d2-01_12 disaster resilient telecommunications systems for smart grid in japan atsushi ohara shikoku...

22
D2-01_12 D2-01_12 Disaster resilient telecommunications Disaster resilient telecommunications systems for smart grid in Japan systems for smart grid in Japan Atsushi Ohara Shikoku Electric Power Co., Inc. Japan [email protected] Ryouichi Ito Fujitsu Ltd. CIGRE SC D2 Colloquium CIGRE SC D2 Colloquium November 2013 November 2013 Mysore - KARNATAKA – INDIA Mysore - KARNATAKA – INDIA Kousuke Kimura Tohoku Electric Power Co., Inc. Japan Noritaka Tamehisa Cisco Systems G.K. Japan

Upload: deirdre-mcbride

Post on 01-Jan-2016

215 views

Category:

Documents


3 download

TRANSCRIPT

D2-01_12D2-01_12

Disaster resilient telecommunications systems Disaster resilient telecommunications systems

for smart grid in Japanfor smart grid in Japan

Atsushi  Ohara                              Shikoku Electric Power Co.,

Inc.

Japan

[email protected]

Ryouichi

Ito                                           Fujitsu Ltd.    

Japan                                          

CIGRE SC D2 ColloquiumCIGRE SC D2 ColloquiumNovember 2013November 2013

Mysore - KARNATAKA – INDIAMysore - KARNATAKA – INDIA

Kousuke Kimura

Tohoku Electric Power Co.,

Inc.

Japan

Noritaka Tamehisa

Cisco Systems G.K.

Japan

 

p2Change of disaster contingency planning

High reliable (Redundant)

3.11

Great East

Japan

EarthquakeHigh early

restoration

Concept of Telecommunication system

Experience

High reliable (Redundant )

High early

restoration

Support for

early recovery

from disaster

by ICT system

<Before the disaster> <After the disaster>

Use this

experience in

SMARTGRID telecommunication

system

p3Location of Shikoku EPCO and Tohoku EPCO

Shikoku EPCO Disaster Countermeasures for

Private Telephone Network

Tohoku EPCO Configuration of TV Conference

System using Satellite

Communication Links

Epicenter of Great East

Japan Earthquake

(11 March 2011)

Risk of earthquakes

in the Tonankai and Nankai area(60%to70% probability of a magunitude

8 to 9 earthquake within the next 30 years)

p4

Private Telephone Network

Case of Shikoku EPCO :Disaster Countermeasures for Private Telephone Network

Disaster resilience

Cost ReductionEnhanced Convenience

Power

Stations

Offices

Grid Operating

Center

Substations

New System

p5Overview of Old System

Pu

blic

Sw

itch

ed T

ele

pho

ne N

etw

ork PBX

CS

Analog phone

Digital phone

PHS

Branch officePower stationGrid control center Other offices

Trunk line

Sales offices Substations

60 PBX units

Terminals:

• Analog phone

• Digital phone

• PHS

*CS is at the same

location as PBXes.

PBX:Private Branch eXchage

PHS:Personal Handy-phone

System

CS:Cell station

p6Overview of New System

Pu

blic

Sw

itch

ed T

ele

pho

ne N

etw

ork IP-PBX

CS

Analog phone

Digital phone

PHS

Branch officePower stationGrid control center Other offices

Trunk line

Sales offices Substations

22 IP-based PBX units

Terminals:         - Analog phone

- Digital phone

- PHS

IP terminals: -

PSTN-GW -

IP-RU -

IP-CS -

IP-phone

*IP-CS can be deployed

at the place where can

connect to IP-network.

IP-Network

PSTN-GW

IP-RU

IP-CS IP-phone

IP-CS

Co

ntr

ol

Bac

k up

p7Benefits of Deployment of New System

Old System New System(IP-based PBX)

Co

nfi

gra

tion

Branch Office

Power Station

Sales Office

Sub Stations

Head

Office

Co

mp

aris

on

Enhanced

convenience

The PHS coverage area is

expanded dramatically

The PHS coverage

area was limited

Cost

reduction60 PBX units 22 PBX units

No backup systemswide-area backup

system

Disaster

resilience

PBX

PBXPBX

PBX PBX PBX PBX

IP-PBX

IP-CS

IP-PBX IP-PBX

IP-CS IP-RUIP-Phone

IP-NW

60units

22units

IP-CS IP-CSAnalogphone

Analogphone

Analogphone

Analogphone

p8Steps to achieve Disaster Resilience

250 km250 km

MSTMST

BUPBUP

Master Station Data

Backup Station Data

MST-TokushimaMST-Tokushima

BUP-Kochi

MST-Kagawa

BUP-Ehime

BUP-Kochi

MST-Kagawa

BUP-Ehime

MST-KochiMST-Kochi

MST-Ehime

BUP-Kagawa

BUP-Tokushima

MST-Ehime

BUP-Kagawa

BUP-Tokushima

(1)Wide-area Backup System

IP terminals select other PBX automatically to ensure continuity of call

control in the event of failure of normal connections

Deployment of Backup stations

p9

(2) Improved Reliability of the Existing IP Network

The microwave radio network that provides greater disaster resilie

nce than optical fiber lines is employed as the alternative route. In

a East Japan great earthquake, many of micro wave radio network

survived.

Steps to achieve Disaster Resilience

Optical fiber lines

microwave radio network

p10

The backup line is composed.

  A temporary line is composed in the disaster area.

Case of Tohoku EPCO :Configuration of TV Conference System using Satellite Communication Links

Purpose

System Configuration

p11

For recovery

Use of the VSAT System during the Great East Japan Earthquake

The wide range is blacked out.  

The telecommunication line of coastal flows out by the tsunami.

When East Japan great earthquake occurs ( March 11, 201

1 )

The telephone and the fax lines are necessary in the office.

The remote monitoring and control lines are necessary in the power

plant and substation.

p12Use of the VSAT System during the Great East Japan Earthquake

In 3 days : The telephone and the fax lines were restored.

In 2 weeks : The remote monitoring and control lines were restored.

Other power companies cooperated in the preparation of the necessary

transportable VSAT stations.

A temporary line was constructed with the VSAT system.

It contributes to the early recovery of the disaster.

p13

The TV conference system was used for the disaster recovery at the East Japan great earthquake.

System configuration

- 183 TV conference terminals in 113 offices.

- Stationary terminal and portable terminal.

- MCU(Multi Control Unit)

Use of the TV Conference System during the Great East Japan Earthquake

With the exception of offices the communication lines of

which had been destroyed by the tsunami, the TV

conference system were available for use in offices.

When Great East Japan Earthquake occurs ( March 11, 201

1 )

p14

-It was used to aid disaster recovery actions from the      very day the Great East Japan Earthquake struck.

-The TV conference system was used frequently for

information sharing.

<Usage Number, Time>

March 11,2011~ March 31,2011(For 21 days)

Number of total conference : 360 times.

Total conference times : for 434 hours.

Use of the TV Conference System during the Great East Japan Earthquake

p15

TV Conference held during the Great East Japan Earthquake

(Emergency Anti-disaster Headquarters in the Head Office)

Use of the TV Conference System during the Great East Japan Earthquake

It contributes to the early recovery of the disaster.

p16

The new system are composed

by VSAT system and TV conference system.

Disaster area

Portable TV conference

terminal

Head office Data Center

Internal communication network

Transportable VSAT station

StationaryTV conference

terminal

MCUMCUMCU

StationaryTV conference

terminal

StationaryTV conference

terminal

Satellitecommunications

Branch office, etc.

TV conference system

VSAT system

phone

phonephone phone

Fixed VSAT station

Fixed VSAT station

Linkage of the VSAT System and TV Conference System

The TV conference can be promptly held in any

locations at the emergency disaster.

Bandwidth

32kbps

192kbps

p17

The ability to view images directly from disaster sites

at the emergency anti-disaster headquarters provides

more accurate information.

Technical support can be provided for affected

facilities and work instructions can be transmitted

directly to disaster sites.

Expected Benefits

etc.

p18Conclusion

We strongly felt the possibility of ICT for considering disaster-

resistant and supporting early recovery, from the experience of

disaster. We learned many things from these use cases.

   - How to ensure the communication system (telephone, video

conference) is important to assist recovery from disaster.

   - VSAT and micro-ware wireless network are highly reliable and

we

can use it in case of wide area disaster.

- In case of disaster, we can do early action if we have

communication system which can use in emergency.

  We would like to use these good experience for expansion of electric

power telecommunication system which aim at SMARTGRID

deployment.

p19

Thank you !

Next:Answers to the Special Report Questions

p20Special Report Q1-7

Q1-7. The authors are invited to provide details of new IP based system and

     its comparison with old systems.

<Answer>

We explained the answer of this question at case of Shikoku EPCO

”Disaster Countermeasures for Private Telephone Network”

at slide 4,5,6.

p21Special Report Q1-8

Q1-8. Does Shikoku and Tohoku Electric Power Companies have standalone

     disaster resilience and support with dedicated telecommunication systems?

     How are they integrated to the enterprise bus of the other utility systems?

<Answer>

VSAT system is the one which has capability of disaster-resistant

independently, and we can compose it if fixed VSAT station is connected to

internal network in advance.

Shikoku Electric Power Company has VSAT system and fixed VSAT station is

connected to internal telephone network. We can connect to internal

telephone network using transportable VSAT station from the place which

encounter the disaster and can't use existing telecommunication system.

Tohoku Electric Power Company, as describing in this paper, in addition to

FAX system and remote monitoring and control line, they can connect to the

TV conferencing system.

p22

Thank you for your attention!