dart underground oral hearing report 29s. · pdf file · 2011-12-20dart underground...
TRANSCRIPT
Dart Underground
Oral Hearing Report
29S.NA0005
Appendix A
List of Oral Hearing Submissions compiled by the Strategic Infrastructure
Development & Local Authority Project Section of An Bord Pleanala
Dart Underground Oral Hearing Submissions
Day 1: Monday, 22nd November 2010
Applicant’s Submissions
No. Title Presented By
1 Introduction to DART Underground Dick Fearn, Chief Executive –
Iarnród Éireann
2 Background and Need for the Scheme Michael Reidy, Manager –
Strategic & Business
Planning, Iarnród Éireann
3 Economic Appraisal Paul Buchanan – Director,
Colin Buchanan & Partners
Ltd.
4
4 (a)
Planning and Policy Context
Power point presentation
Alan Whelan, Director - Tíros
Resources Ltd.
5 Co-ordination of the
Railway Order Application
(includes Appendices)
Mark Conroy, DART
Underground Environmental
Manager, Iarnród Éireann
Day 2: Tuesday, 23rd November 2010
Applicant’s Submissions
No. Title Presented By
6 Introduction of Multi-Disciplinary Technical
Consultants
Tim Corcoran – Railway
Order Manager
7 Overview of EIS; Cumulative Impacts &
Interactions
(This statement also contains items to be dealt
with at No. 36 - Cumulative Impacts and
Interactions - and No. 37 – Summary of
Mitigation Measures & Residual Impacts - of
Module 1)
Eddie Feely – EIS Manager
8 Public Consultation Tom Rowley –
Communications Manager for
DART Underground
9
9A
Design Development & Alternatives
Considered
Conor Lavery – Design
Manager, Arup Halcrow Joint
Venture
Associated Powerpoint presentation Peter Muldoon - Project
Manager
10 Order of Applicant’s submissions & Presenters
Names
Day 3: Wednesday, 24th November 2010
Applicant’s Submissions
No. Title Presented By
10 Response to queries raised by the Inspector Alan Whelan
11 Details of Pearse St . alternatives shown at
public consultation
Irish Rail
12
12a
Description of Railway Order drawings
Associated Powerpoint presentation
Gavin O’Donnell, Railway
Order Drawings Manager
13
13a
Detailed description of Railway Order works
Associated Powerpoint presentation
John Flaherty
Conor Lavery
Day 4: Thursday, 25th November 2010
Applicant’s Submissions
No. Title Presented By
14 Drawing Ref: Railway Works Structures Details
Merrion Square, Entrance Study - Ground Level
/Entrance Study /Entrance Study - Sections
15 Enlarged Version of Running Tunnel /Cross
Passage – Cross Section
Day 5: Friday, 26th November 2010
Applicant’s Submissions
No. Title Presented By
16
Addendum to Submission no, 13 - Detailed
description of Railway Order works
16a
Addendum to Submission 13a – Associated
Powerpoint Presentation
17 Details of East Wall construction compound
access options shown at public consultations
Day 6: Tuesday, 30th November 2010
Applicant’s Submissions
No. Title Presented By
18
18A
18B
Construction Strategy, Scheduling &
Programming
Associated Powerpoint Presentation
Associated graphic image
Kevin McManus
19
Ventilation, Fire and Smoke Control
Dr. Peter Woodburn
Day 7: Wednesday, 1st December 2010
Applicant’s Submissions
No. Title Presented By
20
20A
20B
Property Referencing
Associated Powerpoint presentation
Corrigenda
Aidan Ruane, CIÉ Group
Property Management
21
21A
21B
Risk Management Concept
Geotechnics, Soils and Geology
Ground Conditions – Associated Powerpoint
presentation
Roland Bourke, Property
Contols Manager
22
22A
Settlement
Settlement of Permanent Structures and
Utilities – Associated Powerpoint presentation
Simon Fricker
Day 8: Tuesday, 7th December 2010
Applicant’s Submissions
No. Title Presented By
23
Settlement of permanent structures & utilities
– Clarification for An Bord Pleanála
Simon Fricker
Legal Submissions
No. Title Presented By
24 Legal submission – Response on behalf of the
Applicant in relation to legal matters raised
Conleth Bradley, SC, on
behalf of CIÉ/Irish Rail
25 Judgement from European Court of Human
Rights – Case of Skibinscy V. Poland
Garrett Simons, SC, on behalf
of Spencer Dock
Development Company Ltd
26 Time length of CPO Powers Barry McGee, on behalf of the
Railway Procurement
Agency
Day 9: Wednesday, 8th December 2010
Applicant’s Submissions
No. Title Presented By
27 Property Protection Scheme Mark Conroy
28
28A
Hydrogeology
Associated Powerpoint presentation
Kevin Cullen
29 List of Submissions presented
30
30A
30B
Response to queries raised 24/11/10 to
1/12/10
Appendix A
Appendix B
Conor Lavery (Presented on
9/12/10)
31 Hydrology Dr. Conor Buggy
32
32A
Flood Risk Assessment
Associated Powerpoint presentation
Luke Ballantyne
Day 10: Thursday, 9th December 2010
Applicant’s Submissions
No. Title Presented By
33 Section 9 Corrigenda – Description of table
drawings
34 Set of drawings associated with Response to
queries raised 24/11/10 to 1/12/10 which
was submitted on day 9 (see separate roll of
drawings)
35
35A
Below Ground Noise and Vibration
Associated Powerpoint presentation
Richard Greer
Day 11: Friday, 10th December 2010
Applicant’s Submissions
No. Title Presented By
36 Drainage and Utilities Ross Kinsella
37
37A
37B
Above Ground Noise and Vibration
Associated Powerpoint presentation
Appendix A - Corrigendum
Jennifer Harmon
38 Material Assets – Existing and Proposed
Utilities, Corrigenda / Update - Table corrected
on 10.12.10
Day 12: Tuesday, 14th December 2010
Applicant’s Submissions
No. Title Presented By
39 Summary of Baseline Unattended and Attended
Noise Measurements
40 Transport Model Barry Colleary, National
Transport Authority
41 A0 set of drawings which were submitted as A3
booklet on Day 10 (9.12.10) Section 9.0
Corrigenda / Update – Table corrected
26.11.10 (See separate drawing booklet on
public file table)
42
42A
Traffic and Transportation
Associated Powerpoint Presentation
Donal McDaid, ARUP
Day 13: Wednesday, 15th December 2010
Applicant’s Submissions
No. Title Presented By
43 Methods for predicting groundborne noise and
vibration from trains and tunnels
Richard Greer
44 Response to An Bord Pleanála queries raised
from 1/12/10 to 10/12/10
Day 14 : Thursday, 16th December 2010
No. Title Presented by
45 ‘Land Use Implications for DART
Underground at Inchicore’
Applicant
46/46A ‘Vertical & Horizontal Ground Movements
associated with Island Street Shaft
Construction’
(46A- Associated Slides & Illustrations)
Simon Fricker
47/47A Archaeological & Cultural Heritage
(47A – Associated Slides & illustrations)
Margaret Gowan
48 Socio-Economics Craig Bullock
Day 15: Friday, 17th December 2010
No. Title Presented by
49 ‘Summary of Baseline Attended & Unattended
Noise Measurements’
Jennifer Harmon
50/50A Retail/Business Impact
(50A – Associated Slides & Illustrations)
Alan Whelan
51/51A Waste Management
(51A – Resource & Waste Management
Associated Slides & Illustrations)
Joyanne Manning
52 Flora & Fauna Carmel Brennan
Day 16: Monday, 10th January 2011
Applicant’s Submissions
No. Title Presented By
53 Station Planning / Architectural Design /
Urban Integration
Clare Whte and Leszek
Dobrovolsky
53A Accompanying Slides - Station Planning /
Architectural Design / Urban Integration
Clare Whte and Leszek
Dobrovolsky
Day 17: Tuesday, 11th January 2011
Applicant’s Submissions
No. Title Presented By
53B Platform-Train Interface: Calculation of Gaps Hugh O’Neill
53C Platform-Train Interface: Accessibility Mike Evans
54 Landscape and Visual Assessment Thomas Burns
54A Accompanying Slides - Landscape and Visual
Assessment
Thomas Burns
55 Architectural Heritage David Slattery
55A Accompanying Slides – Architectural Heritage David Slattery
Day 18: Wednesday, 12th January 2011
Applicant’s Submissions
No. Title Presented By
56 Industrial Heritage Mary McMahon
56A Accompanying Slides – Industrial Heritage Mary McMahon
57 Architectural Design – Responses and
Clarifications
Clare White and Leszek
Dobrovolsky
57A Accompanying Slides – Architectural Heritage –
Responses and Clarifications
Clare White and Leszek
Dobrovolsky
58 Response to Queries raised to date
59 Air Quality and Climate Sinéad White
Day 19: Thursday, 13th January 2011
Applicant’s Submissions
No. Title Presented By
60 Electromagnetic Compatibility Chris Marshman
61 Human Health Martin Hogan
62 Responses to Supplemental Information
Request
63A Drawings – Soils and Geology
64 Agreement re conditions between Iarnród
Éireann and Dublin City Council. (‘Agreed
Position’ Document)
64A Drawings – Materials (Station Square)
Day 20: Friday 14th January 2011
Applicant’s Submissions
No. Title Presented By
65/65A/65B/
65C
Response to Queries
65A & B Associated Drawings &
Photographs
65C Schedule of Buildings identified during
settlement assessment
Applicant
66/66A/66B Monitoring
66A Associated Slides
66B Associated Examples
Simon Fricker
67/67A/67B Below Ground Noise & Vibration Example Richard Greer
Calculation
67A Associated Slides/Graphs
67B Procedure for Calculations
Day 21: Wednesday, 19th January 2011
Applicant’s Submissions
No. Title Presented By
68 Cumulative Impacts and Mitigation Measures Eddie Feely
69 Further Information on Interpretation of
Geophysical Survey Data
Applicant
69A Accompanying Drawings – Soils and Geology Applicant
70 Response to ABP request for info on review of
TBM Operation Data
Simon Fricker
70A Accompanying Slides – Information and
Monitoring – TBM Operation Data
Simon Fricker
70B Execution of Special Geotechnical Works –
Bored Piles
Simon Fricker
71 Response to Supplemental Information
Request
National Transport
Authority (Applicant)
72 Clarification on Nature of Proposed Property
Acquisitions at station and shaft sites
Applicant
73 Detail of the DART Underground Property
Protection Scheme
Applicant
74 Response to Queries from ABP and Observers Applicant
74A Accompanying Appendix: Provision of Cycle
Parking at Stations
Applicant
74B Accompanying Appendix: Geotechnical Core
Log Record
Applicant
74C Accompanying Appendix: Determination of
Vertical and Horizontal Movements of Shafts
(Revised Slides)
Applicant
74D Accompanying Photos Applicant
74E Corrigenda – Corrected Table : Settlement of
Permanent Structures and Utilities
Applicant
74F Drawings - Ground Investigation Exploratory
Hole Locations, North Wall ESB Substation
Elevations and North Wall ESB Substation
Ground Level Plan
Applicant
74G Sheriff Street Ramp Traffic – Explanation of
Noise Assessment Methodology
Jennifer Harmon
Day 22: Thursday, 20th January 2011
Applicant’s Submissions
No. Title Presented By
75 Answers to General Questions from Observers Applicant
76 Response – Determination of Vertical and
Horizontal Movements (Shafts): Validation of
Contours
Applicant
77 Corrigenda (EIS): Below Ground Noise and
Vibration
Applicant
78 Drawings: Scenario – DART Underground is
operational prior to Opening of St. Stephens
Green Station (1 of 2 and 2 of 2; see also larger
drawings submitted)
Applicant
79 Programme and Notice to Treat Applicant
Local Authority (Dublin City Council) Submissions
80 Strategic Planning Context Gerard Meehan
81 Strategic Planning Context Dick Gleeson
Day 23: Friday, 21st January 2011
Submissions from Prescribed Bodies
No. Title Presented By
82 Architecture and Architectural Heritage DoEHLG (G. Browner)
83 National Monuments DoEHLG (C. Desmond)
84 Dublin Bus Submission Dublin Bus
85 Health Service Executive Submission Michelle Convey
86 Railway Procurement Agency Submission Rory O’Connor
Submissions from Public Representatives
No. Presented By
87 Cllr. Cieran Perry
88 Joe Costello TD and Cllr. Emer Costello
89 Joe Costello TD and Emer Cllr. Costello (2)
90 Maureen O’Sullivan TD and Cllr. Marie Metcalfe
91 Ógra Fianna Fáil – Dublin Central (Patrick Martin)
Day 24: Tuesday, 25th January 2011
Submissions from Public Representatives
No. Presented by
92 Mary Lou McDonald (for Mary Lou McDonald and
Cllr. Seamas McGrattan)
Submission - East Wall (from Module 6)
No. Presented By
93 Thomas Seery (for Thomas Seery and Others)
Day 25: Wednesday, 26th January 2011
Submissions from General Observers
No. Observer
94 Rail Users Ireland
95 Dargan Project
95A Appendix A: Best Global Practice in Metro
Procurement
95B Appendix B: Code of Practice for Risk Management
of Tunnel Works
95C Appendix C: Accompanying Slides
Day 26: Thursday, 27th January 2011
Submissions from East Wall (North of Sheriff St.)
No. Observer
96 Aidan Foley and Masterlabs Limited
96A Appendix: Report from John Munnis, Audio
Consultant
97 Andrew and Elizabeth Hulton (c/o Tom Hulton)
97A Appendix A: Drawing from DCC file 2219/09 (ABP
ref 29N.233488)
Day 27: Friday, 28th January 2011
Submissions from East Wall (North of Sheriff St.)
No. Observer
98 Adrienne Redmond and Others
99 Anna Flanagan and Others
100 Carmel Cosgrave and Others
101
101A
101B
Ossory Business Park – opening statement by
Brendan Buck, BPS Planning
Michael Kennedy and Declan Rogers submission
Correspondence from Gunne to Mr. Rogers and Mr.
Kennedy dated 14/9/10
Ossory Road Industrial Estate statement by Andrew
Foran, Gunne Auctioneers
101C
Day 28: Tuesday, 1st February 2011
Submissions from East Wall (North of Sheriff St.)
No. Observer
102 Crosbie Properties
103 Daisy Days Childcare
104 Laurence Redmond
105 Michael Muldowney
106 Anne Gahan
107 Phyllis Doyle
108 East Wall Water Sports Group Ltd
109 John Conway
110 Residents of West Road, submission by Brendan
Buck, BPS Planning
Day 29: Wednesday, 2nd February 2011
Submissions from East Wall (North of Sheriff St.)
No. Observer
111 A3 Drawing “Eastern Portal Approach Structures
Potential Haul Routes” submitted by Applicant
112 Elaine & Paul Kenny
113 Ian Hand
114 Martina Kelly & Paul Corrigan
115 Terence Melhorn
116 James Lee
117 Denise Wright
Day 30: Thursday, 3rd February 2011
Submissions from East Wall (North of Sheriff St.)
No. Observer
118 Elizabeth Corrigan, submission by Kevin Glynn
119
119A
Rory O’Meara, submission by Rory Mulcahy BL
Rory O’Meara
120 Deirdre O’Reilly & Karl O’Grady (includes video
received on disc)
Day 31: Wednesday, 9th February 2011
Submissions from East Wall (North of Sheriff St.)
No. Observer
121 Maps Submitted by Applicant
122 Angela Wigglesworth & Others
123 Helen McCabe & Others
124 Joe Mooney
125 Seamus Cummins & Delphine Guine
126 Margaret Roper & Others
127 Tom Hulton
128 Nascadh CDP (includes dvd)
129 Lesley Maher, Zen Hair & Beauty
Day 32: Thursday, 10th February 2011
Submissions from East Wall (North of Sheriff St.)
No. Observer
130 Protect East Wall- List of Submissions
131 Public consultation display drawings submitted by Applicant
132 Protect East Wall – Opening Statement, Brendan Buck, Planning
Consultant
133 Protect East Wall – East Wall, Tony Kelly, Chairman of East Wall
Residents Association, & Dr. Ruth McManus
134 Protect East Wall – Consultation, Angela Broderick, Vice-chairperson of
East Wall Residents Association and Member of Protect East Wall Group
135 Protect East Wall – Planning, Brendan Buck, Planning Consultant
136 Protect East Wall – Construction Strategy, Brendan Buck, Planning
Consultant
137 Protect East Wall – Main areas of Concern, Thomas Hulton, Member of
Protect East Wall Group
Day 33: Friday, 11th February 2011
Submissions from East Wall (North of Sheriff St.)
No. Observer
138 Protect East Wall - Karl Searson – Noise
138A Protect East Wall - Karl Searson – Noise (Associated Graphs &
Tables)
138B Protect East Wall - Karl Searson – Noise (Photos )
138C Protect East Wall - Karl Searson – Noise (DVD Presentation)
139 Protect East Wall – Ian Duckenfield – Vibration
140 Protect East Wall – Andrew Foran – Impact on Property Values
141 Protect East Wall – Brendan Buck / Justin Hughes / John
Morrissey – Policing the Contractor / Enforcement
Day 34: Tuesday, 15th February 2011
Submissions from East Wall (North of Sheriff St.)
No. Observer
142 Protect East Wall - Copy of Meeting Records with Applicant
143 Protect East Wall –Traffic (B.Buck)
143A Supplementary Document – HGV Traffic on East Wall
144 Protect East Wall – Flooding, Water and Sewerage (Caitríona Ní
Cassaithe)
144A Protect East Wall - Photographs of Flood Water in East Wall
144B Protect East Wall - DVD of Flooding in East Wall
145 Protect East Wall – Visual Impact & Architecture
146 Protect East Wall – Human Health
146A Protect East Wall - Letter from Seamus Murphy, School Principal
146B Protect East Wall – Submsn from Prof. Anthony Staines
Day 35: Wednesday, 16th February 2011
Submissions from East Wall (North of Sheriff St.)
No. Observer
147 Protect East Wall – Submission to Dart Underground Oral Hearing
read by Marie Broderick
Protect East Wall – Opening Statement: Brendan Laird, Member of
Protect East Wall Group and Brendan Buck, Planning Consultant
148 Information on West Road Traffic Surveys submitted by Applicant
149 High Court Judgement – Smyth & Anor -V- Railway Procurement
Agency, submitted by Applicant
Day 36: Thursday, 17th February 2011
Submissions from East Wall (North of Sheriff St.)
No. Observer
150 Applicant’s reponse to questions from Protect East Wall –
J.Harmon
151 Parkside North Strand Residents Group – presented by Brian
Harmon on behalf of Dolores Steele
Day 37: Friday, 18th February 2011
Submissions from East Wall (North of Sheriff St.)
No. Observer
150 Applicant’s reponse to questions from Protect East Wall –
J.Harmon
151 Parkside North Strand Residents Group – presented by Brian
Harmon on behalf of Dolores Steele
Day 38: Tuesday, 22nd February 2011
Submissions from the Docklands Area
No. Observer
158 North Port Dwellers’ Association
158A -Associated Slides/Visual Representations
158B – DVD
158C - Submission by Mary Murphy on behalf of NPDA
159 McDonnell Family Submission
160 Spencer Dock Development Co. Legal Submission – Garret Simons
160A – John Spain & Associates – Site Development History
160B – Slides/Visuals
160C – Appendix 3 – Building Drawings
160D – John Bruder – Site Development Impact
160E – Sean McCormack – Site Development/Valuation Impact
Day 39: Wednesday, 23rd February 2011
Submissions from the Docklands Area
No. Observer
160 Spencer Dock Development Co. Ltd
160F –Maps/Drawings from Spencer Dock Masterplan
160G – Definition of a ‘High Building’
160H – SDD Co. Submission on Property Protection Scheme
160I – Mr Brian Madden Brief of Evidence: Engineering Report
160J – Mr Shay Cleary Brief of Evidence: Architecture
160K – Mr Cathal Crimmins Brief of Evidence: Achitectural
Conservation
160L – Mr Daryl Prashad Brief of Evidence: Noise & Vibration
160M – Mr Brian McCann Brief of Evidence: Traffic & Transport
160N - Brian Madden Additional Information/Drawings
160O - A1 Map from Mr McCann’s evidence brief
160P – Mr Dan Boyd Brief of Evidence: Estate Management Impact
Day 40: Thursday, 24th February 2011
Submissions from the Docklands Area
No. Observer
161 A3 Drawing – Docklands North Shaft
161A – A1 Version Docklands North Shaft
162 DU Description of Railway Order Drawings – Further Clarification
by Gavin O’Donnell (Booklet of Powerpoint Slides)
162A – A3 Drawings DSK/10635 &10636 – Cross Sections at
Docklands Showing Separate & Composite Property Acquisition
Types
162B – A0 Versions of above drawings
Day 41: Friday, 25th February 2011
Submissions from the Docklands Area
No. Observer
163 James Synott
164 David Hughes Introductory Statement, CV & Qualifications &
Experience
164A –Watford Conference Presentation (J. Bustinduy) Oct 2009
164B – Architectural Portfolio Extracts
164 – Further Examples of previous work
Day 42: Tuesday, 1st March 2011
Module 8 - Submissions from the Pearse Station Area
No. Observer
164 David Hughes/Damian McGarry
164D – Risks of Project to Health, Safety and Property
164E – Lack of Consultation
164F – Environmental Risk Assessment & Risk Management
164G – Risk Assessment Matrix Diagrams
Day 43: Wednesday, 2nd March 2011
Module 8 - Submissions from the Pearse Station Area
No. Observer
165 David Hughes/Damian McGarry – Mr McGarry’s Submission
165A - Appendices to Mr McGarry’s Submission
165B – Mr Hughes’ Submission on Track Alignment & Journey
Times
Day 44: Thursday, 3rd March 2011
Module 8 - Submissions from the Pearse Station Area
No. Observer
165 David Hughes/Damian McGarry
165C – Mr Karl Searson Report – Noise & Vibration
165D – Photos accompanying Mr Searson’s Report
165E – Mr Hughes’ EIS Submission
165F – Mr Hughes Submission – Cost Benefit Analysis
Day 45: Tuesday, 8th March 2011
Module 8 - Submissions from the Pearse Station Area
No. Observer
166 Kevin Humphries TD Submission
167 David Hughes – Photos & Alternative Design Drawings
168 Joint Submission David Hughes & Damien McGarry
169 Carmel McCormack & Residents of Erne Street Upper (Document
No. 1)
169A - Carmel McCormack & Residents of Erne Street Upper
(Documents No. 2&3)
Day 46: Wednesday, 9th March 2011
Module 8 - Submissions from the Pearse Station Area
No. Document Description Submitted by
170 Applicant’s response to Mssrs Hughes,
McGarry et al re: Settlement of permanent
Structures & Utilities in the Pearse Square Area
Applicamt
171 Submission – O’Callaghan Hotels &
Associated Companies – John Spain Associates
presenting
171A – HKR Architects Submission for
O’Callaghan Hotels
171B HKR Visual Representations
(Slides/Drawings etc.)
171C – OCSC Submission for O’Callaghan
Hotels
O’Callaghan Hotels
& Associated
Companies
Day 47: Thursday, 10th March 2011
Module 8 - Submissions from the Pearse Station Area
No. Document Description Submitted by
172 Presentation slides Damien McGarry
173 Compulsory Purchase Order Documentation Damien McGarry
174 174A
Grand Canal Square – Planning Context
Grand Canal Square – Impact on Buildings
Chartered Land
(Represented by
Stephen Little &
Associates)
Chartered Land
174B
Grand Canal Square – Noise and Vibration
(Represented by
O’Connor Sutton
Cronin)
Chartered Land
(Represented by
Marshall Day
Acoustics)
175 175A 175B 175C 175D
Grand Canal Theatre Company
Planning
Slides
Civil Engineering Aspects
Noise and Vibration
Mike Adamson
John Spain
Associates
O’Connor Sutton
Cronin
Marshall Day
Acoustics
Day 48: Friday, 11th March 2011
Module 9 - Submissions from St. Stephen’s Green Area
No. Document Description Submitted by
176 South King Street: Planning Context Chartered Land Ltd.
(Represented by
Stephen Little &
Associates)
177 South King Street Development-Project No.
C487
Chartered Land Ltd.
(Represented by
O’Connor Sutton
Cronin)
178
South King Street Chartered Land Ltd.
(Represented by
Marshall Day
Acoustics)
Day 49: Monday, 14th March 2011
Module 9 - Submissions from St. Stephen’s Green Area
No. Document Description Submitted by
179 Key Issues – PowerPoint presentation Reid Assoc. on
behalf of James
Adams and Sons
Ltd.
180 Railway Order and Environmental Effects Damian O’Regan
180a
St. Stephen’s Green (Dublin) Bill 1877 (216) Damian O’Regan
180b Dublin Transport Authority Act 2008 Damian O’Regan
180c Metro North and Interconnector overlaid on
St. Stephen’s Green
Damian O’Regan
181 Impacts on St. Stephen’s Green Area Peploe’s Wine
Bistro C/o Cunnane
Stratton Reynolds
Day 50: Tuesday, 15th March 2011
Module 9 - Submissions from St. Stephen’s Green Area
No. Document Description Submitted by
182 Submission by R Kinhg, Chairman Amethyst
Consultants o.b.o Ampleforth Ltd T/A
Fitzwilliam Hotel
182A – Submission by John Spain Associates
o.b.o Ampleforth
182B – Associated Slides, Drawings & Photos
182C – Submission by Shane Carr (Marshall
Day Acoustics)
182D – Metro North Further Information
request, Fitzwilliam Hotel Impact Assessment
Ampleforth Ltd
183 Submission by John Spain Associates
representing Kildare Street & University Club
183A – Associated Drawings, Photos, Slides
etc
183B – Engineering Report submission by
O’Connor Sutton Cronin Consulting Engineers
Kildare Street &
University Club
184
Submission - Letter to An Bord Pleanala
dated 28.1.11
184A – Brochure & Photo of Cliff House
Hotel/22 St Stephen’s Green North
Ciaran McGrath
Day 51: Wednesday, 16th March 2011
Module 9 - Submissions from St. Stephen’s Green Area
No. Document Description Submitted by
185 Response to Queries re Fire Safety &
Legislation
CIE
186 Submission o.b.o. Irish Life Assurances,
Stephen’s Green Centre Residents, Royal
College of Surgeons & Ventasker Ltd
186A - Submission on behalf of Irish Life
Assurances
Tom Phillips &
Associates
187
Submission on behalf of Royal College of
Surgeons
187A – Associated Slides, Drawings & Photos
etc
187B – Marshall Day Acoustics Report
187C – Brian Madden Engineering Report
John Spain
Associates
188 Letter to ABP dated 16.03.11 re Grand canal
Theatre Sound tests
John Spain
Associates
Day 52: Tuesday, 22nd March 2011
Module 10/11 - Submissions from Christchurch-Heuston/Inchicore & War
Memorial Park Area
No. Document Description Submitted by
189 Diageo Site Plan Drawings CIE
190 Responses to questions raised by Protect
East Wall Group
CIE
191
Submission Aifric Ní Chianáin &
Others
Day 53: Wednesday, 23rd March 2011
Module 11 - Submissions from Inchicore & War Memorial Park Area
No. Document Description Submitted by
192 Written Submission/Accompanying Slides,
Visuals etc.
Conor Flood &
Others
193 Written Submission/Accompanying Slides,
Visuals etc
Gerard McGeogh &
Louisa McDonald
194
Written Submission Joseph A Currivan
Day 54: Friday, 25th March 2011
Module 11 - Submissions from Inchicore & War Memorial Park Area
No. Document Description Submitted by
195 Written Submission Niamh Flood, David
Lawless & May
Flood-Lawless
196 Written Submission Paul O’Shea
197
Written Submission Aine Costigan
198 Written Submission Cllr Rebecca
Moynihan
199 Written Submission Seven Oaks
Management
Company
200 Written Submission
200A – ‘Previous Experience’
200B – ‘Impacts of Construction’
200C – ‘Construction of Tunnels’
200D – ‘Proposed Outcomes’
200E – ‘Cumulative Impacts’
200F – Photos/Slides/Illustrations etc
Jo Homewood &
Ned McLoughlin
Day 55: Tuesday, 29th March 2011
Module 11 - Submissions from Inchicore & War Memorial Park Area
No. Document Description Submitted by
201 Karl Searson Noise Report for
McGeogh/McDonald &
Homewood/McLoughlin
201A – Associated Photographs
G. McGeogh & L.
McDonald/J.
Homewood & Ned
McLoughlin
202 Grand Canal Theatre Noise & Vibration Test
Proposal
C.I.E.
203
Grand Canal Theatre Noise & Vibration Test
Proposal
203A – Document detailing Qualifications &
Experience of Sound Engineer conducting
tests
Grand Canal
Theatre
Day 56: Wednesday, 30th March 2011
Module 11 - Submissions from Inchicore & War Memorial Park Area
No. Document Description Submitted by
204 Written Submission
204A – Associated Photographs/Slides
Inchicore Sports &
Social Club
205 Introductory Submission
205A – History of Inchicore Works & Estate
205B – Presentation of Local Railway History
‘Who We Are’ –Ms Deirdre O’Farrell/Ms.
Chris Bennett
205C – Public Consultation& Participation
205D – Associated Photos, Slides etc
205E – Planning , Station & Environs &
Proposed Future
Inchicore On Track
206
Questions to Applicant from Dr Walsh
Dr Fred Walsh
207 Public Consultation Documents from April
2009 Meetings with Inchicore on Track
C.I.E.
Day 57: Thursday, 31st March 2011
Module 11 - Submissions from Inchicore & War Memorial Park Area
No. Document Description Submitted by
205 INCHICORE ON TRACK SUBMISSION (contd.
From Day 56)
205F – Construction and Operation
205G – Exchange of Correspondence between
Inchicore on Track and the Applicant,
November 2010
205H - Architecture & Built Heritage Part A
205I – Architecture & Built Heritage Part B
Inchicore On Track
Day 58: Friday, 1st April 2011
Module 11 - Submissions from Inchicore & War Memorial Park Area
No. Document Description Submitted by
205 INCHICORE ON TRACK SUBMISSION (contd.
From Day 57)
205J – OTB Engineering Report
205K – Community Gain
205L - Suggested Conditions/Modifications
205M – Closing Statement
Inchicore On Track
208 Ordinance Survey Maps of Inchicore –
1867/1911/1994
209 – In day 60 – 6/4/11 – Louise Carroll
CIE/IE
Day 59: Tuesday, 5th April 2011
Module 11 - Submissions from Inchicore & War Memorial Park Area
No. Document Description Submitted by
210 Photo of old CIE dormitory building, circa
1992
CIE
211 Written submission – Frank Moore Sherling Group
212 Copies of CIE & SHerling Group meeting
records
CIE
213 Aerial Photo & Map of Sherling Steelyard site CIE
214 DVD presentation – Frank Moore Sherling Group
Day 60: Wednesday, 6th April 2011
Module 11 - Submissions from Inchicore & War Memorial Park Area
No. Document Description Submitted by
215 European Court of Justuice Ruling (FINAL)
215A – ECJ Ruling Just Satisfaction
Sherling Group
216 John Spain Associates’ Submission on Draft
Kildare County Development Plan
CIE
217 Sketch of Sherling Steelyard Re-configuration CIE
218 Response to Queries re Safety Standards &
Legislation
CIE
218A – Definition of Hierarchy of Design
Standards
218B – Property Advance Condition Survey
219 Settlement of Permanent Structures &
Utilities: St Stephen’s green
219A - Settlement of Permanent Structures &
Utilities: Heuston
219B - Settlement of Permanent Structures &
Utilities: Inchicore
219C – Scheduled Amendments to Book of
Reference
CIE
220 Letter re West Road Bridge Dublin City Council
221 Statement to hearing re agreement between
RPA/CIA
RPA
209 Written Submission (presented Day 54,
copies received 6/4/11)
Louise Carroll
DAY 62 – Friday, 8th April 2011
Module 12 – Closing Submissions
No. Document Description Submitted by
228 M. O’Donnell Response C.I.E.
229 R. Greer’s Contribution to applicant response C.I.E.
230 Ministerial Brief re Transport Budget O’Callaghan Hotels
231 Closing Legal Submission Spencer Dock
Development
Day 61: Thursday, 7th April 2011
Submissions in relation to Grand Canal
Theatre Noise Tests & Legal
219D 219C – Scheduled Amendments to Book of
Reference
C.I.E.
222 Error- Number not used
223 Demonstration of Train Noise at Grand Canal
Theatre
(disc containing 223 & 223A)
223A – Peutz Review on the methodology of
the Noise Test
223B – Figure 16: Comparison of spectral
content
223C – Millward Brown Lansdowne Focus
group
C.I.E.
224 Marshall Day Acoustics Report Grand Canal
Theatre – Listening tests.
224A – Engineered Acoustic Designs, Report
of Witnessed Listening Tests
224B – Marshall Day Response to questions
raised by Fred Walsh
Grand Canal
Theatre
225 Legal Submission by E. Galligan
225A – Extract from EIA Law and Practise
Grand Canal
Theatre
226 Response to Legal Submissions C.I.E.
227
Disc Version of
218A – Definition of Hierarchy of Design
Standard
Company
232 Inspector’s Closing Questions to Applicant ABP
233 Phase 4 Risk Management Strategy C.I.E.
234 Closing Submission Inchicore on Track
235 Closing Submission – Danielle Conaghan Diageo Ireland
236 Closing Submission Stephen’s Green
Centre/ Stephen’s
Court
237 Closing Submission Royal College of
Surgeons
238 Closing Submission Kildare St. Club
239 Closing Submission Fitzwilliam Hotel
240 Closing Submission Carmel McCormack,
David Hughes &
Upper Erne Street
Residents
241 Closing Submission David Hughes
242 Closing Submission Spencer Dock
Development
Company
243 Closing Submission Protect East Wall
244 Closing Submission West Road
Residents
245 Closing Submission Ossory Business
Park
246 Closing Submission Abercorn Road
Residents
247 Closing Submission Patricia Wainsforth
248 Closing Statement C.I.E.