'ESATTO NUMERO DIUTENZE TELEFONICHE DA PREDISPORRE NELL'INTEROEDIFICIO E PERTANTO DI ADEGUARE DI CONSEGUENZAIL PRESENTE SCHEMA.
(**) LE PATCH CORD (IN RAME ED OTTICHE)LATO PERMUTATORE E LATO UTENZA SONO A CARICODELL'APPALTATORE.
(***) SONO DA CONSIDERARSI INCLUSE TUTTE LESTRUTTURE DI ATTESTAZIONE DELLE LINEE IN RAME EDOTTICHE, IN PARTICOLARE CASSETTI OTTICI, PANNELLIDI PERMUTAZIONE DATI/FONIA. E' PREVISTA LACERTIFICAZIONE DELLE LINEE IN RAME EDELLE CONNESSIONI OTTICHE REALIZZATE.
(****) GLI ACCESS POINT SARANNO DEL TIPO POWEROVER ETHERNET E SARANNO DOTATI DI ALIMENTATORESINGOLO COLLEGATO ALLA STRISCIA DI ALIMENTAZIONEDI RACK.
(*****) I PUNTI RETE DEDICATI AI SISTEMI DI SICUREZZA DOVRANNO ESSERE COLLEGATI DIRETTAMENTEALL'ARMADIO SERVER ROOM IN POSIZIONECHIARAMENTE IDENTIFICABILE
RevisioneDataN°
TAVOLA/DRAW:
NOME FILE/FILE NAME:
TITOLO/DESCRIPTION:
COMMITTENTE/CLIENT:
PROGETTO/PROJECT:
PROGETTISTA/DESIGNER:
OGGETTO/OBJECT:
SCALA/SCALE:
DISEGNATO DA:
DATA/DATE:
DRAWING BY:CONTR. DACHECKED BY:
REV.DATA REV.
COMMESSA/JOB:
LOMBARDINI22 S.r.l. (L.663/41 Art.2575)
Nokia Siemens Network S.p.A.Via Roma 108 Cassina de' Pecchi (Mi)
Cassina Plaza - Building CDVia Roma 108 Cassina de' Pecchi (Mi)
Roberto CeredaIscrizione Ordine Ingg Bs 2609
Progetto esecutivo
Riqualificazione Architettonicaed Impiantistica Building CDImpianti di SicurezzaFunzionale Impianto Rete LAN/Fonia
MC+CDV RC
20/04/2011 -
0402_EECDF01a
0402
EE CD F0118/05/2011 a
1 18/05/2011 Revisione per appalto
2
3
4
5
TELECITY GROUP SPA
L22 develops the design of the new ID3 IT room, in addition to
the two existing ones. L22 oversaw the design of all phase of
the process, from the practices to the civil, architectural and
engineering design, including fire prevention and acoustics
consultancy. The new room is about 250 square meters, the air
conditioning system is constituted by direct free-cooling. The
power draw of the site is approximately 2.5 MVA, the site is
classified TIER II.
Client: Telecity Group Spa
Location: Milan – Italy
IT Room Area: 250 sqm
Power: 2.5 MVA
Classification: TIER 2
Service: Civil, Architectural and Engineering Design, Fire Prevention, Acoustic Consultancy