d2016-036 volume 3 of 3
TRANSCRIPT
-
8/17/2019 D2016-036 Volume 3 of 3
1/135
D2016-036
-
8/17/2019 D2016-036 Volume 3 of 3
2/135
-
8/17/2019 D2016-036 Volume 3 of 3
3/135
D2016-036
-
8/17/2019 D2016-036 Volume 3 of 3
4/135
D2016-036
-
8/17/2019 D2016-036 Volume 3 of 3
5/135
D2016-036
-
8/17/2019 D2016-036 Volume 3 of 3
6/135
D2016-036
-
8/17/2019 D2016-036 Volume 3 of 3
7/135
D2016-036
-
8/17/2019 D2016-036 Volume 3 of 3
8/135
D2016-036
-
8/17/2019 D2016-036 Volume 3 of 3
9/135
-
8/17/2019 D2016-036 Volume 3 of 3
10/135
-
8/17/2019 D2016-036 Volume 3 of 3
11/135
UP
75.286
EXISTINGSTAIR
75.286
75.286
75.286
EXISTINGSTAIR
75.286
EXIST.TUNNEL
PRIMARY DIGESTER NO.3 (PD3)
NEW PRIMARY DIGESTER NO.1 (PD1)
GAS ROOM (GR)(CLASSIFIED)
B001
1A105
3A109
1
1
EXIST. PUMP ROOM
B002
HEAT EXCHANGERROOM NO.2
B004
EXIST.CONC.BASES TOREMAIN
EXIST. CONC. BASESTO REMAIN
HEAT EXCHANGERROOM NO.1 (HE)
B005
OPENING ABOVE
EXIST. CONC.BASES TOREMAIN
1A111
PRIMARY DIGESTER NO.2 (PD2)
SEC. DIGESTER NO.1 (SD1)
EX. CMU
NEW CONCRETE
EXISTING CONCRETE
LEGEND:
E Q .
E Q .
18075
CONC. COL.(REFER TO STRUC.)
± 9 5 9 5
T/O CONC.=
T/O CONC.=
T/O CONC.=
EXIT STAIR
103
75.286
CL
CLCL
HEAT EXCHANGERROOM NO.3
B003
T/O CONC.=
9 3 1 0
4 5
. 0 0
°
1
2
1 NEW CONC. BASE (FOR SIZES & DIM. REFERTO STRUCT. DWG.S)
2 SUMP
1
1
1
1
1
T/O CONC.=
1
1
1
2
EQ.EQ.CL
CL
WATERPROOFING
W/ BASEMENT
NEW BLDG. ADDITION
1
1
1
1
3 NEW FLOOR TILE C/W COVE AND WALL BASE
3
3
1 3 0 0 0
1
CONC. COLUMN(REFER TO S110)
WATERPROOFING
10000
1 % m
i n .
1 % m
i n .
TRENCH DRAINC/W GRATING
3
3
15 0 0
1 5 0 0
1 5 0 0
1 5 0 0
E X T E N
T O F
W A T E R
P R O O
F I N G,
F U L L H
E I G H T
O F
T A N K
E X T E N T
O F
W A T E R
P R O O F I N
G ,
F U L L
H E I G H T
O F
T A N K
1
WATERPROOFING
ARCHITECTURAL EXPANSION JOINT SEAL SCHEDULE
1 TYPE 1- BELOW GRADE HORIZONTAL/VERTICALSELF EXPANDING EXPANSION JOINT SEAL
3 TYPE 3- FIRE RATED SELF EXPANDING EXPANSIONJOINT SEAL
DRAWING NUMBER
RVA PROJECT No.
SCALEDESIGNED:
APPROVED:
DRAFTED:
CHECKED:
SHEET NUMBER
BAR IS 25mm ONORIGINAL DRAWING
0 mm 25 mm
IF NOT 25mm ONTHIS SHEET, ADJUST
SCALES ACCORDINGLY
THE REGIONAL MUNICIPALITY
OF DURHAM
WORKS DEPARTMENT CONTRACT NUMBER
ONTARIO
A102DIGESTER FACILITIES UPGRADE - PHASE 1
046220
G. KREZEL
M. LATOSZEK
G. KREZEL ARCHITECTURAL
DIGESTER CONTROL BUILDING - BASEMENT PLAN D2016-036V.L. NAZARETH
CORBETT CREEK WATER POLLUTION CONTROL PLANT 11 of 135
WHITBYRVA#046220-20150910-IF
T
BASEMENT PLAN1
01 2 4 m#M100
NO. DATE NAME REVISIONS
-
8/17/2019 D2016-036 Volume 3 of 3
12/135
-
8/17/2019 D2016-036 Volume 3 of 3
13/135
-
8/17/2019 D2016-036 Volume 3 of 3
14/135
-
8/17/2019 D2016-036 Volume 3 of 3
15/135
78.943
MAIN FLOOR T/OCONC.
83.058
T/O STRUCTURE
75.286
BASEMENT T/OCONC.
83.668
T/EX. DIGES WALL
2 2 0 0
GAS ROOM (GR)(CLASSIFIED)
101
GAS ROOM (GR)(CLASSIFIED)
B001
ROOF ASSEMBLY 1- 2-PLY MODIFIED SBS BITUMEN ROOFING- 13mm PROTECTION BOARD- 100mm TAPERED RIGID INSULATION (MIN. 50mm)- VAPOUR BARRIER- 250mm CONC. ROOF SLAB-150mm MINERAL WOOL INSUL. W/ VINYL FACE
WALL ASSEMBLY 1- 90mm SPLIT RIB CONC. BLOCK- 25mm AIR SPACE- 75mm RIGID INSULATION- AIR/ VAPOUR BARRIER- 200mm CAST-IN-PLACE CONC.
1A108
4A108
50mm RIGIDINSULATION& WATERPROOFING
EXIST.TUNNEL
1 0 7 0
2
2
1
CONC. PAD
NEW BLDG. ADDITION
COLUMN
COLUMN
NEWOPENING
WATERSTOP
770
1 2 0 0
2A113
FLOOR ASSEMBLY 1-CAST-IN-PLACE CONC. SLAB-SELF-LEVELING CASTUNDERLAYMENT TOPPING-200 X 200 QUARRY TILE ONSETTING BED
FLOOR ASSEMBLY 2-SKIM SLAB-WATERPROOFING-SLAB-ON-GRADE-VAPOUR BARRIER-SELF-LEVELING CASTUNDERLAYMENT TOPPING- 200 X 200 QUARRY TILE ON
SETTING BED
78.943
MAIN FLOOR T/OCONC.
83.058
T/O STRUCTURE
75.286
BASEMENT T/OCONC.
83.668
T/EX. DIGES WALL
GAS ROOM (GR)(CLASSIFIED)
B001
GAS ROOM (GR)(CLASSIFIED)
101
EXIT STAIR
103
ROOF ASSEMBLY 1
2 2 5 5
3A108
25mm EXP. JT.
25mm CONTINUOUSEXP. JT. C/W JOINTCOVER
25mm EXP. JT. C/WCOVER
WATERPROOFING
PERFORATEDDRAINAGE PIPEC/W FILTER FABRIC
WALL MOUNTEDHANDRAIL
600 X 600 CONC.PAVERS ONCOMPACTEDDRAINAGE LAYER
WALL ASSEMBLY 1
50mm RIGID
INSULATION
2465
90mm CMUCLOSURE
OPEN
1 6 6 0
3A112
TYP.
2100mm WALLBASE (TYP.)
1 0 0
100mmWALL BASE
90
TYP.
920
1
WATERPROOFING
NEW BLDG. ADDITION
A106
1SIM.A106
1SIM.
WATERSTOP
WATERSTOP
3865
83.308
T/OF PARAPET
5A109
NEW ALUM. RAILING320
10 EQ.
10090900
1070
2
1200
FLOOR ASSEMBLY 2-SKIM SLAB-WATERPROOFING-SLAB-ON-GRADE-VAPOUR BARRIER-SELF-LEVELING CASTUNDERLAYMENT TOPPING-QUARRY TILE ON SETTING BED
ARCHITECTURAL EXPANSION JOINT SEAL SCHEDULE
FOR DETAILS REFER TO SPECIFICATIONS
1
2
TYPE 1- BE LOW GRADE HORIZONTAL/VERTICALSELF EXPANDING EXPANSION JOINT SEAL
TYPE 2- ABOVE GRADE HORIZONTAL/VERTICALSELF EXPANDING EXPANSION JOINT SEAL
INSTALL VAPOUR BARRIER ON TOP OF SLAB-ON-GRADEPRIOR TO INSTALLATION OF UNDERLAYMENT (TYP.)
NOTE:
DRAWING NUMBER
RVA PROJECT No.
SCALEDESIGNED:
APPROVED:
DRAFTED:
CHECKED:
SHEET NUMBER
BAR IS 25mm ONORIGINAL DRAWING
0 mm 25 mm
IF NOT 25mm ONTHIS SHEET, ADJUST
SCALES ACCORDINGLY
THE REGIONAL MUNICIPALITY
OF DURHAM
WORKS DEPARTMENT CONTRACT NUMBER
ONTARIO
A106DIGESTER FACILITIES UPGRADE - PHASE 1
046220
G. KREZEL
M. LATOSZEK
G. KREZEL ARCHITECTURAL
NEW GAS ROOM - SECTIONS D2016-036V.L. NAZARETH
CORBETT CREEK WATER POLLUTION CONTROL PLANT 15 of 135
WHITBYRVA#046220-20150910-IF
T
A105
SECTION200.5 1 2 m
#M5000.5 1 2 m
#M50
A105
1 SECTION
NO. DATE NAME REVISIONS
-
8/17/2019 D2016-036 Volume 3 of 3
16/135
-
8/17/2019 D2016-036 Volume 3 of 3
17/135
-
8/17/2019 D2016-036 Volume 3 of 3
18/135
-
8/17/2019 D2016-036 Volume 3 of 3
19/135
78.943
MAIN FLOOR T/OCONC.
83.058
T/O STRUCTURE
83.668
T/EX. DIGES WALL
ALUMINUM GUARDRAILC/W KICK PLATE (REFER TO 6/A112)
PREFINISHEDCORRUGATED METALWALL SYSTEM
EXPOSED CONCRETEFOUNDATION WALL
78.943
MAIN FLOOR T/OCONC.
83.058
T/O STRUCTURE
83.668
T/EX. DIGES WALL
ALUMINUM GUARDRAILC/W KICK PLATE (REFER TO 6/A112)
PREFINISHEDCORRUGATED METALWALL SYSTEM
EXPOSED CONCRETEFOUNDATION WALL NEW PRIMARY DIGESTER No.1
EXIST. PRECASTCONC. FASCIA
DRAWING NUMBER
RVA PROJECT No.
SCALEDESIGNED:
APPROVED:
DRAFTED:
CHECKED:
SHEET NUMBER
BAR IS 25mm ONORIGINAL DRAWING
0 mm 25 mm
IF NOT 25mm ONTHIS SHEET, ADJUST
SCALES ACCORDINGLY
THE REGIONAL MUNICIPALITY
OF DURHAM
WORKS DEPARTMENT CONTRACT NUMBER
ONTARIO
A110DIGESTER FACILITIES UPGRADE - PHASE 1
046220
G. KREZEL
M. RAKOCEVIC
G. KREZEL ARCHITECTURAL
NEW PRIMARY DIGESTER NO.1 ELEVATIONS D2016-036V.L. NAZARETH
CORBETT CREEK WATER POLLUTION CONTROL PLANT 19 of 135
WHITBYRVA#046220-20150910-IFT
A110
WEST ELEVATION100.5 1 2 m
#M50
A110
SOUTH ELEVATION200.5 1 2 m
#M50
NO. DATE NAME REVISIONS
-
8/17/2019 D2016-036 Volume 3 of 3
20/135
D2016-036
-
8/17/2019 D2016-036 Volume 3 of 3
21/135
D2016-036
-
8/17/2019 D2016-036 Volume 3 of 3
22/135
D2016-036
-
8/17/2019 D2016-036 Volume 3 of 3
23/135
DN
UP
DIGESTER
NEW HEAT EXCHANGERROOM No.1
1 0 6 6
90.00°
32766
1 5 8 5 0
1 5 8 5 0
1 6 9 1 6
1 8
0 7 2
15850 16916
3 1 7 0 0
1807215850
2 2 2 2
33922
EXISTING PRIMARY DIGESTER NO.3
EXISTING PRIMARY DIGESTER NO. 2
EXISTING SECONDARY DIGESTER NO.1
NEW PRIMARY DIGESTER NO.1
3 4 9 8 9
1156
NEW GAS ROOM(BELOW GRADE)
EXISTING DIGESTER CONTROL BUILDING
DIGESTER
DIGESTER
CONTROL BUILDING
DIGESTER
DIGESTER
DIGESTER
DIGESTER
CONTROL BUILDING
EX. TUNNELBELOW GRADE
NEW BOILERSTACK
APPROXIMATE LOACATION OFTEMPORARY SHORING W/ SOLDIERPILING OR APPROVED EQUALSHORING DESIGN IS BY THECONTRACTOR. SUBMIT DESIGN ANDSHOP DRAWINGS FOR REVIEW BYTHE ENGINEER.
EX. PLANT PROCESSPIPES TO SHORE &PROTECT. SEE S110FOR FURTHERDETAILS.
3 0 .0 0 °
ACCESSDOOR
+ / -
+ / -
+/-
APPROXIMATE EXTENT OFEXCAVATION FORCONSTRUCTION
EDGE OF SLAB ONGRADE
INTERIM COMPRESSORBUILDING (SEE SITE/PROCESSDRAWINGS FOR SIZE ANDLOCATION)(SEE S114 FORSLAB DETAILS)
NEW CONCRETE
EXISTING CONCRETE
DRAWING NUMBER
RVA PROJECT No.
SCALEDESIGNED:
APPROVED:
DRAFTED:
CHECKED:
SHEET NUMBER
BAR IS 25mm ONORIGINAL DRAWING
0 mm 25 mm
IF NOT 25mm ONTHIS SHEET, ADJUST
SCALES ACCORDINGLY
THE REGIONAL MUNICIPALITY
OF DURHAM
WORKS DEPARTMENT CONTRACT NUMBER
ONTARIO
S100DIGESTER FACILITIES UPGRADE- PHASE 1
046220
M. CHATTERJEE
M. ARAR
T.RICHARDSON STRUCTURAL
DIGESTERS AND CONTROL BUILDING - GENERAL ARRANGEMENTPLAN D2016-036V.L. NAZARETH
CORBETT CREEK WATER POLLUTION CONTROL PLANT23 of 135
WHITBYRVA#046220-20150910-
IFT
GENERAL ARRANGEMENT PLAN1 01.5 3 6 m
#M150
NO. DATE NAME REVISIONS
-
8/17/2019 D2016-036 Volume 3 of 3
24/135
-
8/17/2019 D2016-036 Volume 3 of 3
25/135
DN
UP
3S105
CORRIDOR
600H X 200WCONC. CURB
2000 X 2000OPENING W/ ACCESS HATCH
EXISTINGSTAIR N01
EXISTINGSTAIR N02
T/LANDING
DN
SITE CONF.
1397
OUTSIDE FACE OFEXISTING PRECASTFASCIA
1S105
OUTSIDE FACE OFEXISTING PRECASTFASCIA
E X I S T I N G S T AI R N 0 .3
5S104
4S104
2S105
4S106
3S106
4S109
B M 1
C 2
DN
NEW PRIMARY DIGESTER NO.1
EXISTING PRIMARY DIGESTER NO.3
EXISTING PRIMARY DIGESTER NO. 2
EXISTING SECONDARY DIGESTER NO.1
78.943
NEW GAS ROOM
77.596
ELECTRICAL ROOM
WORKSHOP
BOILER ROOM
6S109
OPENING 400 X400SEE MECH. DWG
1S110
5S109
C 3
C 3
C 4
C 4
78.943
78.943
78.943
78.943
1% SLOPE
EJ
EXP. JT.
EXP. JT.
EXP. JT.
2S104
2S106
EXIST. ACCESS FOREQUIPMENT REMOVAL
CONC. BASE ANDSTACK
WATERPROOFING ASSPECIFIED FOR WIDTHINDICATED AND FORENTIRE VERTICAL WALL OFDIGESTER
1 5 0 0
WATERPROOFING ASSPECIFIED FOR WIDTHINDICATED AND FOR ENTIREVERTICAL WALL OFDIGESTER
1 5 0 0
1500
EQEQEXISTING BLOCKWALL TO REMAIN
1 5 0 0
VESTIBULE
EXTENT OF 200 mm THK. SLAB ON G RADE
CONC. PADFOR EQUIPMENT(TYP.)
SAW-CUT OPENING INCONC. FLOOR (TYP.)
APPROACHSLAB ON GRADE
EXP. JT
EXP. JT
SITEVE R
IFY
1727
6000
SITEVE
RIFY
1692
4000
20003464
C 22500
2000
1S111
M
IN.
2000
SITE VERIFY
10398
WASHROOM V E S T I B U L E
5658
NEW CONCRETE
EXISTING WALL
EX. CONC. BLOCK WALL
LEGEND:
NEW CONC. BLOCK WALL
DRAWING NUMBER
RVA PROJECT No.
SCALEDESIGNED:
APPROVED:
DRAFTED:
CHECKED:
SHEET NUMBER
BAR IS 25mm ONORIGINAL DRAWING
0 mm 25 mm
IF NOT 25mm ONTHIS SHEET, ADJUST
SCALES ACCORDINGLY
THE REGIONAL MUNICIPALITY
OF DURHAM
WORKS DEPARTMENT CONTRACT NUMBER
ONTARIO
S102DIGESTER FACILITIES UPGRADE- PHASE 1
046220
M. CHATTERJEE
M. ARAR
T.RICHARDSON STRUCTURAL
DIGESTER CONTROL BUILDING - MAIN FLOOR PLAN D2016-036V.L. NAZARETH
CORBETT CREEK WATER POLLUTION CONTROL PLANT25 of 135
WHITBYRVA#046220-20150910-IFT
MAIN FLOOR PLAN1 01 2 4 m
#M100
NO. DATE NAME REVISIONS
-
8/17/2019 D2016-036 Volume 3 of 3
26/135
3S105
1S105
5S104
4S104
2S105
4S106
HEAT EXCHANGER ROOM NO.1ROOF SLAB
OPENINGSSEE MECH. DWGS
6S109
EXIST. 8"HOLLOWCORE SLAB
EXIST. 8" HOLLOW CORE
EXIST.8"HOLLOW
CORE
EXIST.8"HOLLOW
COR
E
EXIST. 8"HOLLOW CORE
PRIMARY DIGESTER NO.1
PRIMARY DIGESTER N0. 2PRIMARY DIGESTER NO.3
SECONDARY DIGESTER NO.1
GAS ROOM
EX. MONORAIL BELOW
83.058
83.058
83.058
83.058
83.058
SLOPE
4S108
TOP OF TEE BEAM
7S108
1S108
2S108
3S108
6S108
5S108
B E A M B
M 4
2000x2000 ROOFACCESS HATCH
9S108
200Wx300H CONC.CURB (TYP.) SEE TYP.CURB DETAIL
BEAM BM5
8S108
9S105
SEE 1/S111 FORBEARING DETAILS OFEXIST. DOUBLE TEESON THIS WALL (TYP.)
ROOF ACCESS PLATFORM
GUARD RAIL ON EACH SIDE OFACCESS PLATFORM. INTEGRATE W/ EXIST. GUARD RAIL (GALV.)SERRATED AND BANDED ALUMINUMGRATING w/ 51x5 BEARING BARS c/wSUPPORT FRAMING (GALV.)
DRAWING NUMBER
RVA PROJECT No.
SCALEDESIGNED:
APPROVED:
DRAFTED:
CHECKED:
SHEET NUMBER
BAR IS 25mm ONORIGINAL DRAWING
0 mm 25 mm
IF NOT 25mm ONTHIS SHEET, ADJUST
SCALES ACCORDINGLY
THE REGIONAL MUNICIPALITY
OF DURHAM
WORKS DEPARTMENT CONTRACT NUMBER
ONTARIO
S103DIGESTER FACILITIES UPGRADE- PHASE 1
046220
M. CHATTERJEE
M. ARAR
T.RICHARDSON STRUCTURAL
DIGESTER CONTROL BUILDING - ROOF PLAN D2016-036V.L. NAZARETH
CORBETT CREEK WATER POLLUTION CONTROL PLANT26 of 135
WHITBYRVA#046220-20150910-IFT
ROOF PLAN1
00.75 1.5 3 m#M75
NO. DATE NAME REVISIONS
-
8/17/2019 D2016-036 Volume 3 of 3
27/135
-
8/17/2019 D2016-036 Volume 3 of 3
28/135
-
8/17/2019 D2016-036 Volume 3 of 3
29/135
-
8/17/2019 D2016-036 Volume 3 of 3
30/135
75.286
T/ BASEMENT SLAB
BREAK AWAY EXIST.CONCRETE AND BUILDSUMP AND TRENCHDRAIN AS SHOWN
25mm DPSAWCUTALONGPERIMETER
1 0 0 M I N .
CONC. PAD
10M DWL @200 E.W.
C/W HILTI HY 200 W/ 125 EMBEDMENT
10M @200 E.W.
75.286
T/ BASEMENT SLAB
75.286
T/ BASEMENT SLAB
2 0 0 0
UNDER-PINNING &SHORING
25mmEXP. JT.
15MPa CONC.FILL
11 73.286
4 0 0
1 3 5 0
6 5 0
450 900 350 100
NOTE:REINFORCEMENT FOR SUMPARE 15M@200 E.W. & E.F.
75.286
T/ BASEMENT SLAB
2 1 "
5 3 3
25
L38X38X6 ALUM ANGLE C/W25X3X100 LG STRAP @ 400, CASTIN PLACE. SAW-CUT EX CONCAND BUILD TO MATCH.
5 0 0
1 5 0
6 5 0
EX. WALL
EX. SLAB
NEW SLAB
32x 4.8 BORDEN ALUM.GRATING W/ L38x38x6 C/WALUM. ANGLE CAST INPLACE
150x150 DP. TRENCHDRAIN CONNECT TO SUMPW/ 0.5% SLOPE175
2-15M H/E.F.
15M@200TI-TIES
3 5
0
SEE 5/S111 FOR COL-BEAMCONNECTION DETAIL
5 5 0
450
BM. 450 x 550 7-30M /BOT.
15M@200TI-TIES
7-30M /TOPOVER SUPPORT
78.943T/ MAIN FLOOR SLAB
2 0 0
200 2000 200
3 5
0
(FOR REINF.SEEDETAIL 7/S105)
DRAWING NUMBER
RVA PROJECT No.
SCALEDESIGNED:
APPROVED:
DRAFTED:
CHECKED:
SHEET NUMBER
BAR IS 25mm ONORIGINAL DRAWING
0 mm 25 mm
IF NOT 25mm ONTHIS SHEET, ADJUST
SCALES ACCORDINGLY
THE REGIONAL MUNICIPALITYOF DURHAM
WORKS DEPARTMENT CONTRACT NUMBER
ONTARIO
S107DIGESTER FACILITIES UPGRADE- PHASE 1
046220
M. CHATTERJEE
V. WALTON
T.RICHARDSON STRUCTURAL
DIGESTER CONTROL BUILDING - HEAT EXCHANGER ROOM No.1 -SECTIONS AND DETAILS D2016-036V.L. NAZARETH
CORBETT CREEK WATER POLLUTION CONTROL PLANT 30 of 135
WHITBYRVA#046220-20150910
-IFT
S101
SECTION DETAIL AT GUTTER DRAIN4S106
SECTION DETAIL AT GUTTER DRAIN50200 400 800 mm
#M20
0200 400 800 mm#M20
S101
SUMP DETAIL3S106
TRENCH DETAIL6
S106
BEAM - BM 6, BM 720200 400 800 mm
#M20
S106
SECTION10200 400 800 mm
#M20
0200 400 800 mm#M20
0200 400 800 mm#M20
NO. DATE NAME REVISIONS
-
8/17/2019 D2016-036 Volume 3 of 3
31/135
-
8/17/2019 D2016-036 Volume 3 of 3
32/135
26-25M EXISTING 200 DIA PVC
SLOPE
-
8/17/2019 D2016-036 Volume 3 of 3
33/135
78.943
T/ MAIN FLOOR SLAB
75.286
T/ BASEMENT SLAB
3 6 5 8
760 Ø (OD) ST ACK
25M DWL
15M TIE@200
1 5 0
1 4 0 0
3-15M TIES@75
15M @200H/E.W.
25M @200H/E.W.
15M @200U-BAR
EXIST.CONTROLBLDG.
50mm THK.STYROFOAM 'SM'
200mm THK. SLABON GRADE
4850
1750 1350 1750
7 5 0
SKIM SLAB 75 THK. MIN.
EXIST. PIPES - SEETABLE BELOW
EXP. JT.FILLER (TYP.)
GRAN 'A' COMPACTED TO100% S.P.D.D.
GRAN 'B'COMPACTED TO100% S.P.D.D.
SLAB ON GRADE W/ 15M@200 E.W.PLACED AT CENTER. PROVIDECONTRACTION JOINT @ 3000 E.W.
PVC MEMBRANE
4 5 0 3 0 0
2 0 0
PEDESTAL
MIN. REQ'D SOIL BEARINGCAPACITY 150kPa (SLS)
1S110
18-32mm DIA. SS316 ANCHORBOLTS EQUALLY SPACED ON915 BOLT CIRCLE, BY STACKSUPPLIER
25M @200 BOT. E.W.
4850
1 3 5 0
1350
4 8 5 0
NOTE:CONTRACTOR TO DESIGN SHORING FOREXISTING PROCESS PIPES. SEE SITE ANDPROCESS DRAWINGS FOR PIPE LOCATIONS.SUBMIT SHOP DWG. FOR REVIEW BY ENGINEER.PROTECT ALL PIPES DURING EXCAVATION,CONSTRUCTION, SHORING AND BACKFILLINGOPERATIONS.* COORDINATE STACK LOCATION w/MECHANICAL
CL. OF CONTROLBUILDING
EXIST. PIPES
EXTG. CONTROL BLDG. WALL
838 *
15M T1TIES @200
V
0.5% SLOPE TYP.
EXISTING 200 DIA PVCSUBDRAIN SITE VERIFYFOR LOCATION , SIZE &INVERT
1 5 0 D I A
P V C
S U B D R
A I N ( T Y P . )
S E E T Y
P . D E T A I L
CONNECT TOEXISTINGSUBDRAIN
EX. INVERT 71.00SITE VERIFY
DROP
0 . 5 %
S L O P E
TOE OF HEATEXCHANGERROOM NO. 1WALL
DROP FROM 73.40TO 71.85
150mm DIA RISER PIPE W/C.I.VALVE BOX BELOW GRADE
150mm DIA PVCCOLLECTOR PIPE
EXISTING PRIMARY
DIGESTER NO. 2
NEW PRIMARYDIGESTER NO.1
INV. EL. 74.9
100mm DIASUBDRAIN
INV. EL. 72.00
INV. EL. 72.20
INV. EL. 72.80TYP.
INV. EL. 73.75
INV. EL. 73.50
0.5% SLOPE(TYP.)
0. 5 % S
L O P E
T Y P.
0 . 5
% S
L O P E
T Y P
.
BACKFILL TRENCHWITH FILL CONCRETETO U/S OF SLAB
INV. EL. 74.86
DRAWING NUMBER
RVA PROJECT No.
SCALEDESIGN