das emerg final

Upload: ion-albert-logofatu

Post on 03-Jun-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/12/2019 Das Emerg Final

    1/5

    WARATAH EMERGENCY FAMILIARISATION COURSEDelivery & Assessment Strategy

    Section 1 Waratah Emergency Familiarisation CourseOutline:

    Course Code &Title:

    Code:WT09

    Title:Waratah Emergency Familiarisation Course

    Purpose: The purpose of this course in to enable Emergency Services Personnel to work safely aroundthe train and utilise Waratah (A-Set) equipment and systems for emergency operations.

    LearningOutcomes:

    At the completion of this course, the participants will be able to:

    Identify hazards of the Waratah (A-Set) train.

    Identify the safety and security features of the Waratah (A-Set) train.

    Locate Waratah (A-Set) emergency equipment.

    Describe the internal layout of the Waratah (A-Set) train.

    Describe the external layout of the Waratah (A-Set) train.

    Identify roof mounted equipment of the Waratah (A-Set) train.

    Locate the roof emergency cut-out areas of the Waratah (A-Set) train.

    Describe the procedure to operate Alternate Access Panels on the Inter-car doors.

    Describe the operation of Emergency Door Releases.

    Describe the operation of the Terminal End Access Door.

    Describe the deployment of the Emergency Access Ramp.

    Nominal Duration: 2 Hours

    Prerequisites: Applicable?

    Yes/No

    Participants of this course must be employed by relevant Emergency Serviceorganisations and have training/qualifications suitable for emergency/rescueoperations involving RailCorp Train Set types.

    Recertification Applicable?

    Yes/No

    RailCorp to advise

    Target Audience: This course is deigned for personnel of Emergency Service Organisations who may bedirectly involved with emergency operations of Waratah (A-Set) Trains.

    InquiryRecommendations/Compliance issuesaddressed:

    Applicable?

    Yes/No

    RailCorp to address

    Reference to RiskRegister & KnownHazard Statements:

    Applicable?

    Yes/No

    N/A

    Safety ManagementSystem (SMS)Reference

    Applicable?

    Yes/No

    N/A

    Reference to

    relevant Bus inessRules/ StandardOperatingProcedures:

    Applicable?

    Yes/No

    RailCorp to advise

    Course StructureOverview:

    This course will be conducted over the period of 1 hour using one of two methods:

    1. Classroom instruction with practical demonstration (when classroom and trainavailable); or

    2. Conducted entirely onboard a train without a classroom session being carried out(when classroom unavailable and train available); or

    The Course facilitators guide will detail each method.

    AssessmentStrategy Overview:

    Applicable?

    Yes/No

    NO

    RailCorp Version1.00 Page 1 of 5

    Date Issued 09/04/10 Revised: NA Uncontrolled when printedWaratah Emergency Familiarisation Course

  • 8/12/2019 Das Emerg Final

    2/5

    ResourcesRequired:

    1. Human Resources.

    a. Instructor meeting the requirements of Course Information (Section 2).

    2. Physical Resources.

    a. Computer (laptop or desktop);

    b. Data projector;

    c. Facilitators Guide for Waratah Emergency Familiarisation Course;

    d. Participants Handout for Waratah Emergency Familiarisation Course;

    e. Classroom;

    f. The use of:

    a) Waratah Train or

    b) PPTV

    N/AQualification Code& Title and/or anyother Certificatesissued:

    Code: Qualification/Certificate to be issued: When to be issued:

    Relevant TrainingPackage Code &

    Title:

    Applicable?

    Yes/No

    Code: Name of Training Package:

    Name ofRTO/TrainingProvider:

    Downer EDI Rail Public Private Partnership Through Life Support Organisation

    RailCorp Version1.00 Page 2 of 5

    Date Issued 09/04/10 Revised: NA Uncontrolled when printedWaratah Emergency Familiarisation Course

  • 8/12/2019 Das Emerg Final

    3/5

    Course Topics Duration Deliveredon/off the

    job

    Assessment(Yes/No)

    Linked toUofC if

    applicable(Yes/No)

    Waratah Layout 10 minutes

    (TBD)

    Off-the-joband on the

    train

    Yes No

    Hazards, Safety and EmergencyEquipment

    15 minutes

    (TBD)

    Off-the-joband on the

    train

    Yes No

    Train Walk Through 40 Minutes

    (TBD)

    Off-the-joband on the

    train

    Yes No

    Door Operation 10 minutes

    (TBD)

    Off-the-joband on the

    train

    Yes No

    TEEA Door and TEEA RampOperation

    15 minutes

    (TBD)

    Off-the-joband on the

    train

    Yes No

    RailCorp Version1.00 Page 3 of 5

    Date Issued 09/04/10 Revised: NA Uncontrolled when printedWaratah Emergency Familiarisation Course

    By signing below, the Course Committee members acknowledge they have read and agreed with Section 1 of theDelivery & Assessment Strategy prior to the development of curriculum material.

    Approval Section 1: Course Out line by Course Commit tee Members

    Units of Competency: Appl icable? Yes/No

    Course Outline:

  • 8/12/2019 Das Emerg Final

    4/5

    Version 1.00 Date Issued 09/04/10 Revised: NA

    Waratah Emergency Familiarisation Course

    Section 2 Detailed Course Information:

    A. Mapping of Units of Competency to Session:

    B. Assessment Methods:

    C. Qualifications & Technical Competencies of Trainers/Assessors:

    A. Course & Mapping to Units of Competency B. Assessment Methods

    CourseCode

    Course Title Unit Code(refer to

    Section 1)

    Full/PartialCompletion

    of Unit

    AssessedOn/Offthe job

    A B C D E F G H

    Waratah EmergencyFamiliarisation Course

    WT09Off-the-job

    WMaCe

    Un

    Assessment Methods Key:

    (customise methods accordingly)

    A Writtentest

    B Practicalobservation

    C Questions D RolePlay

    E Third PartyReport

    F

  • 8/12/2019 Das Emerg Final

    5/5

    RailCorp Version1.00 Page 5 of 5

    D. Mapping of courses to Units of Competency: Applicable? Yes/No

    Unit Code Unit of Competency Name Course Code Course Name

    Reasonable Adjustment:

    RailCorp is aware of the need for inclusive teaching, learning and assessment practices. This includes providingadditional support, where necessary, in order that participants gain quality learning, and achieve successfuloutcomes. RailCorp Training manages its access and equity in strict accordance with the RailCorps diversityprinciples and strategy. It also ensures the assessment process incorporates reasonable adjustment procedures.Refer to the Access & Equity Policy (QTMS-PO-13).

    Recognition:

    Where applicable, application for recognition is considered on an individual basis in accordance with theRecognition Policy (QTMS-PO-14).

    Record of Curriculum Materials:

    Curriculum materials are located on the RCT G: server under __________ (insert pathway) according to theCurriculum Development Procedure (QTMS-PR-39). (TBA)

    Evaluation/Review/Validation & Continuous Improvement:

    RailCorp commits to reviewing curriculum materials every 3 years at a minimum. For more information onvalidation, review & evaluation of this program, refer to the Program Management Template (QTMS-TE-04). Referto Evaluation, Review & Validation Policy (QTMS-PO-17) & Continuous Improvement Procedure (QTMS-PR-17).

    After any Evaluation, Review & Validation process or Continuous Improvement Procedure has been initiated;Downer EDI RailThrough Life Support for PPP Project must be notified and kept informed. Changes to thetechnical content must be approved by Downer EDI RailThrough Life Support for PPP Project beforeincorporation into amended or new training programs. Any alterations to this course require Downer EDI RailThrough Life Support for PPP Project to be notified. (This statement TBC on acceptance of the ConfigurationManagement Plan).

    RCT TrainingManagersendorsement

    (name & signature):

    Date:

    DAS History:

    Version Date Changed Author of changes Descript ion of Changes

    0.1 15 Oct 2009 Paul James Initial Issue

    0.2 16 Nov 2009 Paul James Draft (after initial review)

    0.3 22 Dec 2009 Paul James Course Review Board recommended changes

    0.4 02 Mar 2010 Paul James Course Title Change

    1.00 09 Apr 2010 Paul James Acceptance

    Date Issued 09/04/10 Revised: NA Uncontrolled when printedWaratah Emergency Familiarisation Course