dasher exhibit 2

Upload: leejl012602

Post on 27-Feb-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/25/2019 Dasher Exhibit 2

    1/3

    Standard Production Time (min) September'

    Setup Run Orders

    Preparation

    Artwork & Generatio 29 0.000 50

    Inspect & Shear 20 0.500 60

    Puch Tooling Holes 0 0.500 60

    Image Transfer

    !rill

    "anual 5 0.0#0 5

    $%$ 20 0.00 9

    "etalli'ation 0 0.(50 60

    !)*P

    Panel Prep 5 0.200 60

    +a,inate an- /pose 20 2.000 60

    !eelop 20 0.200 60

    lectroplate 25 #.500 60Strip !)*P 5 0.200 60

    tch & Tin Strip 0 0.200 60

    Fabrication

    Sol-er,ask 5 .500 55

    Sol-er !ip 10 0.500 55

    Prole

    Punch Press 50 .000 (

    $%$ )outer 50 0.500 6

    Inspect3 Test3 Pack 5 .500 60

    TOTAL

  • 7/25/2019 Dasher Exhibit 2

    2/3

    Production September's Total Standard Production

    Boards Setup Run (in min)

    (99 350 4 350

    53(6 3200 160 3560

    53(6 600 160 960

    916 (65 1(30 1#3205

    3#25 2360 93650 3#0

    53(6 600 50 30

    53(6 100

    53(6 3200 30 2360

    53(6 3200 31

    53(6 3500 632 (36253(6 100

    53(6 600 (

    53( 23(5 30(( 13552

    53( 3650 159 23009

    322 23150 322 135(

    311 900 2366 13066

    53(6 23(00 #362 312

    23950 693955 93905

  • 7/25/2019 Dasher Exhibit 2

    3/3

    (in ours)

    2.2

    26.0

    6.0

    616.#

    96.#

    9.0

    (.

    .0

    22.

    2(.0(.

    2.

    59.2

    11.5

    59.6

    5.

    #9.0

    351.(