d05_r04 shi & estimation

Upload: james-mcguire

Post on 14-Apr-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/30/2019 d05_r04 Shi & Estimation

    1/27

    1 2 3 4

    No damage Severity: Low Severity: Medium Severity: High

    1 Bearing 0.00 each 0.00 0.00 0.00 0.00 0.000 3 1 0 0 Year of construction

    2 Abutment & dirt wall 59.04 m2 57.56 1.48 0.00 0.00 1.025 2 2 4.10 1 Road type MDR

    3 Wing wall 77.76 m2

    73.87 3.89 0.00 0.00 1.050 2 2 4.20 1 Number of span 2

    4 Concrete deck slab 93.48 m2

    77.12 0.00 0.00 16.36 1.525 3 2 9.15 1 Each span length (m) 5.7

    5 Abutment & pier caps 10.78 m2 10.78 0.00 0.00 0.00 1.000 4 2 8.00 1 Outer width of bridge (m) 8.2

    6 Piers 62.53 m2 53.15 9.38 0.00 0.00 1.150 4 2 9.20 1 Total plan area (m

    2) 93.48

    7 RCC/PSC/Steel girder 0.00 m2 0.00 0.00 0.00 0.00 0.000 4 2 0.00 0 Number of pier 1

    8 Expansion joints 24.60 m 24.60 0.00 0.00 0.00 1.000 1 3 3.00 1 Top width of pier (m) 1

    9 Approach carriageway 57.40 m2 57.40 0.00 0.00 0.00 1.000 1 3 3.00 1 Bottom width of pier (m) 1.4

    10 Batter protection 0.00 m2 0.00 0.00 0.00 0.00 0.000 1 2 0.00 0 Height of pier (m) 3.1

    11 General cleaning 0.00 each 0.00 0.00 0.00 0.00 0.000 1 3 0.00 0 Length of return/wing wall (m) 5.4

    12 Wearing surface 83.22 m2 62.42 20.81 0.00 0.00 1.250 1 3 3.75 1 Number of bearings 0

    13 Waterway 2.00 each 2.00 0.00 0.00 0.00 1.000 1 3 3.00 1 Thickness of superstructure (m) 0.5

    14 Parapet/Railing/Crash barrier 22.80 m 12.80 0.00 10.00 0.00 1.877 1 2 3.75 1 Width of bridge between kerbs 7.3

    15 Floor protection work 173.20 m2 173.20 0.00 0.00 0.00 1.000 1 2 2.00 1 Thickness of caps 0.3

    16 Foundation 0.00 m2 0.00 0.00 0.00 0.00 0.000 4 2 0.00 0 Depth of girder 0

    (ESCI*SI*CPIL) 53.154386 11 No of girders per span 0

    A E R I

    CF=0411 A+0 120E+0.

    107R+0.362I 4.00 4.00 3.00 3.00 3.53

    17.064

    D05_R04_CH - 0.024 - (Nimapada Astaranga Road)

    ItemElement

    description

    Total

    quantityUnits

    Estimated quantity in various condition states ESCI

    (Eq1)Si Mi ESCI*Si*Mi

    SHI=CF*{(ESCI*SI*MI)/n SHI = 53.1543859649123 X 3.531 / 11

    OSCI=1 when SHI=1

    OSCI=2 when 1

  • 7/30/2019 d05_r04 Shi & Estimation

    2/27

    Rate Amount

    a a1 2.3 Clearing and uprooting rank vegetation, bushes, shrubs, saplings etc including removal and disposal. m

    2 10 LS 5 000

    2 Cleaning and Greasing of Metallic bearings complete as per Technical specification no. 1 093 0 0 NA

    3 16.8Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement

    complete as per Technical specification (10mm thick)m

    2 537 0 0 NA

    4 16.3Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with

    epoxy complete as per Technical specification (25mm thick)m

    2 1 157 16 18 927

    5 16.6Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter,

    available in present formulations, to be applied as per instructions of manufacturer and as approved by the E ngineer.m

    2 2 580 0 0 NA

    6

    Jacketing of concrete surface and exposed steel reinforcement complete as per Technical specification using 200mm

    thick M 30 grade concrete including reinforcement(@ 40 kg per m3), formwork etc and all accessories to complete

    the work.

    m2 2 203 0 0 NA

    7 Supplying ,hoisting, fixing steel joists in superstructure including painting and all required materials complete. tonne 75 000 0 0 NA

    8 14.2 Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and technical specifications tonne 68 793 1 68 793

    9Drilling of holes in existing concrete and fixing new reinforcement with epoxy mortar grout but excluding cost of

    reinforcementno. 423 0 0 NA

    10 16.11 Epoxy bonding of new concrete to old concrete m2 663 0 0 NA

    11 12.5Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing

    and technical specificationsm

    3 5 083 0 0 NA

    12 13.1Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical

    Specificationsm

    3 5 165 0 0 NA

    13 13.4 Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications m3 3 588 0 0 NA

    14 13.2 Pointing with cement mortar (1:3 ) on brick work/stone work in substructure as per Technical specifications m2 40 0 0 NA

    15 13.5 Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications m2 101 15 1 489

    16 16.4

    Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical

    Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion

    of grouting with Cement/Epoxy

    no. 501 0 0 NA

    17 16.5Sealing of crack / porous concrete with cement grout by injection process through nipples / grouting complete as

    per clause 2803.1.kg 66 0 0 NA

    18 16.7 Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. kg 925 0 0 NA

    D05_R04_CH - 1.84 - (Nimapada Astaranga Road) Poor < 30m

    Sl.

    No.

    MORTH

    Ref.Item description Unit Quantity Remarks

    2 of 27

  • 7/30/2019 d05_r04 Shi & Estimation

    3/27

    Rate Amount

    a a

    D05_R04_CH - 1.84 - (Nimapada Astaranga Road) Poor < 30m

    Sl.

    No.

    MORTH

    Ref.Item description Unit Quantity Remarks

    19 16.17 Replacement of Expansion Joints complete as per drawings m 2 642 0 0 NA

    20 15.4Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of t oe

    of embankment complete as per drawing and Technical specifications.m

    3 1 376 0 0 NA

    21 15.5 Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. m3 1 117 0 0 NA

    22 Construct ion of masonry toe wal l for batter protection. m3 3 588 0 0 NA

    23 15.11Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40

    kg beyond curtain wall.m

    3 1 328 0 0 NA

    24 Construction of Cut off wall for bed protection with m15 grade cement concrete m3 4 952 0 0 NA

    25Providing and laying rubble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid

    over cement concrete bedding.m

    3 4 944 0 0 NA

    26 16.2Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic

    asphalt including disposal with all lift and lead upto 1000m.

    m2 47 21 978

    27 5.14

    Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40

    mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical

    specification sections 500 and 2700 or as directed by the Engineer.

    m2 1 356 21 28 212

    28 14.4Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and

    Technical Specificationsm

    3 11 538 0 0 NA

    29 Providing new guard post in both side of carriage way as per technical specifications no. 800 0 0 NA

    30 16.18 Replacement of Damaged Concrete Railing. m 2 031 0 0 NA

    31 16.22 Repair of RCC Railing m 122 10 1 220

    32 14.9 Providing Drainage Spouts complete as per drawing and Technical specification no. 1 114 0 0 NA

    33 8.3 Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paintblack or any other approved colour to give an even shade)

    Eachbridge

    611 2 1 222

    34 Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works 10 000 LS 10 000

    35 Provision for miscellaneous items not accounted for LS 20 000

    155 841

    1 667

    Total Cost :

    Cost of Bridge per m2 of plan area

    3 of 27

  • 7/30/2019 d05_r04 Shi & Estimation

    4/27

    1 2 3 4

    No damage Sevirity: Low Sevirity: Medium Sevirity: High

    1 Bearing 0.00 each 0.00 0.00 0.00 0.00 0.000 3 1 0 0 Year of construction

    2 Abutment & dirt wall 30.42 m2 11.41 0.00 0.00 19.01 2.875 2 2 11.50 1 Road type MDR

    3 Wing Wall 22.82 m2 8.56 0.00 0.00 14.26 2.875 2 2 11.50 1 Number of Span 2

    4 Concrete deck Slab 71.76 m2 59.20 0.00 0.00 12.56 1.525 3 2 9.15 1 Each span length(m) 4.6

    5 Abutment & pier caps 6.74 m2 6.41 0.34 0.00 0.00 1.050 4 2 8.40 1 Outer width of bridge(m) 7.8

    6 Piers 27.64 m2 10.37 0.00 0.00 17.28 2.875 4 2 23.00 1 Total plan area(m^2) 71.76

    7 RCC / PSC/Steel girder 0.00 m2 0.00 0.00 0.00 0.00 0.000 4 2 0.00 0 Number of pier 1

    8 Expansion joints 23.40 m 23.40 0.00 0.00 0.00 1.000 1 3 3.00 1 Top width of pier(m) 0.89 Approach carriageway 54.60 m2 54.60 0.00 0.00 0.00 1.000 1 3 3.00 1 Bottom width of pier(m) 1

    10 Batter protection 32.30 m2 0.00 0.00 0.00 32.30 4.000 1 2 8.00 1 Height of pier(m) 1.5

    11 General cleaning 0.00 each 0.00 0.00 0.00 0.00 0.000 1 3 0.00 0 Length of return/wing wall(m) 2.925

    12 Wearing surface 64.40 m2 53.13 0.00 11.27 0.00 1.350 1 3 4.05 1 Number of bearings 0

    13 Waterway 2.00 each 2.00 0.00 0.00 0.00 1.000 1 3 3.00 1 Thickness of superstructure (m) 0.45

    14Parapet/Railing/Crash

    barrier18.40 m 0.00 0.00 0.00 18.40 4.000 1 2 8.00 1 width of bridge between kerbs 7

    15 Floor protection work 0.00 m2 0.00 0.00 0.00 0.00 0.000 1 2 0.00 0 Thickness of caps 0.2

    16 Foundation 0.00 m2 0.00 0.00 0.00 0.00 0.000 4 2 0.00 0 Depth of girder 0

    (ESCI*SI*CPIL) 92.6 11 No of girders per span 0

    A E R I

    CF=0411 A+0 120E+0.

    107R+0.362I4.00 4.00 3.00 3.00 3.53

    29.727

    D05_R04_CH - 1.84 - (Nimapada Astaranga Road)

    ItemElement

    description

    Total

    quantityUnits

    Estimated quantity in

    various condition statesESCI

    (Eq1)Si Mi ESCI*Si*Mi

    SHI=CF*{(ESCI*SI*MI)/n SHI = 92.6 X 3.531 / 11

    OSCI=1 when SHI=1

    OSCI=2 when 1

  • 7/30/2019 d05_r04 Shi & Estimation

    5/27

    Rate Amount

    a a1 2.3 Clearing and uprooting rank vegetation, bushes, shrubs, saplings etc including removal and disposal. m

    2 10 LS 1 000

    2 Cleaning and Greasing of Metallic bearings complete as per Technical specification no. 1 093 0 0 NA

    3 16.8Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement

    complete as per Technical specification (10mm thick)m

    2 537 0 0 NA

    4 16.3Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with

    epoxy complete as per Technical specification (25mm thick)m

    2 1 152 13 14 855

    5 16.6Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter,

    available in present formulations, to be applied as per instructions of manufacturer and as approved by the E ngineer.m

    2 2 580 0 0 NA

    6

    Jacketing of concrete surface and exposed steel reinforcement complete as per Technical specification using 200mm

    thick M 30 grade concrete including reinforcement(@ 40 kg per m3), formwork etc and all accessories to complete

    the work.

    m2 2 232 30 67 897

    7 Supplying ,hoisting, fixing steel joists in superstructure including painting and all required materials complete. tonne 75 000 0 0 NA

    8 14.2 Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and technical specifications tonne 68 793 0.045 3 127

    9Drilling of holes in existing concrete and fixing new reinforcement with epoxy mortar grout but excluding cost of

    reinforcementno. 466 0 0 NA

    10 16.11 Epoxy bonding of new concrete to old concrete m2 663 0 0 NA

    11 12.5Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing

    and technical specificationsm

    3 5 044 0 0 NA

    12 13.1Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical

    Specificationsm

    3 5 124 0 0 NA

    13 13.4 Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications m3 3 519 8 28 152

    14 13.2 Pointing with cement mortar (1:3 ) on brick work/stone work in substructure as per Technical specifications m2 40 51 2 022

    15 13.5 Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications m2 99 0 0 NA

    16 16.4

    Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical

    Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion

    of grouting with Cement/Epoxy

    no. 501 0 0 NA

    17 16.5Sealing of crack / porous concrete with cement grout by injection process through nipples / grouting complete as

    per clause 2803.1.kg 66 0 0 NA

    18 16.7 Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. kg 925 0 0 NA

    D05_R04_CH - 1.84 - (Nimapada Astaranga Road) Poor 6m-30m

    Sl.

    No.

    MORTH

    Ref.Item description Unit Quantity Remarks

    5 of 27

  • 7/30/2019 d05_r04 Shi & Estimation

    6/27

    Rate Amount

    a a

    D05_R04_CH - 1.84 - (Nimapada Astaranga Road) Poor 6m-30m

    Sl.

    No.

    MORTH

    Ref.Item description Unit Quantity Remarks

    19 16.17 Replacement of Expansion Joints complete as per drawings m 2 599 0 0 NA

    20 15.4Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of t oe

    of embankment complete as per drawing and Technical specifications.m

    3 1 359 10 13 170Stone

    pitching

    21 15.5 Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. m3 1 099 5 5 325

    F ter

    22 Construct ion of masonry toe wal l for batter protection. m3 3 588 9 32 971

    23 15.11Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40

    kg beyond curtain wall.m

    3 1 312 0 0 NA

    24 Construction of Cut off wall for bed protection with m15 grade cement concrete m3 4 848 0 0 NA

    25Providing and laying rubble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid

    over cement concrete bedding.m

    3 4 841 0 0 NA

    26 16.2Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic

    asphalt including disposal with all lift and lead upto 1000m.

    m2 47 11 530

    27 5.14

    Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40

    mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical

    specification sections 500 and 2700 or as directed by the Engineer.

    m2 1 355 11 15 271

    28 14.4Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and

    Technical Specificationsm

    3 12 012 0 0 NA

    29 Providing new guard post in both side of carriage way as per technical specifications no. 800 0 0 NA

    30 16.18 Replacement of Damaged Concrete Railing. m 2 173 0 0 NA

    31 16.22 Repair of RCC Railing m 129 0 0 NA

    32 14.9 Providing Drainage Spouts complete as per drawing and Technical specification no. 1 114 0 0 NA

    33 8.3 Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paintblack or any other approved colour to give an even shade)

    Eachbridge

    611 2 1 222

    34 Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works 10 000 LS 10 000

    35 Provision for miscellaneous items not accounted for LS 20 000

    215 542

    3 004

    Total Cost :

    Cost of Bridge per m2 of plan area

    6 of 27

  • 7/30/2019 d05_r04 Shi & Estimation

    7/27

    1 2 3 4

    No damage Severity: Low Severity: Medium Severity: High

    1 Bearing 0.00 each 0.00 0.00 0.00 0.00 0.000 3 1 0 0 Year of construction

    2 Abutment & dirt wall 42.84 m2 42.84 0.00 0.00 0.00 1.000 2 2 4.00 1 Road type MDR

    3 Wing wall 39.02 m2

    39.02 0.00 0.00 0.00 1.000 2 2 4.00 1 Number of span 6

    4 Concrete deck slab 292.32 m2 275.27 0.00 17.05 0.00 1.117 3 2 6.70 1 Each span length (m) 5.8

    5 Abutment & pier caps 34.01 m2 32.31 0.00 1.70 0.00 1.100 4 2 8.80 1 Outer width of bridge (m) 8.4

    6 Piers 209.39 m2 207.29 0.00 2.09 0.00 1.020 4 2 8.16 1 Total plan area (m

    2) 292.32

    7 RCC/PSC/Steel girder 0.00 m2 0.00 0.00 0.00 0.00 0.000 4 2 0.00 0 Number of pier 5

    8 Expansion joints 58.80 m 0.00 58.80 0.00 0.00 2.000 1 3 6.00 1 Top width of pier (m) 0.8

    9 Approach carriageway 58.80 m2 58.80 0.00 0.00 0.00 1.000 1 3 3.00 1 Bottom width of pier (m) 1.2

    10 Batter protection 55.24 m2 0.00 55.24 0.00 0.00 2.000 1 2 4.00 1 Height of pier (m) 2.1

    11 General cleaning 6.00 each 6.00 0.00 0.00 0.00 1.000 1 3 3.00 1 Length of return/wing wall (m) 3.825

    12 Wearing surface 245.34 m2 245.34 0.00 0.00 0.00 1.000 1 2 2.00 1 Number of bearings 0

    13 Waterway 6.00 each 6.00 0.00 0.00 0.00 1.000 1 3 3.00 1 Thickness of superstructure (m) 0.45

    14 Parapet/Railing/Crash barrier 69.60 m 69.60 0.00 0.00 0.00 1.000 1 2 2.00 1 Width of bridge between kerbs 7.05

    15 Floor protection work 520.32 m2 429.26 91.06 0.00 0.00 1.175 1 2 2.35 1 Thickness of caps 0.3

    16 Foundation 0.00 m2 0.00 0.00 0.00 0.00 0.000 4 2 0.00 0 Depth of girder 0

    (ESCI*SI*CPIL) 57.01 13 No of girders per span 0

    A E R I

    CF=0411 A+0 120E+0.

    107R+0.362I 4.00 4.00 3.00 3.00 3.53

    15.486

    D05_R04_CH - 4.88 - (Nimapada Astaranga Road)

    ItemElement

    description

    Total

    quantityUnits

    Estimated quantity in various condition states ESCI

    (Eq1)Si Mi ESCI*Si*Mi

    SHI=CF*{(ESCI*SI*MI)/n SHI = 57.01 X 3.531 / 13

    OSCI=1 when SHI=1

    OSCI=2 when 1

  • 7/30/2019 d05_r04 Shi & Estimation

    8/27

    Rate Amount

    a a1 2.3 Clearing and uprooting rank vegetation, bushes, shrubs, saplings etc including removal and disposal. m

    2 10 LS 3 000

    2 Cleaning and Greasing of Metallic bearings complete as per Technical specification no. 1 093 0 0 NA

    3 16.8Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement

    complete as per Technical specification (10mm thick)m

    2 537 126 67 723

    4 16.3Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with

    epoxy complete as per Technical specification (25mm thick)m

    2 1 157 17 19 729

    5 16.6Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter,

    available in present formulations, to be applied as per instructions of manufacturer and as approved by the E ngineer.m

    2 2 580 0 0 NA

    6

    Jacketing of concrete surface and exposed steel reinforcement complete as per Technical specification using 200mm

    thick M 30 grade concrete including reinforcement(@ 40 kg per m3), formwork etc and all accessories to complete

    the work.

    m2 2 203 0 0 NA

    7 Supplying ,hoisting, fixing steel joists in superstructure including painting and all required materials complete. tonne 75 000 0 0 NA

    8 14.2 Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and technical specifications tonne 68 793 0 0 NA

    9Drilling of holes in existing concrete and fixing new reinforcement with epoxy mortar grout but excluding cost of

    reinforcementno. 423 0 0 NA

    10 16.11 Epoxy bonding of new concrete to old concrete m2 663 0 0 NA

    11 12.5Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing

    and technical specificationsm

    3 5 083 0 0 NA

    12 13.1Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical

    Specificationsm

    3 5 165 0 0 NA

    13 13.4 Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications m3 3 588 0 0 NA

    14 13.2 Pointing with cement mortar (1:3 ) on brick work/stone work in substructure as per Technical specifications m2 40 0 0 NA

    15 13.5 Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications m2 101 0 0 NA

    16 16.4

    Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical

    Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion

    of grouting with Cement/Epoxy

    no. 501 0 0 NA

    17 16.5Sealing of crack / porous concrete with cement grout by injection process through nipples / grouting complete as

    per clause 2803.1.kg 66 0 0 NA

    18 16.7 Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. kg 925 0 0 NA

    D05_R04_CH - 4.88 - (Nimapada Astaranga Road) Poor >30m

    Sl.

    No.

    MORTH

    Ref.Item description Unit Quantity Remarks

    8 of 27

  • 7/30/2019 d05_r04 Shi & Estimation

    9/27

    Rate Amount

    a a

    D05_R04_CH - 4.88 - (Nimapada Astaranga Road) Poor >30m

    Sl.

    No.

    MORTH

    Ref.Item description Unit Quantity Remarks

    19 16.17 Replacement of Expansion Joints complete as per drawings m 2 642 0 0 NA

    20 15.4Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of t oe

    of embankment complete as per drawing and Technical specifications.m

    3 1 376 18 24 273Stone

    pitching

    21 15.5 Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. m3 1 117 9 9 852

    F ter

    22 Construct ion of masonry toe wal l for batter protection. m3 3 588 0 0 NA

    23 15.11Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40

    kg beyond curtain wall.m

    3 1 328 12 15 958

    24 Construction of Cut off wall for bed protection with m15 grade cement concrete m3 4 952 0 0 NA

    25Providing and laying rubble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid

    over cement concrete bedding.m

    3 4 944 41 202 581 NA

    26 16.2Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic

    asphalt including disposal with all lift and lead upto 1000m.

    m2 47 0 0 NA

    27 5.14

    Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40

    mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical

    specification sections 500 and 2700 or as directed by the Engineer.

    m2 1 356 0 0 NA

    28 14.4Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and

    Technical Specificationsm

    3 11 538 0 0 NA

    29 Providing new guard post in both side of carriage way as per technical specifications no. 800 0 0 NA

    30 16.18 Replacement of Damaged Concrete Railing. m 2 031 0 0 NA

    31 16.22 Repair of RCC Railing m 122 0 0 NA

    32 14.9 Providing Drainage Spouts complete as per drawing and Technical specification no. 1 114 0 0 NA

    33 8.3 Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paintblack or any other approved colour to give an even shade)

    Eachbridge

    611 2 1 222

    34 Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works 10 000 LS 10 000

    35 Provision for miscellaneous items not accounted for LS 20 000

    374 338Total Cost :

    9 of 27

  • 7/30/2019 d05_r04 Shi & Estimation

    10/27

    1 2 3 4

    No damage Sevirity: Low Sevirity: Medium Sevirity: High

    1 Bearing 0.00 each 0.00 0.00 0.00 0.00 0.000 3 1 0 0 Year of construction

    2 Abutment & dirt wall 30.78 m2 30.78 0.00 0.00 0.00 1.000 2 2 4.00 1 Road type MDR

    3 Wing Wall 21.66 m2 21.66 0.00 0.00 0.00 1.000 2 2 4.00 1 Number of Span 3

    4 Concrete deck Slab 111.78 m2 41.92 0.00 0.00 69.86 2.875 3 2 17.25 1 Each span length(m) 4.6

    5 Abutment & pier caps 10.54 m2 10.54 0.00 0.00 0.00 1.000 4 2 8.00 1 Outer width of bridge(m) 8.1

    6 Piers 58.37 m2 56.92 0.00 1.46 0.00 1.050 4 2 8.40 1 Total plan area(m^2) 111.78

    7 RCC / PSC/Steel girder 0.00 m2 0.00 0.00 0.00 0.00 0.000 4 2 0.00 0 Number of pier 2

    8 Expansion joints 32.40 m 0.00 32.40 0.00 0.00 2.000 1 3 6.00 1 Top width of pier(m) 0.65

    9 Approach carriageway 56.70 m2 56.70 0.00 0.00 0.00 1.000 1 3 3.00 1 Bottom width of pier(m) 0.65

    10 Batter protection 0.00 m2 0.00 0.00 0.00 0.00 0.000 1 2 0.00 0 Height of pier(m) 1.6

    11 General cleaning 0.00 each 0.00 0.00 0.00 0.00 0.000 1 3 0.00 0 Length of return/wing wall(m) 2.85

    12 Wearing surface 100.74 m2 100.74 0.00 0.00 0.00 1.000 1 2 2.00 1 Number of bearings 0

    13 Waterway 3.00 each 3.00 0.00 0.00 0.00 1.000 1 3 3.00 1 Thickness of superstructure (m) 0.3

    14Parapet/Railing/Crash

    barrier27.60 m 27.60

    0.00 0.00 0.001.000 1 2 2.00 1 width of bridge between kerbs 7.3

    15 Floor protection work 211.65 m2 211.65 0.00 0.00 0.00 1.000 1 2 2.00 1 Thickness of caps 0.2

    16 Foundation 0.00 m2 0.00 0.00 0.00 0.00 0.000 4 2 0.00 0 Depth of girder 0

    (ESCI*SI*CPIL) 59.65 11 No of girders per span 0

    A E R I

    CF=0411 A+0 120E+0.

    107R+0.362I4.00 4.00 3.00 3.00 3.53

    19.149

    D05_R04_CH - 8.39 - (Nimapada Astaranga Road)

    ItemElement

    description

    Total

    quantityUnits

    Estimated quantity in

    various condition statesESCI

    (Eq1)Si Mi ESCI*Si*Mi

    SHI=CF*{(ESCI*SI*MI)/n SHI = 59.65 X 3.531 / 11

    OSCI=1 when SHI=1OSCI=2 when 1

  • 7/30/2019 d05_r04 Shi & Estimation

    11/27

    Rate Amount

    a a1 2.3 Clearing and uprooting rank vegetation, bushes, shrubs, saplings etc including removal and disposal. m

    2 10 LS 1 200

    2 Cleaning and Greasing of Metallic bearings complete as per Technical specification no. 1 093 0 0 NA

    3 16.8Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement

    complete as per Technical specification (10mm thick)m

    2 537 0 0 NA

    4 16.3Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with

    epoxy complete as per Technical specification (25mm thick)m

    2 1 152 112 128 771

    5 16.6Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter,

    available in present formulations, to be applied as per instructions of manufacturer and as approved by the E ngineer.m

    2 2 580 0 0 NA

    6

    Jacketing of concrete surface and exposed steel reinforcement complete as per Technical specification using 200mm

    thick M 30 grade concrete including reinforcement(@ 40 kg per m3), formwork etc and all accessories to complete

    the work.

    m2 2 232 0 0 NA

    7 Supplying ,hoisting, fixing steel joists in superstructure including painting and all required materials complete. tonne 75 000 0 0 NA

    8 14.2 Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and technical specifications tonne 68 793 1.3 90 119

    9Drilling of holes in existing concrete and fixing new reinforcement with epoxy mortar grout but excluding cost of

    reinforcementno. 466 0 0 NA

    10 16.11 Epoxy bonding of new concrete to old concrete m2 663 0 0 NA

    11 12.5Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing

    and technical specificationsm

    3 5 044 0 0 NA

    12 13.1Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical

    Specificationsm

    3 5 124 0 0 NA

    13 13.4 Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications m3 3 519 0 0 NA

    14 13.2 Pointing with cement mortar (1:3 ) on brick work/stone work in substructure as per Technical specifications m2 40 0 0 NA

    15 13.5 Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications m2 99 1 144 NA

    16 16.4

    Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical

    Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion

    of grouting with Cement/Epoxy

    no. 501 0 0 NA

    17 16.5Sealing of crack / porous concrete with cement grout by injection process through nipples / grouting complete as

    per clause 2803.1.kg 66 0 0 NA

    18 16.7 Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. kg 925 0 0 NA

    D05_R04_CH - 8.39 - (Nimapada Astaranga Road) Poor

  • 7/30/2019 d05_r04 Shi & Estimation

    12/27

    Rate Amount

    a a

    D05_R04_CH - 8.39 - (Nimapada Astaranga Road) Poor

  • 7/30/2019 d05_r04 Shi & Estimation

    13/27

    1 2 3 4

    No damage Severity: Low Severity: Medium Severity: High

    1 Bearing 0.00 each 0.00 0.00 0.00 0.00 0.000 3 1 0 0 Year of construction

    2 Abutment & dirt wall 23.20 m2 23.20 0.00 0.00 0.00 1.000 2 2 4.00 1 Road type MDR

    3 Wing wall 12.62 m2

    12.62 0.00 0.00 0.00 1.000 2 2 4.00 1 Number of span 2

    4 Concrete deck slab 57.60 m2 51.12 0.00 6.48 0.00 1.225 3 2 7.35 1 Each span length (m) 3.6

    5 Abutment & pier caps 6.81 m2 6.81 0.00 0.00 0.00 1.000 4 2 8.00 1 Outer width of bridge (m) 8

    6 Piers 18.04 m2 18.04 0.00 0.00 0.00 1.000 4 2 8.00 1 Total plan area (m

    2) 57.6

    7 RCC/PSC/Steel girder 0.00 m2 0.00 0.00 0.00 0.00 0.000 4 2 0.00 0 Number of pier 1

    8 Expansion joints 24.00 m 24.00 0.00 0.00 0.00 1.000 1 3 3.00 1 Top width of pier (m) 0.65

    9 Approach carriageway 56.00 m2 46.20 0.00 9.80 0.00 1.350 1 3 4.05 1 Bottom width of pier (m) 0.65

    10 Batter protection 0.00 m2 0.00 0.00 0.00 0.00 0.000 1 2 0.00 0 Height of pier (m) 1

    11 General cleaning 0.00 each 0.00 0.00 0.00 0.00 0.000 1 3 0.00 0 Length of return/wing wall (m) 2.175

    12 Wearing surface 51.84 m2 42.77 0.00 9.07 0.00 1.350 1 2 2.70 1 Number of bearings 0

    13 Waterway 2.00 each 2.00 0.00 0.00 0.00 1.000 1 3 3.00 1 Thickness of superstructure (m) 0.45

    14 Parapet/Railing/Crash barrier 14.40 m 14.40 0.00 0.00 0.00 1.000 1 2 2.00 1 Width of bridge between kerbs 7.2

    15 Floor protection work 110.00 m2 110.00 0.00 0.00 0.00 1.000 1 2 2.00 1 Thickness of caps 0.2

    16 Foundation 0.00 m2 0.00 0.00 0.00 0.00 0.000 4 2 0.00 0 Depth of girder 0

    (ESCI*SI*CPIL) 48.1 11 No of girders per span 0

    A E R I

    CF=0411 A+0 120E+0.

    107R+0.362I 4.00 4.00 3.00 3.00 3.53

    15.441SHI=CF*{(ESCI*SI*MI)/n SHI = 48.1 X 3.531 / 11

    OSCI=1 when SHI=1

    OSCI=2 when 1

  • 7/30/2019 d05_r04 Shi & Estimation

    14/27

    Rate Amount

    a a1 2.3 Clearing and uprooting rank vegetation, bushes, shrubs, saplings etc including removal and disposal. m

    2 10 LS 5 000

    2 Cleaning and Greasing of Metallic bearings complete as per Technical specification no. 1 093 0 0 NA

    3 16.8Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement

    complete as per Technical specification (10mm thick)m

    2 537 0 0 NA

    4 16.3Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with

    epoxy complete as per Technical specification (25mm thick)m

    2 1 157 6 7 497

    5 16.6Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter,

    available in present formulations, to be applied as per instructions of manufacturer and as approved by the E ngineer.m

    2 2 580 0 0 NA

    6

    Jacketing of concrete surface and exposed steel reinforcement complete as per Technical specification using 200mm

    thick M 30 grade concrete including reinforcement(@ 40 kg per m3), formwork etc and all accessories to complete

    the work.

    m2 2 203 0 0 NA

    7 Supplying ,hoisting, fixing steel joists in superstructure including painting and all required materials complete. tonne 75 000 0 0 NA

    8 14.2 Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and technical specifications tonne 68 793 0 0 NA

    9Drilling of holes in existing concrete and fixing new reinforcement with epoxy mortar grout but excluding cost of

    reinforcementno. 423 0 0 NA

    10 16.11 Epoxy bonding of new concrete to old concrete m2 663 0 0 NA

    11 12.5Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing

    and technical specificationsm

    3 5 083 0 0 NA

    12 13.1Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical

    Specificationsm

    3 5 165 0 0 NA

    13 13.4 Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications m3 3 588 0 0 NA

    14 13.2 Pointing with cement mortar (1:3 ) on brick work/stone work in substructure as per Technical specifications m2 40 0 0 NA

    15 13.5 Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications m2 101 0 0 NA

    16 16.4

    Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical

    Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion

    of grouting with Cement/Epoxy

    no. 501 0 0 NA

    17 16.5Sealing of crack / porous concrete with cement grout by injection process through nipples / grouting complete as

    per clause 2803.1.kg 66 0 0 NA

    18 16.7 Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. kg 925 0 0 NA

    D05_R04_CH - 8.39 - (Nimapada Astaranga Road) FAIR

  • 7/30/2019 d05_r04 Shi & Estimation

    15/27

    Rate Amount

    a a

    D05_R04_CH - 8.39 - (Nimapada Astaranga Road) FAIR

  • 7/30/2019 d05_r04 Shi & Estimation

    16/27

    1 2 3 4

    No damage Severity: Low Severity: Medium Severity: High

    1 Bearing 30.00 each 27.00 0.00 0.00 3.00 1.300 3 1 3.9 1 Year of construction 1968

    2 Abutment & dirt wall 104.58 m2 104.58 0.00 0.00 0.00 1.000 2 2 4.00 1 Road type MDR

    3 Wing wall 238.14 m2

    238.14 0.00 0.00 0.00 1.000 2 2 4.00 1 Number of span 5

    4 Concrete deck slab 892.25 m2 874.41 17.85 0.00 0.00 1.020 3 2 6.12 1 Each span length (m) 21.5

    5 Abutment & pier caps 51.55 m2 49.49 0.00 2.06 0.00 1.080 4 2 8.64 1 Outer width of bridge (m) 8.3

    6 Piers 373.88 m2 372.01 0.00 0.00 1.87 1.015 4 2 8.12 1 Total plan area (m

    2) 892.25

    7 RCC/PSC/Steel girder 1322.25 m2 1309.03 0.00 13.22 0.00 1.020 4 2 8.16 1 Number of pier 4

    8 Expansion joints 49.80 m 0.00 0.00 49.80 0.00 3.000 1 3 9.00 1 Top width of pier (m) 1.6

    9 Approach carriageway 58.10 m2 58.10 0.00 0.00 0.00 1.000 1 3 3.00 1 Bottom width of pier (m) 2

    10 Batter protection 337.18 m2 337.18 0.00 0.00 0.00 1.000 1 2 2.00 1 Height of pier (m) 4.20

    11 General cleaning 0.00 each 0.00 0.00 0.00 0.00 0.000 1 3 0.00 0 Length of return/wing wall (m) 9.45

    12 Wearing surface 779.38 m2 779.38 0.00 0.00 0.00 1.000 1 2 2.00 1 Number of bearings 30

    13 waterway 5.00 each 5.00 0.00 0.00 0.00 1.000 1 3 3.00 1 Thickness of superstructure (m) 2.1

    14 Parapet/Railing/Crash barrier 215.00 m 204.25 10.75 0.00 0.00 1.050 1 2 2.10 1 Width of bridge between kerbs 7.25

    15 Floor protection work 0.00 m2 0.00 0.00 0.00 0.00 0.000 1 2 0.00 0 Thickness of caps 0.5

    16 Foundation 0.00 m2 0.00 0.00 0.00 0.00 0.000 4 2 0.00 0 Depth of girder 1.9

    (ESCI*SI*CPIL) 64.04 13 No of girders per span 3

    A E R I

    CF=0411 A+0 120E+0.

    107R+0.362I 4.00 4.00 3.00 3.00 3.53

    17.396SHI=CF*{(ESCI*SI*MI)/n SHI = 64.04 X 3.531 / 13

    OSCI=1 when SHI=1

    OSCI=2 when 1

  • 7/30/2019 d05_r04 Shi & Estimation

    17/27

    Rate Amount

    a a1 2.3 Clearing and uprooting rank vegetation, bushes, shrubs, saplings etc including removal and disposal. m

    2 10 LS 10 000

    2 Cleaning and Greasing of Metallic bearings complete as per Technical specification no. 1 093 30 32 790

    3 16.8Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement

    complete as per Technical specification (10mm thick)m

    2 537 0 0 NA

    4 16.3Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with

    epoxy complete as per Technical specification (25mm thick)m

    2 1 157 35 40 494

    5 16.6Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter,

    available in present formulations, to be applied as per instructions of manufacturer and as approved by the E ngineer.m

    2 2 580 0 0 NA

    6

    Jacketing of concrete surface and exposed steel reinforcement complete as per Technical specification using 200mm

    thick M 30 grade concrete including reinforcement(@ 40 kg per m3), formwork etc and all accessories to complete

    the work.

    m2 2 203 0 0 NA

    7 Supplying ,hoisting, fixing steel joists in superstructure including painting and all required materials complete. tonne 75 000 0 0 NA

    8 14.2 Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and technical specifications tonne 68 793 0 0 NA

    9Drilling of holes in existing concrete and fixing new reinforcement with epoxy mortar grout but excluding cost of

    reinforcementno. 423 0 0 NA

    10 16.11 Epoxy bonding of new concrete to old concrete m2 663 0 0 NA

    11 12.5Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing

    and technical specificationsm

    3 5 083 0 0 NA

    12 13.1Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical

    Specificationsm

    3 5 165 0 0 NA

    13 13.4 Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications m3 3 588 0 0 NA

    14 13.2 Pointing with cement mortar (1:3 ) on brick work/stone work in substructure as per Technical specifications m2 40 0 0 NA

    15 13.5 Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications m2

    101 0 0 NA

    16 16.4

    Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical

    Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion

    of grouting with Cement/Epoxy

    no. 501 0 0 NA

    17 16.5Sealing of crack / porous concrete with cement grout by injection process through nipples / grouting complete as

    per clause 2803.1.kg 66 0 0 NA

    18 16.7 Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. kg 925 19 17 908

    D05_R04_CH - 20.06 - (Nimapada Astaranga Road) POOR >30m

    Sl.

    No.

    MORTH

    Ref.Item description Unit Quantity Remarks

    17 of 27

  • 7/30/2019 d05_r04 Shi & Estimation

    18/27

    Rate Amount

    a a

    D05_R04_CH - 20.06 - (Nimapada Astaranga Road) POOR >30m

    Sl.

    No.

    MORTH

    Ref.Item description Unit Quantity Remarks

    19 16.17 Replacement of Expansion Joints complete as per drawings m 2 642 50 131 572

    20 15.4Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of t oe

    of embankment complete as per drawing and Technical specifications.m

    3 1 376 0 0 NA

    21 15.5 Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. m3 1 117 0 0 NA

    22 Construction of masonry toe wall for batter protection. m3 3 588 0 0 NA

    23 15.11Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40

    kg beyond curtain wall.m

    3 1 328 0 0 NA

    24 Construction of Cut off wall for bed protection with m15 grade cement concrete m3 4 952 0 0 NA

    25Providing and laying rubble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid

    over cement concrete bedding.m

    3 4 944 0 0 NA

    26 16.2Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic

    asphalt including disposal with all lift and lead upto 1000m.m

    2 47 0 0 NA

    27 5.14

    Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40

    mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical

    specification sections 500 and 2700 or as directed by the Engineer.

    m2 1 356 0 0 NA

    28 14.4Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and

    Technical Specificationsm

    3 11 538 0 0 NA

    29 Providing new guard post in both side of carriage way as per technical specifications no. 800 0 0 NA

    30 16.18 Replacement of Damaged Concrete Railing. m 2 031 0 0 NA

    31 16.22 Repair of RCC Railing m 122 11 1 312

    32 14.9 Providing Drainage Spouts complete as per drawing and Technical specification no. 1 114 0 0 NA

    33 8.3 Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paintblack or any other approved colour to give an even shade)

    Eachbridge

    611 2 1 222

    34 Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works 10 000 LS 10 000

    35 Provision for miscel laneous i tems not accounted for LS 20 000

    265 297Total Cost :

    18 of 27

  • 7/30/2019 d05_r04 Shi & Estimation

    19/27

    1 2 3 4

    No damage Severity: Low Severity: Medium Severity: High

    1 Bearing 0.00 each 0.00 0.00 0.00 0.00 0.000 3 1 0 0 Year of construction

    2 Abutment & dirt wall 22.01 m2 22.01 0.00 0.00 0.00 1.000 2 2 4.00 1 Road type MDR

    3 Wing wall 10.94 m2

    10.94 0.00 0.00 0.00 1.000 2 2 4.00 1 Number of span 2

    4 Concrete deck slab 74.98 m2 71.23 0.00 3.75 0.00 1.100 3 2 6.60 1 Each span length (m) 4.6

    5 Abutment & pier caps 6.96 m2 6.96 0.00 0.00 0.00 1.000 4 2 8.00 1 Outer width of bridge (m) 8.15

    6 Piers 18.50 m2 18.50 0.00 0.00 0.00 1.000 4 2 8.00 1 Total plan area (m

    2) 74.98

    7 RCC/PSC/Steel girder 0.00 m2 0.00 0.00 0.00 0.00 0.000 4 2 0.00 0 Number of pier 1

    8 Expansion joints 24.45 m 0.00 24.45 0.00 0.00 2.000 1 3 6.00 1 Top width of pier (m) 0.7

    9 Approach carriageway 57.05 m2 57.05 0.00 0.00 0.00 1.000 1 3 3.00 1 Bottom width of pier (m) 0.7

    10 Batter protection 0.00 m2 0.00 0.00 0.00 0.00 0.000 1 2 0.00 0 Height of pier (m) 1

    11 General cleaning 2.00 each 2.00 0.00 0.00 0.00 1.000 1 3 3.00 1 Length of return/wing wall (m) 2.025

    12 Wearing surface 67.16 m2 33.58 0.00 33.58 0.00 2.000 1 2 4.00 1 Number of bearings 0

    13 Waterway 2.00 each 2.00 0.00 0.00 0.00 1.000 1 3 3.00 1 Thickness of superstructure (m) 0.35

    14 Parapet/Railing/Crash barrier 18.40 m 18.40 0.00 0.00 0.00 1.000 1 2 2.00 1 Width of bridge between kerbs 7.3

    15 Floor protection work 142.88 m2 142.88 0.00 0.00 0.00 1.000 1 2 2.00 1 Thickness of caps 0.2

    16 Foundation 0.00 m2 0.00 0.00 0.00 0.00 0.000 4 2 0.00 0 Depth of girder 0

    (ESCI*SI*CPIL) 53.6 12 No of girders per span 0

    A E R I

    CF=0411 A+0 120E+0.

    107R+0.362I 4.00 4.00 3.00 3.00 3.53

    15.773SHI=CF*{(ESCI*SI*MI)/n SHI = 53.6 X 3.531 / 12

    OSCI=1 when SHI=1

    OSCI=2 when 1

  • 7/30/2019 d05_r04 Shi & Estimation

    20/27

    Rate Amount

    a a1 2.3 Clearing and uprooting rank vegetation, bushes, shrubs, saplings etc including removal and disposal. m

    2 10 LS 1 000

    2 Cleaning and Greasing of Metallic bearings complete as per Technical specification no. 1 093 0 0 NA

    3 16.8Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement

    complete as per Technical specification (10mm t hick)m

    2 537 0 0 NA

    4 16.3Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with

    epoxy complete as per Technical specification (25mm thick)m

    2 1 157 4 4 338

    5 16.6Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter,

    available in present formulations, to be applied as per instructions of manufacturer and as approved by the Engineer.m

    2 2 580 0 0 NA

    6

    Jacketing of concrete surface and exposed steel reinforcement complete as per Technical specification using 200mm

    thick M 30 grade concrete including reinforcement(@ 40 kg per m3), formwork etc and all accessories to complete

    the work.

    m2 2 203 0 0 NA

    7 Supplying ,hoisting, fixing steel joists in superstructure including painting and all required materials complete. tonne 75 000 0 0 NA

    8 14.2 Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and technical specifications tonne 68 793 0 0 NA

    9Drilling of holes in existing concrete and fixing new reinforcement with epoxy mortar grout but excluding cost o f

    reinforcementno. 423 0 0 NA

    10 16.11 Epoxy bonding of new concrete to old concrete m2 663 0 0 NA

    11 12.5Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing

    and technical specificationsm

    3 5 083 0 0 NA

    12 13.1Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical

    Specificationsm

    3 5 165 0 0 NA

    13 13.4 Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications m3 3 588 0 0 NA

    14 13.2 Pointing with cement mortar (1:3 ) on brick work/stone work in substructure as per Technical specifications m2 40 0 0 NA

    15 13.5 Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications m2

    101 0 0 NA

    16 16.4

    Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical

    Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion

    of grouting with Cement/Epoxy

    no. 501 0 0 NA

    17 16.5Sealing of crack / porous concrete with cement grout by injection process through nipples / grouting complete as

    per clause 2803.1.kg 66 0 0 NA

    18 16.7 Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. kg 925 0 0 NA

    D05_R04_CH - 22.13 - (Nimapada Astaranga Road) FAIR < 30m

    Sl.

    No.

    MORTH

    Ref.Item description Unit Quantity Remarks

    20 of 27

  • 7/30/2019 d05_r04 Shi & Estimation

    21/27

    Rate Amount

    a a

    D05_R04_CH - 22.13 - (Nimapada Astaranga Road) FAIR < 30m

    Sl.

    No.

    MORTH

    Ref.Item description Unit Quantity Remarks

    19 16.17 Replacement of Expansion Joints complete as per drawings m 2 642 0 0 NA

    20 15.4Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of to e

    of embankment complete as per drawing and Technical specifications.m

    3 1 376 0 0 NA

    21 15.5 Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. m3 1 117 0 0 NA

    22 Construction of masonry toe wall for batter protection. m3 3 588 0 0

    23 15.11Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40

    kg beyond curtain wall.m

    3 1 328 0 0 NA

    24 Construction of Cut off wall for bed protection with m15 grade cement concrete m3 4 952 0 0 NA

    25Providing and laying rubble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid

    over cement concrete bedding.m

    3 4 944 0 0 NA

    26 16.2Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic

    asphalt including disposal with all lift and lead upto 1000m.m

    2 47 34 1 578

    27 5.14

    Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40

    mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical

    specification sections 500 and 2700 or as directed by the E ngineer.

    m2 1 356 34 45 534

    28 14.4Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and

    Technical Specificationsm

    3 11 538 0 0 NA

    29 Providing new guard post in both side of carriage way as per technical specifications no. 800 0 0 NA

    30 16.18 Replacement of Damaged Concrete Railing. m 2 031 0 0 NA

    31 16.22 Repair of RCC Railing m 122 0 0 NA

    32 14.9 Providing Drainage Spouts complete as per drawing and Technical specification no. 1 114 0 0 NA

    33 8.3 Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paintblack or any other approved colour to give an even shade)

    Eachbridge

    611 2 1 222

    34 Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works 10 000 LS 10 000

    35 Provision for misce llaneous items not accounted for LS 20 000

    83 672

    1 116

    Total Cost :

    Cost of Bridge per m2 of plan area

    21 of 27

  • 7/30/2019 d05_r04 Shi & Estimation

    22/27

  • 7/30/2019 d05_r04 Shi & Estimation

    23/27

    Rate Amount

    a a1 2.3 Clearing and uprooting rank vegetation, bushes, shrubs, saplings etc including removal and disposal. m

    2 10 LS 5 000

    2 Cleaning and Greasing of Metallic bearings complete as per Technical specification no. 1 093 0 0 NA

    3 16.8Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement

    complete as per Technical specification (10mm thick)m

    2 537 8 4 467

    4 16.3Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with

    epoxy complete as per Technical specification (25mm thick)m

    2 1 157 12 14 004

    5 16.6Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter,

    available in present formulations, to be applied as per instructions of manufacturer and as approved by the E ngineer.m

    2 2 580 0 0 NA

    6

    Jacketing of concrete surface and exposed steel reinforcement complete as per Technical specification using 200mm

    thick M 30 grade concrete including reinforcement(@ 40 kg per m3), formwork etc and all accessories to complete

    the work.

    m2 2 203 0 0 NA

    7 Supplying ,hoisting, fixing steel joists in superstructure including painting and all required materials complete. tonne 75 000 0 0 NA

    8 14.2 Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and technical specifications tonne 68 793 0 0 NA

    9Drilling of holes in existing concrete and fixing new reinforcement with epoxy mortar grout but excluding cost of

    reinforcementno. 423 0 0 NA

    10 16.11 Epoxy bonding of new concrete to old concrete m2 663 0 0 NA

    11 12.5Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing

    and technical specificationsm

    3 5 083 0 0 NA

    12 13.1Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical

    Specificationsm

    3 5 165 0 0 NA

    13 13.4 Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications m3 3 588 0 0 NA

    14 13.2 Pointing with cement mortar (1:3 ) on brick work/stone work in substructure as per Technical specifications m2 40 0 0 NA

    15 13.5 Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications m2

    101 0 0 NA

    16 16.4

    Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical

    Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion

    of grouting with Cement/Epoxy

    no. 501 0 0 NA

    17 16.5Sealing of crack / porous concrete with cement grout by injection process through nipples / grouting complete as

    per clause 2803.1.kg 66 0 0 NA

    18 16.7 Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. kg 925 0 0 NA

    D05_R04_CH - 25.06 - (Nimapada Astaranga Road) FAIR < 30m

    Sl.

    No.

    MORTH

    Ref.Item description Unit Quantity Remarks

    23 of 27

  • 7/30/2019 d05_r04 Shi & Estimation

    24/27

    Rate Amount

    a a

    D05_R04_CH - 25.06 - (Nimapada Astaranga Road) FAIR < 30m

    Sl.

    No.

    MORTH

    Ref.Item description Unit Quantity Remarks

    19 16.17 Replacement of Expansion Joints complete as per drawings m 2 642 0 0 NA

    20 15.4Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of t oeof embankment complete as per drawing and Technical specifications.

    m3 1 376 0 0 NA

    21 15.5 Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. m3 1 117 0 0 NA

    22 Construct ion of masonry toe wal l for batter protection. m3 3 588 0 0 NA

    23 15.11Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40

    kg beyond curtain wall.m

    3 1 328 0 0 NA

    24 Construction of Cut off wall for bed protection with m15 grade cement concrete m3 4 952 0 0 NA

    25Providing and laying rubble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid

    over cement concrete bedding.m

    3 4 944 0 0 NA

    26 16.2Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic

    asphalt including disposal with all lift and lead upto 1000m.m

    2 47 0 0 NA

    27 5.14

    Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40

    mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical

    specification sections 500 and 2700 or as directed by the Engineer.

    m2 1 356 0 0 NA

    28 14.4Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and

    Technical Specificationsm

    3 11 538 0 0 NA

    29 16.21 Providing and fixing guard post no. 800 24 19 200

    30 16.18 Replacement of Damaged Concrete Railing. m 2 031 0 0 NA

    31 16.22 Repair of RCC Railing m 122 0 0 NA

    32 14.9 Providing Drainage Spouts complete as per drawing and Technical specification no. 1 114 0 0 NA

    33 8.3

    Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paint

    black or any other approved colour to give an even shade)

    Each

    bridge 611 2 1 222

    34 Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works 10 000 LS 10 000

    35 Provision for miscellaneous items not accounted for LS 20 000

    73 894

    305

    Total Cost :

    Cost of Bridge per m2 of plan area

    24 of 27

  • 7/30/2019 d05_r04 Shi & Estimation

    25/27

    1 2 3 4

    No damage Severity: Low Severity: Medium Severity: High

    1 Bearing 0.00 each 0.00 0.00 0.00 0.00 0.000 3 1 0 0 Year of construction

    2 Abutment & dirt wall 23.25 m2 23.25 0.00 0.00 0.00 1.000 2 2 4.00 1 Road type MDR

    3 Wing wall 0.00 m2

    0.00 0.00 0.00 0.00 0.000 2 2 0.00 0 Number of span 2

    4 Concrete deck slab 63.00 m2 51.98 0.00 0.00 11.03 1.525 3 2 9.15 1 Each span length (m) 4.2

    5 Abutment & pier caps 6.41 m2 6.41 0.00 0.00 0.00 1.000 4 2 8.00 1 Outer width of bridge (m) 7.5

    6 Piers 21.30 m2 21.30 0.00 0.00 0.00 1.000 4 2 8.00 1 Total plan area (m

    2) 63

    7 RCC/PSC/Steel girder 0.00 m2 0.00 0.00 0.00 0.00 0.000 4 2 0.00 0 Number of pier 1

    8 Expansion joints 22.50 m 0.00 22.50 0.00 0.00 2.000 1 3 6.00 1 Top width of pier (m) 0.65

    9 Approach carriageway 52.50 m2 52.50 0.00 0.00 0.00 1.000 1 3 3.00 1 Bottom width of pier (m) 0.65

    10 Batter protection 20.41 m2 15.31 0.00 0.00 5.10 1.750 1 2 3.50 1 Height of pier (m) 1.25

    11 General cleaning 0.00 each 0.00 0.00 0.00 0.00 0.000 1 3 0.00 0 Length of return/wing wall (m) 2.325

    12 Wearing surface 56.28 m2 56.28 0.00 0.00 0.00 1.000 1 3 3.00 1 Number of bearings 0

    13 Waterway 2.00 each 2.00 0.00 0.00 0.00 1.000 1 3 3.00 1 Thickness of superstructure (m) 0.3

    14 Parapet/Railing/Crash barrier 16.80 m 15.96 0.84 0.00 0.00 1.050 1 2 2.10 1 Width of bridge between kerbs 6.7

    15 Floor protection work 125.33 m2 125.33 0.00 0.00 0.00 1.000 1 2 2.00 1 Thickness of caps 0.2

    16 Foundation 0.00 m2 0.00 0.00 0.00 0.00 0.000 4 2 0.00 0 Depth of girder 0

    (ESCI*SI*CPIL) 51.75 11 No of girders per span 0

    A E R I

    CF=0411 A+0 120E+0.

    107R+0.362I4.00 4.00 3.00 3.00 3.53

    16.613SHI=CF*{(ESCI*SI*MI)/n SHI = 51.75 X 3.531 / 11

    OSCI=1 when SHI=1

    OSCI=2 when 1

  • 7/30/2019 d05_r04 Shi & Estimation

    26/27

    Rate Amount

    a a1 2.3 Clearing and uprooting rank vegetation, bushes, shrubs, saplings etc including removal and disposal. m

    2 10 LS 1 000

    2 Cleaning and Greasing of Metallic bearings complete as per Technical specification no. 1 093 0 0 NA

    3 16.8Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement

    complete as per Technical specification (10mm thick)m

    2 537 1 269

    4 16.3Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with

    epoxy complete as per Technical specification (25mm thick)m

    2 1 157 0 0 NA

    5 16.6Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter,

    available in present formulations, to be applied as per instructions of manufacturer and as approved by the E ngineer.m

    2 2 580 11 28 445

    6

    Jacketing of concrete surface and exposed steel reinforcement complete as per Technical specification using 200mm

    thick M 30 grade concrete including reinforcement(@ 40 kg per m3), formwork etc and all accessories to complete

    the work.

    m2 2 203 0 0 NA

    7 Supplying ,hoisting, fixing steel joists in superstructure including painting and all required materials complete. tonne 75 000 0 0 NA

    8 14.2 Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and technical specifications tonne 68 793 0 0 NA

    9Drilling of holes in existing concrete and fixing new reinforcement with epoxy mortar grout but excluding cost of

    reinforcementno. 423 0 0 NA

    10 16.11 Epoxy bonding of new concrete to old concrete m2 663 0 0

    11 12.5Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing

    and technical specificationsm

    3 5 083 0 0 NA

    12 13.1Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical

    Specificationsm

    3 5 165 0 0 NA

    13 13.4 Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications m3 3 588 0 0 NA

    14 13.2 Pointing with cement mortar (1:3 ) on brick work/stone work in substructure as per Technical specifications m2 40 0 0 NA

    15 13.5 Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications m2

    101 0 0 NA

    16 16.4

    Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical

    Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion

    of grouting with Cement/Epoxy

    no. 501 4 2 004 NA

    17 16.5Sealing of crack / porous concrete with cement grout by injection process through nipples / grouting complete as

    per clause 2803.1.kg 66 1 66

    18 16.7 Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. kg 925 22 19 980

    D05_R04_CH - 25.06 - (Nimapada Astaranga Road) POOR < 30m

    Sl.

    No.

    MORTH

    Ref.Item description Unit Quantity Remarks

    26 of 27

  • 7/30/2019 d05_r04 Shi & Estimation

    27/27

    Rate Amount

    a a

    D05_R04_CH - 25.06 - (Nimapada Astaranga Road) POOR < 30m

    Sl.

    No.

    MORTH

    Ref.Item description Unit Quantity Remarks

    19 16.17 Replacement of Expansion Joints complete as per drawings m 2 642 0 0 NA

    20 15.4 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of t oeof embankment complete as per drawing and Technical specifications.

    m3 1 376 0 0 NA

    21 15.5 Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. m3 1 117 0 0 NA

    22 Construct ion of masonry toe wal l for batter protection. m3 3 588 0 0 NA

    23 15.11Flexible Apron: Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40

    kg beyond curtain wall.m

    3 1 328 0 0 NA

    24 Construction of Cut off wall for bed protection with m15 grade cement concrete m3 4 952 0 0 NA

    25Providing and laying rubble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid

    over cement concrete bedding.m

    3 4 944 0 0 NA

    26 16.2Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic

    asphalt including disposal with all lift and lead upto 1000m.m

    2 47 0 0 NA

    27 5.14

    Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40

    mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical

    specification sections 500 and 2700 or as directed by the Engineer.

    m2 1 356 0 0 NA

    28 14.4Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and

    Technical Specificationsm

    3 11 538 0 0 NA

    29 16.21 Providing and fixing guard post no. 800 0 0 NA

    30 16.18 Replacement of Damaged Concrete Railing. m 2 031 0 0 NA

    31 16.22 Repair of RCC Railing m 122 0 0 NA

    32 14.9 Providing Drainage Spouts complete as per drawing and Technical specification no. 1 114 0 0 NA

    338.3

    Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paint

    black or any other approved colour to give an even shade)

    Each

    bridge611 2 1 222

    34 Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works 10 000 LS 10 000

    35 Provision for miscellaneous items not accounted for LS 20 000

    82 985

    1 317

    Total Cost :

    Cost of Bridge per m2 of plan area

    27 of 27