cycle superhighway 9 section a / hammersmith road (sheet ......cycle superhighway 9 section a /...

2
CS9 CS9 CS9 CS9 CS9 CS9 CS9 CS9 CS9 CS9 CS9 CS9 CS9 CS9 CS9 CS9 CS9 CS9 CS9 BUS LANE BUS LANE BUS LANE SOLO M/CS ONLY BUS LANE BUS LANE KEEP CLEAR STOP BUS STOP BUS STOP BUS STOP BUS STOP BUS STOP BUS A315 HAMMERSMITH ROAD A315 HAMMERSMITH ROAD COLET GARDENS SHORTLANDS BROOK GREEN EDITH ROAD AURIOL ROAD BLYTHE ROAD ROWAN ROAD Junction tightened and resident parking bay extended by 12 metres Junction tightened and new 12 metre resident parking bay Junction tightened and new 24 metre resident parking bay Junction tightened New signal-controlled junction New cycle connection to Edith Road Segregated two-way cycle track replaces advisory cycle lane, eastbound general traffic lane and some footway Segregated two-way cycle track replaces eastbound traffic lane, advisory cycle lane and some footway New advanced stop line and early release for cyclists Bus stop removed, combined with bus stop 155 metres west New advanced stop line New advanced stop line New entry treatment giving pedestrians and cyclists priority Wider footway and new entry treatment. Cycle priority across Blythe Road New cycle connection to Shortlands Existing pedestrian crossing replaced by two new signal-controlled pedestrian crossings Relocated bus stop and bus stop bypass Bus lane hours extended to Mon - Sun 7am - 10am 4pm - 8pm Bus lane hours extended to Mon - Sun 7am - 10am 4pm - 8pm Some parking and motorcycle parking bays retained next to cycle track Footway narrowed and tree removed to accommodate cycle track Junction tightened and resident parking bay extended by 8 metres. Cycle priority across Rowan Road Note: Refer to parking/loading map for details Cycle Superhighway 9 Section A / Hammersmith Road (sheet 1 of 2) Key: Existing tree Existing kerbline removed Potential urban realm improvement Raised carriageway / ramp New footway / traffic island Signal-controlled pedestrian crossing Contrasting surfacing for safety at side roads Cycle Superhighway 9 Existing road markings New white road markings New yellow road markings Bus stop Bus stop removed Tree removed Potential new tree Cycle Hire Docking Station relocated Continued on Section B Continued above Continued below Continued on sheet 2

Upload: others

Post on 27-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Cycle Superhighway 9 Section A / Hammersmith Road (sheet ......Cycle Superhighway 9 Section A / Hammersmith Road (sheet 1 of 2) Key: Existing tree Existing kerbline removed Potential

CS9

CS9

CS9 CS9

CS9

CS9

CS9CS9

CS9

CS9

CS9

CS9

CS9

CS9

CS9

CS9

CS9

CS9

CS9

BUS LANE

BUS LANEBUS LAN

E

SOLO M/CS ONLY

BUS LANE

BUS LANE

KEEPCLEAR

STOPBUS

STOPBUS

STOP BUS

STOP BUS

STOPBUSSTOPBUSA315 HAMMERSMITH ROAD

A315 HAMMERSMITH ROAD

COLE

T G

ARD

ENS

SHO

RTLA

NDS

BROO

K GREEN

EDIT

H R

OA

D

AURI

OL

ROA

D

BLYT

HE R

OAD

ROW

AN

RO

AD

Junction tightened andresident parking bayextended by 12 metres

Junction tightened andnew 12 metre resident

parking bay

Junction tightened andnew 24 metre resident

parking bayJunction tightened

New signal-controlled junction

New cycle connection to Edith Road

Segregated two-way cycle track replacesadvisory cycle lane, eastboundgeneral traffic lane and some footway

Segregated two-way cycle trackreplaces eastbound traffic lane, advisory cycle lane and some footway

New advanced stop line and early release for cyclists

Bus stop removed, combined withbus stop 155 metres west

New advancedstop line

New advanced stop line

New entry treatmentgiving pedestrians andcyclists priority

Wider footway andnew entry treatment.Cycle priority across

Blythe Road

New cycle connection to Shortlands

Existing pedestrian crossing replacedby two new signal-controlledpedestrian crossings

Relocated bus stopand bus stop bypass

Bus lane hours extended to

Mon - Sun7am - 10am4pm - 8pm

Bus lane hours extended to

Mon - Sun7am - 10am4pm - 8pm

Some parking and motorcycle parkingbays retained next to cycle track

Footway narrowed and treeremoved to accommodatecycle track

Junction tightened and residentparking bay extended by 8 metres.Cycle priority across Rowan Road

Note: Refer to parking/loading map for details

Cycle Superhighway 9Section A / Hammersmith Road (sheet 1 of 2)

Key:

Existing tree

Existing kerbline removed

Potential urban realm improvement

Raised carriageway / ramp

New footway / traffic island

Signal-controlled pedestrian crossing

Contrasting surfacing forsafety at side roads

Cycle Superhighway 9Existing road markings

New white road markings

New yellow road markings

Bus stop

Bus stop removedTree removed

Potential new tree Cycle Hire Docking Stationrelocated

Continued on Section B

Continued above

Con

tinue

d be

low

Con

tinue

d on

she

et 2

Page 2: Cycle Superhighway 9 Section A / Hammersmith Road (sheet ......Cycle Superhighway 9 Section A / Hammersmith Road (sheet 1 of 2) Key: Existing tree Existing kerbline removed Potential

SOLO MOTORCYCLES ONLY

TAXIS

TAXIS

ONEWAY

LOADING ONLY

CS9 CS9

CS9

CS9

CS9

CS9

CS9

CS9

CS9

CS9

CS9

CS9

CS9 CS9

CS9

CS9

CS9

CS9

CS9

CS9

CS9 CS9

CS9

CS9

CS9

CS9

CS9CS9

CS9

CS9 CS9

BUSLANE

BUS LANE

CS9

TURNLEFT

BUS LANE

BUSLANE

BUSLANE BUS STOP

STOPBUSSTOP BUS

STOPBUS STOPBUS

STOP BUS

STOP BUS

STOP BUS

BUS BUS

STOP STOP

A315 HAMMERSMITH ROAD

A315 HAMMERSMITH ROADA315 KENSINGTON HIGH STREET

NO

RTH

EN

DRO

AD

SOU

THCO

MBE

STR

EET

MU

NDE

N S

TREE

T

EARS

BY S

TREE

T

AVO

NM

ORE

RO

AD

ADDI

SON

BRID

GE

PLAC

E

RADN

OR

TERR

ACE

OLYM

PIA WAY

RUSSELL ROAD

HOLLAN

D

ROAD

BLYT

HE R

OAD

New entry treatment

Bus stop relocated13 metres west.Footway narrowed and tree removedfor new busstop bypass

New 10 metre residentparking bay

Junction tightened andnew 25 metre resident

parking bay

Extend residentparking 12 by metres

Access to North End Road fromcycle track via Southcombe Street Wider pedestrian crossing

Cyclists from North End Road can join cycle track

New entry treatmentwith cycle priority across Avonmore Road

Segregated cycle trackreplaces bus lane

Proposals tie into A3220 Warwick Road/Kensington junction improvements

Segregated two-way cycle trackreplaces eastbound traffic lane, advisory cycle lane and some footway

Signal-controlled cyclecrossing to accesssegregated two-way track

Taxi rank relocated toAvonmore Road

Right turn to/fromRussell Road providedfor cyclists

LON

DON

BORO

UGH

OF HAM

MERSM

ITH & FULHAM

ROYAL BORO

UGH

OF KEN

SINGTO

N & CHELSEA

New bus stopbypass

Relocated taxi rank replacesfour pay and display parking bays

New uncontrolledcrossing

Cycle connection into potentialQuietway cycle route on Russell Road

New entry treatment

Wider pedestriancrossing

Bus stop lengthened to accomodate Routes 700, 701 and 709

Bus lane hours extended to

Mon - Sun7am - 10am4pm - 8pm

Bus lane hours extended to

Mon - Sun7am - 10am4pm - 8pm

New bus lanewould operate

Mon - Sun24hrs

New bus lane would operate

24hrsMon - Sun

New entry treatmentCoach stop relocated 90 metres west

Pedestrian crossingmoved 34 metres westand widened

Note: Refer to parking/loading map for details

Cycle priority acrossOlympia access

Cycle priority acrossjunctions

Cycle Superhighway 9Section A / Hammersmith Road (sheet 2 of 2)

Olympia London

Key:

Existing tree

Existing kerbline removed

Potential urban realm improvement

Raised carriageway / ramp

New footway / traffic island

Signal-controlled pedestrian crossing

Contrasting surfacing forsafety at side roads

Cycle Superhighway 9Existing road markings

New white road markings

New yellow road markings

Bus stop

Bus stop removedTree removed

Potential new tree Cycle Hire Docking Station

Continued on sheet 1

Continued above

Con

tinue

d be

low

Exte

nt o

f sch

eme