cvrd ect level 3 workshop rms express (advanced operations) module 7 of 9 september 09, 2013
TRANSCRIPT
![Page 1: CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013](https://reader036.vdocuments.us/reader036/viewer/2022062417/551b613e550346ae7a8b5af9/html5/thumbnails/1.jpg)
CVRD ECT Level 3 WorkshopRMS Express (Advanced Operations)
Module 7 of 9
September 09, 2013
![Page 2: CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013](https://reader036.vdocuments.us/reader036/viewer/2022062417/551b613e550346ae7a8b5af9/html5/thumbnails/2.jpg)
Module
TrainingDate , Time
and Location
M1 ECT Standards March 04
M2 RMS Express – Intro & Basics March 18
M3 Connectors #1 April 08
M4 Connectors #2 May 06
M5 SuperComBox and Pelican Case Radio Kits June 03
M6 Field Visit to all EOC’s TBA
M7 RMS Express – Advanced Operation September 09
M8 EOC Radio Setup October 07
M9 ECT ‘Grab-n-Go-Kits’ November 04
Training will take place in either CVRD Board Room or PSD #213
![Page 3: CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013](https://reader036.vdocuments.us/reader036/viewer/2022062417/551b613e550346ae7a8b5af9/html5/thumbnails/3.jpg)
![Page 4: CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013](https://reader036.vdocuments.us/reader036/viewer/2022062417/551b613e550346ae7a8b5af9/html5/thumbnails/4.jpg)
ECT Training – September 09, 2013
![Page 5: CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013](https://reader036.vdocuments.us/reader036/viewer/2022062417/551b613e550346ae7a8b5af9/html5/thumbnails/5.jpg)
Agenda• Opening remarks• Round table introductions with comments • RMS Station Setup• Basic Packet Architecture • RMS Express Program Operation
![Page 6: CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013](https://reader036.vdocuments.us/reader036/viewer/2022062417/551b613e550346ae7a8b5af9/html5/thumbnails/6.jpg)
Opening Remarks• CVRD ECT operational standards• Objectives of this session• Deployment Expectations
![Page 7: CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013](https://reader036.vdocuments.us/reader036/viewer/2022062417/551b613e550346ae7a8b5af9/html5/thumbnails/7.jpg)
Introductions• Name and Call Sign• Do you have a dedicated packet station?• Do you have a Kantronics TNC? Model?• Do you use a sound card modem for packet?• Is your packet station operational 24x7?• Do you update the RMS program regularly?• Rate your packet knowledge level (B, I, A)
![Page 8: CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013](https://reader036.vdocuments.us/reader036/viewer/2022062417/551b613e550346ae7a8b5af9/html5/thumbnails/8.jpg)
RMS Station Setup discussion1. Quick review of our earlier (basic) session as a refresher2. Review of install and update procedure3. Review of the P2P <Setup> screen and the disable function4. Setting transmit deviation with examples of why this is critical5. Recording the XMITLVL and labelling your radio / TNC package6. Actual testing of attendee radio / TNC packages for TX deviation7. Kantronics TNC setting <Display> command8. Simple Terminal9. Navigating the command list in your TNC10. Format to set <Daytime> command11. Changes within your TNC when you experiment (with another
program) and importance of having a base-line listing for your TNC12. RMS Express on a memory stick13. Whitelist maintenance schedule for each station
![Page 9: CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013](https://reader036.vdocuments.us/reader036/viewer/2022062417/551b613e550346ae7a8b5af9/html5/thumbnails/9.jpg)
Basic Packet Architecture1. Packet radio network in CRD, CVRD and WA-state2. Frequency plans3. Nodes4. Digipeating5. RMS Packet gateways6. Node stacks7. AX25 packet traffic protocol8. Peer-to-Peer connectivity
![Page 10: CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013](https://reader036.vdocuments.us/reader036/viewer/2022062417/551b613e550346ae7a8b5af9/html5/thumbnails/10.jpg)
RMS Express Program Operation1. Formatting a new message (WL2K versus P2P)2. Templates and Node scripting3. Importance of turning off certain features
• Auto add to contacts list• Read receipts• Auto connect• No CC or Bcc
• Sending message to the intended station• Replying to messages – no read receipts or CC• Maintenance of <Inbox and Trash>• Importance of leaving station in P2P mode• VE7SAG message mystery
![Page 11: CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013](https://reader036.vdocuments.us/reader036/viewer/2022062417/551b613e550346ae7a8b5af9/html5/thumbnails/11.jpg)
VE7SAG message1. VE7SAG sent VE7AVV a P2P message.2. VE7AVV replied to VE7SAG
![Page 12: CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013](https://reader036.vdocuments.us/reader036/viewer/2022062417/551b613e550346ae7a8b5af9/html5/thumbnails/12.jpg)