dak standard 07 b eng

36
Aker Yards DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 1 av 36 DAK STANDARD FOR AUTOCAD 2007/2008 1 General ........................................................................................................................ 2 2 Drawing setup ............................................................................................................. 2 3 Part list and TAG ....................................................................................................... 6 4 Layer structure ............................................................................................................ 9 5 Eksterne referanser – XREF ..................................................................................... 11 6 Block,s ...................................................................................................................... 12 7 Revisions ................................................................................................................... 13 8 SFI component number ............................................................................................. 13 9 Verftsgruppens standard for SFI-group code ............................................................ 13

Upload: mazare-ion

Post on 24-Oct-2014

243 views

Category:

Documents


14 download

TRANSCRIPT

Page 1: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 1 av 36

DAK STANDARD FOR AUTOCAD 2007/2008

1 General ........................................................................................................................ 2

2 Drawing setup ............................................................................................................. 2

3 Part list and TAG ....................................................................................................... 6

4 Layer structure ............................................................................................................ 9

5 Eksterne referanser – XREF ..................................................................................... 11

6 Block,s ...................................................................................................................... 12

7 Revisions ................................................................................................................... 13

8 SFI component number ............................................................................................. 13

9 Verftsgruppens standard for SFI-group code ............................................................ 13

Page 2: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 2 av 36

1 General

1.1 Validity Denne standard gjelder for alle tegninger laget av/for Aker Yards AS (AY), internt og eksternt. Avvik fra denne standard må avtales med AY i hvert enkelt tilfelle. Eventuelle avvik som er avtalt i kontraktsforhandlinger overstyrer denne standard. This standard are for all drawings made by/for AY , internal and extern. Change from this standard has to be written agreement with AY in each case. Possible change who is made in contract negotiations over steering this standard.

1.2 Software Denne revisjon av standard er tilpasset bruk av AutoCAD versjon 2007/2008. Langsten benytter i tillegg Proship 2007, men dette er ikke påkrevet for konsulent. This revision off standard is for use of AutoCad 2007. Langsten use also Proship. This is not necessary for consultant.

1.3 Tegnerutiner/ drawing rutine • Tegninger skal være målrette og ryddige • Drawing to clear and in right measurement • OSNAP-funksjoner skal benyttes • OSNAP functions must be used • Lagstruktur skal være i henhold til Norskip standard (se kap.) 3) • Layer according to Norship std. ( se chapter 3) • Når tegning er fullført skal denne ryddes for overflødige elementer (PURGE-

kommando) • When drawing is finished should this be cleaned for unused elements (

PURGE command) • Det skal i størst mulig grad unngås å legge tegningselementer utenfor

tegningsramme • Try to not have drawing elements outside drawing boarder • Alle entiteter skal ha farge og linjetype iht. laget de er plassert på

(=BYLAYER), unntak for blokker se kap. 6 • All elements must have color and line type acc.to layer used. Exception for

block. (see shaper 6)

2 Tegningsoppsett / Drawing setup

2.1 Mal-fil / template file Aker Yards mal-fil AY.DWT Eksempel: Hver enkelt cad administrator lokalt ordner dette. (\\LSB5\Autocad\Acadcfg\Lsb16\Template\AY.dwt) brukes alltid som mal ved opprettelse av nye tegninger. Dette sikrer riktig oppsett av linjetyper, målsetting osv. Aker Yard template files AY.DWT always use this template with start of new drawing. This to secure that right linetype, measurement is used.

Page 3: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 3 av 36

2.2 Tegningsrammer / Drawing frame Bare Aker Yards standardrammer skal benyttes, disse legges på lag 000-BT5. Stående formater skal kun unntaksvis benyttes. Blokken som utgjør rammen skal aldri eksploderes. A1 skal som hovedregel benyttes som største format. Only Aker Yards standard frames to be used, layer to use 000-BT5. Portrait formats should be used as an exception. A1 should be used as largest format.

2.3 Tittelfelt / titlebar Example from AYL Standard tittelfelt er TF_LAS1 for tegninger utarbeidet på AYL. På tegninger fra underleverandører skal TF_LAS2 settes inn. På enkelte prosjekt blir det utarbeidet spesielle tittelfelt som skal benyttes. Tittelfeltet legges på lag 000-BT5 og blokken skal aldri eksploderes. Standard title bar is TF_LAS1 for drawings made on AYL. On drawings from subcontractors should TF_LAS2 be used? On some projects there will be made special ttile bar for use. Layer for title bar is 000-BT5 and should not be exploded NB! ProShip 2007 brukere benytter kommando ”Tegningsoppsett” for ramme/tittelfelt/skala. For brukere som ikke har ProShip 2007 installert: Tegningsrammer og tittelfelt er plassert på \\LSB5\Autocad\ProShip2007\ og har filnavn tilsvarende format (A1, A0, A0S osv.), og navn som starter med ”TF_” for tittelfeltene. Dersom denne stien legges inn i AutoCAD support-path kan ramme/tittelfelt settes inn med kommando INSERT, og deretter angivelse av blokknavn. Proship 2004 users use command”Tegningsoppsett” for frame / title bar / scale. For user without Proship is frame and title bar placed on \\LSB5\Autocad\ProShip2007\ and have filename as format A1, A0, A0S and TF for title bar. If path for this is added to AutoCad support-path could frame / TB be added with insert command?

Page 4: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 4 av 36

Alternativ for Proship er å benytte ”TOOL PALETTE” Med rammer og tittelfelt for å dra rett inn på tegning. For å lage egne menyer åpnes toolpallets og designsenter. Høreklikk på toolpallet og velg ny. Det er bare å dra blokker inn på toolpallet.

Nb! For å lage tool bars er det samme fremgangsmåte, Alternative to Proship is to make ”TOOL PALETTE” with titlebar and drawingframes to drag and drop into drawing. To make your own menu open toolpaletts and desigsenter. Right click on tool pallet and select new palette. Drag and drop from designsenter into tool pallette.

2.4 Revisjonsfelt / revision field. Revisjonsfelt skal settes inn over tittelfeltet. Blokken RFELT settes inn på lag 000-BT5 med kommando INSERT ved første revisjon. Ved neste revisjon kopieres denne blokken. Revision field placed above titlebar. Block RFELT placed on layer 000-BT5 with command INSERT on first revision. Copy this block at next revision.

Page 5: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 5 av 36

2.5 Tegningsnummer Tegningsnummer hentes fra tegningsliste for hvert enkelt prosjekt. Dersom tegningen ikke er i listen, skal tegningsnummer tildeles av Teknisk Koordinator/Gruppeleder. Drawing number from drawing list on each project. If drawing not listed, will technical coordinator / group leader add one. Drawing number has following syntax. Tegningsnummer har følgende syntaks:

SFI - Løpenr. RevisjonEksempel: 101 - 001 A

Revisjoner skal angis med en bokstav. Revision marked with a letter. Tegninger som har flere blad skal ha ulike tegningsnummer, fortrinnsvis med påfølgende løpenummer. “Sheet n of n” angis i tittelfelt på tegning. Drawing with plural sheets must have separate numbers, preferably with ensuing drawing number. Sheet n of n informer in titlebar on drawing.

2.6 Format Format skal angis i tittelfelt og henviser til papirformatet for tegningen når den er plottet i riktig skala. Tabell for formatkodene: Format marked in title bar guiding to paper format when it is plotted in correct scale. Table for format codes.

Format Kode A0 0 A0 Stående/ Standing 0S A0 Lang / Long 0L A1 1 A1 Stående / Standing 1S A1 Lang / Long 1L A2 2 A2 Stående / Standing 2S A3 3 A3 Stående / Standing 3S A4 4

2.7 Filnavn/ filename Filnavn har syntaks BNR-SFI-LNR-REV: eks. 7xx-101-001-A.DWG Kun tegningsfil for siste revisjon av tegning skal lagres på H:\DAK\SHIP\[BNR]\ Filename are as following: BNB-SFI-LNR-REV: eks. 7xx-101-001-A. Only with latest revision to be stored on H:\DAK\SHIP\[BNR]

Page 6: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 6 av 36

2.8 Tekst / text Standard tekststil skal være ROMANS. For overskrifter o.l. benyttes ROMANC, alternativt ROMANS. Standard tekststørrelse er 2.5 mm x skala. For overskrifter etc. benyttes 3.5 - 5 - 7 mm x skala tekststørrelse. “TrueType”-skrifter og skrifter som ikke er inkludert i standard AutoCAD installasjon skal som hovedregel ikke benyttes. Standard textstyle is ROMANS. For title ect. Utilise ROMANC alternative ROMANS. Standard text height is 2,5mm x scale. For headings ect. Use 3,5-5-7mm x scale. ¨TrueTyp¨styles and styles not included in std AutoCad must not be used as a main rule.

2.9 Målsettinger / dimension Vanligvis brukes dimstyle med navn MODEL-SPACE. ”DIMSCALE” settes lik skala for tegningen. Målsettinger plasseres på lag 201-DM1. Alle målsettinger skal være målriktige, dvs. at ved bruk av DDEDIT skal tekst være <>. Use dim style with name MODEL-SPACE usually. ”DIMSCALE” same as drawing scale. Dimension on layer 201-DM1. All measurement to be exactly, in other words with use of DDEIT text be like <>

2.10 Viktigt / Importent Tegning med ”SHEET” skal kun inneholde en tegning, dersom det er flere blad pr tegning opprettes det egne tegninger med egne nummer. Dette MÅ gjøres for at revisjons og historikk skal kunne følges.

3 Stykklister/ partlist

3.1 Generelt/ general På alle system og arrangementstegninger skal stykklister genereres fra AL TAG system. På andre tegninger skal som hovedregel LAS standard stykklister benyttes. Det er imidlertid tillatt å lage stykklister med andre kolonner dersom det er mer hensiktsmessig (f.eks. antennearrangement, dørplan etc.). Det er også mulig å kopiere tabell fra Excel/Access inn til AutoCAD. Radene i stykklister skal normalt bestå av blokker med attributter. On all system and arrangement drawing must part list be marked from AL TAG system. On other drawing, must as a main rule LAS part list be used. It’s allowed to make part list with other columns if it is expedient for eks. Antenna, door plan etch. It is also possible to copy table from excel/access into AutoCAD. Row in part list is normally block with attribute.

Page 7: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 7 av 36

TAG integrator, generering av stykklister / Generate part list. Tag linkes til tegning via MY PROJECT på web. http://www.myproject.no Bygg og ønsket tag linkes til tegning og lagres. Så åpnes tegning og TAG integrator velges fra Langsten nedtrekks meny. Følgende vindu vises da på skjermen. TAG added to drawing from MY PROJECT on web. http://www.myproject.no Project and wanted TAG, add to drawing and save drawing. Then open drawing and select TAG integrator from pull down menu. Following window shonw on screen.

Get tags, velg enten fra SFI eller POS. NB! Det er viktig at man setter Scale med en gang, så slipper man og scalere opp i tegnig etterpå. Stykkliste kommer inn i nedre ventre hjørne. Generelt benyttes SFI på system og maskintegning og POS på øvrige tegninger. Get tags; choose from SFO or POS. Mark! It is important to set scale at once, then you don’t have to scale part list in drawing afterwards. AutoPOS: For å legge til SFI/POS nummerering velges AutoPOS fra AY-TAG nedtrekksmeny. Pek på SFI/POS nr i stykklista og velg komponent. To put on SFI/POS numbers choose AutoPOS from AY-TAG pull down menu. Point on SFI/POS number in part list and choose component.

sam
Sticky Note
Revised 31.03.2008
Page 8: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 8 av 36

Pek på TAG nr. / point on TAG number.

For å sette ramme rundt TAG velges dim leader (velg settings så kommer denne boks opp. Kryss av for frame text. For frame around TAG choose dim leader, choose settings and this box display. Mark frame text.

Page 9: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 9 av 36

3.2 Stykklister / part list (Exsample from AYL) 1. Engelsk/Norsk med SFI/Tag SKAL benyttes på alle arrangement- og systemtegninger. TO BE USED on all arrangements drawing. 601.001.10 ABC12345 1 MAIN ENGINE

NO. 1 B32:40 L6P 3000 kW

750 RPM RRM BERGEN

SFI TAG # PCS DESCRIPTION TYPE CAPACITY SUPPLIER SFI TAG # ANT BESKRIVELSE TYPE KAPASITET LEVERANDØR

Fotblokk: SF_1ELAS (engelsk) SF_1NLAS (norsk) Radblokk: SR_1LAS Footblock: SF_1ELAS (englich) SF_!NLAS (Norwegian) Rad block: SR_1LAS 2. Engelsk/Norsk uten Tag/ English/Norwegian without Tag Brukes til fundamentstegninger etc. hvor det ikke inngår komponenter med TAG#. For use on fundation drawing’s without komponents with TAG#

POS PCS. DESCRIPTION MATERIAL NOTE POS ANT. BESKRIVELSE MATERIAL MERKNAD

Fotblokk: SF_2ELAS (engelsk) SF_2NLAS (norsk) Radblokk: SR_2LAS 3. Fribordsplan/ freeboard plan Eget stykklisteoppsett for fribordsplan er definert i ProShip. Own part list setup for freeboard plan is defined in Proship. 4.SFI/POS Komponent nummerering: AY std for nummerering av komponenter er som følgende:

4 Lagstruktur/ Layer structure

(Exsample from AYL)

4.1 Generelt/General NORSKIP lagstruktur skal benyttes for alle tegninger. Dette sikrer at tegningene effektivt kan benyttes som videre arbeidsunderlag for Langsten. Norship layer structure to be used for all drawing, this for efficient use for Langsten as work base.

Page 10: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 10 av 36

4.2 Linjetyper/ Linetypes Linjetyper benyttes iht. Norskip-standard, linjene ligger i filen Norskip.lin (\\LSB5\Autocad\ProShip2007\Norskip.lin). LTSCALE settes lik skala i AutoCAD. Linjetype skal være satt til BYLAYER for alle entiteter. Unntaket er blokker som tegnes på lag 0 og settes inn på et annet lagnavn. Use line type according to Nordship std, lines in file Norskip.lin \\LSB5\Autocad\ProShip2007\Norskip.lin) LTSCALE like scale in AutoCad. Line type by layer for all entities. Exception block drawn on layer o and pleased in drawing on other layer name.

4.3 Farger og penntykkelser/color and penthiknes Farger iht. Norskip-standard og alle entiteter skal ha farge BYLAYER. Unntak også her for blokker som tegnes på lag 0. Følgende innstillinger for penntykkelser benyttes ved plotting: Color according to Norskip-std. and all entities colored BYLAYER. Exception also for block drawn in layer 0. Following pen thickness for use by plotting:

Fargenr. Farge Penntykkelse 1 Rød 0,18 mm 2 Gul 0,25 mm 3 Grønn 0,35 mm 4 Cyan 0,50 mm 5 Blå 0,70 mm 6 Magenta 0,35 mm 7 Hvit 0,25 mm 8 Grå 0,13 mm

9-255 0,10 mm Innstillingene er lagret i SFI.CTB (U:\Acadcfg\Lsb-2007) som brukes som standard pennoppsett. Recommendations stored in SFI.CTB (U:\Acadcfg\LSB-2007) std. pen setup.

4.4 Lagnavn/Layername Norskip standard skal benyttes: SFI-EEn. Aker Yard standard for SFI-gruppekoder er gjengitt i bakerst i dette dokumentet. EE er entitetskode (CO, CE, DA osv.) og n er penn-nummer/tykkelse. Fargenummer fra 9 og oppover gir n=1. Det kan eventuelt legges inn kort hjelpetekst bak denne koden (eks: 570-CO1-EXH, ventilasjon avtrekk). Lagnavn som ikke er iht. Norskip standard skal som hovedregel ikke forekomme. Norskip std to be used: SFI-EEn. Aker Yard standard for SFI group code list enclosed in this document. EE is entities code (co, CE, DA ect.) and N is pen number/thickness. Color number 9 and above gives n=1. For help text you can add a short description behind this code (eks. 570-co1-EXH, ventilation) Main rule is to use Norskip layer name.

Page 11: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 11 av 36

4.5 Senterlinjer/Spantelinjer, centerline/frameline På XREF-katalogen under hvert byggnummer skal det lages senterlinjer med spantenummerering for bruk på forskjellige skalaer: CL_[Skala GA] CL_50 CL_25 On XREF-catalog on each build number it shall be made frame lines for use on different scale (on plotting) Senterlinjene bygges opp på følgende måte: Entitet Lag Linjetype Farge Senterlinje 0 CEW018 1 – Rød Spantelinjer, større på hver 5. spant 0 CONT 1 – Rød Tekst, spanteangivelse hvert 5. spant 0 CONT 2 – Gul

Filene settes inn som blokker (ikke xref) på lagnavn 100-CE1. Dersom nødvendig klippes blokkene med XCLIP-kommandoen for å vise ønsket utsnitt. Files insert as block (not xref) on layer name 100-CE1. If necessary use XCLIP command to show necessary of the drawing.

5 Eksterne referanser – XREF / External reffrense

5.1 Generelt GA-plan skal bygges opp av eksterne referanser, dvs. at hvert plan og profil ligger i en egen tegningsfil. Xrefer settes inn med opsjon ”OVERLAY” på lag $-XREF i hovedtegningen. Disse eksterne referansene skal benyttes for alle plantegninger (seksjonsplan, dokkingplan, innredningsplaner, isolasjonsplaner osv.). Xrefene skal opprettes fortløpende gjennom prosjektet, etterhvert som detaljarrangementer blir klare og endringer skjer. Dette sikrer at alle som er involvert i prosjektet til en hver tid har siste oppdaterte informasjon, og at dette kommer med på revisjoner av plantegninger. GA-plan build up of external reference, each plan and profile in one drawing file. Xref insert with opsjon “OVERLAY” on layer $-XREF in main drawing. This external reference shall be used for all plan drawing (section plan, docking plan, accommodation, insulation drawing so.) XREF will be updated continuous trough project after arrangement drawing is finished and changed are done. This to be sure that all has the latest detail and information. This secure that drawing’s have the latest revision on drawing.

Page 12: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 12 av 36

5.2 Filnavn/ Filename Filnavn for eksterne referanser bygges opp på følgende måte:

<BNR>X − <Dekk/profil> Eks: 200-Xn.DWG Dekk n (n = 1,2,3,...) 200-XAFT.DWG Tverrskipsprofil aktenfra 200-XP.DWG Profil File name for external reffrence to be made in following way. <BNR>X- <Deck/profile> Eks: 200-Xn.DWG Deck n (n = 1,2,3,...) 200-XAFT.DWG Crosssection profile from the rear 200-XP.DWG Profile

5.3 Innsettingspunkt/ Insertion point Eksterne referanser skal ha UCS World nullpunktet i: spant 0 – senterlinje – basislinje (x–y–z). NB! z-verdi skal alltid være 0 for alle objekter på xrefer. Zero point for External refferenses frame 0 – centerline – baseline (x-y-z). Note! Z – Value always frame 0 – centerline – baseline (x-y-z).

Blokker/Block

6.1 Generelt Det skal alltid lages blokker av målskisser fra underleverandør som settes inn på tegninger. Ved innsettelse av blokker skal alle entitene i blokken legges på lag 0 med individuelle farger og linjetyper (ikke BYLAYER) og blokken settes inn på lagnavn som består av SFI nummer. Alle tegninger som mottas fra underleverandør skal ryddes på denne måten før de settes inn på tegninger som blokker. Blokknavn skal være logisk oppbygget (med SFI-nummer i begynnelsen). Antall tegn i blokknavn bør være maks. 15 pga. begrensninger i AutoCAD. General: Drawing from subcontractor, always make block of these to be inserted on drawing. When you insert an block, be sure all entities is on layer 0 with individual color and line types (not BYLAYER) and insert block on layer with SFI code. All drawing received from sub contractor have to be clear on this way before they be inserted in drawing. Block name shall be logical with SFI number at start in block name. Number of letters in block name should not exceed 15 characters.

Page 13: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 13 av 36

6.2 Detaljeringsgrad/ Detail of drawing Blokkenes detaljeringsgrad skal tilpasses tegningens skala. Dersom blokkens entiteter flyter sammen ved plotting skal blokken forenkles. Uansett bør detaljeringsgraden begrenses slik at tegningsfilenes størrelse holdes på et minimum. Detail in block adjusted to drawing scale. If block entities floating together at plotting must block simplifies. In any case detailing has to keep to a minimum for size of drawing.

7 Revisjoner/ Revisjon Ved revidering av tegninger skal følgende utføres: 1. Revisjonsbokstav i tittelfelt økes et trinn (A-B-C osv.) 2. Endringer ”skyes” inn ved hjelp av sky-verktøyet (arc-lengde 6 x skala). Generelt

skal ikke bruken av sky overdrives, men det skal være lett å se hva som er endret fra forrige revisjon av tegningen. Ved generell revisjon og ”as bilt” revisjon av tegning brukes ikke skyer. Ved siden av sky settes blokken REV inn (trekant med revisjonsbokstav). Skyen og blokken tegnes på lagnavn $REV-X, X angir revisjonsbokstav. Ved neste revisjon skrus dette laget av, slik at revisjonshistorien for tegningen er lett tilgjengelig.

3. Revisjonshistorien over tittelfeltet oppdateres. Hver linje ligger som blokk og kan kopieres opp og endres attributter for. Denne blokken skal ikke eksploderes. Aker Yard standard for SFI-gruppekoder.

On revision on drawing do as follow:

1. Revision letter in title bar increase step by step. (A-B-C so) 2. Changes marked by revision cloud. Do not overdo use of cloud in drawing.

With general an AS-Built drawing cloud is not used. In general do not use clouds in large scale. It should be easy to see what have been changed. Do not use cloud on drawings for general and as-built drawing. Insert block REV beside revision cloud. Cloud and rev letter SHALL be in layer $REV-X. X is revision (eks. $rev-A). On next revision turn this layer of and make a new layer to this revision. Doing like this we can see revision historic.

3. Revision history in rev field to be updated. Each line is a block and can be copied for new revision and change attributes. This shall not be exploded. Use Aker Yards standard for SFI group code.

Page 14: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 14 av 36

BYGG XXX 8 SFI KOMPONENTNUMMERERING

Alle komponenter skal identifiseres med SFI kode nummer. All components shall be identified with SFI code number. SFI koden er 8-sifret; de 3 første sifrene er gruppenummer, de 3 neste er detaljnummer og de 2 siste er løpenummer. SFI code is 8-number; 3 first are groupnumer, 3 next are detailnumber, and 2 last is serialnumber. Gruppenummer hentes fra SFI gruppesystem. Group number come from SFI group system. Detaljnummer hentes fra SFI detaljkoder. Detail number come from SFI detail code. Løpenummer, bygg XXX har følgende faste nummer: Serial number, hull XXX have following number. 10, 20, 30 …..90 Main components 11, 21, 31 …..91 12, 22, 32 …..92 El. motors 13, 23, 33…...93 14, 24, 34…...94 15, 25, 35…...95 16, 26, 36…...96 17, 27, 37…...97 18, 28, 38…...98 19, 29, 39…...99 El. starters

Eksempler: Hovedkomponenter/ main components Eks.1 731.001.20

731 viser at dette er et STARTELUFTSYSTEM show this is STARTING AIR SYSTEM

001 viser at dette er STARTELUFTKOMPRESSOR show that this is STARTING AIR COMPRESSOR

20 viser at dette er en HOVEDKOMPONENT, show this is MAIN COMPONENT starteluftkompressor nr. 2

starting air compressor n.2

Page 15: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 15 av 36

Under komponenter Eks. 2 731.001.22

731 viser at dette er et STARTELUFTSYSTEM show this is STARTING AIR SYSTEM 001 viser at dette er STARTELUFTKOMPRESSOR

Show that is STARTING AIR COMPRESSOR 22 viser at dette er en EL. MOTOR for startluft kompressor nr. 2

Show that this is EL. ENGINE to start air compressor no. 2 Eks. 3 731.001.29

731 viser at dette er et STARTELUFTSYSTEM show this is STARTING AIR SYSTEM

001 viser at dette er STARTELUFTKOMPRESSOR show that is STARTING AIR COMPRESSOR

29 viser at dette er et STARTERSKAP for starteluftkompressor Show that is STARTER CABINET for start air compressor.

Når flere komponenter med samme SFI gruppe- og detaljnummer skal nummereres skal følgende rekkefølge benyttes etter rang:

1. Forenfra og akterover i skipet (laveste tall forut). 2. Fra babord mot styrbord (laveste tall babord). 3. Oven fra og ned.

When several components with same SFI group- and detail number shall have a number, use ranking as follow.

1. From ahead and aft ward (lowest number ahead) 2. From portside to starboard (lowest number portside) 3. From above to bottom.

Page 16: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 16 av 36

Page 17: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 17 av 36

AKER YARDS SFI code.

MAIN GROUPS 0 HOURLY COSTS 1 SHIP GENERAL 2 HULL 3 EQUIPMENT FOR CARGO 4 SHIP EQUIPMENT 5 EQUIPMENT FOR CREW AND PASSENGER 6 MACHINETY MAIN COMPONENTS 7 SYSTEM FOR MACHINERY MAIN COMPONENTS 8 SHIP COMMON SYSTEM 9 SPECIAL EQUIPMENT / PACKAGE PRICES

0 HOURLY COSTS OO WAGE COSTS OO1 Internal direct hourly costs OO2 Internal indirect hourly costs OO3 External hourly costs

Page 18: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 18 av 36

1 SHIP GENERAL 10 SPECIFICATION, ESTIMATING, DRAWING, MODEL

TESTING

101 Contract, specification work, general design, model testing 101 001 Towing tank test 101 002 Funnel test 101 003 Propeller cavitation test 101 004 Noise analysis / measurings / Comf-V analysis 101 005 Vibration analysis / measurings 101 006 FMEA analysis 101 007 102 Drawings specific work from design consultans 102 001 Drawing package from consultans

102 002 Workshop drawings from Aker Yards, Tulcea/Braila in excess of standard scope of work

102 003 103 Drawings and design work from electrical consultants 104 Internal drawings and project work general 104 001 Internal drawings and executive work 104 002 ISO drawings 104 003 3D drawings 104 004 107 Estimating. Drawings and offers with regards to change

orders

108 General consulting, licence and patent fees 109 Maintenance system, instruction material and courses 109 001 Maintenance system 109 002 PC equipment 109 003 Installation of data 109 004 Travelling expences

Page 19: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 19 av 36

109 005 Course expences 109 006 11 INSURANCE, FEES AND GENERAL EXPENCES,

REPRESENTATION

111 Insurance in the building period 111 001 * 0,xx % of the contract price incl. for towing 111 002 112 Classification and statutory fees 112 001 Classification fees 112 002 Maritime authorities fees 112 003 113 Building advance interest, finance cost 113 001 Interest expences 113 002 Exchange rate loss 113 003 Financial costs incl. Guarantees 113 004 Premium / costs to GIEK 113 005 114 Cancellation expences 115 Delay penalty 116 Broker's commissions 116 001 *Broker no. 1 116 002 *Broker no. 2 116 003 117 Representation and travel during building period excl.

survey at Hull Yard (see g.no 208)

118 Representation by delivery and naming ceremony 12 GENERAL WORK AND MODELS 121 Planning work and preparation 121 001 Project manager

Page 20: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 20 av 36

121 002 Purchaser 121 003 Production Co-ordinators 121 004 122 Fire guard, Supervision and Watch keeping 123 Clearing and Cleaning 123 001 Clearing, cleaning 123 002 Washing internal incl. Accomodation 123 003 124 Snow clearing, de-iceing 125 Transportation (excl. hull parts) 126 Assistance with Owner's supply 127 Models, Photos, Albums 128 Helth, environment, safety

13 PROVISIONAL RIGGING

131 Prov. gangways, staging, rigging etc. incl. lights, electricity, gas, water, ventilation etc..

134 Provisional transport openings

14 LAUNCHING, DOCKING 141 Keelblocks, pillars, cushions for sections on building berth

142 Launching arr, with cradle, supports, water filling, platform etc..

143 Crew, pilots, tugs, clearing at launching 144 Dry docking, slip docking 145 Shifting, towing (excl. Launching) 146 Gas freeing, tank cleaning

Page 21: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 21 av 36

15

QUALITY CONTROL, MEASUREMENTS TESTS AND TRIALS

151 Machinery testing 152 Capacity inclination, vibration measurements 153 Fuel and lub oil for tests and trial trips 154 Trial trips 155 Special tests / trials (DP test)

16 GUARANTEE / MENDING WORK 162 Estimated Guarantee costs / work after delivery

164 Repair of damages caused by yard, incl. Paint damages on cars

17 SPECIAL SERVICE 171 Disposal of waste, garbage, oil chemicals and blast sand 173 Transport of yard personell between the yards 174 Costs of house / accomodation rental for sub contractors 175 Services to ship's crew (house, cars, meals etc.) 176 Other divided direct costs

19 CONSUMPTION ARTICLES 191 Consume of welding core / rods 192 Gas, oxygen, coal and oil

196

Miscellaneous consumption articles

Page 22: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 22 av 36

2 HULL 20 HULL MATERIALS, GENERAL HULL WORK 201 Hull materials

202 Transportation, sorting and storage of hull materials / units

(incl. sandblasting, shoppriming) 204 Pressure testing of tanks 205 X-ray and ultrasonic testing of hull parts 206 NC-data, templates, and moulding work 207 Joining of hull parts in dock 208 Purchasing of hull 208 001 Hull weight: Price EURO / ton: Exchange rate EURO / NOK: Total price standard scope of work: 208 002 Building inspection of AYAS people 208 003 Towing of hull incl. all taxes (insurance incl. in gr.no 111) 208 004 Materials sent from AYAS to the hull builder incl. freight 208 005 Travel expences AYAS people to / from hull builder 208 006 Various aligning of hull after arrived at outfitting yard 208 007 Extended outfitting at hull builder 208 008 Mounting of Steering Gear 208 009 Mounting of Rudder 208 010 Mounting of Main Engines 208 011 Mounting of Main Switch Board 208 012 Mounting of el. Wiring in excess of standard 208 013 Mounting of Thrusters 208 014 Mounting of exhaust pipes incl. Insulation 208 015 Mounting of pipesystem in excess of standard 208 016 Insulation for accomodation 208 017 Various design and drawing work (see also g.no 102 001) 208 018 VO - variation orders - expected!

Page 23: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 23 av 36

208 019 208 020 208 021 208 022 209 Purchasing and assembley of steel units 21 AFTERBODY 211 Afterbody 22 ENGINE AREA 221 Engine area 23 CARGO AREA 231 Cargo area 24 FOREBODY 241 Forebody 25 DECK HOUSES AND SUPERSTRUCTURE 251 Deck houses, wheelhouse 252 Mast-, pump-, fan- and winch- houses 26 HULL OUTFITTING 261 Hull and house markings 262 Bottom plugs, sea chests and bilge wells 263 Foundations 264 Fender and wear bars, bilge keels, ice fins etc. 266 Hawse pipes 267 Gutter bars, flat bar steel, bulwark, breakwaters

Page 24: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 24 av 36

268 Funnels 269 Moonpool 27 MATERIAL PROTECTION, EXTERNAL 270 Purchasing of paint and blast sand, internal and external 271 Material protection external, all over 276 Galvanizing, metallizing and nickel-plating 278 External cathodic protection 278 001 Zink anodes 278 002 Plant for impressed current 278 003 28 MATERIAL PROTECTION, INTERNAL 281 Material protection internal, all over excl. tanks

284 Material protection of cargo tanks, ballast tanks, fresh

water tanks etc.. 287 Material protection of FO / LO- tanks 3 EQUIPMENT FOR CARGO 30 HATCHES AND PORTS 301 Hatches and hatch covers, incl. smaller hatches 304 Manholes 305 Bow-, stern- and side- ports 308 Cargo doors in bulkheads 309 Common hydraulic oil system for hatches/ports 31 EQUIPMENT FOR CARGO IN HOLDS / ON DECK 311 Loose decks and platforms for cargo, ramps

Page 25: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 25 av 36

312 Loose tanks for cargo, for ex. Cement tanks 314 Hold battens, gratings and external wooden deck 315 Deck/hold cargo pillars, cargorail 316 Tarpaulines / canvas 317 Containers, pallets 32 SPECIAL CARGO HANDLING EQUIPMENT 321 Cargo lifts 324 Trucks etc.. 325 Conveyor belts, screw transporters, etc..

326 Pneumatic plants for bulk cargo handling (See also g.no 326)

33 DECK CRANES FOR CARGO 331 Cranes with crane pillars etc. 34 MASTS, DERRICK POSTS, RIGGING AND WINCHES FOR CARGO 341 Masts, derrick posts, rigging and winches for cargo 35 LOADING/DISCHARGING SYSTEM FOR LIQUID CARGO 351 Purchasing of Loading/Discharge pumps for Cargo incl. Agitators

352 Mounting of Loading/Discharge system deck, pump and tanks incl. pipes, flanges and valves

355 Methanol- and Special Product- System 36 FREEZING, REFRIGERATING AND HEATING SYSTEMS FOR CARGO 361 Insulation and sheating of cargo holds/tanks factory decks etc..

362 Freezing and refrigerating systems for dry cargo (incl. RSW tanks)

365 Indirect cooling/heating systems, cargo oil heating 366 Ice-production for cargo

Page 26: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 26 av 36

37 GAS/VENTILATION SYSTEMS FOR CARGO HOLDS / TANKS 371 Ventilation system for refrigerated cargo holds 372 Closed, mechanic ventilation systems for cargo holds 373 Open ventilation system for cargo hold 374 Cargo ventilation, gas freeing system 376 Inert gas system for cargo tanks 38 AUXILIARY SYSTEM AND EQUIPMENT FOR CARGO 382 Tank cleaning system and equipment 383 Lifting gear for cargo hoses 384 Separate cooling water system for cargo equipment (RSW) 386 Equioment for addition/dosing of preservatives/ice 387 Special structures for loading/discharge over stern/bow 4 SHIP EQUIPMENT 40 MANOEUVRING MACHINERY AND EQUIPMENT 401 Rudder with rudderstock 403 Steering gear 404 Side Thrusters 404 001 Forward: 404 002 Aft: 404 003 Gyro thruster: 405 Stabilizers 408 Dynamic positioning system 41 NAVIGATION AND SEARCHING EQUIPMENT

410 Navigation-, Communication- and search- equipment. Electronic package. Purchasing and installation.

414 Underwater searching equipment. Underwater outfitting.

Page 27: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 27 av 36

415 Clinometers, trim indicator and load indicators 417 Clocks, central clock systems, nautical equipment incl. compass 418 Radar-, signal- and antenna mast with platform 42 COMMUNICATION EQUIPMENT 427 Light- and signal equipment (lanterns and typhons etc.) 43 ANCHORING, MOORING AND TOWING EQUIPMENT 431 Anchors with chains and equipment 432 Windlasses with chain stoppers, rollers etc., Capstans, Mooring winches etc. 435 Fixed mooring equipment 436 Loose mooring equipment 437 Towing equipment 437 001 Towing winch 437 002 Stern roller 437 003 Shark jaw 437 004 Towing pins 437 005 Towing hook 437 006 438 Common hydraulic oil system for anchoring/mooring and towing equipment 44 REPAIR / MAINT. / CLEAN. EQUIPMENT, WORKSHOP / STORE OUTFIT 441 Machine tools, cutting and welding equipment 442 Machine tools, electrical tools and painting tools 444 Cleaning equipment, garbage chutes 445 Incinerator plant, Garbage disposal plant 446 Outfitting in store rooms and workshos 447 Clamps / foundations for spare parts 448 Name plates / marking on machinery, equipment, pipes and cables

45 LIFTING AND TRANSPORT EQUIPMENT FOR MACHINERY COMPONENTS

Page 28: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 28 av 36

452 Travelling cranes and lifting gear in engine room 46 FISHING AND HUNTING EQUIPMENT 462 Autoline equipment 463 Purse nets and seine equipment 464 Trawling equipment incl. ice-trawl davits, blocks and wire etc. 465 Fish pump plants and landing equipment 47 ARMAMENT, WEAPONS AND WEAPONS COUNTERMEASURES 48 SPECIAL EQUIPMENT 481 Drilling equipment 482 Dredging equipment 483 ROV and diving equipment 484 Laboratory equipment 485 Cable laying equipment 486 Auxiliary vessels 487 De-icing equipment 488 Seismic equipment 489 Oil recovery equipment 49 FISH PROCESSING EQUIPMENT 491 Raw material handling 492 Fillet factory equipment 493 Shrimp factory equipment 494 Meal and oil factory equipment 495 Surimi factory equipment 496 Shell factory equipment

Page 29: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 29 av 36

5 EQUIPMENT FOR CREW AND PASSENGER 50 LIFESAVING, PROTECTION AND MEDICAL EQUIPMENT 501 Lifeboats / Davits with equipment 502 Liferafts / Davits with equipment 503 Lifesaving, safety and emergency equipment 504 Medical-, dental- and first aid- equipment. Medicines 505 Loose firefighting apparatus and equipment, firemen's outfit 507 Stand-by / rescue equipment

51 INSULATION, PANELS, BULKHEADS, DOORS, SIDESCUTTERS AND SKYLIGHT

511 ACCOMODATION: Insulation, Bulkheads, Ceiling and Wall Panels, Furniture, Deck Cover and Doors in Accomodation

513 Other internal doors with coamings 514 External doors with coamings 515 Side scuttles and windows with equipment 52 INTERNAL DECK COVERING, LADDERS, STEPS AND RAILINGS 522 Internal deck top covering 524 Loose floor plates, platforms, steps & ladders in accomodation 525 Loose floor plates, platforms and ladders in engine and pump rooms 526 Ladders, platforms and railing in ballast, fuel and cargo tanks 53 EXTERNAL DECK COVERING, LADDERS, STEPS AMD GAMGWAYS 531 External deck covering 533 Handrails, railing, rail gates 534 Stairs, Ladders, Platforms, Gratings and Grids 535 Gangway with equipment 536 Awnings / Sunroof with equipment

Page 30: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 30 av 36

54 FURNITURE, INVENTORY AND ENTERTAINMENT EQUIPMENT

541 Furniture for crew and passengers, standard furniture. (See also g.no. 511)

542 Special furniture in wheelhouse, chart and radio room etc.. 543 Bedclothing and mattresses 544 Curtains and carpets 545 Decorations 546 Hobby, sports and entertainment equipment etc. 548 Name plates / marking on machinery, equipment and pipes etc..

55 GALLEY / PANTRY EQUIPMENT, PROVISION PLANTS, LAUNDRY / IRONING EQUIOPMENT

551 Galley machinery and equipment for preparation and serving 554 Freezing / refrigerating system for provision 558 Laundry, ironing and drying equipment 56 TRANSPORT EQUIPMENT FOR CREW, PASSENGERS AND PROVISION 561 Personal lifts, escalators 564 Shore gangways with davits, landing booms 566 Helocopter platforms with equipment 57 VENTILATION, AIR-CONDITIONING AND HEATING SYSTEM 571 Ventilation / air-conditioning system for accomodation 576 Other ventilation. For control room, engine room and pump room 577 Central heating system with radiators

58 SANITARY SYSTEMS WITH DISCHARGES, ACCOMODATION DRAIN SYSTEM

581 Sanitary supply system incl. equipment 582 Sanitary discharge system 582 001 Vacuum system incl. Toilets 582 002 Seawage treatment plant

Page 31: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 31 av 36

6 MACHINERY MAIN COMPONENTS 60 DIESEL ENGINES FOR PROPULSION 601 Diesel engines for propulsions 602 Mounting av main engines 61 MAIN PROPULSION STEAM TURBINE 62 OTHER TYPES OF MAIN PROPULSION MACHINERY

625 Generators, Main switchboards, El. Motors and Frequency

converters for diesel electri propulsion 63 PROPELLERS, TRANSMISSIONS AND FOILS

634 Controllable pitch propeller plant incl. nozzles and

gyrothrusters 637 Main reduction gears with thrust bearings and couplings 638 Central gear plant. Auxiliary gear. 64 BOILERS, STEAM AND GAS GENERATORS 641 Main boiler, complete 646 Exhaust gas boiler 647 Steam generator 648 Central heating boiler / Hot water boiler 65 DIESEL GENERATOR FOR MAIN ELECTRIC

POWER PRIODUCTION

651 Diesel generators, complete

66 OTHER AGGREGATES AND GENERATORS FOR

MAIN AND EMERG. EL. POWER PRODUCTION

Page 32: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 32 av 36

665 Harbour- and emergency aggregates complete 667 Shaft generators

7 SYSTEM FOR MACHINERY - MAIN COMPONENTS 70 FUEL OIL SYSTEM 701 Fuel oil system incl. separators 705 Heavy fuel oil system and heating coils in HFO-tanks 707 Natural Gas Propulsion System 71 LUB. OIL SYSTEM 711 Lub. oil system incl. separators 72 COOLING SYSTEMS 721 Sea water cooling systems incl. internal catodic protection 722 Fresh water cooling systems 723 Box Coolers 724 Central Coolers 73 COMPRESSED AIR SYSTEMS 731 Starting air compressor system 732 Service air compressor system 734 Instrument air compressor system 74 EXHAUST SYSTEM 743 Exhaust systems for propulsion machinery and boilers

Page 33: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 33 av 36

748 Exhaust cleaning system / Catalysts equipment 75 STEAM, CONDENSATE AND FEED WATER SYSTEM 751 Primary full pressure steam systems 76 DESTILLED AND MAKE-UP WATER SYSTEM 761 Destilled and make-up water systems (F. W. generator)

77

PIPES, FLANGES AND VALVES FOR MAIN SHIP SYSTEMS

771 Pipes, flanges and valves for g.no 58, 70, 71, 72, 73, 75, 76,

79, 80, 81 and 83 - Only the vessel's main system 79 AUTOMATION SYSTEM FOR MACHINERY 791 Manouvre consoles / main consoles 792 Common automation and alarm systems 797 Remote sounding system of tanks. Valve controls 8 SHIP COMMON SYSTEM 80 BALLAST AND BILGE SYSTEMS. DRAIN SYSTEMS 801 Ballast systems, solid ballast 803 Bilge system 804 Drain system 805 Anti Heeling system

81 FIRE AND LIFEBOAT ALARM, FIRE FIGHTING AND WASH DOWN SYSTEMS

813 Fire / wash down system, emergency fire pumps. Sprinkler system 814 Fi-Fi (Fire Fighting) system 815 Fire fighting system with gas, foam, steam, powder

Page 34: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 34 av 36

82 AIR AND SOUNDING SYSTEMS FROM TANKS TO DECK 821 Air and sounding system from tanks to deck - manual. (See also 797) 83 SPECIAL COMMON HYDRAULIC OIL SYSTEMS 831 Special hydraulic oil systems (excl. 309 and 438) 84 CENTRAL HEAT TRANSFER SYSTEM WITH CHEMICAL FLUIDS / OIL 841 Heating oil treatment systems 85 COMMON ELECTRIC AND ELECTRONIC SYSTEM ??

851 Purchasing of Pump packages for ships systems g.no 58,

70, 71, 72,73, 75, 76, 80 AND 81 855 Common computer system 86 ELECTRIC POWER SUPPLY 87 COMMON ELECTRIC DISTRIBUTION SYSTEM 871 El. Switchboards 88 ELECTRIC CABLE INSTALLATION 89 ELECTRIC CONSUMER SYSTEMS 894 Electric installation 895 Steel work - Electric installation 9 SPECIAL EQUIPMENT / PACKAGE PRICES 90 OWNER'S ALLOWANCE, ADDITIONAL ORDERS BY OWNERS 901 Owner's allowance 909 "Buffer" 91 SUB SUPPLIERS / PACKAGE PRICES

Page 35: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 35 av 36

910 Rolls-Royce Marine package 911 AYAS package 912 Other packages ACADCFG folder.

Page 36: Dak Standard 07 b Eng

Aker Yards

DAK Standard Rev. 07_B Sign.: SAM Aker Yards 31.03.2008 Side 36 av 36