dal datos metereologicos
DESCRIPTION
aTRANSCRIPT
ESTACIÓN YUNGAY
LATITUD 09° 09’ 9.3”LONGITUD 77° 44’ 13.2” ALTITUD 2556 m.s.n.m.
PRECIPITACION TOTAL MENSUAL EN (mm)
Año ENE FEB MAR ABR2006 170.7 82.2 125 34.52007 102.7 55.8 135.8 42.12008 154.3 151.5 61.5 8.52009 89.9 89.4 66.2 14.12010 270.1 145.1 155.8 62011 100.7 170.6 109.2 32.92012 67 157 54.2 30.1
TEMPERATURA MAXIMA MEDIA MENSUAL EN (ºC)
Año ENE FEB MAR ABR2006 20.9 22.2 21.4 22.72007 22.2 21.6 21.2 21.62008 20 21.7 20.9 22.22009 21.1 21.5 21.7 232010 21.2 22 22.5 23.72011 22.3 20.2 21 22.62012 21.8 20.8 21.5 22.2
TEMPERATURA MINIMA MEDIA MENSUAL EN (ºC)
Año ENE FEB MAR ABR2006 10.1 10.3 10.2 8.42007 11.1 10.6 10.1 8.52008 10.3 9.5 9.3 8.32009 10.3 10.2 9.9 9.62010 10.6 10.6 10.7 8.72011 10.6 10.3 10.3 8.12012 10.1 10.1 9.5 8.5
DPTO ANCASHPROV. YUNGAYDIST. YUNGAY
MAY JUN JUL AGO SET OCT NOV DIC0 30 0 14.3 5.2 42.7 69.7 117.1
7.6 0 1.7 0 4.9 32.7 66.9 83.35.9 3.6 0.7 3.2 9.8 46.8 64.1 133.90.2 0 3.1 0.8 20.4 8.2 118.1 115.36.5 1.1 1.4 11.4 1.8 72.7 26.3 204.26.8 7 8.6 0.6 27.9 26.2 48 134.51.2 0.5 0.8 0.5 24.1 8.6 127 146.8
MAY JUN JUL AGO SET OCT NOV DIC23.9 22.5 22.9 23.4 24 23.2 22.1 21.322.9 23.2 22.4 23.9 21.2 23.2 24.2 22.222.5 22.6 23 24 23.8 22.9 24.3 21.923.4 24.1 22.9 24.6 24.4 25.8 24.4 22.424.3 24.1 24.9 24.5 24.5 24.2 24.3 22.823.3 24.2 22.2 23.8 22.6 23.9 25 21.123.8 23.6 24.2 24.3 23.2 24.8 25 21
MAY JUN JUL AGO SET OCT NOV DIC4.7 4.8 3.4 6.7 8.4 10 9.8 9.87.1 4.1 5 6.1 7.3 9.1 9.8 9.95.8 4.8 4.5 6.6 8.1 10.1 10.1 10.66.1 4.9 5.5 6.5 8.5 9.6 11.4 10.67.5 5.4 5.3 5.2 8.7 9.8 10.3 10.35.6 4.7 4.6 6 8.6 9.8 9.9 9.8
5 4.9 4 5.2 7.3 9.5 10.3 10.7
DISEÑO DEL VOLUMEN A EMBALSAR: Modelo de Temez
1.- VOLUMEN DE ESCURRIMIENTO DE LA CUENCA DE APORTE1.1 PreCipitación mensual
PRECIPITACIÓN DE LA ESTACION YUNGAYAÑO ENERO FEBRERO MARZO ABRIL MAYO
2006 170.7 82.2 125 34.5 02007 102.7 55.8 135.8 42.1 7.62008 154.3 151.5 61.5 8.5 5.92009 89.9 89.4 66.2 14.1 0.22010 270.1 145.1 155.8 6 6.52011 100.7 170.6 109.2 32.9 6.82012 67 157 54.2 30.1 1.2
1.2 Area de la cuencaAc 24394.50 Hec
1.3 Agua disponible(AD)Suelo GC 22.3 mm grava arcillosa
1.4 Consideraciones0.3
I max 386 mmHmax 20.43 mm
α 2.33 mes^-1
1.5 Evapotranspiración (CROPWAT-V8.0)
TOMAREMOS COMO DATO LA ESTACION MAS CERCA DE LA LAGUNA PURHUAY------ ESTACION YUNGAY
CP0
PLANILLA DE CALCULO: VOLUMEN DE ESCORRENTIA
i ETPi Precip. δi Poi Ti
Año Mes dias mm mm mm mm mm
2011
Enero 31 162.13 100.70 182.56 6.13 33.00Febrero 28 136.36 170.60 156.79 6.13 85.84Marzo 31 154.38 109.20 174.81 6.13 39.09Abril 30 135.60 32.90 156.03 6.13 4.06Mayo 31 128.65 6.80 149.08 6.13 0.00Junio 30 120.00 7.00 140.43 6.13 0.01Julio 31 117.49 8.60 137.92 6.13 0.05Agosto 31 131.75 0.60 152.18 6.13 0.22Septiembre 30 139.20 27.90 159.63 6.13 2.70Octubre 31 156.55 26.20 176.98 6.13 2.11Noviembre 30 168.00 48.00 188.43 6.13 7.82Diciembre 31 166.16 134.50 186.59 6.13 53.36
DISEÑO DEL VOLUMEN A EMBALSAR: Modelo de Temez
PRECIPITACIÓN DE LA ESTACION YUNGAYJUNIO JULIO AGOSTO SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ANUAL
30 0 14.3 5.2 42.7 69.7 117.1 691.40
0 1.7 0 4.9 32.7 66.9 83.3 533.50
3.6 0.7 3.2 9.8 46.8 64.1 133.9 643.80
0 3.1 0.8 20.4 8.2 118.1 115.3 525.70
1.1 1.4 11.4 1.8 72.7 26.3 204.2 902.40
7 8.6 0.6 27.9 26.2 48 134.5 673.00
0.5 0.8 0.5 24.1 8.6 127 146.8 617.80
5.234.874.984.524.15
43.79
TOMAREMOS COMO DATO LA ESTACION MAS CERCA DE LA LAGUNA PURHUAY------ ESTACION YUNGAY
4.254.645.05
5.65.36
PLANILLA DE CALCULO: VOLUMEN DE ESCORRENTIA
Hi ETRi Ii Asupi V Asubi
mm mm mm mm mm mm mm Hm30.00 0.000.00 67.70 30.40 2.60 9.51 20.90 23.50 57.320.00 84.76 70.22 15.62 22.89 56.84 72.46 176.760.00 70.11 35.50 3.60 13.34 45.05 48.64 118.670.00 28.84 4.01 0.04 2.56 14.79 14.84 36.190.00 6.80 0.00 0.00 0.25 2.31 2.31 5.640.00 6.99 0.01 0.00 0.03 0.23 0.23 0.560.00 8.55 0.05 0.00 0.02 0.06 0.06 0.130.00 0.38 0.22 0.00 0.07 0.16 0.16 0.400.00 25.20 2.69 0.02 0.85 1.91 1.93 4.700.00 24.09 2.10 0.01 0.74 2.21 2.22 5.410.00 40.18 7.67 0.16 2.47 5.94 6.09 14.860.00 81.14 46.88 6.48 14.90 34.45 40.93 99.84
520.49
ATi Vesc
DISEÑO DE ALMACENAMIENTO
a) Graficar las curvas de ÁREAS-CAPACIDADES del vaso, cuyos datos se muestran a continuación:
Elevación Area Area 1 + Área 2
m ha3701.8 160.03702.8 480.0 640.0 0.063703.8 2,520.0 3,000.0 0.303704.8 7,880.0 10,400.0 1.043705.8 20,920.0 28,800.0 2.883706.8 48,970.0 69,890.0 6.993707.8 81,680.0 130,650.0 13.073708.8 101,920.0 183,600.0 18.363709.8 135,020.0 236,940.0 23.693710.8 184,720.0 319,740.0 31.973711.8 215,680.0 400,400.0 40.043712.8 238,920.0 454,600.0 45.463713.8 266,680.0 505,600.0 50.563714.8 292,640.0 559,320.0 55.93
INTERPRETACION GRAFICA
Area 1 + Área 2
m2 m2
DISEÑO DE ALMACENAMIENTO
a) Graficar las curvas de ÁREAS-CAPACIDADES del vaso, cuyos datos se muestran a continuación:
0.5 h Volumen parcial
m m
1.0 0.5 320.0 320.01.0 0.5 1,500.0 1,820.01.0 0.5 5,200.0 7,020.01.0 0.5 14,400.0 21,420.01.0 0.5 34,945.0 56,365.01.0 0.5 65,325.0 121,690.01.0 0.5 91,800.0 213,490.01.0 0.5 118,470.0 331,960.01.0 0.5 159,870.0 491,830.01.0 0.5 200,200.0 692,030.01.0 0.5 227,300.0 919,330.01.0 0.5 252,800.0 1,172,130.01.0 0.5 279,660.0 1,451,790.0
Intervalo vertical (h)
Volumen acumulado
m3 m3
3,702 3,703 3,704 3,705 3,706 3,707 3,708 3,709 3,710 3,711 3,712 3,713 3,714 3,715 3,7160
10
20
30
40
50
60
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
1,100,000
1,200,000
1,300,000
1,400,000
1,500,000
1,600,000
DIAGRAMA VOLUMEN CAPACIDAD - AREA CAPA-CIDAD
Area Volumen
ELEVACION (m)
AREA
(m2)
3,702 3,703 3,704 3,705 3,706 3,707 3,708 3,709 3,710 3,711 3,712 3,713 3,714 3,715 3,7160
10
20
30
40
50
60
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
1,100,000
1,200,000
1,300,000
1,400,000
1,500,000
1,600,000
DIAGRAMA VOLUMEN CAPACIDAD - AREA CAPA-CIDAD
Area Volumen
ELEVACION (m)
AREA
(m2)