damen 511205 6 7

Upload: zzz-zzz

Post on 18-Oct-2015

213 views

Category:

Documents


16 download

DESCRIPTION

.

TRANSCRIPT

  • Year of building 2002

    Customer

    Yardnumber

    Serialnumber

    Type

    Kind of winch

    DAMEN SHIPYARDS PARTS DIVISION P.O. Box 1 NL-4200 AA Gorinchem Nederland +31-183-639911 +31-183-635551

  • 21-feb-01 e01

    GENERAL

    Introduction Thank you for choosing a KRAAIJEVELD product. We trust that it will give you excellent service. This user's manual is based upon the latest technology of the field. Every possible care has been taken to avoid errors when compiling it. The compiler/manufacturer is not responsible for errors or omissions, if any, in the presentation or description of the product. Anyone in charge of processing, transport, operation, maintenance or repair must read the user's manual, and especially the section "Safety" and act in accordance with the instructions. The winch uses state-of-the-art engineering and safety provisions in its construction, and yet despite this danger can occur for the user, third parties or the environment if the winch is used injudiciously. The winch must therefore only be used in good order, with an awareness of dan-gers and safety, by persons authorised to operate it. Faults which affect safety should be rectified at once. The manufacturer cannot accept liability for damage due to improper or injudicious use. The user is entirely responsible for risks and dangers. Injudicious use includes not reading and acting in accordance with the user's manual. Use and maintenance are described in the user's manual. The winch should only be operated and maintained by reliable and trained personnel, in accordance with the directives laid down for this as regards safety and also the general directives applicable concerning health and safety at work. Any conversion or changes to the winch or parts of it carried out by customers themselves mean that all liability on the part of the manufacturer is excluded.

    Delivery Every KRAAIJEVELD winch has the particulars of the order checked and a test run carried out before leaving the factory. KRAAIJEVELD winches are shipped without being filled with oil; all lubrication points are filled with grease before shipment, however. Unless otherwise agreed, winches are shipped un-packed. Sometimes, if necessary, they are secured to a wooden pallet.

    Paintwork

    Unless otherwise agreed, winches are painted grey externally to RAL standard specifications, resistant to an industrial atmosphere and temperatures of up to approx. 110 C. The paint applied at the factory can if necessary be painted over with any good synthetic paint.

    Long-term storage

    The winch can be stored for up to 2 years in an enclosed space and 6 months in the open air. For storage, the gearbox should be filled completely with rust-preventing oil and all nipples should be carefully greased.

    Applications Use the winch only for applications for which it is designed and never use it to hoist or move people. The load applied to the winch should never exceed the load for which it is designed. Application particulars and the technical specifications are to be found further on in this manual. To ensure your safety, you are advised not to make any changes to the winch without first con-sulting the manufacturer.

  • 21-feb-01 e01

    Installation Always remember that trouble-free working depends on expert installation and operation.

    Positioning

    General

    If you wish to move the winch to the intended position, you should use the lifting eyes attached to the winch. If this is not possible or necessary because of the design, no lifting eyes are fitted. You should yourself determine a suitable position for sufficiently strong slings or chains. The lifting eyes are only suitable for lifting the weight of the winch itself. Always position the winch on a sufficiently firm and strong foundation and always in for which it was built. When the winch is positioned on a foundation, you should usbolts of the correct diameter.

    Wild cat

    The chain should run over the wild cat in such a way that the curve around which the chain runs is sufficiently large, see figure below. The position of the chain must form an angle of 20 minimum with the horizontal at the hauling edge. At the trailing side the chain must be able to run smoothly into the chain locker via a spacious hawse pipe. If necessary, a chain plug may be positioned so that the chain runs more smoothly into the chain locker. It is advisable to make the trailing part of the chain as long as pos-sible and thus to position the chain locker on the level of the ship. The gauge of chain for which the winch is designed is given in the technical specifications and in the general plan.

    Drum

    Wind the wire onto the drum in the direction for which the winch is designed. The first four turns on the drum must always remain wound on in order to re-lieve the load on the wire rope attachment of the winch. It must also be borne in mind that wire rope should be fitted in the direction for which the drum is made; this is certainly the case if an automatic wire rope spooling device is fitted. Most winches are de-signed to haul in one direction of rotation : this is because of the band brakes, friction devices and/or the hydraulic system. The direction of rotation is indi-cated on the drawing. The wire and the wire storage for which the drum is designed is given in the techni-cal specifications and on the general plan. On a drum with a left hand lead a right-laid rope must be used and on a drum with a right lead a left-laid rope, see drawing. The tendency of the rope to twist will then mean that the rope rolls more and more tightly against the previous turn, which gives a regular firm layer of rope on the drum (a good foundation for the following layer).

    Warping head

    If your winch or capstan is fitted with a warping head you can use it for hauling in a wire. It is not the intension of the warping to fix your ship with it, it is possible that the gearbox is not executed with a multi disk brake. In that case you can damage your hydraulic motor.

    path of

    wire rope the position e adequate

    chain

  • 21-feb-01 e01

    Winches of type KAB

    The gearboxes of KAB type winches are often suitable for welding directly onto the deck, so that keeping the deck clean under the winch is simplified. The gearbox has a raised bottom so that the winch can be grooved out and finish welded to suit the camber or sheer of the deck. By burning a slanting edge to the gearbox, for example as shown by the dash-dot line in the figure opposite, the top of the winch can easily be positioned parallel with, say, a deckhouse. When aligning the winch, the strips should first be removed from the end plates. After this, the gearbox can be grooved out and finish welded. Next, the cover strips of the plates should be cut to size and finish welded. Below deck, reinforcement should be fitted at the position of the gearbox and the plates.

    Capstans

    The capstans of type KAC, provided with an optional foundation pipe, are suitable to be mounted directly on deck. This foundation pipe is completely closed, which makes is easy to clean the deck around the capstan. The foundation pipe can be welded directly on deck according to round of beam. Always mount the capstan in the position for which it was ordered. The capstans are not provided with a pawl, but with an electrical multiplate brake which will be automatically excited when voltage fall down.

    Putting into operation

    Filling with oil

    The winch is delivered with the gearbox and hydraulic reservoir, if any, not filled with oil/fluid. All greasing points are lubricated before delivery. The gearbox/fluid reservoir should be filled in accordance with the instructions further on in this manual.

    Connecting the electric/hydraulic motor

    The motor should be connected in accordance with the instructions further on in this manual.

    Connecting the air system (optional)

    The air cylinder should be connected in accordance with the instructions further on in this man-ual.

    Safety The manufacturer is not liable for unsafe situations which are the result of: Disregarding warnings or instructions as displayed on the machine or in the documentation Using for applications or in circumstances other than indicated in the documentation Modifications to the machine. This includes the use of spare parts other than original ones. Insufficient maintenance

    Safe use

    When using the winch, special attention should be given to the following points : Only allow the winch to be used with the approval of the skipper or responsible official, as

    appropriate The characteristics of the brake lining may change if it becomes wet or worn Make sure that there is always someone supervising when the winch is used

    gearbox type KAB

  • 21-feb-01 e01

    Operate the dog clutch only when the main shaft is stationary Always use the locking pin in the handle of the dog clutch Turn the winch back a little so that the dog clutch is free and can more

    easily be disengaged Only use the band brake in the direction for which it is designed Keep well away from wire ropes or anchor chains Watch the load Do not wear loose clothing Never stand on the winch Stand on a smooth, non-slip surface Make sure of proper lighting when working with the winch Watch the temperature of the drive motor or gearbox; if the temperature

    becomes too high, consult the manufacturer Make sure that the rope or chain does not end up next to the flanges of the drum or chain

    pulley Use the chain stopper, if there is one, correctly Remember that the coefficient of friction of the brake lining may change due to the effects of

    temperature/weather Use of anchor chain of the correct dimensions and breaking strain Use of rope of the correct diameter and length, suited to the drum

    Maintenance

    General

    It is recommended that the winch should be maintained by authorised and expert personnel. Revolving parts are dangerous and if touched can cause serious injuries. Never remove guards or covers during use and never carry out work on a revolving winch. Maintenance is limited to checking the oil level, regularly changing the oil in the gearbox/fluid in the hydraulic reservoir, and greasing the nip-ples. If the level in the gearbox rises, this may mean that water is getting into the oil, or that the shaft seal of the hydraulic motor has failed so that hydraulic fluid ends up in the gearbox. The oil/fluid should be replaced on the first occasion after about 800 hours of operation. Subsequently, depending on the operating conditions, change the oil/fluid after about 4000 - 6000 hours of operation. It is best to drain the gearbox while this is still warm. With gearboxes with a large oil bath, remove the cover or the filler cap and if necessary insert the suction hose of a portable oil pump. Also check whether there is any water present in the gearbox oil. Lubricate all grease nipples after every 8 hours of operation, even on

    parts which are little used Recommended greases and oils are to be found in the tables further on For correct operation of the band brakes, the various swivel points and threaded rods should

    be greased regularly Occasionally check bearing play of drums, pulleys and similar. If the play is too great, this

    may mean that the bronze bearing is due for replacement. Replace the brake lining in good time, using only asbestos-free brake linings Remember to close the gearbox covers properly after inspection Brake rods should be greased regularly Protect the winch in good time with the correct paint so that rust is not given a chance

    dog clutch

    lubricating nipple

  • 21-feb-01 e01

    Scrapping If the winch is to be scrapped, the regulations for waste disposal which apply at the place and time of scrapping should be complied with. Only generally known materials and ingredients have been processed in the machine. At the time of building, possibilities existed for waste disposal and no particular risks were known for the persons responsible for the scrapping work. Com-pressed air or hydraulic cylinders, if any, should never be dismantled, as it is possible that a spring under load may be fitted in the cylinder.

    Service / Guarantee / Parts Service, guarantee and parts are obtainable from the manufacturer. The address is to be found on the front of this manual. Make sure that you have the serial number to hand: the number is given on the front of this manual, in the test certificate/specifications and on the name plate on the gearbox.

  • 21-feb-01 E02

    GEARBOX

    Choice of lubricating oil

    General / gearbox section

    The gears should be lubricated with mineral oils with additives which increase the strength of the oil film subjected to pressure. The oil must also contain anti-foaming additives. The oil must be resistant to oxidation at high temperatures. The table below gives the recommended viscosity in relation to speed of rotation and the ambient temperature. For viscosity values equivalent to ISO class VG : see table of recommended lubricants further on. This table is not restrictive, and equivalent brands may also be used. If a multi-plate clutch is used in the gearbox, oil with a viscosity of VG 68 should be used. Venting: excess pressure is prevented by a valve in the filler cap (0,3 bar). In some cases, the cap referred to is replaced by one without a pinhole because of the possibility of water splashes finding their way into the gearbox. In that case the geabox has to be vented to under deck (3/8 thread in gearbox side).

    Slowly rotating shaft Ambient temperature

    -10 .. 15 C 0 .. +30 C +10 .. +50 C 0 .. 10 rpm VG 150 VG 220 VG 320 10 .. rpm VG 68 VG 150 VG 220

    Winch with multi-plate clutch VG 68 VG 68 VG 68

    Electric/hydraulic winches of types KAB-..-EH-..

    With these winches, the hydraulic system is combined with the gearbox, and fluid is used from the same reservoir. The gearbox should be filled with hy-draulic fluid in accordance with the table further on.

    Electric/hydraulic winches of type KABEH-..-..

    The hydraulic system is separate from the gearbox; both have a separate fluid/oil reservoir and different types of fluid/oil. The gearbox section and the hydraulic section should be filled with oil/fluid in accordance with the tables further on in this manual. For filling the hydraulic reservoir, refer to the relevant section concerning electric/hydraulic winches.

    Greasing/filling with oil Revolving parts are dangerous and if touched can cause serious injuries. Ne-ver remove guards or covers during use and never carry out work on a revol-ving winch. The oil/fluid level in the gearbox and/or hydraulic reservoir can be determined by the oil level sight glass.

    oil filler cap

    oil sight glass

  • 21-feb-01 E02

    Fill the gearbox, and when the final level is reached ensure that the whole sight glass is filled with oil. The quantity of oil is to be found in the table further on in this manual or in the technical specification. For filling the gearbox, the top cover may be removed, or the large oil filler cap may be used. All greasing points for bearings which are not lubricated with oil are provided with flat nipples to DIN 3404. They are filled with grease before shipment. Use only good quality grease with consistency NLGI class 2 or 3, see table further on.

    lubricating

    nipple

  • 21-02-01 E03

    PLANETAIRY GEARBOX

    Starting Be sure that the various plugs are in the proper position, breather plug on the top, empting plug (magnetic) on the bottom, level plugs in the middle position for horizontal gears, and in the upper position on vertically mounted gears. Because the gearbox is delivered empty, fill in with the proper quantity of lubrication oil (generally EP type). Roughly horizontal gears must be half filled while those vertical must be completely filled. The oil level must e checked when the gear is not running. For gearboxes with oil circulation system, check carefully the proper connection of all the pipes, with gear, pump and filter/cooler. Be sure of the proper setting of the relief valve, and that clean water is flowing through the cooler.

    Oil lubrication The first oil change should be made after running up tiem i.e. 50-100 working hours. The same oil could be even used again, provided that it is very carefully filtered, (use filter 10u max.) be-cause it certainly contains small iron particles. Before filling up the gear case again, wash it with mineral oil. Other oil changes should be made every 2.500 hours, and at least once a year.

    Maintenance Check periodically the fixing bolts are properly tightened and that the good alignment situation between gear and machine is kept. Once a week look at the oil level, even if each unit is fitted with seals, there can be some leakage, quite dangerous for the life of the entire unit.

    Multi disc brake (optional)

    Description

    The brake is a negative brake due to spring force, and can be opened only applying a convenient oil pressure. The can withstand a max. pressure of 320 bar, but only 20-25 bar - depending on the brake type and setting - are required to open them. The brake is intended for parking or emergency stopping of the machine. Normal stopping of the machine should be done by the hydraulic system.

    Pressure and lubrication fluid

    Hydraulic oil is required for the cylinder of the brake, with viscosity 4-6E at 50C. SAE 10 or ATF oils too can be used. The same oil in convenient for disc lubrication. Avoid all oils with additives reducing friction (like EP oils).

    Installation

    The typical circuit arrangement is for both closed and open circuits. Let's reminding that the brake-connection with the tank must be as free as possible, otherwise the practical opening will cause generally the brake overheat.

    Maintenance

    No particular operation is required, because the brake is self-adjusting during it's service life, until the wear on the disc brake is too heavy, in such case, replace them. Let's remind that for the most common installations this is quite unusual, because the disc life, while too much oil is not allowed by the cylinder that squeezes it out of the first operation. The use of a thick oil produces frequently overheating and residual torque when the brake is opened, and reduced torque when braking.

  • 20-aug-01 E08

    HYDRAULICALLY DRIVEN WINCHES

    General The winch is driven by one or more hydraulic motors in two directions of rotation. The direction of rotation for hoisting is indicated on the ge-neral plan of the winch. When connecting the motor(s), the following should be taken into account : direction of rotation with the winch hoisting drain connection; the motor housing should remain filled with fluid,

    the leakage fluid should be fed back without pressure to the tank an optional multi-plate brake, bearing in mind the maximum and

    minimum switching pressure, the values of which are given in the technical specification

    an optional double-stroke motor, bearing in mind the maximum and minimum switching pressure, the values of which are given in the technical specification

    Bearing in mind the maximum pressure, do not set the system pressure higher than the maxi-mum pressure of the motor. The fluid flow must not be more than given in the specifications in view of the maximum rpm of the hydraulic motor. It may be that the winch is provided with a proportional control valve, a brake valve and an ex-ternal safety device. If this is the case, the attached circuit diagram should be consulted.

    Choice of fluid HL and HLP hydraulic fluids to DIN 51 524 are suitable. The manufacturer advises the use of high quality mineral hydraulic fluid with anti-wear agents, anti-foaming additives and additives which increase the strength of the fluid film subject to pressure. The fluid must be resistant to oxidation at high temperatures. The permitted temperature range must be : ideal : + 30 C to + 50 C permitted : - 20 C to + 80 C The ideal viscosity of the fluid is : ideal : 40 cSt permitted : 8 cSt to 3000 cSt The choice of hydraulic fluid must be made in such a way that the viscosity is chosen in the temperature range in which the winch is operated.

    Installing When connecting the hydraulic motor, remember that the casing of the hydraulic motor must always be filled with fluid. If there are several leakage lines on the motor, the upper-most one must be used. If this is not possible, the leakage line should first of all be taken up-wards and only then routes to the tank (see drawing opposite). Before running the winch, the housing of the motor must be filled with hydraulic fluid. The leakage line may be used for this.

    Maintenance Hydraulic motors should be checked regularly for leakage. Also regularly check the quality of the fluid and replace the hydraulic filter regularly. If the motor starts to make a noise or becomes very hot, the manufacturer should be consulted

    hydromotor

  • 20-aug-01 E08

    Use of winch at low temperatures The temperature of the hydraulic oil in the machine-room never may be lower than + 10C ( oil in the oiltank and suction pipes ). If the outside temperature is below +10C, the hydraulic motors on the winch have to be run at low speed (about 0,5 rev/min of the drum) during 5 minutes, before the winch may be used un-der load.

  • 20-aug-01 E10

    PNEUMATIC OPERATED CLUTCHES

    General / Operation If your winch is equipped with an air cylinder (4701-1) on the clutch of the drum(s), you can ope-rate the drum remotely, and you can engage the drum when already turning. The clutch is de-signed for one direction of hauling. The lever (4302-1) of the friction clutch is fitted with an exter-nal spring (3015-1) which ensures that without air pressure the drum is free. The operating force can be increased by raising the air pressure.

    Connecting When connecting the air, clean dry air with a maximum pressure of 8 bars should be used. Oc-casionally it is necessary to fit a tank in the air system to provide sufficient air when the clutch is operated frequently. If an air operated brake band is also used, both need to be operated so as to overlap, so that during clutch operation the drum is either engaged or on the brake. In the rest state, the friction clutch is released and the band brake is applied. Air is supplied via a rotorseal which is fitted to the end of the main shaft.

    Maintenance For proper operation of the friction clutch, the various swivel points and threaded rods should be greased regularly. Replace the brake lining in good time, using only an asbestos-free brake lining. If after the passage of time the operating force of the friction clutch is no longer sufficient becau-se the air cylinder reaches the end of its stroke too early, there are 3 posibilities to adjust the friction clutch:

    Adjust the nuts on bolt (3015-1) the position of the air cylinder (4701-1) can be altered. The cylinder should be loosened

    and moved up one or more bolt positions. Another possibility is to fit packing between the fitting surfaces of the two halves of the

    clutch (4301-1).

  • 21-feb-01 E11

    HAND-OPERATED BAND BRAKE WITH DOG CLUTCH

    General Your winch is fitted with a dog clutch as shown in the drawing opposite. For drum/chain pulley braking, a band brake is used, and this is lined with a brake lining (riveted or vulcanised). The dog clutch consists of the following parts : CL dog clutch with square shaft hole CLM clutch sleeve with square CLH clutch handle CLR clutch ring attached to drum or chain pulley The band brake consists of the following parts : NB 51 band brake with brake lugs and brake lining NB 49 brake block (RB) NB 52 brake rod with screw thread (RS) NB 50 brake nut with screw thread (RM) NB 53 brake link secured to deck or foundation (RST)

    Use The following tips are suggested for use of the dog clutch : Operate the dog clutch when the main shaft is stationary Always use the locking pin in the dog clutch handle, both in the engaged and disengaged

    states Run the winch backwards a little so that the dog clutch is free and can be disengaged more

    easily Only use the band brake in the direction for which it is designed

    Maintenance For proper operation of the band brake, the various

    swivel points and threaded rods should be greased regularly.

    Replace the brake lining in good time, using only an asbestos-free brake lining.

    The square on the clutch sleeve on the shaft should be lubricated regularly. For this, four grease nipples are fitted to the outside of the dog clutch. Use grea-se in accordance with the table further on.

    dog clutch

    band brake

  • 21-feb-01 E12

    PNEUMATIC-OPERATED BRAKES

    General If your winch is equipped with air cylinders on the band brake(s) of the drum(s), the drum can be operated remotely. The brake is designed for braking in one direction. The lever (4) of the brake is fitted with one or two cylinders (3) with an internal spring which ensures that without air pressure the drum is braked. The braking force can be reduced by raising the air pressure.

    Connecting When connecting the air, clean dry air with a maximum pressure of 7 bars should be used. Occasionally it is necessary to fit a tank in the air system to provide sufficient air when the brake is operated repeatedly. If an air operated clutch is also used, both need to be operated so as to overlap, so that during clutch operation the drum is either engaged or on the brake. In the rest state, the friction clutch is released and the band brake is applied. If the lever (2) is also provided with a handwheel 2 as shown in the illustration below, make sure that this brake rod is completely backed off in the rest state, so that the air cylinder(s) can move the lever without hindrance. The outermost positions are determined by the two rings (stops) which are fitted on the brake rod (2).

    Maintenance For proper operation of the brake band, the various swivel points and threaded rods should be greased regularly. Replace the brake lining in good time, using only an asbe-stos-free brake lining. If in the course of time the braking force is no longer suffi-cient because the brake lining is worn, the band brake can be adjusted by means of the nut (1). Always make sure that the cylinder(s) (3) are never in the outermost position when maximum load is applied to the drum. Turn the nut (1) far enough so that this outermost position is never rea-ched. Never dismantle the operating cylinders as they contain a spring under load.

    air brake band with two cylinders

  • 21-feb-01 N15

    Aanbevolen smeermiddelen

    LUBRICANTS CHART LUBRIFIANTS PRCONISS EMPFOHLENE SCHMIERSTOFFE

    mm/S/40C ISO VG 68

    ISO VG 150

    ISO VG 220

    ISO VG 320

    BEARING GREASE

    STORAGE OIL

    AGMA 2EP 4EP 5EP 6EP GRAISSE POUR ROULEMENTS

    HUILE ANTIROUILLE

    cSt/50C 43 90 125 180 WLZLAGER-FETT

    ROSTBESTN-DIGES L

    E/50C 6 12 16 24 LAGERVET ROESTWERENDE OLIE

    SSU/100F 315 700 1000 1500

    ANTAR REDUCTELF SP68

    REDUCTELF SP150

    REDUCTELF SP220

    REDUCTELF SP320

    EPEXA 2

    ELF STOCKAGE

    ARAL BG 68 BG 150 BG 220 BG 320 ARAL FETT HL3

    KONIT SEA 20W-20

    BP ENERGOL GR-XP 68

    ENERGOL GR-XP 150

    ENERGOL GR-XP 220

    ENERGOL GR-XP 320

    ENERGREASE LS EP2

    ENERGOL PROTECTIVE OIL 20

    CASTROL ALPHA SP68

    ALPHA SP150

    ALPHA SP220

    ALPHA SP320

    SPHEEROL EP3

    CASTROL STORAGE OIL

    CHEVRON NL GEAR COMPOUND

    68

    NL GEAR COMPOUND

    150

    NL GEAR COMPOUND

    220

    NL GEAR COMPOUND

    320

    DURA-LITH GREASE EP2

    SP ANTIRUST OIL A

    ELF REDUCTELF SP 68

    REDUCTELF SP 150

    REDUCTELF SP 220

    REDUCTEL SP 320

    EPEXA 2

    ELF STOCKAGE

    ESSO SPARTAN EP68

    SPARTAN EP150

    SPARTAN EP220

    SPARTAN EP320

    BEACON EP2

    RUST-BAN 623

    FINA GIRAN 68 GIRAN 150 GIRAN 220 GIRAN 320

    MARSON L3

    RUSAN MOTOR OIL SAE 30

    GULF EP LUBRI-CANT HD 68

    EP LUBRI-CANT

    HD 150

    EP LUBRI-CANT

    HD 220

    EP LUBRI-CANT

    HD 320

    GULFCROWN GREASE NR 3

    HARMONY 53

    MOBIL MOBILGEAR 626

    MOBILGEA 629

    MOBILGEAR 630

    MOBILGEAR 632

    MOBILPLEX 48

    MOBILARMA 524

    SHELL OMALA 68

    OMALA 150

    OMALA 220

    OMALA 320

    ALVANIA GREASE R3

    ENSIS MOTOR OIL 30

    SUNOCO SUNEP 1050 ISO 68

    SUNEP 1060 ISO 150

    SUNEP 1070 ISO 220

    SUNEP 1090 ISO 320

    MULTI DUTY 2 SUNVIS 2600-C SAE 30

    TEXACO MEROPA 68 MEROPA 150 MEROPA 220 MEROPA 320 MULTIFAK EP 2 PRESERVATIVE OIL 30

    TOTAL CARTER EP 68

    CARTER EP 150

    CARTER EP 220

    CARTER EP 320 N

    MULTIS EP2

    TOTAL STOCKAGE SEA 30

  • 21-feb-01 N17

    SMEEROLIEKEUZE PLANETAIRE TANDWIELKASTEN

    LUBRICANT SELECTION PLANETARY GEARBOXES WAHL DES SCHMIERMITTELS PLANETENGETRIEBEN

    -20C/+5C

    IV 95 in +5C/+30C IV 95 min

    +30C/+50C IV 95 min

    -30C/+65C IV 165 min

    ISO 3448 VG 100 VG 150 VG 320 VG 150-200

    AGIP Blasia 100 Blasia 150 Blasia 320 Blasia S 220

    ARAL Degol BP 100 Degol BP 150 Degol BP 320 Degol GS 220

    BP MACH GR XP 100 GR XP 150 GR XP 320 Enersyn HTX220

    CASTROL Alpha SP 100 Alpha SP 150 Alpha 320 Alpha SN 150

    CHEVRON non leaded gear compound 100

    non leaded gear compound 150

    non leaded gear compound 320

    ESSO Spartan EP 100 Spartan EP 150 Spartan EP 320

    GULF EP lubricant HD 150 EP lubricant HD 320

    I.P. Mellana 100 Mellana 150 Mellana 320 Telesia Oil 150

    MOBIL Mobilgear 629 Mobilgear 632 Glyoyle 22 / 30 SHC 630

    SHELL Omala oil 100 Omala oil 150 Omala oil 320 Tivela Oil SA

    TOTAL Carter EP 100 N Carter EP 150 Carter EP 320 N

    KLUEBER Lamora 100 Lamora 150 Lamora 320 Synteso D220 EP

    ELF Reductelf SP 100 Reductelf SP 150 Reductelf SP 320 Elf ORITIS 125 MS Elf Syntherma P 30

  • OLIEVULLING TANDWIELKASTEN / HYDRAULISCHE RESERVOIRS

    type ltrs tandwielkast ltrs tandwielkast+reservoir totaal

    ltrs hydraulischreservoir

    KAB-1-E + KAB-1-H 16 - -

    KAB-2-E + KAB-2-H 54 - -

    KAB-5-E + KAB-5-H 54 - -

    KAB-7-E + KAB-7-H 65 - -

    KABV-1-E + KABV-1-H 65 - -

    KABV-2-E + KABV-2-H - -

    KAB-1-EH - 60 -

    KAB-2-EH - 90 -

    KAB-5-EH - 90 -

    KAB-7-EH - 90 -

    KABEH-1 45 - 60

    KABEH-2 54 - 60

    KABEH-5 65 - 80

    KABEH-7 65 - 140

    KABEH-10 110 - 170

    KABEH-15 110 - 230

    KABEH-20 120 - 270

    KABV-1-E + KABV-1-H - -

    KABV-2-E + KABV-2-H - -

    KAC-1 30

    KAC-2 45

    KAC-3 45

    KAC-5 55

    KAC-8 90

    KAC-10 115

    Voor andere types fabrikant raadplegen a.u.b.

  • 20-aug-01 E25

    INSTALLATION OF A TOWING WINCH

    Put the winch on deck and adjust the height of the gearbox with adjustment bolts

    (temporary blocks with tapped holes to be welded on the gear box). The main shaft bearings on the gear box can now be used as a reference to the bearing in the support.

    Lower the end support with adjustment bolts (temporary blocks with tapped holes to be welded on the support). The position of the main shaft will be as shown on the drawing in situation 1: as result of the weight of the drum, the main shaft will be leaning in the bearings in the gear box: the clearance in the bearing at the side of the drum will be at the upper side; in the outermost bearing at the bottom side. Measure the clearance in the outermost bearing with feeler gauges. In case of a cover on this bearing, the cover has to be removed. Attention: do not lower the bearing support too much, to avoid tilting of the gearbox.

    Adjust the end support with the adjustment bolts straight upwards, so that the clearance in the outermost bearing on the gear box will be at the upper side (do not adjust the support too much). The position of the main shaft is now as shown on the drawing in situation 2. Check the clearance with the feeler gauges.

    The clearance in the end support bearing is now at the upper side. Inclination of the end support can be checked with a feeler gauge which is long enough to measure the clearance over the full length of the bearing. If measurement of the radial clearance is not possible (for instance because of a warping head), the inclination can be checked by measuring the axial clearance all around between the drum and the end support.

    An intermediate support (in case of a winch with two drums) is the last one to be adjusted. Measurement of the radial bearing clearance is here not possible, so the adjustment has to be done by the feel. Eventual inclination has to be checked by measuring the radial clearance all around between the drums and the support.

    If the winch is equipped with an automatic spooling device, it must be checked during the adjustment of the support, if the roller case can still be moved over the guiding shafts. This can be done by declutching the driving chain wheel and rotating the double-threaded driving shaft with the supplied wrench. If this is too heavy, the support must be rotated around the main shaft with the adjustment bolts (the clearance in the support bearing must of course remain the same).

  • 20-aug-01 E26

    INSTRUCTIONS FOR THE INSTALLATION AND ADJUSTMENT OF A PNEUMATI-CALLY OPENED BANDBRAKE WITH AN ECCENTRIC SHAFT:

    Installation of the bandbrake: When the bandbrake is installed, the lever (5) has to be squared to the threaded rod of the air cilinder (3). Therefor the piston rod of the air cilinder (1) is locked with a pin (2). Tighten the brake band on the drum rim by means of clamps; begin at the thin end of the band. The deck seating (9) is now in longitudinal direction in the correct position. For the correct height the seating has to be filled or milled. The seating can now be welded at the deck. The locking pin of the piston rod (2) can now be removed (put air pressure on the cilinder). To avoid dragging of the opened brake band on the top of the drum rim, a support can be mounted (8), which is provided with a bolt to adjust the clearance of the opened brake band. If the winch is delivered with a foundation, this support is already mounted. In case of delivery of the winch without a foundation, this support has to be mounted by the yard/customer. The air pressure connection at the back side of the air cilinder (connection G ) has to be flexible: when the brake band is opened, the air cilinder rotates slightly. At the front side of the cilinder, the air breather (7, connection G ) must be led below the deck by means of a flexible tube. The reason for this is the inlet of dirty air or seawater in the pneumatic cylinder

    Adjustment of the brake: The required adjustments of the brake as a result of wear of the brake lining must only be done with the nut (6) ! Adjust the brake in such a way, that the lever (5) is squared to the threaded rod of the air cilinder (3), when no air pressured is put on the cilinder. In this position the brake has its most holding force.

    Adjustment of the air cilinder spring force: The force of the springs in the air cilinder is usually already adjusted and is about 1000 kg. In some cases more spring force can be required. The block (4) must then be turned further on the threaded rod (3). Put air pressure (6 bar) on the air cilinder and remove the bolt. Each centimeter movement of the block on the threaded rod results in 67 kg more spring force. The stroke of the air cilinder and therefore the clearance of the opened brake band will however be less.

  • 20-aug-01 E26

  • MACHINE- & LIERENFABRIEK

    C. KRAAIJEVELD B.V.

    Industrieweg 57-61 NL-3361 HJ Sliedrecht Holland Phone +31-184-410866 Fax +31-184-419447 [email protected] www.winches.nl

    ROTOR SEALS FCODE : 4703

    Rotor seals are mounted on one of the ends of the main shaft to provide the friction clutch with pneumatic air pressure There are two possibilities:

    rotor seal for 1 friction clutch on the winch rotor seal for 2 friction clutches on the winch.

  • MACHINE- & LIERENFABRIEK

    C. KRAAIJEVELD B.V.

    Industrieweg 57-61 NL-3361 HJ Sliedrecht Holland Phone +31-184-410866 Fax +31-184-419447 [email protected] www.winches.nl

    QUICK EXHAUST VALVES FCODE 4704

    Quick exhaust valves are used to quick release the pneumatic pressure out of the cylinder of the band brake. This ensures a quicker functioning of the brake. Connections are G 3/8 P = pressure, max. 10 bars R = release (not connected) A = to cylinder b1= 60 mm b2 = 25 mm h1 = 51 mm

  • 7-sep-01 Disc brake 1/1

    MACHINE- & LIERENFABRIEK

    C. KRAAIJEVELD B.V.

    Industrieweg 57-61 NL-3361 HJ Sliedrecht Holland Phone +31-184-410866 Fax +31-184-419447 [email protected] www.winches.nl

    Disc brake FCODE

    The minimum opening pressure of the brake is 12 upto 26 bars, depending on the size. The maximum pressure is 250 bars. Pressure connection: M12x1,5 Oil fill + Drain R Brake has to be filled with oil max VG 150. Oil level: mid brake

  • Scha

    al1:

    30O

    rder

    num

    mer

    D 0

    23-9

    34G

    etek

    end

    J. d

    e G

    .Kl

    ant

    Dam

    en S

    hipy

    ards

    Dat

    um1-

    10-2

    002

    Bouw

    num

    mer

    5112

    05 t/

    m 5

    1120

    7G

    ewijz

    igd

    Betre

    ftH

    YDR

    AULI

    SCH

    E AN

    KER

    -/SLE

    EPLI

    ERM

    ACH

    INE-

    & L

    IER

    ENFA

    BRIE

    KTe

    keni

    ngnr

    .

    C. KR

    AAIJ

    EVEL

    D B.

    V.Sl

    iedr

    echt

    H

    olla

    nd27

    87-0

    0

    Type

    Dru

    m Pull 1

    st la

    yer

    30 (8

    )T

    Spe

    ed 1

    st la

    yer

    20 (3

    5)m

    /min

    Hol

    ding

    cap

    acity

    150

    T (1

    st la

    yer)

    Wire

    cap

    acity

    300

    m

    64

    Laye

    rs8

    Wild

    cat

    22m

    m s

    tud

    link

    Pul

    l4

    TS

    peed

    10m

    /min

    Hyd

    raul

    ic m

    otor

    Sta

    ffa H

    MC

    080

    -90/

    50W

    orki

    ng p

    ress

    ure

    drop

    200

    bar

    Max

    . pre

    ssur

    e25

    0ba

    rM

    ax. f

    low

    450

    l/min

    Gea

    rbox

    Lubr

    icat

    ing

    oil

    125

    l (IS

    O V

    G 2

    20)

  • Scha

    al1:

    30O

    rder

    num

    mer

    D 0

    23-9

    34G

    etek

    end

    J. d

    e G

    .Kl

    ant

    Dam

    en S

    hipy

    ards

    Dat

    um1-

    10-2

    002

    Bouw

    num

    mer

    5112

    05 t/

    m 5

    1120

    7G

    ewijz

    igd

    Betre

    ftH

    YDR

    AULI

    SCH

    E AN

    KER

    -/SLE

    EPLI

    ERM

    ACH

    INE-

    & L

    IER

    ENFA

    BRIE

    KTe

    keni

    ngnr

    .

    C. KR

    AAIJ

    EVEL

    D B.

    V.Sl

    iedr

    echt

    H

    olla

    nd27

    87-0

    0

    Type

    Dru

    m Pull 1

    st la

    yer

    30 (8

    )T

    Spe

    ed 1

    st la

    yer

    20 (3

    5)m

    /min

    Hol

    ding

    cap

    acity

    150

    T (1

    st la

    yer)

    Wire

    cap

    acity

    300

    m

    64

    Laye

    rs8

    Wild

    cat

    22m

    m s

    tud

    link

    Pul

    l4

    TS

    peed

    10m

    /min

    Hyd

    raul

    ic m

    otor

    Sta

    ffa H

    MC

    080

    -90/

    50W

    orki

    ng p

    ress

    ure

    drop

    200

    bar

    Max

    . pre

    ssur

    e25

    0ba

    rM

    ax. f

    low

    450

    l/min

    Gea

    rbox

    Lubr

    icat

    ing

    oil

    125

    l (IS

    O V

    G 2

    20)

  • Scha

    al1:

    5O

    rder

    num

    mer

    D 0

    23-9

    34G

    etek

    end

    J. d

    e G

    .Kl

    ant

    Dam

    en S

    hipy

    ards

    Dat

    um11

    -10-

    2002

    Bouw

    num

    mer

    5112

    05 t/

    m 5

    1120

    7G

    ewijz

    igd

    Betre

    ftSA

    MEN

    ST. E

    N O

    ND

    ERD

    ELEN

    T.W

    .KAS

    TM

    ACH

    INE-

    & L

    IER

    ENFA

    BRIE

    KTe

    keni

    ngnr

    .

    C. KR

    AAIJ

    EVEL

    D B.

    V.Sl

    iedr

    echt

    H

    olla

    nd27

    87-0

    2

    3011

    -11

    HOO

    FDAS

    BUS

    Fe 3

    60

    3003

    -21

    OLI

    EKEE

    RR

    ING

    265.

    290.

    16 R

    3003

    -11

    OLI

    EKEE

    RR

    ING

    240.

    270.

    15 R

    3001

    -22

    TWEE

    RIJI

    G T

    ONL

    AGER

    SKF

    2302

    8 C

    C

    3001

    -11

    TWEE

    RIJI

    G T

    ONL

    AGER

    SKF

    2221

    2 E

    2205

    -11

    EER

    STE

    AS42

    CrM

    o 4

    2204

    -11

    TUSS

    ENAS

    RO

    NDSE

    L34

    CrN

    iMo

    6

    2102

    -11

    EER

    STE

    RO

    NDSE

    L34

    CrN

    iMo

    6

    1107

    -12

    DEK

    SEL

    Fe 3

    60

    1102

    -12

    LAG

    ERPO

    TFe

    360

    POS

    AAN-

    OM

    SCHR

    IJVIN

    GM

    ATER

    IAAL

    TYPE

    /TEK

    . NR

    .OPM

    ERKI

    NGEN

    NR.

    TAL

  • Scha

    al1:

    6O

    rder

    num

    mer

    D 0

    23-9

    34G

    etek

    end

    J. d

    e G

    .Kl

    ant

    Dam

    en S

    hipy

    ards

    Dat

    um4-

    10-2

    002

    Bouw

    num

    mer

    5112

    05 t/

    m 5

    1120

    7G

    ewijz

    igd

    Betre

    ftSA

    MEN

    STEL

    LIN

    G F

    RIK

    TIE

    MAC

    HIN

    E- &

    LIE

    REN

    FABR

    IEK

    Teke

    ning

    nr.

    C. KR

    AAIJ

    EVEL

    D B.

    V.Sl

    iedr

    echt

    H

    olla

    nd27

    87-0

    6

  • Scha

    al1:

    25O

    rder

    num

    mer

    D 0

    23-9

    35G

    etek

    end

    J. d

    e G

    .Kl

    ant

    Dam

    en S

    hipy

    ards

    Dat

    um26

    -9-2

    002

    Bouw

    num

    mer

    5112

    05 t/

    m 5

    1120

    7G

    ewijz

    igd

    30-1

    0-20

    02Be

    treft

    HYD

    RAU

    LISC

    HE

    SLEE

    PLIE

    RM

    ACH

    INE-

    & L

    IER

    ENFA

    BRIE

    KTe

    keni

    ngnr

    .

    C. KR

    AAIJ

    EVEL

    D B.

    V.Sl

    iedr

    echt

    H

    olla

    nd27

    88-0

    0B

    Type

    Dru

    m Pull 2

    nd la

    yer

    110

    (30)

    TS

    peed

    2nd

    laye

    r10

    (30)

    m/m

    inH

    oldi

    ng c

    apac

    ity15

    0T

    (1st

    laye

    r)W

    ire c

    apac

    ity75

    0m

    52La

    yers

    10H

    ydra

    ulic

    mot

    orS

    taffa

    HM

    C 2

    00 (2

    x)W

    orki

    ng p

    ress

    ure

    drop

    200

    bar

    Max

    . pre

    ssur

    e25

    0ba

    rM

    ax. f

    low

    700

    l/min

    Gea

    rbox

    Lubr

    icat

    ing

    oil

    390

    l (IS

    O V

    G 2

    20)

  • Scha

    al1:

    8O

    rder

    num

    mer

    D 0

    23-9

    35G

    etek

    end

    J. d

    e G

    .Kl

    ant

    Dam

    en S

    hipy

    ards

    Dat

    um28

    -10-

    2002

    Bouw

    num

    mer

    5112

    05 t/

    m 5

    1120

    7G

    ewijz

    igd

    Betre

    ftSA

    MEN

    STEL

    LIN

    G T

    AND

    WIE

    LKAS

    TM

    ACH

    INE-

    & L

    IER

    ENFA

    BRIE

    KTe

    keni

    ngnr

    .

    C. KR

    AAIJ

    EVEL

    D B.

    V.Sl

    iedr

    echt

    H

    olla

    nd27

    88-0

    2

    3006

    -11

    BOR

    GM

    OER

    M 1

    35 x

    2SK

    F KM

    27

    3003

    -22

    OLI

    EKEE

    RR

    ING

    150.

    180.

    13 R

    3003

    -11

    OLI

    EKEE

    RR

    ING

    280.

    310.

    15 R

    3001

    -41

    GR

    OEF

    KOG

    ELLA

    GER

    SKF

    6228

    3001

    -31

    TWEE

    RIJI

    G T

    ONL

    AGER

    SKF

    2322

    8 C

    C

    3001

    -24

    TWEE

    RIJI

    G T

    ONL

    AGER

    SKF

    2303

    4 C

    C

    3001

    -13

    TWEE

    RIJI

    G T

    ONL

    AGER

    SKF

    2222

    4 E

    POS

    AAN-

    OM

    SCHR

    IJVIN

    GM

    ATER

    IAAL

    TYPE

    /TEK

    . NR

    .OPM

    ERKI

    NGEN

    NR.

    TAL

  • Scha

    al0,

    15O

    rder

    num

    mer

    D 0

    23-9

    35G

    etek

    end

    J. d

    e G

    .Kl

    ant

    Dam

    en S

    hipy

    ards

    Dat

    um22

    -10-

    2002

    Bouw

    num

    mer

    5112

    05 t/

    m 5

    1120

    7G

    ewijz

    igd

    Betre

    ftSA

    MEN

    STEL

    LIN

    G F

    RIK

    TIE

    MAC

    HIN

    E- &

    LIE

    REN

    FABR

    IEK

    Teke

    ning

    nr.

    C. KR

    AAIJ

    EVEL

    D B.

    V.Sl

    iedr

    echt

    H

    olla

    nd27

    88-0

    7

  • Scha

    al1:

    16O

    rder

    num

    mer

    D 0

    23-9

    42G

    etek

    end

    J. d

    e G

    .Kl

    ant

    Dam

    en S

    hipy

    ards

    Dat

    um2-

    10-2

    002

    Bouw

    num

    mer

    5112

    05 t/

    m 5

    1120

    7G

    ewijz

    igd

    3-10

    -200

    2Be

    treft

    HYD

    RAU

    LISC

    HE

    TUG

    GER

    LIER

    MAC

    HIN

    E- &

    LIE

    REN

    FABR

    IEK

    Teke

    ning

    nr.

    C. KR

    AAIJ

    EVEL

    D B.

    V.Sl

    iedr

    echt

    H

    olla

    nd27

    91-0

    0A

    Type

    Dru

    m Pull 1

    st la

    yer

    5T

    Spe

    ed 1

    st la

    yer

    18m

    /min

    Hol

    ding

    cap

    acity

    10T

    (1st

    laye

    r)W

    ire c

    apac

    ity30

    m

    15

    Laye

    rs2

    Hyd

    raul

    ic m

    otor

    Abe

    x M

    3B-0

    36W

    orki

    ng p

    ress

    ure

    drop

    180

    bar

    Max

    . pre

    ssur

    e20

    0ba

    rM

    ax. f

    low

    60l/m

    inG

    earb

    oxLu

    bric

    atin

    g oi

    l55

    l (IS

    O V

    G 2

    20)

  • Scha

    al1:

    2,5

    1:6

    ,25

    Ord

    ernu

    mm

    erD

    023

    -942

    Get

    eken

    dJ.

    de

    G.

    Klan

    tD

    amen

    Shi

    pyar

    dsD

    atum

    5-11

    -200

    2Bo

    uwnu

    mm

    er51

    1205

    t/m

    511

    207

    Gew

    ijzig

    dBe

    treft

    ON

    DER

    DEL

    EN E

    ERST

    E AS

    MAC

    HIN

    E- &

    LIE

    REN

    FABR

    IEK

    Teke

    ning

    nr.

    C. KR

    AAIJ

    EVEL

    D B.

    V.Sl

    iedr

    echt

    H

    olla

    nd27

    91-0

    3

    2102

    -11

    EER

    STE

    RO

    NDSE

    L42

    CrM

    o 4

    2205

    -11

    EER

    STE

    ASC

    35

    POS

    AAN-

    OM

    SCHR

    IJVIN

    GM

    ATER

    IAAL

    TYPE

    /TEK

    . NR

    .OPM

    ERKI

    NGEN

    NR.

    TAL

    bouwnummer: 511205 + 6 + 7serienummer: 2787 + 2788 + 2791type: SOORTLIER: winches