TICKET RISK ASSESSMENT PREVENT DAMAGES AND SAVE LIVES USICLLC.com DAMAGE PREVENTION Ticket Risk Assessment couples real time, predictive analytics and targeted field services that are cost effective. We can identify over 50% of the future damage sites within a small percentage of the tickets. This enables us to respond proactively and coordinate damage prevention efforts at the right dig sites prior to and throughout the dig. Predictive analytics determine the dig sites most likely to result in infrastructure damage. Invest additional field resources there beyond a standard locate to reduce excavation damages. THE LEADER IN DAMAGE PREVENTION Performing over 70 million locates annually, USIC is the most trusted name in underground utility damage prevention. USIC provides a full suite of utility services throughout the United States and Canada. Our mission is to deliver quality, safe, efficient, and innovative solutions to protect our partners’ infrastructure and critical assets.

Upload: others

Post on 20-Jun-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DAMAGE PREVENTION TICKET RISK ASSESSMENT

TICKET RISK ASSESSMENT

PREVENT DAMAGES AND SAVE LIVES

USICLLC.com

DAMAGE PREVENTION

Ticket Risk Assessment couples real time, predictive analytics and targeted field services that are cost effective. We can identify over 50% of the future damage sites within a small percentage of the tickets. This enables us to respond proactively and coordinate damage prevention efforts at the right dig sites prior to and throughout the dig.

Predictive analytics determine the dig sites most likely to result in infrastructure damage. Invest additional field resources there beyond a standard locate to reduce excavation damages.

THE LEADER IN DAMAGE PREVENTIONPerforming over 70 million locates annually, USIC is the most trusted name in underground utility damage prevention. USIC provides a full suite of utility services throughout the United States and Canada. Our mission is to deliver quality, safe, efficient, and innovative solutions to protect our partners’ infrastructure and critical assets.

Page 2: DAMAGE PREVENTION TICKET RISK ASSESSMENT

CORPORATE OFFICE 9045 River Road, Suite 300 Indianapolis, IN 46240 | Phone: 317.575.7800 | USICLLC.com

TICKET RISK ASSESSMENT

TWO PHASES OF TICKET RISK ASSESSMENT

PHASE 1: TRA DATA SERVICEWe assess the risk of damage for every 811 ticket received within seconds of receipt. We accomplish this through algorithms customized to consider ticket and historical damage information.

KEY POINT: Predictive analytics without excavator engagement is half of a solution. USIC’s TRA process is industry leading with regard to how many factors are considered, effectiveness in predicting damage sites and timeliness which is critical to mitigating risk pre-dig.

PHASE 2: IN THE FIELDEffective dig-site excavator engagement by a qualified team of damage prevention professionals prevents damages. This must be done at the right sites and at the right time (post-locate and pre-dig).

KEY POINT: Excavator engagement without predictive analytics is expensive and broad efforts typically do not target all dig sites posing damage risk. TRA field services provide the opportunity to deploy valuable field resources in the most effective manner while streamlining cost.

SERVICES PERFORMED:• Communicate awareness on high risk tickets• Verify accuracy of gas locate marks• Assist locating hard to identify facilities• Site surveillance to ensure safe digging practices• Serve as Liaison between contractor and utility

CLIENT BENEFITS:• Reduced damages and fines• Improved efficiency (less work stoppages due to

downtime for repair, or incomplete locate marks)• Increased employee and public safety

NOTABLE STATISTICS:• Reduced YOY damage rate per 1,000 tickets

by 30+%

ACHIEVE A 30% REDUCTION IN OVERALL DAMAGEPER 1,000 TICKETS: