1
Pintail Way Bonsai Circle Armstrong Rd Baxter Rd Jean Nicholas Rd Leon Rd Lantana Way 79 Cookie I 0 500 1,000 Feet Figure D-5 Partial Underground Alternative " ) " ) Proposed Underground Portion Proposed 115 kV Subtransmission Line Upgraded ROW Existing ROW Valley South Subtransmission Project D. ALTERNATIVES Final EIR June 2016 D-29

Upload: trinhhuong

Post on 10-Dec-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Pintail Way

Bonsai Circle

Armstrong Rd

Baxter Rd Jean Nicholas Rd

Leon Rd

Lantana Way

79

Cookie

I0 500 1,000

Feet

Figure D-5

Partial Underground Alternative

")

")

Proposed Underground PortionProposed 115 kV Subtransmission LineUpgraded ROWExisting ROW

Valley South Subtransmission Project D. ALTERNATIVES

Final EIR June 2016D-29