DAR Specific Guidelines:
Criteria for assessing technical capablity of LGUs:- track record/experience in implementing similar projects- no. & competency of technical staff involved in:
project supervision/mgtproject monitoringreport preparationfunds management
Transfer of Funds: DBM – DARCO – DARRO – DARPO/LGUDBM – DTI/NIA/DENR - LGU
Monitoring of project implementation: As a regular subproject (per WFP)LPRAT /MARO- DARPO/DTI/DENR/NIA - DARRO – DARCO/NAPC/DILG
![Page 2: Dar specific guidelines](https://reader036.vdocuments.us/reader036/viewer/2022082700/549c29c3b479599b318b4684/html5/thumbnails/2.jpg)
LGUs which are eligible to implement a GPB project must submit the documents required by the concerned participating agency as basis for fund release which may include:
Project Proposal Work and Financial Plan Terms of Reference Detailed Estimates Deed of Donations or Certificate of Land Availability (for
infrastructure)
If the LGU is ineligible to implement a GPB project, the project will be implemented by the participating agency concerned.
GPB Project Implementation:
![Page 3: Dar specific guidelines](https://reader036.vdocuments.us/reader036/viewer/2022082700/549c29c3b479599b318b4684/html5/thumbnails/3.jpg)
Proposed Projects shall be validated considering the following:
1.) Location: Barangay and Municipality (whether in an ARC, ARC Cluster, non-ARC)2.) No. of farmers (ARBs & Non-ARBs) to be benefitted3.) Recipients-POs (no. of ARB-members)3.) If in an ARC, is the Project included in the ARCDP?4.) Physical targets/Scope of work (for infrastructure)5.) Breakdown of Costs6.) Plan of Implementation (Implementing Agency/Unit, duration, target date, etc)7.) Other relevant data/information