Datacenter Standards,Best Practices,
and Success Stories
www.charm.au.edu
Prof. Dr. Srisakdi CharmonmanPresident Emeritus of the
Computer Association of ThailandCEO of the College of Internet Distance Education
Assumption University of Thailand
Invited Talk for “Datacenter Satellite Conference & Exhibition Series” Auckland, Bangkok, Beijing, Hyderabad, Kuala Lumpur, Melbourne, and Osaka
organized thru VDO Conference by Pacific and Strategy Holding Ptc. Ltd. For Bangkok at Westin Sukhumvit Hotel, July 16, 2009
![Page 2: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/2.jpg)
1. Introduction2. Datacenter Standards3. Datacenter Best
Practices4. Green Datacenter5. Datacenter Success
Stories 6. Concluding Remarks 2
Datacenter Standards, Best Practices,
and Success Stories.
![Page 3: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/3.jpg)
3
1. Introduction.
As of the year 2009, most organizations depend on computer network and the Internet.
Most organizations cannot continue operating without computer network.
![Page 4: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/4.jpg)
4
Introduction (Cont.)
Therefore, most organizations need backup
for their computer network
which may be in the form of datacenter.
According to Wikipedia, “a data center or datacenter or datacentre or server farm is a facility to house computer systems and associated components, such as telecommunications and storage systems.”
![Page 5: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/5.jpg)
5
Introduction (Cont.)
A datacenter generally includes: * Redundant or backup power supplies* Redundant data communications connections* Environmental controls and security devices
![Page 6: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/6.jpg)
6
Introduction (Cont.)
During the 1980s, microcomputers were used in most organizationsbecause of their low cost and ease of operation.
The word “datacenter” appeared in the 1990s, when more powerful microcomputers called “servers” were used to replace mainframe, and intalled in old mainframe room.
![Page 7: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/7.jpg)
7
Introduction (Cont.)
During the 2000s, organizations needed nonstop operation and 24/7 presence on the Internet, and so datacenters became more popular.
As a matter of fact, they were called “Internet DataCenters or IDC”
In 2009, datacenter may also be operated by datacenter service providers.
![Page 8: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/8.jpg)
A well-known datacenter standard is TIA-942 (TIA = Telecommunication Industry Association)
For more information see www.adc.com/Library/Literature/102264AE.pdf
8
2. Datacenter Standards.
![Page 9: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/9.jpg)
TIA- 942 is the first standard dd dddddddddddd ddddddd datacenter infrastructure.
TIA-942 includes g uidelines on a wide range
of subjects. d ddddddd d dddddddd ddd d dd
ddddddd dddddddddd cabling sys tem using standard media.
9
ANSI/TIA-942
![Page 10: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/10.jpg)
Later, ANSI (American National Standards Institute) also approved TIA-942.
TIA-942 became “ANSI/TIA-942 Telecommunications Infrastructure for Data Center”.
10
ANSI/TIA-942 (Cont.)
![Page 11: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/11.jpg)
11
ANSI/TIA-942 (Cont.)
![Page 12: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/12.jpg)
The requirements of ANSI/TIA-942 covers the following.2.1 Site Space and Layout2.2 Cabling Infrastructure2.3 Tiered Reliability2.4 Environmental Consideration
12
ANSI/TIA-942 (Cont.)
![Page 13: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/13.jpg)
The datacenter should be designed with plenty of flexible “White Space”, empty space that can accommodate future racks or cabinets.
For future growth, surrounding empty space should also be available.
13
2.1 Site Space and Layout
![Page 14: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/14.jpg)
According to ANSI/TIA-942, a datacenter should include the following key functional areas.* Entrance Room (ER) –
outside the computer room for better security.
14
Site Space and Layout (Cont.)
![Page 15: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/15.jpg)
* Main Distribution Area (MDA) location of Main Cross-Connect (MC) such as routers and switches.
* Horizontal Distribution Area (HDA) location of Horizontal Cross-Connect (HC), such as racks for fiber and coaxial cable.
15
Site Space and Layout (Cont.)
![Page 16: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/16.jpg)
* Zone Distribution Area (ZDA) location of Zone Outlet (ZO) or Consolidation Point (CP)
* Equipment Distribution Area (EDA) location of equipment cabinets and racks. 16
Site Space and Layout (Cont.)
![Page 17: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/17.jpg)
17
2.2 Cabling Infrastructure
Horizontal Cabling * Should install the highest capacity media available to reduce the need for re-cabling
in the future. * The maximum horizontal distance is 90 m.
independent of media type.* The maximum channel distance
including equipment cords is 100 m.
![Page 18: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/18.jpg)
18
Horizontal C abling Distances (Cont.)
* The maximum backbone fiber optic cabling is 300 m.
* The horizontal copper cabling is 100 m.
![Page 19: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/19.jpg)
19
Cabling Infrastructure (Cont.) Computer Room & Entrance
Room Requirementssuch as * Minimum clear height of 2.6m/8.5 ft* Minimum door size 1m/3ft wide 2.13/7ft high
![Page 20: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/20.jpg)
The ANSI/TIA-942 includes 4 levels, each specifying details: * Architectural* Security* Electrical* Mechanical* Telecommunication
20
2.3 Tiered Reliability
![Page 21: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/21.jpg)
Tier descriptions include information on* Raised floor heights* Watts per square foot* Points of failure
21
Tiered Reliability (Cont.)
![Page 22: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/22.jpg)
Tier 1 – Basic: 99.671% Availability* Single path for power and cooling distribution* Optioned raised floor, UPS, generator* Takes 3 months to implement* Annual downtime of 28.8 hours* Must be shut down completely
for preventive maintenance
22
Tiered Reliability (Cont.)
![Page 23: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/23.jpg)
Tier 2 – Redundant Components: 99.741% Availability* Less susceptible to disruption
from both planned and unplanned activity* Single path for power and cooling distribution * Includes raised floor, UPS, and generator
23
Tiered Reliability (Cont.)
![Page 24: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/24.jpg)
* Takes 3 to 6 months to implement* Annual downtime of 22.0 hours* Maintenance of power path and other parts of
the infrastructure require a processing shutdown 24
Tiered 2 (Cont.)
![Page 25: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/25.jpg)
Tier 3 – Concurrently Maintainable: 99.982% Availability* Enables planned activity without disrupting computer hardware operation
but unplanned events will still cause disruption* Multiple power and cooling distribution paths
but with only one path active
25
Tiered Reliability (Cont.)
![Page 26: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/26.jpg)
* Takes 15 to 20 months to implement* Annual downtime of 16.0 hours* Includes raised floor and sufficient capacity
and distribution to carry load on one path
while performing maintenance on the other
26
Tiered 3 (Cont.)
![Page 27: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/27.jpg)
Tier 4 – Fault Tolerant: 99.995% Availability* Planned activity does not disrupt critical load
and data center can sustain
at least one worst-case unplanned event
with no critical load impact
27
Tiered Reliability (Cont.)
![Page 28: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/28.jpg)
* Multiple active power and cooling distribution paths includes redundant components,
i.e. 2 UPS each with N+1 redundancy* Takes 15 to 20 months to implement* Annual downtime of 0.4 hours
28
Tiered 4 (Cont.)
![Page 29: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/29.jpg)
Several environmental considerations exist within the ANSI/TIA-942 datacenter standard that are* Fire suppression* Humidity levels* Operating temperatures* Architectural* Electrical (power)* Mechanical system specifications
29
2.4 Environmental Consideration
![Page 30: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/30.jpg)
30
3. Datacenter Best Practices.
3.1 Microsoft’s Environmentally Sustainable Datacenters
3.2 IRIDE Environmentally Friendly Datacenter
3.3 Merger & Acquisition-Driven Datacenter
3.4 Datacenter Assessment and Design
![Page 31: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/31.jpg)
31
3.1 Microsoft’s Environmentally
Sustainable Datacenters. Microsoft prepared top ten best business practices for environmentally sustainable datacenters.
![Page 32: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/32.jpg)
32
Microsoft’s Practices (Cont.)
1. Provide incentives that support primary goals.
Microsoft provides specific incentives to reward managers for improving the efficiency of their operations, using metrics such as Power Usage Effectiveness (PUE).
![Page 33: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/33.jpg)
33
Microsoft’s Practices (Cont.)
Incentives help achieve results in short time if apply properly.* Datacenter manager rewarded for efficiency
and not uptime.* Incentives given for low energy usage.
![Page 34: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/34.jpg)
34
Microsoft’s Practices (Cont.)
2. Focus on effective resource utilization.
Using resources effectively.
Utilizing existing datacenter infrastructure.
![Page 35: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/35.jpg)
35
Microsoft’s Practices (Cont.)
3. Use virtualization to improve server utilization and increase operational efficiency.
Migrating application from physical to virtual machines.
Encourage cloud operating system which use virtualization.
![Page 36: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/36.jpg)
36
Microsoft’s Practices (Cont.)
Key benefits of virtualization. * Reduction in capital expenditures.* Decrease in real estate, power,
and cooling costs. * Faster time to market for new products
and services. * Reduction in outage and maintenance windows.
![Page 37: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/37.jpg)
37
Microsoft’s Practices (Cont.)
4. Drive quality up through compliance.
There are many regulatory and security standards.
Compliance must be strictly enforced.
![Page 38: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/38.jpg)
38
Microsoft’s Practices (Cont.)
5. Embrace change management.
Standardized procedures for the request, approval, coordination and execution of changes can greatly reduce the number and severity of unplanned outages.
If not well managed, poorly planned changes may cause disastrous results.
![Page 39: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/39.jpg)
39
Microsoft’s Practices (Cont.)
Other features that change management process should include:* Documented policies around communication
and timeline requirements. * Standard templates for requesting, communicating, and reviewing changes.* Post-implementation review,
including cases where things went well.
![Page 40: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/40.jpg)
40
Microsoft’s Practices (Cont.)
6. Invest in understanding the application workload and behavior.
Require hardware engineering.
Credible and competent in-house expertise.
Provide meaningful feedback to vendors.* To evaluate new hardware properly* Optimizing request for proposal (RFP)
process for servers* Experiment new technology.
![Page 41: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/41.jpg)
41
Microsoft’s Practices (Cont.)
7. Right-size server platforms to meet application requirements.
A major initiative in Microsoft datacenters involves right-sizing the platform.
![Page 42: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/42.jpg)
42
Microsoft’s Practices (Cont.)
There are two forms:(1) Work closely with server manufacturers
to optimize their designs and remove items
that are not used. Focus on high
efficiency power supplies and advanced power
management features.
![Page 43: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/43.jpg)
43
Microsoft’s Practices (Cont.)
(2) Being disciplined about developing the exact specifications for servers to meet the needs, and then not buying machines that exceed specifications.
![Page 44: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/44.jpg)
44
Microsoft’s Practices (Cont.)
8. Evaluate and test servers for performance, power,
and total cost of ownership.
Test on short list candidate servers to calculatetotal cost of ownership.
Not rely on benchmark data, which may not be applicable to needs and environment.
![Page 45: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/45.jpg)
45
Microsoft’s Practices (Cont.)
9. Converge on as small a number of stock-keeping units (SKUs) as possible.
Narrowing the number of SKUs allows Microsoft to make larger volume buys, thereby cutting capital costs.
![Page 46: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/46.jpg)
10. Take advantage of competitive bids from multiple manufacturers
to foster innovation and reduce costs.
Microsoft encourages to analyze proposals from multiple companies that puts most of the weight on price, power, and performance.
46
Microsoft’s Practices (Cont.)
![Page 47: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/47.jpg)
47
Microsoft’s Practices (Cont.)
Competition among multiple manufacturers to drive innovation and provide the most energy efficient & lowest cost.
![Page 48: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/48.jpg)
48
Microsoft’s Practices (Cont.)
Microsoft’s Global Foundation Services’ team was taking significant steps in four areas important to environmental sustainability: * Using recycled resources whenever practical* Using renewable resources whenever available* Reducing waste in operations* Taking part in industry environmental groups
![Page 49: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/49.jpg)
49
Microsoft’s Practices (Cont.)
Microsoft announced in March 2009 that it was taking a proactive corporate approach to reduce its carbon emissions per unit of revenue by at least 30 percent.
![Page 50: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/50.jpg)
50
3.2 IRIDE Environmentally Friendly Datacenter.
Producing electrical power & thermal energy from renewable sources (Hydroelectric).
Two hundred virtual machines on only fifteen physical machines and cost savings up to 70 percent.
Reduce the number of physical servers and improve flexibility.
![Page 51: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/51.jpg)
Using Intel Xeon processors with four cores to meet the need for balance and modularity.
Intel Xenon also provide high performance and energy efficiency.
Intel Multi-core technology has brought several important improvements for IRIDE.
51
IRIDE (Cont.)
![Page 52: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/52.jpg)
Business Challenge* An Insurance holding company
needed to move the IT assets it had acquired
into its own data center.
According to the terms of the acquisitions,
it had to meet a tight deadline in doing so
or must pay penalty.
52
3.3 Merger & Acquisition-Driven Datacenter.
![Page 53: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/53.jpg)
Solution* Establish a parallel operating environment
and migrate the applications and data* Assesses all elements of the infrastructure, networking, backups and restores, security
and systems monitoring, etc.* Integrate the business unit smoothly step by step
53
Insurance Holding Company (Cont.)
![Page 54: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/54.jpg)
Results* The powering down of the new environment, relocation of the equipment,
re-establishment of the environment
in the buyer’s datacenter,
successful cutover done over the weekend
54
Insurance Holding Company (Cont.)
![Page 55: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/55.jpg)
A major book, music and home entertainment. datacenter was* Approaching capacity* Lack a backup generator* Lack comprehensive power source* In a tornado zone 55
3.4 Datacenter Assessment and Design.
![Page 56: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/56.jpg)
Solution * Detailed assessment of datacenter strengths
and weaknesses* Gather information about history
> What the datacenter was designed for
> How demands had grown
> Actual IT utilization > IT asset inventory
56
Datacenter Assessment and Design (Cont.)
![Page 57: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/57.jpg)
Results* A Tier II datacenter operational on time,
on budget and without business interruption.
57
Datacenter Assessment and Design (Cont.)
![Page 58: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/58.jpg)
4. Green Datacenter
58
There are many examples of green datacenters4.1 Amazon Green Datacenter 4.2 Google Green Datacenter4.3 Sun Green Mobile Datacenter4.4 Fujitsu Green Datacenter4.5 Datacenter in Second Life
![Page 59: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/59.jpg)
4.1 Amazon Green Datacenter
59
From “www.greenm3.com”
dated 1 November 2008,Datacenter Knowledge reported on Amazon.com’s new green datacenter in Oregon, USA.
![Page 60: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/60.jpg)
Amazon Green Datacenter (Cont.)
60
The Amazon Datacenter is located on the bank of the Columbia River in Oregon.
The cost of the datacenter was at US$ 100 million.
![Page 61: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/61.jpg)
Amazon Green Datacenter (Cont.)
61
It includes three buildings. The first building will be
116,000 square feet. The hydro electricity on
Columbia River basin uses cheap and clean power.
![Page 62: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/62.jpg)
4.2 Google Green Datacenter
62
From “www.internetnews.com” dated 3 October 2008,Google, the world largest search company announced how its squeeze considerable energy saving out of its datacenter.
![Page 63: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/63.jpg)
Google Green Datacenter (Cont.)
63
The purpose of Google was to reduce datacenter power costs by targeting the center, not the computer.
![Page 64: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/64.jpg)
Google Green Datacenter (Cont.)
64
There are five elements of Google’s strategyfor building management:* Clean Energy* Server Retirement* Efficient Equipment
* Water Management* Efficient datacenter
![Page 65: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/65.jpg)
Google Green Datacenter (Cont.)
65
It could save about $30 per server per year.
Google removes unused componentssuch as sound and discrete graphics.
![Page 66: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/66.jpg)
Google Green Datacenter (Cont.)
66
Evaporative cooling has been used instead of refrigerators.
Cold water * Run thru the datacenter to absorb the heat
from the computer* Run down from the roof to the ground outside the datacenter, similar to at restaurant, to help let the heat dissipate
![Page 67: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/67.jpg)
4.3 Sun Mobile Datacenter
67
From “blog.internetnews.com” dated 18 September 2008, Sun Microsystems * stored the datacenter
in a mine deep underground in Japan
where the climate is cool
![Page 68: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/68.jpg)
Sun Mobile Datacenter (Cont.)
68
* The datacenter consists of Sun systems densely packed in a standard shipping container, 20x40 feet
* The datacenter hold 240 rack unitswhich could be large servers such as SPARC Enterprise M4000 and M5000 or third-party equipments
![Page 69: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/69.jpg)
69
Sun Mobile Datacenter (Cont.)
* The datacenters contain not only the systembut also the power and cooling necessary to operate the system
* One of the most famous examples is 100 meters down an abandoned mine,relying on the natural cool climate
![Page 70: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/70.jpg)
4.4 Fujitsu Green Datacenter
70
From “www.computerweekly.com” in June 2008, Fujitsu has launched Green Infrastructure Solution Service to provide specialists with expertise in both IT and construction to assist customers with planning, design, employment, and operation, as well as building “highly energy-efficient datacenters” or “Green Datacenters”.
![Page 71: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/71.jpg)
Fujitsu Green Datacenter (Cont.)
71
The efficient IT service aims to reduce power consumption and CO2 emission by as much as 50% of the previous level, excluding power savings from IT product themselves.
![Page 72: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/72.jpg)
Fujitsu Green Datacenter (Cont.)
72
Fujitsu said the green datacenter is nearly twice as energy-efficientas previous datacenters it has opened.
The datacenter uses advanced cooling, heating,
and IT systems to tailor power consumption to processing and operational needs.
![Page 73: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/73.jpg)
4.5 Datacenter in Second Life
73
From “www.informationweek.com”dated 14 August 2008, IBM launched “Eco Datacenter” in Second Life.
Visitors who want to check out IBM’s latest eco-datacenter have to do as an avatar in Linden Lab’s Second Life, where the facility “exist”.
![Page 74: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/74.jpg)
Datacenter in Second Life (Cont.)
74
The datacenter is used as a demonstration area for IBM’s eco-friendly technologies and services.
![Page 75: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/75.jpg)
5. Datacenter Success Stories
75
There are many examples of successful datacenters5.1 UC Berkeley, 5.2 IBM’s Boulder Facility5.3 BAA Inc.
![Page 76: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/76.jpg)
5.1 UC Berkeley
76
UC Berkeley’s Datacenter consisting of nearly 40 years of accumulated technology legacy while minimizing the impact on the more than 40,000 members of the UC Berkeley community dependent on those systems.
![Page 77: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/77.jpg)
UC Berkeley (Cont.)
77
The space design process for a datacenter is very complex and is, in fact, the first critical step to ensure success.
![Page 78: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/78.jpg)
UC Berkeley (Cont.)
78
A detailed analysis of all of the systems and the technology trends that would impact future designs was necessary to design a space flexible enough to handle legacy systems as well as whatever new computers would be installed in future years.
![Page 79: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/79.jpg)
UC Berkeley (Cont.)
79
The information gained from that process was provides to the architects and systems planners to crate a leading-edge datacenter design that could be connected to the old datacenter via fiber and high-speed connections to allow for electronic “moving” where possible.
![Page 80: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/80.jpg)
5.2 IBM’s Boulder Facility
80
IBM completed the installation of a 72,000 square foot raised floor datacenter at the Boulder facility and received Silver LEED certification
“LEED” stands for “Leadership in Energy and Environmental Design”
![Page 81: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/81.jpg)
IBM’s Boulder Facility (Cont.)
81
IBM engaged the services of Texas A&M University, Energy Systems Laboratory, for two phases
of commissioning work at the IBM facility.
Commission is the process in which mechanical equipment is analyzed and operating specifications are modified to optimize energy efficiency.
![Page 82: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/82.jpg)
IBM’s Boulder Facility (Cont.)
82
The first survey was performed on the Central Utility Plant equipment.
Recommendations from this survey were:* Operate the backup satellite chiller plant
as the datacenter primary cooling system
instead of the Central Utility Plant
![Page 83: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/83.jpg)
IBM’s Boulder Facility (Cont.)
83
* Automate the chiller and the free-cooling control systems
* Eliminate three way valves in chilled water systems
* Improve boiler efficiency with operational changes
![Page 84: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/84.jpg)
IBM’s Boulder Facility (Cont.)
84
In a second commission effort 70 air handlers were surveys and their operation specifications were modified to include:* Broadening of economizer controls
which utilize outside air for free cooling* Implementing static pressure resets
for cooling airflow which is dependent
on outside air temperature
![Page 85: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/85.jpg)
IBM’s Boulder Facility (Cont.)
85
* Implementing static pressure night setback to reduce airflow for overnight operations
* Chilled water pump operation for start/stop control based on required demand
* Control program changes which eliminate the opportunities for simultaneous heating and cooling
![Page 86: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/86.jpg)
5.3 BAA Inc.
86
Airport titan BAA needed to consolidate its databases and servers, as well as improve the IT environment’s use of space and energy.
Furthermore, the company needed the ability to add more processing power in the future without disrupting business critical services.
![Page 87: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/87.jpg)
BAA Inc. (Cont.)
87
BAA hosts 141 million passengers through its airport in the United Kingdom. With growing numbers of travels and airlines using its facilities. The world’s largest airport operator strives for improve efficiency and customer service
![Page 88: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/88.jpg)
BAA Inc. (Cont.)
88
BAA IT staff must make the best use of space and save energy, which are challenges due to the heat generated, power required, and real estate consumed by numerous datacenter servers.
![Page 89: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/89.jpg)
BAA Inc. (Cont.)
89
BAA IT needed to consolidate about 80 servers running 135 separate Microsoft SQL Server database that contain departmental, parking, environmental, regulatory, financial, and security information.
![Page 90: Data Center Best Practices and Standards](https://reader031.vdocuments.us/reader031/viewer/2022020800/55257088550346586f8b4819/html5/thumbnails/90.jpg)
6. Concluding Remarks.
90
Datacenters are required to keep organization running 24/7.
Standards must be adopted.
Best practices should be followed.
Green datacenter should be implemented.
Success stories should be examined for the benefits of all concerned.