dale osborn 10:30 am friday june 12
DESCRIPTION
Economically Efficient Transmission Design Processes for a 20% Wind Energy Scenario for the U.S. Eastern Interconnection. Dale Osborn 10:30 AM Friday June 12. 2. 3. NREL Eastern Wind Integration Transmission Study Data. 4. - PowerPoint PPT PresentationTRANSCRIPT
Economically Efficient Transmission Design Processes for a 20% Wind Energy Scenario
for the U.S. Eastern Interconnection
Dale Osborn
10:30 AM Friday June 12
2
3
4
NREL Eastern Wind Integration Transmission Study Data
• Transmission planning to date has been focused on meeting National Electric Reliability Corp. reliability standards. Deterministic criteria based on the loss of lines and resources ( generators).– Minimum capital for transmission– Not necessarily the minimum cost to the customer
• Energy markets added constraints that allow mainly gas generation to provide reliable service by relieving constraints by locating in higher priced areas
• Wind energy and other types of generation generally need transmission to gain access to higher priced areas and be able to compete.
Reliability (Capacity) vs. Economic Transmission Expansion
5
6
7
20% Wind Energy Scenario
Without and With the JCSP
Overlay
Annual Generator Location Marginal Prices
8
JCSP PROMOD outputs - July 22, 2008
11
9
Potential BenefitsAdjusted Production Costs
$35B/Yr
PJM14%
MISO10%
SERCNI25%
ISO-NE10%
NYISO13%
E_CAN12%
IMO3%
MHEB3%
SPP4%
TVASUB6%
MAPP0%
10
11
Joint Coordinated System Plan Overlay
12
20% Wind Energy Scenario
Without and With the JCSP
Overlay
Annual Generator Location Marginal Prices
13
14