CWM Technical Guideline LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY CWM.TG/11 This Document is the property of Center of Waste Management – Abu Dhabi, and cannot be used nor given to outside party without prior authorization

Upload: others

Post on 24-Sep-2020

35 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CWM Technical Guideline - tadweer.gov.ae Guidelines/ESPs... · CWM Technical Guideline LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY CWM.TG/11 This Document

CWM Technical Guideline

LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY

CWM.TG/11

This Document is the property of Center of Waste Management – Abu Dhabi, and cannot be used nor given to

outside party without prior authorization

Page 2: CWM Technical Guideline - tadweer.gov.ae Guidelines/ESPs... · CWM Technical Guideline LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY CWM.TG/11 This Document

LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY

CWM.TG/11

Issue/Revision (1/0) Page 2 of 24

AUTHORS BY

Name: ……………………….......... Signature …………………….. Date …../…../………

REVIEWED BY

Name: ……………………….......... Signature …………………….. Date …../…../………

Name: ……………………….......... Signature …………………….. Date …../…../………

Name: ……………………….......... Signature …………………….. Date …../…../………

Name: ……………………….......... Signature …………………….. Date …../…../………

Name: ……………………….......... Signature …………………….. Date …../…../………

Name: ……………………….......... Signature …………………….. Date …../…../………

CHECKED BY

Name: ……………………….......... Signature …………………….. Date …../…../………

APPROVED BY

Name: ……………………….......... Signature …………………….. Date …../…../………

Effective Date ……./……./……………

Page 3: CWM Technical Guideline - tadweer.gov.ae Guidelines/ESPs... · CWM Technical Guideline LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY CWM.TG/11 This Document

LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY

CWM.TG/11

Issue/Revision (1/0) Page 3 of 24

VERSION & CHANGE HISTORY

Date Issue/Revision Document Revision/Change History Document

Author/Reviser

June2013 1/0 New Document GM

Page 4: CWM Technical Guideline - tadweer.gov.ae Guidelines/ESPs... · CWM Technical Guideline LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY CWM.TG/11 This Document

LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY

CWM.TG/11

Issue/Revision (1/0) Page 4 of 24

Table of Contents Version & Change History ................................................................................................................................ 3

1. Introduction ......................................................................................................................................... 6

2. Requirements ....................................................................................................................................... 6

2.1 Legal Requirements ............................................................................................................................... 6

2.2 Permits and Licensing ............................................................................................................................ 7

3. Permits and Licensing Requirements for Transportation, Treatment and Disposal Facility ............... 7

4. Annexures .......................................................................................................................................... 11

5. References ......................................................................................................................................... 11

Annex 1: Permitting & Licensing of Waste Transportation ....................................................................... 13

Annex 2: Permitting & Licensing of Waste Transportation (Renewal) ...................................................... 14

Annex 3: Permitting & Licensing of Treatment Facility (New) ................................................................... 15

Annex 4: Permitting & Licensing of Treatment Facility (Renewal) ............................................................ 16

Annex 5: Permitting & Licensing of Waste Recycling Facility (New).......................................................... 17

Annex 6: Permitting & Licensing of Waste Recycling Facility (Renewal) ................................................... 18

Annex 7: Application Form for Waste Transportation Permit ................................................................... 19

Annex 8: Application Form for Waste Treatment Facility Permit .............................................................. 21

Annex 9: Application Form for Waste Recycling Facility Permit ................................................................ 23

Page 5: CWM Technical Guideline - tadweer.gov.ae Guidelines/ESPs... · CWM Technical Guideline LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY CWM.TG/11 This Document

LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY

CWM.TG/11

Issue/Revision (1/0) Page 5 of 24

Abbreviations

CWM The Centre of Waste Management

DED Department of Economic Development

EAD Environmental Agency Abu Dhabi

PPE Personal Protective Equipment

SME Subject Matter Expert

NOC No Objection Certificate

RSP Registered Service Provider

Page 6: CWM Technical Guideline - tadweer.gov.ae Guidelines/ESPs... · CWM Technical Guideline LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY CWM.TG/11 This Document

LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY

CWM.TG/11

Issue/Revision (1/0) Page 6 of 24

1. Introduction This technical guideline provides permitting and licensing requirements for transportation,

treatment and recycling facilities. The waste management permitting or licensing does not

allow the entity to operate the facility unless all relevant permits or licenses from other

authorities are obtained like, vehicle registration with UAE traffic department,

Environmental Permit from Environmental Agency Abu Dhabi (EAD), Industrial License

from Industrial Development Bureau (IDB) etc.

2. Requirements

2.1 Legal Requirements

Listed below are the main legislative requirements related to the hazardous waste within

the Abu Dhabi Emirate. All the requirements listed within these documents shall be

adhered to, however compliance with this document and those referenced within, shall

ensure compliance with the requirements stated within the legal standards listed below:

(i) Federal Cabinet Resolution No. (39) of 2006 on Banning the Import and

Production of Asbestos;

(ii) Federal Law No (24) for the year 1999 on the Protection and the Development

of the Environment;

(iii) Federal Law No. (28) of 2001 Regarding the Establishment of the emirates

authority for standards and Meteorology;

(iv) Federal Regulation for Handling Hazardous Materials, Hazardous Wastes and

Medical Wastes, issued by Cabinet Decree No. 37 of 2001;

(v) Law No (21) for the year 2005 on Waste Management in the Emirate of Abu

Dhabi;

(vi) Decree 2G24 of 2009 for Tariff System of the Waste in the Emirates of Abu

Dhabi;

(vii) Centre of Waste Management Board of Directors Decree No 1/2010 for Waste

Tracking System;

Page 7: CWM Technical Guideline - tadweer.gov.ae Guidelines/ESPs... · CWM Technical Guideline LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY CWM.TG/11 This Document

LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY

CWM.TG/11

Issue/Revision (1/0) Page 7 of 24

(viii) Decree No 17 of 2008 Establishing the Centre of Waste Management – Abu

Dhabi;

(ix) Decree No 42 of 2009 Requirements of the Abu Dhabi Emirate Environment,

Health and Safety Management System (EHSMS) Regulatory Framework;

(x) The Trade Effluent Control Regulations, 2010; and

(xi) Basel Convention Protocol for Liability and Compensation on the Control of

Transboundry Movement of Hazardous Wastes and their Disposal (Texts and

Annexes).

(xii) Recycled Water and Bio-solids Regulations 2010.

2.2 Permits and Licensing

Listed are the specific licensing and permitting requirements relevant to this technical

guideline. The Waste Generator is required to ensure that all licensing and permitting

requirements have been complied prior to commence any work.

a) Hazardous waste carriers / transporter:

(i) To be approved by CWM-AD.

b) Hazardous waste Facilities:

(i) To be approved by CWM-AD.

c) Testing Facilities:

(i) All testing facility shall be approved for the purpose (Scope of accreditation)

by Emirates Standardization and Metrology (ESMA) Authority.

3. Permits and Licensing Requirements for Transportation, Treatment and Disposal Facility

(I). This technical Guideline explains the licensing and permitting of transportation,

treatment and disposal facility & submission of request or application in the Emirate

of Abu Dhabi through the following CWM Customer Service offices:

Page 8: CWM Technical Guideline - tadweer.gov.ae Guidelines/ESPs... · CWM Technical Guideline LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY CWM.TG/11 This Document

LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY

CWM.TG/11

Issue/Revision (1/0) Page 8 of 24

Location Name City Address

The Licensing Department (NADAFA) of

the Center of Waste Management-Abu

Dhabi

Abu Dhabi Street No. 13, Al Nhayan

Complex, behind Red

crescent-Branch.

The Center of Waste Management-Abu

Dhabi, Al Ain Office

Al Ain

Tem Centre Madinat Zayed Western

Region

Western

Region

Table 1: Customer Service Offices

1. This technical guidelines shall be applicable for Permits & Licensing of the

following:

A. Waste Transportation Permit

B. Waste Treatment Facility Permit

C. Waste Recycling Facility Permit

2. Registered Service Provider shall submit application along with all legal,

administrative and technical documents to the Center of Waste management-Abu

Dhabi through at any of the above mentioned offices in table 1.

3. Registered Service Provider shall submit the following technical documents along

with the legal and administrative documents & application:

A. Waste Transportation Permit

a. Emergency Plan in case of Hazardous & Medical Waste transportation only

b. Training Certificate of Driver & Operator by 3rd Party approved by AD EHS

Center

c. Lifting Equipment Test certificate by approved 3rd Party in case of Waste

transportation vehicle equipped with lifting device.

Page 9: CWM Technical Guideline - tadweer.gov.ae Guidelines/ESPs... · CWM Technical Guideline LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY CWM.TG/11 This Document

LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY

CWM.TG/11

Issue/Revision (1/0) Page 9 of 24

d. Vehicle Fitness certificate by AD Police.

e. EHSMS Registration in case of Nominated Entity by SRA.

f. Waste Transportation ESP application for renewal will only be considered if the

ESP has regularly submitted ‘Monthly ESP Register’ and ‘Manifestation’.

B. Waste Treatment & Recycling Facility Permit

a. Complete process

b. Operation Manual

c. By products details

d. Waste disposal Option

e. EHSMS Registration

New Waste treatment & recycling facility licensing shall involve following 3 stages:

1. Initial Permitting based on technological assessment;

2. Onsite assessment before commissioning to ensure conformity to what has

been permitted as ‘Initial Permit’, if need be CWM may ask for Certificate of

Conformity (CoC); and

3. Final Permit for operation based on test certificates of waste (before and

after) and other technical documents as required including calibration

certificate, AD Civil Defence approval, wastewater discharge consent,

Environment Permit from EAD, Industrial License from IDB, etc.

3.1 Waste Transportation Permit Requirements 1. RSP shall comply with CWM Technical Guideline No. 1, 2 & 3 for Hazardous and

Medical Waste Transportation vehicle.

2. RSP shall comply with CWM Technical Guideline No. 9 for Waste Transportation

Vehicle and GPS Requirements.

Page 10: CWM Technical Guideline - tadweer.gov.ae Guidelines/ESPs... · CWM Technical Guideline LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY CWM.TG/11 This Document

LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY

CWM.TG/11

Issue/Revision (1/0) Page 10 of 24

3. Mechanism for permits and licensing shall be complied as specified in Annexure 1

& 2 for new & renew, respectively.

4. Application template for waste transportation vehicle shall be used as specified in

Annexure 7.

3.2 Waste Treatment Facility Permit Requirements

1. Mechanism for permits and licensing shall be complied as specified in Annexure 3

& 4 for new & renew, respectively;

2. The application for new treatment facility will be subject to a detailed technical

evaluation of the technology of waste treatment;

3. Renewal applications will only be considered if detailed record of monthly

submission of waste manifestation / treated waste laboratory analysis, calibration

certificates is submitted;

4. Application template for waste treatment facility shall be used as specified in

Annexure 8.

3.3 Waste Recycling Facility Permit Requirements

1. Mechanism for permits and licensing shall be complied as specified in Annexure 5

& 6 for new & renew, respectively.

2. Renewal applications will only be considered if detailed record of monthly

submission of waste manifestation / treated waste laboratory analysis, calibration

certificates is submitted.

3. Application template for waste recycling facility shall be used as specified in

Annexure 9.

Page 11: CWM Technical Guideline - tadweer.gov.ae Guidelines/ESPs... · CWM Technical Guideline LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY CWM.TG/11 This Document

LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY

CWM.TG/11

Issue/Revision (1/0) Page 11 of 24

4. Annexures Annexure 1: Mechanism for Waste Transportation Permit (NEW)

Annexure 2: Mechanism for Waste Transportation Permit (RENEW)

Annexure 3: Mechanism for Waste Treatment Facility Permit (NEW)

Annexure 4: Mechanism for Waste Treatment Facility Permit (RENEW)

Annexure 5: Mechanism for Waste Recycling Facility Permit (NEW)

Annexure 6: Mechanism for Waste Recycling Facility Permit (RENEW)

Annexure 7: Application for Waste Transportation Permit

Annexure 8: Application for Waste Treatment Facility Permit

Annexure 9: Application for Waste Recycling Facility Permit

5. References 1. Federal Cabinet Resolution No. (39) of 2006 on Banning the Import and

Production of Asbestos;

2. Federal Law No (24) for the year 1999 on the Protection and the Development of

the Environment;

3. Federal Law No. (28) of 2001 Regarding the Establishment of the emirates

authority for standards and Meteorology;

4. Federal Regulation for Handling Hazardous Materials, Hazardous Wastes and

Medical Wastes, issued by Cabinet Decree No. 37 of 2001;

5. Law No (21) for the year 2005 on Waste Management in the Emirate of Abu

Dhabi;

6. Decree 2G24 of 2009 for Tariff System of the Waste in the Emirates of Abu

Dhabi;

7. Centre of Waste Management Board of Directors Decree No 1/2010 for Waste

Tracking System;

8. Decree No 17 of 2008 Establishing the Centre of Waste Management – Abu

Dhabi;

9. Decree No 42 of 2009 Requirements of the Abu Dhabi Emirate Environment,

Health and Safety Management System (EHSMS) Regulatory Framework;

Page 12: CWM Technical Guideline - tadweer.gov.ae Guidelines/ESPs... · CWM Technical Guideline LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY CWM.TG/11 This Document

LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY

CWM.TG/11

Issue/Revision (1/0) Page 12 of 24

10. The Trade Effluent Control Regulations, 2010;

11. Basel Convention Protocol for Liability and Compensation on the Control of

Transboundry Movement of Hazardous Wastes and their Disposal (Texts and

Annexes).

12. Dubai Municipality Technical Guideline No. 50 – Requirements for the

Transportation of Hazardous Waste;

13. Recycled Water and Bio-solids Regulations 2010.

14. Center of Waste Management Technical Guideline No. 1 (Requirements and

Procedures for the Disposal of Hazardous Wastes)

15. Center of Waste Management Technical Guideline No. 2 (Annual Approvals for

Hazardous Waste Disposal)

16. Center of Waste Management Technical Guideline No. 3 (Requirements for the

Transportation of Hazardous Waste)

17. Center of Waste Management Technical Guideline No. 9 (Waste Transportation

Vehicle & GPS Requirements)

Page 13: CWM Technical Guideline - tadweer.gov.ae Guidelines/ESPs... · CWM Technical Guideline LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY CWM.TG/11 This Document

LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY

CWM.TG/11

Issue/Revision (1/0) Page 13 of 24

Annex 1: Permitting & Licensing of Waste Transportation

Permitting & Licensing of Waste Transportation (NEW)

CWM Customer ServiceRSP CWM SME CWM Inspection Licensing OfficerCWM TC

StartStart

Submission of Application and

attached documents

Submission of Application and

attached documents

Application Duly Signed & Stamped by Authorized Person,

Administrative, legal & technical Documents* submitted, All required fields Populated,

application fee submitted

Application Duly Signed & Stamped by Authorized Person,

Administrative, legal & technical Documents* submitted, All required fields Populated,

application fee submitted

ApprovedApproved

Application along with Administrative, legal &

Technical Documents* to be submitted to CWM

SME Review

Application along with Administrative, legal &

Technical Documents* to be submitted to CWM

SME Review

SME Preliminary approval

SME Preliminary approval

NO

Transportation Facility & vehicles to

be inspected by CWM Inspection

Team using Inspection Checklist

Transportation Facility & vehicles to

be inspected by CWM Inspection

Team using Inspection Checklist

YES

Inspection Report to be produced

Inspection Report to be produced

ViolationViolation

Violations must be rectified and

Compliance report to be

submitted within 30 days

Violations must be rectified and

Compliance report to be

submitted within 30 days

YES

ComplianceCompliance

Application along with Administrative, legal & Technical Documents*,

Inspection report with SME recommendations and

justifications to be submitted to CWM

Technical Committee for ReviewNO

Technical Committee

approval

Application to be submitted to CWM Licensing Officer for

approval

YES

NO

Issue Permit

ENDEND

Hazardous & Medical Waste Transportation

Hazardous & Medical Waste Transportation

NO

YES

YES

NO

NO

GPS installation for each Waste transportation vehicle must

comply with TG 9

GPS installation for each Waste transportation vehicle must

comply with TG 9

YES

* Technical Documents includes the followings:1. Emergency Plan in case of Hazardous & Medical Waste transportation only2. Training Certificate of Driver & Operator by 3rd Party approved by AD EHS Center3. Lifting Equipment Test certificate by approved 3rd Party in case of Waste transportation vehicle equipped with lifting device.4. Vehicle Fitness certificate by AD Police5. EHSMS Registration in case of Nominated Entity by SRA

* Technical Documents includes the followings:1. Emergency Plan in case of Hazardous & Medical Waste transportation only2. Training Certificate of Driver & Operator by 3rd Party approved by AD EHS Center3. Lifting Equipment Test certificate by approved 3rd Party in case of Waste transportation vehicle equipped with lifting device.4. Vehicle Fitness certificate by AD Police5. EHSMS Registration in case of Nominated Entity by SRA

Page 14: CWM Technical Guideline - tadweer.gov.ae Guidelines/ESPs... · CWM Technical Guideline LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY CWM.TG/11 This Document

LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY

CWM.TG/11

Issue/Revision (1/0) Page 14 of 24

Annex 2: Permitting & Licensing of Waste Transportation (Renewal)

Permitting & Licensing of Waste Transportation (RENEW)

CWM Customer ServiceRSP CWM SME CWM Inspection Licensing OfficerCWM TC

StartStart

Submission of Application and

attached documents

Submission of Application and

attached documents

Application Duly Signed &

Stamped by Authorized Person, Administrative, legal & technical

Documents* submitted, All required fields Populated,

application fee submitted

Application Duly Signed &

Stamped by Authorized Person, Administrative, legal & technical

Documents* submitted, All required fields Populated,

application fee submitted

ApprovedApproved

Application along with Administrative, legal & Technical Documents*, Proof of monthly RSP Register & Manifest

Submission to be submitted to CWM SME Review

Application along with Administrative, legal & Technical Documents*, Proof of monthly RSP Register & Manifest

Submission to be submitted to CWM SME Review

SME Preliminary approval

SME Preliminary approval

NO

Transportation Facility & vehicles to

be inspected by CWM Inspection

Team using Inspection Checklist

Transportation Facility & vehicles to

be inspected by CWM Inspection

Team using Inspection Checklist

YES

Inspection Report to be produced

Inspection Report to be produced

ViolationViolation

Violations must be rectified and

Compliance report to be

submitted within 30 days

Violations must be rectified and

Compliance report to be

submitted within 30 days

YES

ComplianceCompliance

Application along with Administrative, legal & Technical Documents*,

Inspection report, Proof of monthly RSP Register &

Manifest Submission with SME recommendations and

justifications to be submitted to CWM

Technical Committee for Review

NO

Technical Committee

approval

Application to be submitted to CWM Licensing Officer for

approval

YES

NO

Issue Permit

ENDEND

Hazardous & Medical Waste Transportation

Hazardous & Medical Waste Transportation

NO

YES

YES

NO

NO

GPS installation for each Waste transportation vehicle must

comply with TG 9

GPS installation for each Waste transportation vehicle must

comply with TG 9

YES

* Technical Documents includes the followings:1. Emergency Plan in case of Hazardous & Medical Waste transportation only2. Training Certificate of Driver & Operator by 3rd Party approved by AD EHS Center3. Lifting Equipment Test certificate by approved 3rd Party in case of Waste transportation vehicle equipped with lifting device.4. Vehicle Fitness certificate by AD Police5. EHSMS Registration in case of Nominated Entity by SRA6. Record of submission of ‘Monthly ESP Register’ and ‘Manifestation’

* Technical Documents includes the followings:1. Emergency Plan in case of Hazardous & Medical Waste transportation only2. Training Certificate of Driver & Operator by 3rd Party approved by AD EHS Center3. Lifting Equipment Test certificate by approved 3rd Party in case of Waste transportation vehicle equipped with lifting device.4. Vehicle Fitness certificate by AD Police5. EHSMS Registration in case of Nominated Entity by SRA6. Record of submission of ‘Monthly ESP Register’ and ‘Manifestation’

Page 15: CWM Technical Guideline - tadweer.gov.ae Guidelines/ESPs... · CWM Technical Guideline LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY CWM.TG/11 This Document

LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY

CWM.TG/11

Issue/Revision (1/0) Page 15 of 24

Annex 3: Permitting & Licensing of Treatment Facility (New)

Permitting & Licensing of Treatment Facility (NEW)

CWM Customer ServiceRSP CWM SME CWM Inspection Licensing OfficerCWM TC

StartStart

Submission of Application and

attached documents

Submission of Application and

attached documents

Application Duly Signed & Stamped by Authorized Person,

Administrative, legal & technical Documents* submitted, All required fields Populated,

application fee submitted

Application Duly Signed & Stamped by Authorized Person,

Administrative, legal & technical Documents* submitted, All required fields Populated,

application fee submitted

ApprovedApproved

Application along with Administrative, legal &

Technical Documents* to be submitted to CWM SME for Technological

Review

Application along with Administrative, legal &

Technical Documents* to be submitted to CWM SME for Technological

Review

SME Preliminary approval

SME Preliminary approval

NO

NO

Treatment Facility to be inspected by CWM Inspection

Team using Inspection Checklist

Treatment Facility to be inspected by CWM Inspection

Team using Inspection Checklist

YES

Inspection Report to be produced

Inspection Report to be produced

ViolationViolation

Violations must be rectified and

Compliance report to be

submitted within 30 days

Violations must be rectified and

Compliance report to be

submitted within 30 days

YES

ComplianceCompliance

Application along with Administrative, legal & Technical Documents*,

Inspection report with SME recommendations and

justifications to be submitted to CWM

Technical Committee for Technological Review*

NO

YES

NO

Technical Committee

approval

Application to be submitted to CWM Licensing Officer for

approval

YES

NO

YES

Initial Approval for

3 monthsRSP shall obtain permission from EAD & EAD permit to be submitted to CWM

RSP shall obtain permission from EAD & EAD permit to be submitted to CWM

EAD Permit Submitted to CWM

EAD Permit Submitted to CWM

Bank Guarantee of 250,000 AED

Bank Guarantee of 250,000 AED

NO

Final approvalYES

NOApplication

Rejected

Application Rejected

ENDEND

* Technical Documents includes the followings:1. Complete process2. Operation Manual3. By products details4. Waste disposal Option5. EHSMS Registration

* Technical Documents includes the followings:1. Complete process2. Operation Manual3. By products details4. Waste disposal Option5. EHSMS Registration

Page 16: CWM Technical Guideline - tadweer.gov.ae Guidelines/ESPs... · CWM Technical Guideline LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY CWM.TG/11 This Document

LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY

CWM.TG/11

Issue/Revision (1/0) Page 16 of 24

Annex 4: Permitting & Licensing of Treatment Facility (Renewal)

Permitting & Licensing of Treatment Facility (RENEW)

CWM Customer ServiceRSP CWM SME CWM Inspection Licensing OfficerCWM TC

StartStart

Submission of Application and

attached documents

Submission of Application and

attached documents

Application Duly Signed & Stamped by Authorized Person,

Administrative, legal & technical Documents* submitted, All required fields Populated,

application fee submitted

Application Duly Signed & Stamped by Authorized Person,

Administrative, legal & technical Documents* submitted, All required fields Populated,

application fee submitted

ApprovedApproved

Application along with Administrative, legal,

Technical Documents*, Proof of monthly RSP Register & Manifest

submission to be submitted to CWM SME for Technological Review

Application along with Administrative, legal,

Technical Documents*, Proof of monthly RSP Register & Manifest

submission to be submitted to CWM SME for Technological Review

SME Preliminary approval

SME Preliminary approval

NO

NO

Treatment Facility to be inspected by CWM Inspection

Team using Inspection Checklist

Treatment Facility to be inspected by CWM Inspection

Team using Inspection Checklist

YES

Inspection Report to be produced

Inspection Report to be produced

ViolationViolation

Violations must be rectified and

Compliance report to be

submitted within 30 days

Violations must be rectified and

Compliance report to be

submitted within 30 days

YES

ComplianceCompliance

Application along with Administrative, legal & Technical Documents*,

Inspection report, Proof of monthly RSP Register &

Manifest submission with SME recommendations and

justifications to be submitted to CWM

Technical Committee for Technological Review*

NO

YES

NO

Technical Committee

approval

Application to be submitted to CWM Licensing Officer for

approval

YES

NO

YES

Initial Approval for

3 monthsRSP shall obtain permission from EAD & EAD permit to be submitted to CWM

RSP shall obtain permission from EAD & EAD permit to be submitted to CWM

EAD Permit Submitted to CWM

EAD Permit Submitted to CWM

Bank Guarantee as per CWM

requirements

Bank Guarantee as per CWM

requirements

NO

Final approvalYES

NOApplication

Rejected

Application Rejected

ENDEND

* Technical Documents includes the followings:1. Any Change in process2. Laboratory Test reports of Treated Waste3. Waste disposal records& permits4. Calibration Certificates5. EHSMS approval

* Technical Documents includes the followings:1. Any Change in process2. Laboratory Test reports of Treated Waste3. Waste disposal records& permits4. Calibration Certificates5. EHSMS approval

Page 17: CWM Technical Guideline - tadweer.gov.ae Guidelines/ESPs... · CWM Technical Guideline LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY CWM.TG/11 This Document

LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY

CWM.TG/11

Issue/Revision (1/0) Page 17 of 24

Annex 5: Permitting & Licensing of Waste Recycling Facility (New)

Permitting & Licensing of Recycling Facility (NEW)

CWM Customer ServiceRSP CWM SME CWM Inspection Licensing OfficerCWM TC

StartStart

Submission of Application and

attached documents

Submission of Application and

attached documents

Application Duly Signed & Stamped by Authorized Person,

Administrative, legal & technical Documents* submitted, All required fields Populated,

application fee submitted

Application Duly Signed & Stamped by Authorized Person,

Administrative, legal & technical Documents* submitted, All required fields Populated,

application fee submitted

ApprovedApproved

Application along with Administrative, legal &

Technical Documents* to be submitted to CWM SME for Technological

Review

Application along with Administrative, legal &

Technical Documents* to be submitted to CWM SME for Technological

Review

SME Preliminary approval

SME Preliminary approval

NO

NO

Treatment Facility to be inspected by CWM Inspection

Team using Inspection Checklist

Treatment Facility to be inspected by CWM Inspection

Team using Inspection Checklist

YES

Inspection Report to be produced

Inspection Report to be produced

ViolationViolation

Violations must be rectified and

Compliance report to be

submitted within 30 days

Violations must be rectified and

Compliance report to be

submitted within 30 days

YES

ComplianceCompliance

Application along with Administrative, legal & Technical Documents*,

Inspection report with SME recommendations and

justifications to be submitted to CWM

Technical Committee for Technological Review

NO

YES

NO

Technical Committee

approval

Application to be submitted to CWM Licensing Officer for

approval

YES

NO

YES

Initial Approval for

3 monthsRSP shall obtain permission from EAD & IDB License, to be submitted to CWM

RSP shall obtain permission from EAD & IDB License, to be submitted to CWM

EAD Permit & IDB License Submitted

to CWM

EAD Permit & IDB License Submitted

to CWM

Bank Guarantee of 250,000 AED

Bank Guarantee of 250,000 AED

NO

Final approvalYES

NOApplication

Rejected

Application Rejected

ENDEND

* Technical Documents includes the followings:1. Complete process2. Operation Manual3. By products details4. Disposal Option for Waste (if any) 5. EHSMS Registration

* Technical Documents includes the followings:1. Complete process2. Operation Manual3. By products details4. Disposal Option for Waste (if any) 5. EHSMS Registration

Page 18: CWM Technical Guideline - tadweer.gov.ae Guidelines/ESPs... · CWM Technical Guideline LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY CWM.TG/11 This Document

LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY

CWM.TG/11

Issue/Revision (1/0) Page 18 of 24

Annex 6: Permitting & Licensing of Waste Recycling Facility (Renewal)

Permitting & Licensing of Recycling Facility (RENEW)

CWM Customer ServiceRSP CWM SME CWM Inspection Licensing OfficerCWM TC

StartStart

Submission of Application and

attached documents

Submission of Application and

attached documents

Application Duly Signed & Stamped by Authorized Person,

Administrative, legal & technical Documents* submitted, All required fields Populated,

application fee submitted

Application Duly Signed & Stamped by Authorized Person,

Administrative, legal & technical Documents* submitted, All required fields Populated,

application fee submitted

ApprovedApproved

Application along with Administrative, legal,

Technical Documents*, Proof of Monthly RSP Register & manifest

submission to be submitted to CWM SME for Technological Review

Application along with Administrative, legal,

Technical Documents*, Proof of Monthly RSP Register & manifest

submission to be submitted to CWM SME for Technological Review

SME Preliminary approval

SME Preliminary approval

NO

NO

Treatment Facility to be inspected by CWM Inspection

Team using Inspection Checklist

Treatment Facility to be inspected by CWM Inspection

Team using Inspection Checklist

YES

Inspection Report to be produced

Inspection Report to be produced

ViolationViolation

Violations must be rectified and

Compliance report to be

submitted within 30 days

Violations must be rectified and

Compliance report to be

submitted within 30 days

YES

ComplianceCompliance

Application along with Administrative, legal & Technical Documents*,

Inspection report, Proof of Monthly RSP Register &

manifest submission with SME recommendations and

justifications to be submitted to CWM

Technical Committee for Technological Review

NO

YES

NO

Technical Committee

approval

Application to be submitted to CWM Licensing Officer for

approval

YES

NO

YES

Initial Approval for

3 monthsRSP shall obtain

permission from EAD & IDB License, to be submitted to CWM

RSP shall obtain permission from EAD & IDB License, to be submitted to CWM

EAD Permit & IDB License Submitted

to CWM

EAD Permit & IDB License Submitted

to CWM

Bank Guarantee as per CWM

requirements

Bank Guarantee as per CWM

requirements

NO

Final approvalYES

NOApplication

Rejected

Application Rejected

ENDEND

* Technical Documents includes the followings:1. Any Change in process2. Laboratory Test reports of Treated Waste3. Waste disposal records& permits4. Calibration Certificates5. EHSMS approval

* Technical Documents includes the followings:1. Any Change in process2. Laboratory Test reports of Treated Waste3. Waste disposal records& permits4. Calibration Certificates5. EHSMS approval

Page 19: CWM Technical Guideline - tadweer.gov.ae Guidelines/ESPs... · CWM Technical Guideline LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY CWM.TG/11 This Document

LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY

CWM.TG/11

Issue/Revision (1/0) Page 19 of 24

Annex 7: Application Form for Waste Transportation Permit

Page 20: CWM Technical Guideline - tadweer.gov.ae Guidelines/ESPs... · CWM Technical Guideline LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY CWM.TG/11 This Document

LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY

CWM.TG/11

Issue/Revision (1/0) Page 20 of 24

Page 21: CWM Technical Guideline - tadweer.gov.ae Guidelines/ESPs... · CWM Technical Guideline LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY CWM.TG/11 This Document

LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY

CWM.TG/11

Issue/Revision (1/0) Page 21 of 24

Annex 8: Application Form for Waste Treatment Facility Permit

Page 22: CWM Technical Guideline - tadweer.gov.ae Guidelines/ESPs... · CWM Technical Guideline LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY CWM.TG/11 This Document

LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY

CWM.TG/11

Issue/Revision (1/0) Page 22 of 24

Page 23: CWM Technical Guideline - tadweer.gov.ae Guidelines/ESPs... · CWM Technical Guideline LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY CWM.TG/11 This Document

LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY

CWM.TG/11

Issue/Revision (1/0) Page 23 of 24

Annex 9: Application Form for Waste Recycling Facility Permit

Page 24: CWM Technical Guideline - tadweer.gov.ae Guidelines/ESPs... · CWM Technical Guideline LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY CWM.TG/11 This Document

LICENSING REQUIREMENTS FOR TRANSPORTATION, TREATMENT AND RECYCLING FACILITY

CWM.TG/11

Issue/Revision (1/0) Page 24 of 24