Tallinna Elektrijaam
Ceneral data
Output of the CHP plant 25 MWel / 49 MWth + scrubber 18 MWth (max)
Fuel wood and peat
Woodchips consumption up to 270 000 sm3/year
Planned electricity production up to180 GWh/year
Planned heat production up to 430 GWh/year
Decrease in CO2 emissions 266 000 ton/year
Efficiency up to 90 % (over 100% with FGC)
Investment 72,2 m€
Staff 23 employees
Tallinna Elektrijaam
Project Milestones
Feasability study 2003
EIA report 2004-2006
Main contracts signed 08.2006
Detailled land planning 08.2006
Investment decision 12.2006
Construction-permit 06.2007
Loan contract 08.2007
First foundation ready 10.2007
Start of boiler & turbine
installation 01/04.2008
First fire in the boiler 11.2008
First steam to the turbine 01.2009
First synchronization of turbine 23.01.2009
Start of full load production 02.2009
Tallinna Elektrijaam
Project ExpectationsVery high efficiency
Production of the renewable energy/electricity up to 180GWh/year
Very efficient reduction of the CO2 emission
Power and heat cogeneration all year round
Alternative supplier of the heat. Decreasing the dependence onnatural gas. Increasing the reliability of the DH network.Decreasing the natural gas import
Decentralization of the power generation and positive impact tothe reliability of the electrical system
Valuation of the low quality forests. Increasing the employment inrural areas
Decreasing the water use and oil shale combustion in Narvapowerplants
Gentrification one of the most awful areas in Tallinn
Tallinna Elektrijaam
Fuel supply - social and environmental impacts
Biofuels reduce greenhouse gasemissions in comparison to fossil fuels
Increasing stable demand of biofuelscaused a boom on biofuel market .
More value is added to forestry sector
Additional investments are made intowood processing equipment
This has encouraged new supportschemes for forest and agriculureentrepreneurs
Created new jobs and contributed toregional and rural development
Tallinna Elektrijaam
� Classical cycle with a steam boiler, a steam turbine and a generator
� Flue Gas Condenser (Scrubber)
� Combustion air Humidification system
FGC
boiler turbine G
water
Makeupwater
DH net
Tallinna Elektrijaam
Fluidized-bed steam boiler NFBST:
Power (MCR) 75 MW
Steam output 28.2 kg/s
Steam parameters:pressure 110 barstemperature 530 oC
Main fuelswood chips, forest wastepeatwood fuels + peat
Fuel for startlight fuel oil
Tallinna Elektrijaam
Single-housing condensation (back pressure)extraction turbine Siemens SST 600
Number of bleeds 41. High pressure heat exchanger2. Deaerator3. Low pressure heat exchanger4. District heating network heat exchanger
Nom. exhaust steam pressure 0.27 barMax. exhaust steam pressure 3.10 barNumber of blades lines 28 pcsTurbine control system TURLOOP S7Generator rated power 25 MWRotations frequency
– Steam turbine 6000 p/min– Generator 1500 p/min
Tallinna Elektrijaam
The scrubber enables flue gascleaning and water vapourcondensation by adding heat power upto 18 MWth.
Water used in the scrubber is purifiedand after that used in the districtheating network as make-up water.
Tallinna Elektrijaam
Company structure
Powerplantmanager
Financialmanager
Personnelmanager-secretary
Operationalmanager
Maintenancemanager
Engineer Administrativemanager
Accountant
I shift(2)
II shift(2)
III shift(2)
IV shift(2)
V shift(2)
Automationspecialist
Electricalspecialist
Mechanicalspecialist
Board
Chemicalengineer
Chiefoperator
Tallinna Elektrijaam
2010 estimation
Net sales 30,6 MEURSales of electricity 178 285 MWhSales of heat energy 424 530 MWh
EBITDA 18,0 MEUR
Net profit 11,2 MEUR
Balance sheet 79,4 MEUR