Washington State
Ocean Energy Conference
November 9, 2011
Executive Director – Jeffery K. Robb
Washington State
Ocean Energy Conference
November 9, 2011
Executive Director – Jeffery K. Robb
Alternative EnergyAlternative Energy
Port Strategic PlanPort Strategic Plan: :
Be a Leader in the Assessment and Be a Leader in the Assessment and Development of New Market Opportunities Development of New Market Opportunities
Partnership with Battelle Partnership with Battelle Supported EDC Grant Application to Develop Alternative Supported EDC Grant Application to Develop Alternative
Energy Road MapEnergy Road Map Develop Waterfront Infrastructure in Support of IndustryDevelop Waterfront Infrastructure in Support of Industry Develop Industrial Park Facilities in Support of IndustryDevelop Industrial Park Facilities in Support of Industry
Port Angeles…Ideally LocatedPort Angeles…Ideally Located
Port Angeles
Port Angeles HarborPort Angeles Harbor
Terminal #1 & #3
Terminal #7Terminal #5
TerminalTerminal #1 #1
Berth Capacity up to 1,200 feetBerth Capacity up to 1,200 feet 125,000 Dead Weight Tonnage125,000 Dead Weight Tonnage 38 Feet Draft at Berth38 Feet Draft at Berth Cold Iron Electrical ServicesCold Iron Electrical Services Topside Repair of Ships and BargesTopside Repair of Ships and Barges Tug and Fueling ServicesTug and Fueling Services
Terminal #3Terminal #3 Berth Capacity up to 750 feetBerth Capacity up to 750 feet Engineering and Permitting in Process to Engineering and Permitting in Process to
Expand to 1,200 feet CapacityExpand to 1,200 feet Capacity
Airport and Industrial PropertiesAirport and Industrial Properties
William R. Fairchild International AirportWilliam R. Fairchild International Airport 63506350’’ Runway Capable up to 737 Aircraft Runway Capable up to 737 Aircraft Instrument Landing System (ILS)Instrument Landing System (ILS) Scheduled Air ServiceScheduled Air Service
110 acre Industrial Park 110 acre Industrial Park Access to Primary and Secondary Runway Access to Primary and Secondary Runway Additional Industrial Property AvailableAdditional Industrial Property Available Under Construction Two 25,000 SF Composite Under Construction Two 25,000 SF Composite
Manufacturing Buildings Manufacturing Buildings
Angeles Composite TechnologiesAngeles Composite Technologies125 Jobs and growing…125 Jobs and growing…
Composites Manufacturing Composites Manufacturing Campus ExpansionCampus Expansion
November 3, 2011November 3, 2011
Competitive Advantages
Proximity to Ocean Energy Deep Water Harbor with Marine Terminals Trained Marine Trades Workforce Industrial Manufacturing Facilities International Airport Pacific Northwest National Laboratory Peninsula College Community Support
Port of Port AngelesPort of Port AngelesLeaders in Economic Development