daq system at the 2002 atlas muon test beam g. avolio – univ. della calabria e. pasqualucci - infn...
TRANSCRIPT
DAQ System at the 2002DAQ System at the 2002ATLAS Muon Test BeamATLAS Muon Test Beam
G. Avolio – Univ. della CalabriaE. Pasqualucci - INFN Roma
2nd Sept. 2002 CERN - ATLAS Muon Week 2
Hardware and Software Hardware and Software Configuration (1)Configuration (1)
Hardware: Three VME crates:
BEAM CRATE Read-out via S-Link 1 RIO-II (CC and ROD emulator) 1 I/O Register (Trigger purpose) 3 KLOE TDCs for tracker readout 1 CAMAC/VME interface for hodoscope readout
2 MDT CRATES 1 Read-out via S-Link, 1 read-out via Ethernet 1 RIO-II (CC and ROD emulator) 3 CSMs for chambers readout each 1 VME Corbo
2nd Sept. 2002 CERN - ATLAS Muon Week 3
Hardware and Software Hardware and Software Configuration (2)Configuration (2)
Hardware: 3 RIOs Six PCs:
One running the online software (RunControl, etc…)2 ROS
One receives data via S-LinkOne receives data via EthBoth have a CORBO PCI
1 for monitoring tasks and DFM1 for EB, SFI/O and data collection1 used as GW + DNS of the private network
DAQ farm for Event Filter Fast ethernet network for control messages and ROD
data Gigabit ethernet for data and connection to the EF farm
2nd Sept. 2002 CERN - ATLAS Muon Week 4
Hardware and Software Hardware and Software Configuration (3)Configuration (3)
Software: DAQ –1 environment
Online software release 0.0.17 + patchesROS software release 2_22 with Linux kernel
updateOBK upgraded to MySQL database version
KLOE softwarekIPC, VME libraries, TDC libraries
Specific modules libraries Rod emulator and crate controller (running on
RIO-II) Online monitoring and EF
2nd Sept. 2002 CERN - ATLAS Muon Week 5
The DAQ SchemaThe DAQ SchemaADCs, TDCs
C.C.
ROD
TDCs Reg
Beam Crate
C.C.
ROD
Corbo
CSM
MDT_1 Crate C.
C.
ROD
Corbo
CSM
MDT_2 Crate
OnlinePC
MonitoringCalibration
PC
PC
PVSS / DCS
GEthFEth
PC ROS 1
GEthFEthPCROS 2
GW
GEth
FEth
GEth SFI SFO
PC
Sw
itch
GE
th
Data Flow
Barrel Endcap
CDR
Event Filter
Control
Switch FEth
Ethernet
2nd Sept. 2002 CERN - ATLAS Muon Week 6
New Features:New Features:Programmable TriggerProgrammable Trigger
Trigger selectionthrough RunControl
IGUIInformation
stored in the IS
Trigger controller
Reads trigger type from
the IS
C.C.
ROD
TDCs Reg Programs the
I/O Register
Signals sent tothe trigger
logic
2nd Sept. 2002 CERN - ATLAS Muon Week 7
Pctbmu04
Event
Frag
men
tsFr
om
RO
Ss
QuadPC Farm
Calib Online
New Features:New Features:Event Filter (1)Event Filter (1)
SFOSFI
Event FilterTask
CDR
SFI: SubFarmInput – It receives andbuffers the events fragments from ROSs, builds a full event and sendsit to the EF
SFO: SubFarmOutput – It receivescomplete events accepted by the EFand writes all data to disk
2nd Sept. 2002 CERN - ATLAS Muon Week 8
New Features:New Features:Event Filter (2)Event Filter (2)
TDCs Spectra
Channel Map
Nowadays the EF produces online histos such as TDCs spectra,channel maps, residuals (this means on-line tracking!)
2nd Sept. 2002 CERN - ATLAS Muon Week 9
New Features:New Features:DataFlow Manager (DFM)DataFlow Manager (DFM)
The DFM informs ROSs where they have to send their data fragment
It also receives messages if SFI is not ready to accept a new event
Why DFM at H8 test beam? It’s a very useful test It avoids fragment misalignment because of
the difference in speed between the two ROSs (one receiving data via S-Link and the other one via Fast Ethernet)
2nd Sept. 2002 CERN - ATLAS Muon Week 10
New Features:New Features:Monitoring TasksMonitoring Tasks
They are the same program
They run in the on-line environment and are automatically controlled by a controller
It’s possible to control them “by hand” and then give the control back to the controller
Temporary histos files are created
Histos are automatically saved at the end of run
C.C.
ROD
Corbo
CSM
MDT_1 Crate
Sampler atcrate level
(Barrel Event)
Monitoring Task 1
Monitoringfactory
Pctbmu04SFI SFO
Monitoring Task 2
Sampler atSFI level
(Complete Event)
Monitoringfactory
2nd Sept. 2002 CERN - ATLAS Muon Week 11
New Features:New Features:Online Event Display (1)Online Event Display (1)
GEthFEth
PC ROS 1
GEthFEthPCROS 2
GEth
FEth
GEth SFI SFO
PC
Switch
Persint reads the eventat the SFI level…
…and displaysit
2nd Sept. 2002 CERN - ATLAS Muon Week 12
New Features:New Features:Online Event Display (2)Online Event Display (2)
2nd Sept. 2002 CERN - ATLAS Muon Week 13
This Java panel is executed at the end of each run
New Features:New Features:OBK InterfaceOBK Interface
Shifter commentto the run
From the IS
From theconfiguration DB
Informations sentto the OBK to be
displayed ascomments
2nd Sept. 2002 CERN - ATLAS Muon Week 14
DAQ – DAQ – DCS (1)DCS (1)
DCS achievements: End Cap Alignment Bar and MDTs (EOL-EOS)
Temperature Monitoring Barrel MDTs Temperature Monitoring Chamber Gas System Monitoring Acquiring SPS-H8 Accelerator Data using PVSSII Integrate new CAEN SY2527 HV system in PVSSII New DAQ-DCS Communication to Exchange Data
Information Service used to publish informations as gas parameters and magnet current
2nd Sept. 2002 CERN - ATLAS Muon Week 15
DAQ – DAQ – DCS (2)DCS (2)
Daq – DCS communication: Alignment
EndCapDCS implemented with a PVSS applicationDDC (DAQ to DCS Communication) package
used to implement a communication system from and to DAQ (Start/End of Run, Run Number)
BarrelDCS uses ICARAS softwareNo DAQ communication
TemperatureTemperature data sent to the DAQ and
recorded in an ascii file along with the DAQ main stream of data
2nd Sept. 2002 CERN - ATLAS Muon Week 16
AchievementsAchievements
Full system working with good stability The system has been able to handle a
rate of ~ 5 KHz System limit has not been reached Sometimes low rate because of electronics problems
Very complete configuration: 3 crates (2 read-out via S-Link and 1 via Ethernet) 2 ROSs EB, SFI/O, DFM, EF Online monitoring Online event display DAQ to DCS communication
2nd Sept. 2002 CERN - ATLAS Muon Week 17
ProblemsProblemsMain Problems
Missing fragmentNot frequentPossible random fragment
size bigger than the page size due to chamber noise
Recovery time about 3 minutes
RIO CPUs OS not handling well system resources
PC ROS 1
ADCs, TDCs
C.C.
ROD
TDCs Reg
Beam Crate
C.C.
ROD
Corbo
CSM
MDT_1 Crate
Other Problems DCS communication
Application not killed at the DAQ shutdown Just kill the application “by hand” and restart
OBK browser not showing comments