Fermilab: Wanwei Wu, Tingjun Yang, Linda Bagby, Shekhar MishraSLAC: Mark R. Convery, Matt T. Graham, Patrick K. V. TsangTest TPC Coordination MeetingThursday, 9 August 2018
DAQ Update for DUNE Small TPC CE Test at Fermilab
Today’s Topic
8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab2
• ORC Preparation• DAQ Status and Next• Electronics Layout/Timing/Trigger
ORC Preparation—Overview
8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab3
• SLAC team locates the COB etc.a. COB from JJ (James J. John, Russell), has 3 DPMs.b. SLAC will make sure the firmware is up to date when sending
it to Fermilab.c. Discussions are ongoing regarding previous safety review
findings on the COBd. DPM and RCEs will come along with COBe. Patrick has RTM at CERN and will send to Fermilab.f. An FPGA Carrier Board is needed for the timing system. One
may be available at CERN.
• SLAC team can send the COB etc. in the following weeks.• We are working on one ORC review for the whole DAQ system.
ORC Preparation—Overview
8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab4
Name Quantity StatusATCA shelf 1 YRTM 1 YPC 1 YCOB 1 YDPM 3 YCopper ethernet cable 1 YFiber/SFP+ 1 YTiming Board 1 YSpliter 1 ?WIB 3 YFiber/MPO 3 Y
• Core components for DAQ
4 FEMBs -> 1 WIB -> 2 RCEs4 DPM / COB2 RCEs / DPM
ORC Preparation—Overview
8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab5
https://docs.google.com/document/d/1XKaibq62KJuxdlmH11K7QEu0R63RbIWw4Bb74i237Mo
• ORC document (draft) is available:
DAQ Status and Next—ATCA Shelf
8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab6
• Need to connect to one of the servers
• Request remote login for setup, for Matt (mgraham), JJ (jrussell) and Sergio (username?)
• Matt has access to PAB server now
DAQ Status and Next—COB and RCE
8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab7
• Optical fiber connects (from) the WIB to RCEs. There is an IP on WIB and specific UDP ports on FEMB.
• IP addresses: SLAC assign them using DHCP but fix them in the dhcpd.conf. (Also, MAC addresses provided by JJ)
• A static IP address for the shelf manager that also needs to set up on the 1GbE network (may already works since we are using the same PCs).
• Get an IP to the shelf manager setup• Have access to the software• Use various commands to integrate the RCEs and COB• This is documented on a SLAC confluence page (but need a SLAC
computer account to access it)• Need to modify IP if taling to shelf manager
DAQ Status and Next—Software
8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab8
• A meeting has been scheduled with CD on coming Monday. We will
present our software request:a. What hardware is involved.b. What expertise we have and can bring to the table.c. What expertise and support we need from CD.d. Are there any quicker solution than full-blow artdaq
acceptable• Kurt and John are busy with protoDUNE. We’re contacting them to
find some time to setup the DAQ software.
TPC Electronics—Layout
8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab9
FPGA
COB
FEMB (x10)
WIB
RCE
PTC Crate
TimingCard
Splitter
LAr
Tx: 1310 nmRx: 1550 nm
• David Newbold showed us a layout of the electronics
TPC Electronics—Timing System Components
8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab10
Timing System Shopping List
Item Quantity Configuration Estimated Price ($) Links
Splitter 11x8, LC/UPC in, LC/UPC
out 25.3https://www.fs.com/products/48475.html
Patch cables 6
Simplex, OS2, LC/UPC to LC/UPC, choose the right length, 3/6 spare 10
https://www.fs.com/products/40435.html
Timing FMC SFP module 3 2/3 spare 36
https://www.fs.com/products/20141.html
Endpoint SFP module 3 2/3 spare 27
https://www.fs.com/products/20140.html
JTAG cable 1 60
https://www.digikey.com/product-detail/en/digilent,-inc./410-249/1286-1019-ND/3902812?WT.srch=1&gclid=Cj0KCQjw-o_bBRCOARIsAM5NbIOuhUzis6PGwH4MZoDRYX9mNpBgfu2Eql5oZpqpZUs_oOAy41llReQaAnaMEALw_wcB
TPC Electronics—Trigger
8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab11
• How will the trigger signal be
generated?
• David Newbold provided an
option: replicate the CERN setup
which uses the AIDA TLU - this unit is
specifically designed to make
coincidence triggers from scintillators,
and can connect directly to the timing
system�David Cussans, who is the
designer of the TLU�.
From David Newbold
To use four scintillators two on top and two on bottom to make a cosmic trigger, …
Backup
8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab12
COB and RCE
8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab13
• a dump of the power draw. (This is with the RCE doing basically nothing,
so the draw will depend somewhat on load. 35Watts is the what the
shelf manager has allocated to each DPM (2 RCEs). The DTM has a
smaller FPGA so is less. )
COB and RCE
8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab14
DAQ Rack AC Distribution
8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab15
2APulizzi I (12A) Pulizzi II (12A)
Server 02 (750W)
Server 01 (495W)
NIM BIN (140 W)
3.125A3.125A
2A
1.25AATCA (300W)
RPS1A
1.25A
1.17A
NIM FAN
NSW
1A
2A
PAB LS/PP-05 CKT# 17
PAB PP/PA-01 CKT# 11
DAQ Rack AC Distribution
8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab16
14AWG/SJT/300VPulizzi I (12A) Pulizzi II (12A)
Server 02 (750W)
Server 01 (495W)
NIM BIN (140 W)
18AWG/SJT/300V18AWG/SVT/300V ATCA (300W)
18AWG
14AWG
Cable along the NIM BIN
NIM FAN
NSW
Cable along the fan: 18/SJT
18AWG
RPS
PAB LS/PP-05 CKT# 17
PAB PP/PA-01 CKT# 11
14AWG/SJT/300V
14AWG
DAQ Power Supply Request
8/9/18 Wanwei Wu | DAQ Update for DUNE Small TPC CE Test at Fermilab17
Group A (building ground):• 120V-20A quad panel CKT X (NEMA 5-20)• 120V-20A quad panel CKT Y (NEMA 5-20)• 120V-20A quad panel CKT Z (NEMA 5-20)
Group B (building ground):• 120V-30A with twist lock (L5-30R)• 208V-3!-30A
Group C (Detector ground):• 480V-15KVA with twist lock (Linda’s ISOLATION XFMR)
Group A and Group B are for DAQ Rack system; Group C is for TPC and Cold Electronics.