data center cecklist - data foundry · data center cecklist power substation feeds dedicated to...

6
DATA CENTER CHECKLIST POWER Substation feeds dedicated to data center facility Substation is fed by independent sources on the electrical grid Substation feeds enter the property via diverse routes At least one feed is underground and concrete-encased end-to-end UPS designed with a maintenance bypass, allowing live full replacement Maintenance bypass is UPS protected Generator fuel stored on site Generators run at least 48 hours at full load Power system is concurrently maintainable POWER SCORE COOLING Chilled water design Water pipes run under the data center Diverse water feeds Condenser water system paralleled Chillers paralleled Chilled water pumps paralleled Chilled water distribution triple looped Cooling system is concurrently maintainable COOLING SCORE After narrowing down your search for your next data center, use our data center checklist to evaluate key criteria as you tour your top facilities. 1. Enter the names of your prospective colocation providers at the top of the checklist. 2. Check off the features found in each facility. 3. When finished touring, compare section scores and total scores for each facility. COLOCATION PROVIDERS

Upload: others

Post on 26-Jan-2021

10 views

Category:

Documents


5 download

TRANSCRIPT

  • DATA CENTER CHECKLIST

    POWER

    Substation feeds dedicated to data center facility

    Substation is fed by independent sources on the electrical grid

    Substation feeds enter the property via diverse routes

    At least one feed is underground and concrete-encased end-to-end

    UPS designed with a maintenance bypass, allowing live full replacement

    Maintenance bypass is UPS protected

    Generator fuel stored on site

    Generators run at least 48 hours at full load

    Power system is concurrently maintainable

    POWER SCORE

    COOLING

    Chilled water design

    Water pipes run under the data center

    Diverse water feeds

    Condenser water system paralleled

    Chillers paralleled

    Chilled water pumps paralleled

    Chilled water distribution triple looped

    Cooling system is concurrently maintainable

    COOLING SCORE

    After narrowing down your search for your next data center, use our data center checklist to evaluate key criteria as you tour your top facilities.

    1. Enter the names of your prospective colocation providers at the top of the checklist.

    2. Check off the features found in each facility.

    3. When finished touring, compare section scores and total scores for each facility.

    COLOCATION PROVIDERS

  • DATA CENTER CHECKLIST

    NETWORK & CONNECTIVITY

    Carrier-neutral with access to at least 10 different carriers

    High quality blended Internet service offering

    Internal meet-me-room or telecom exchange point

    Core network equipment protected from customer access

    Underground, concrete-encased network conduits

    Diverse network entry points

    Diverse network feed paths

    Private data transport between data centers available

    Data transport is diverse and redundant

    Direct connectivity to major cloud providers

    Network is monitored from provider-controlled Network Operations Center (NOC)

    Will provide connectivity to offices and other data centers

    CONNECTIVITY SCORE

    COMPLIANCESSAE 18 SOC Type I

    SSAE 18 SOC Type II

    ISO 27001

    PCI-DSS

    HIPAA

    COMPLIANCE SCORE

    SCALABILITY

    Owners/operators have planned for future expansion

    There is sufficient space availabe for your future expansion needs

    There is sufficient power capacity available to the site for expansion

    SCALABILITY SCORE

  • DATA CENTER CHECKLIST

    SECURITY

    Facility is staffed 24x7x365

    Security staff are direct hires of the data center provider, not third-party

    Protected by perimeter fencing

    Centralized security at loading docks and entry points

    Security viewing area is behind bullet-proof glass

    Digital video recording of all personnel at all times

    Digital video recording of data halls at all times

    Digital video recording archived

    Man traps

    Visitor tracking

    Private access control systems permitted for cages and cabinets

    Customer-defined access lists

    Gated entry monitored by onsite security

    Dual factor authentication that includes biometric screening

    Mechanical plant equipment located outdoors is fenced in and protected

    SECURITY SCORE

    SUPPORT & SERVICES

    Offers remote hands

    Managed shipping and receiving

    Maintains network engineers on staff

    Provides network management and network security services

    Provides back-up and disaster recovery services

    Has 24x7x365 support

    Offers cloud storage services

    Offers cabling services

    SERVICE SCORE

  • DATA CENTER CHECKLIST

    BUILDING STRUCTURE

    Foundation supported by underground piers

    No ramps up to white floor

    Building is purpose-built to be a data center

    Each UPS system is in a secure, isolated room

    Walls and roof built to withstand 185+ mph winds

    Exterior walls are concrete and at least 10 inches thick

    Roof is made of concrete and sealed

    Slab design loading per sq ft is at least 250 psf

    Raised floor will hold equipment racks weighing up to 4,000 lbs each

    At least 36 inches between raised floor and subfloor

    STRUCTURE SCORE

    EFFICIENCY

    Variable frequency drive chillers

    Variable frequency drive pumps

    Variable frequency drive air handlers

    Sealed cabinets

    Insulated roof

    Efficient UPS with eco mode

    EFFICIENCY SCORE

  • DATA CENTER CHECKLIST

    LOCATION

    Distance of 1+ miles from major roadways

    Distance of 1+ miles from train tracks

    Distance of 2+ miles from airport

    Located above the 500-year flood plain

    Located outside earthquake zone

    Located outside hurricane zone

    Located outside tornado zone

    Located outside blizzard/snowstorm zone

    Proximity to hotels, restaurants and retail

    LOCATION SCORE

    STAFF AMENITIES

    Loading dock

    Staging area

    Conference rooms

    Dedicated office space available

    Dedicated storage space available

    Briefing / presentation room

    Breakroom stocked with coffee, snacks, beverages & MREs

    Cots available for overnight stays

    Showers on site

    Washer / dryer on site

    Personal lockers available

    Site is easily accessible to staff via airport and roadways

    AMENITIES SCORE

  • DATA CENTER CHECKLIST

    TOTAL SCORE

    [email protected] • 888-839-2794 • www.datafoundry.com

    COMPANY PROFILE

    Track record of financial stability

    20+ years of experience as a data center operator

    Core competency is designing and operating data centers

    Does not outsource data center staff

    Will customize solutions for your business

    Offers 100% uptime SLA

    Can provide customer references

    COMPANY SCORE

    Colocation Provider A: Colocation Provider AColocation Provider B: Colocation Provider BColocation Provider C: Colocation Provider CColocation Provider D: Colocation Provider DCompany Profile CP_A_2: OffCompany Profile CP_A_3: OffCompany Profile CP_A_4: OffCompany Profile CP_A_5: OffCompany Profile CP_A_6: OffCompany Profile CP_A_7: OffColocation Provider E: Colocation Provider EPower CP_A_9: OffPower Score A: 0Power CP_B_9: OffPower Score B: 0Power CP_C_9: OffPower Score C: 0Power CP_D_9: OffPower Score D: 0Power CP_E_9: OffPower Score E: 0Cooling Score B: 0Cooling CP_B_2: OffCooling CP_B_3: OffCooling CP_B_4: OffCooling CP_B_5: OffCooling CP_B_6: OffCooling CP_B_7: OffCooling CP_B_8: OffCooling CP_C_1: OffCooling CP_C_3: OffCooling CP_C_4: OffCooling CP_C_5: OffCooling CP_C_6: OffCooling CP_C_7: OffCooling CP_C_8: OffCooling Score C: 0Cooling CP_D_1: OffCooling CP_D_3: OffCooling CP_D_4: OffCooling CP_D_5: OffCooling CP_D_6: OffCooling CP_E_1: OffCooling CP_E_2: OffCooling CP_E_3: OffCooling CP_E_4: OffCooling CP_E_5: OffCooling CP_D_7: OffCooling CP_E_6: OffCooling CP_E_7: OffCooling CP_E_8: OffCooling CP_D_8: OffCooling Score D: 0Cooling Score E: 0Cooling CP_D_2: OffCompany Profile CP_A_1: OffColocation Provider A Total Score: 0Colocation Provider B Total Score: 0Colocation Provider C Total Score: 0Colocation Provider D Total Score: 0Colocation Provider E Total Score: 0Cooling Score A: 0Network Score E: 0Network Score D: 0Network Score C: 0Network Score B: 0Network Score A: 0COMPLIANCE Score B: 0COMPLIANCE Score C: 0COMPLIANCE Score D: 0COMPLIANCE Score E: 0COMPLIANCE Score A: 0SCALABILITY Score B: 0SCALABILITY Score C: 0SCALABILITY Score D: 0SCALABILITY Score E: 0SCALABILITY Score A: 0SECURITY Score A: 0SECURITY Score B: 0SECURITY Score C: 0SECURITY Score E: 0SECURITY Score D: 0SUPPORT Score E: 0SUPPORT Score A: 0Building Score B: 0Building Score E: 0Building Score D: 0Building Score C: 0Building Score A: 0EFFICIENCY SCORE B: 0EFFICIENCY SCORE C: 0EFFICIENCY SCORE D: 0EFFICIENCY SCORE E: 0EFFICIENCY SCORE A: 0LOCATION SCORE B: 0LOCATION SCORE C: 0LOCATION SCORE D: 0LOCATION SCORE E: 0LOCATION SCORE A: 0STAFF AMENITIES SCORE B: 0STAFF AMENITIES SCORE C: 0STAFF AMENITIES SCORE D: 0STAFF AMENITIES SCORE E: 0STAFF AMENITIES SCORE A: 0COMPANY SCORE A: 0COMPANY SCORE B: 0COMPANY SCORE C: 0COMPANY SCORE D: 0COMPANY SCORE E: 0Cooling CP_C_2: OffOther: OtherCooling CP_B_1: OffCompany Profile CP_E_5: OffCompany Profile CP_E_7: OffCompany Profile CP_E_6: OffCompany Profile CP_E_4: OffCompany Profile CP_E_3: OffCompany Profile CP_E_2: OffCompany Profile CP_E_1: OffLOCATION CP_D_9: OffLOCATION CP_D_8: OffLOCATION CP_D_7: OffLOCATION CP_D_6: OffLOCATION CP_D_5: OffLOCATION CP_D_4: OffLOCATION CP_D_3: OffLOCATION CP_D_2: OffLOCATION CP_D_1: OffLOCATION CP_A_9: OffLOCATION CP_A_8: OffLOCATION CP_A_7: OffLOCATION CP_A_6: OffLOCATION CP_A_5: OffLOCATION CP_A_4: OffLOCATION CP_A_3: OffLOCATION CP_A_2: OffLOCATION CP_A_1: OffLOCATION CP_B_9: OffLOCATION CP_B_8: OffLOCATION CP_B_6: OffLOCATION CP_B_5: OffLOCATION CP_B_4: OffLOCATION CP_B_3: OffLOCATION CP_B_2: OffLOCATION CP_C_9: OffLOCATION CP_C_8: OffLOCATION CP_C_7: OffLOCATION CP_C_6: OffLOCATION CP_C_5: OffLOCATION CP_C_4: OffLOCATION CP_C_3: OffLOCATION CP_C_2: OffLOCATION CP_C_1: OffCOMPLIANCE CP_A_6: OffCOMPLIANCE CP_A_5: OffCOMPLIANCE CP_A_4: OffCOMPLIANCE CP_A_3: OffCOMPLIANCE CP_A_2: OffCOMPLIANCE CP_A_1: OffCOMPLIANCE CP_B_6: OffCOMPLIANCE CP_B_5: OffCOMPLIANCE CP_B_4: OffCOMPLIANCE CP_B_3: OffCOMPLIANCE CP_B_2: OffCOMPLIANCE CP_B_1: OffCOMPLIANCE CP_C_5: OffCOMPLIANCE CP_C_4: OffCOMPLIANCE CP_C_3: OffCOMPLIANCE CP_C_2: OffCOMPLIANCE CP_C_1: OffSCALABILITY CP_E_1: OffSCALABILITY CP_E_2: OffSCALABILITY CP_E_3: OffSCALABILITY CP_D_3: OffSCALABILITY CP_D_2: OffSCALABILITY CP_D_1: OffSCALABILITY CP_C_3: OffSCALABILITY CP_C_2: OffSCALABILITY CP_C_1: OffSCALABILITY CP_B_3: OffSCALABILITY CP_B_2: OffSCALABILITY CP_B_1: OffSCALABILITY CP_A_3: OffSCALABILITY CP_A_2: OffSCALABILITY CP_A_1: OffSTAFF CP_E_12: OffSTAFF CP_E_11: OffSTAFF CP_E_10: OffSTAFF CP_E_9: OffSTAFF CP_E_8: OffSTAFF CP_E_7: OffSTAFF CP_E_6: OffSTAFF CP_E_5: OffSTAFF CP_E_4: OffSTAFF CP_E_3: OffSTAFF CP_E_2: OffSTAFF CP_E_1: OffSTAFF CP_D_12: OffSTAFF CP_D_11: OffSTAFF CP_D_10: OffSTAFF CP_D_9: OffSTAFF CP_D_8: OffSTAFF CP_D_7: OffSTAFF CP_D_6: OffSTAFF CP_D_5: OffSTAFF CP_D_4: OffSTAFF CP_D_3: OffSTAFF CP_D_2: OffSTAFF CP_D_1: OffSTAFF CP_C_12: OffSTAFF CP_C_11: OffSTAFF CP_C_10: OffSTAFF CP_C_9: OffSTAFF CP_C_8: OffSTAFF CP_C_7: OffSTAFF CP_C_6: OffSTAFF CP_C_5: OffSTAFF CP_C_4: OffSTAFF CP_C_3: OffSTAFF CP_C_2: OffSTAFF CP_C_1: OffSTAFF CP_B_12: OffSTAFF CP_B_10: OffSTAFF CP_B_9: OffSTAFF CP_B_8: OffSTAFF CP_B_7: OffSTAFF CP_B_6: OffSTAFF CP_B_5: OffSTAFF CP_B_4: OffSTAFF CP_B_3: OffSTAFF CP_B_2: OffSTAFF CP_B_1: OffSTAFF CP_A_12: OffSTAFF CP_B_11: OffSTAFF CP_A_11: OffSTAFF CP_A_10: OffSTAFF CP_A_9: OffSTAFF CP_A_8: OffSTAFF CP_A_7: OffSTAFF CP_A_6: OffSTAFF CP_A_5: OffSTAFF CP_A_4: OffSTAFF CP_A_3: OffSTAFF CP_A_2: OffSTAFF CP_A_1: OffLOCATION CP_B_7: OffLOCATION CP_B_1: OffEFFI CP_E_6: OffEFFI CP_E_4: OffEFFI CP_E_3: OffEFFI CP_E_2: OffEFFI CP_E_1: OffEFFI CP_D_6: OffEFFI CP_E_5: OffEFFI CP_D_4: OffEFFI CP_D_5: OffEFFI CP_D_3: OffEFFI CP_D_2: OffEFFI CP_D_1: OffEFFI CP_C_6: OffEFFI CP_C_5: OffEFFI CP_C_4: OffEFFI CP_C_3: OffEFFI CP_C_2: OffEFFI CP_C_1: OffEFFI CP_B_6: OffEFFI CP_B_5: OffEFFI CP_B_4: OffEFFI CP_B_3: OffEFFI CP_B_2: OffEFFI CP_B_1: OffEFFI CP_A_6: OffEFFI CP_A_5: OffEFFI CP_A_4: OffEFFI CP_A_3: OffEFFI CP_A_2: OffEFFI CP_A_1: OffBUILD CP_E_10: OffBUILD CP_E_9: OffBUILD CP_E_8: OffBUILD CP_E_7: OffBUILD CP_E_6: OffBUILD CP_E_5: OffBUILD CP_E_4: OffBUILD CP_E_3: OffBUILD CP_E_2: OffBUILD CP_E_1: OffBUILD CP_D_10: OffBUILD CP_D_9: OffBUILD CP_D_8: OffBUILD CP_D_7: OffBUILD CP_D_6: OffBUILD CP_D_5: OffBUILD CP_D_4: OffBUILD CP_D_3: OffBUILD CP_D_2: OffBUILD CP_D_1: OffBUILD CP_C_10: OffBUILD CP_C_8: OffBUILD CP_C_7: OffBUILD CP_C_6: OffBUILD CP_C_5: OffBUILD CP_C_4: OffBUILD CP_C_3: OffBUILD CP_C_2: OffBUILD CP_C_1: OffBUILD CP_B_10: OffBUILD CP_C_9: OffBUILD CP_B_9: OffBUILD CP_B_8: OffBUILD CP_B_7: OffBUILD CP_B_6: OffBUILD CP_B_5: OffBUILD CP_B_4: OffBUILD CP_B_3: OffBUILD CP_B_2: OffBUILD CP_B_1: OffBUILD CP_A_10: OffBUILD CP_A_9: OffBUILD CP_A_8: OffBUILD CP_A_7: OffBUILD CP_A_6: OffBUILD CP_A_5: OffBUILD CP_A_4: OffBUILD CP_A_3: OffBUILD CP_A_2: OffBUILD CP_A_1: OffComp CP_D_7: OffComp CP_D_6: OffComp CP_D_5: OffComp CP_D_4: OffComp CP_D_3: OffComp CP_D_2: OffComp CP_D_1: OffComp CP_C_7: OffComp CP_C_6: OffComp CP_C_5: OffComp CP_C_4: OffComp CP_C_3: OffComp CP_C_2: OffComp CP_C_1: OffComp CP_B_7: OffComp CP_B_6: OffComp CP_B_5: OffComp CP_B_4: OffComp CP_B_3: OffComp CP_B_2: OffComp CP_B_1: OffSEC CP_E_15: OffSEC CP_E_14: OffSEC CP_E_13: OffSEC CP_E_12: OffSEC CP_E_11: OffSEC CP_E_10: OffSEC CP_E_9: OffSEC CP_E_8: OffSEC CP_E_7: OffSEC CP_E_6: OffSEC CP_E_5: OffSEC CP_E_4: OffSEC CP_E_3: OffSEC CP_E_2: OffSEC CP_E_1: OffSEC CP_D_15: OffSEC CP_D_14: OffSEC CP_D_13: OffSEC CP_D_12: OffSEC CP_D_11: OffSEC CP_D_10: OffSEC CP_D_9: OffSEC CP_D_8: OffSEC CP_D_7: OffSEC CP_D_6: OffSEC CP_D_5: OffSEC CP_D_4: OffSEC CP_D_3: OffSEC CP_D_2: OffSEC CP_D_1: OffSEC CP_C_15: OffSEC CP_C_14: OffSEC CP_C_13: OffSEC CP_C_12: OffSEC CP_C_11: OffSEC CP_C_10: OffSEC CP_C_9: OffSEC CP_C_8: OffSEC CP_C_7: OffSEC CP_C_6: OffSEC CP_C_5: OffSEC CP_C_4: OffSEC CP_C_3: OffSEC CP_C_2: OffSEC CP_C_1: OffSEC CP_B_15: OffSEC CP_B_14: OffSEC CP_B_13: OffSEC CP_B_12: OffSEC CP_B_11: OffSEC CP_B_10: OffSEC CP_B_9: OffSEC CP_B_8: OffSEC CP_B_7: OffSEC CP_B_6: OffSEC CP_B_5: OffSEC CP_B_4: OffSEC CP_B_3: OffSEC CP_B_2: OffSEC CP_B_1: OffSEC CP_A_15: OffSEC CP_A_14: OffSEC CP_A_13: OffSEC CP_A_12: OffSEC CP_A_11: OffSEC CP_A_10: OffSEC CP_A_9: OffSEC CP_A_8: OffSEC CP_A_7: OffSEC CP_A_6: OffSEC CP_A_5: OffSEC CP_A__4: OffSEC CP_A_3: OffSEC CP_A_2: OffSEC CP_A_1: OffSUPPORT CP_E_8: OffSUPPORT CP_E_7: OffSUPPORT CP_E_6: OffSUPPORT CP_E_5: OffSUPPORT CP_E_4: OffSUPPORT CP_E_3: OffSUPPORT CP_E_2: OffSUPPORT CP_E_1: OffSUP CP_D_8: OffSUP CP_D_7: OffSUP CP_D_6: OffSUP CP_D_5: OffSUP CP_D_4: OffSUP CP_D_3: OffSUP CP_D_2: OffSUP CP_A_8: OffSUP CP_A_7: OffSUP CP_A_6: OffSUP CP_A_5: OffSUP CP_A_4: OffSUP CP_A_3: OffSUP CP_A_2: OffSUP CP_A_1: OffNet CP_E_12: OffNet CP_E_11: OffNet CP_E_10: OffNet CP_E_9: OffNet CP_E_8: OffNet CP_E_7: OffNet CP_E_6: OffNet CP_E_5: OffNet CP_E_4: OffNet CP_E_3: OffNet CP_E_2: OffNet CP_E_1: OffNet CP_D_12: OffNet CP_D_11: OffNet CP_D_10: OffNet CP_D_9: OffNet CP_D_8: OffNet CP_D_7: OffNet CP_D_6: OffNet CP_D_5: OffNet CP_D_4: OffNet CP_D_3: OffNet CP_D_2: OffNet CP_D_1: OffNet CP_C_12: OffNet CP_C_10: OffNet CP_C_9: OffNet CP_C_8: OffNet CP_C_7: OffNet CP_C_6: OffNet CP_C_5: OffNet CP_C_4: OffNet CP_C_3: OffNet CP_C_2: OffNet CP_C_1: OffNet CP_B_12: OffNet CP_C_11: OffNet CP_B_11: OffNet CP_B_10: OffNet CP_B_9: OffNet CP_B_8: OffNet CP_B_7: OffNet CP_B_6: OffNet CP_B_5: OffNet CP_B_4: OffNet CP_B_3: OffNet CP_B_2: OffNet CP_B_1: OffNet CP_A_12: OffNet CP_A_11: OffNet CP_A_10: OffNet CP_A_9: OffNet CP_A_8: OffNet CP_A_7: OffNet CP_A_6: OffNet CP_A_5: OffNet CP_A_4: OffNet CP_A_3: OffNet CP_A_2: OffNet CP_A_1: OffCOMPL CP_E_6: OffCOMPL CP_E_5: OffCOMPL CP_E_4: OffCOMPL CP_E_3: OffCOMPL CP_E_2: OffCOMPL CP_E_1: OffCOMPL CP_D_6: OffCOMPL CP_D_5: OffCOMPL CP_D_4: OffCOMPL CP_D_3: OffCOMPL CP_D_2: OffCOMPL CP_D_1: OffCOMPLIANCE CP_C_6: OffSUP CP_D_1: OffSUPPORT Score D: 0SUPPORT Score C: 0SUPPORT Score B: 0SUP CP_B_8: OffSUP CP_B_7: OffSUP CP_B_6: OffSUP CP_B_5: OffSUP CP_B_4: OffSUP CP_B_3: OffSUP CP_B_2: OffSUP CP_B_1: OffSUP CP_C_8: OffSUP CP_C_7: OffSUP CP_C_6: OffSUP CP_C_5: OffSUP CP_C_4: OffSUP CP_C_3: OffSUP CP_C_2: OffSUP CP_C_1: OffCooling CP_A_8: OffCooling CP_A_7: OffCooling CP_A_6: OffCooling CP_A_5: OffCooling CP_A_4: OffCooling CP_A_3: OffCooling CP_A_2: OffCooling CP_A_1: OffPower CP_A_1: OffPower CP_A_2: OffPower CP_A_3: OffPower CP_A_4: OffPower CP_A_5: OffPower CP_A_6: OffPower CP_A_7: OffPower CP_A_8: OffPower CP_B_8: OffPower CP_B_7: OffPower CP_B_6: OffPower CP_B_5: OffPower CP_B_4: OffPower CP_C_1: OffPower CP_C_2: OffPower CP_C_3: OffPower CP_C_4: OffPower CP_C_5: OffPower CP_C_6: OffPower CP_C_7: OffPower CP_C_8: OffPower CP_D_1: OffPower CP_D_2: OffPower CP_D_3: OffPower CP_D_4: OffPower CP_D_5: OffPower CP_D_6: OffPower CP_D_7: OffPower CP_D_8: OffPower CP_E_1: OffPower CP_E_2: OffPower CP_E_3: OffPower CP_E_4: OffPower CP_E_5: OffPower CP_E_6: OffPower CP_E_7: OffPower CP_E_8: OffPower CP_B_1: OffPower CP_B_2: OffPower CP_B_3: OffLOCATION CP_E_9: OffLOCATION CP_E_8: OffLOCATION CP_E_7: OffLOCATION CP_E_6: OffLOCATION CP_E_5: OffLOCATION CP_E_4: OffLOCATION CP_E_3: OffLOCATION CP_E_2: OffLOCATION CP_E_1: Off