cv_fathor

7
Phone : +6289603002303 E-mail : [email protected] Fathor Rohman P. CURRICULUM VITAE Personal Detail Name : Fathor Rohman P. Sex : Male Address : Jalan Kendang Sari No. 124 B Surabaya - 60292 Phone. 089603002303 E-mail : [email protected] Place / Date of Birth : Surabaya, February 21 th 1986 Language : Indonesian, Javanese, English Marital Status : Single Personality : Fast Learner, hardworker, able to work under pressure, able to work with team or individu. Formal Education Elementary School (SD N Kendang Sari II Surabaya), 1991 – 1997 Junior High School (SLTP N 13 Surabaya), 1997 – 2000 Senior High School (SMUN 2 Surabaya), 2000 – 2003 Electrical Engineering Dept (Bachelor Degree / S1), Majoring Telecommunication Multimedia, Sepuluh Nopember Institute of Technology Surabaya, 2003 – 2008 with GPA 3.24 of 4.0 scale With final project “Router Respons Analysis to Traffic at a Bottleneck Link”. Software/Hardware Abilities - Operating systems : DOS, Windows - Office applications : Word, Excel, Power Point, Access - Transmission tools : Pathloss 4.0, Global mapper - Drive test tools : TEMS Investigation 8.04, TEMS Route Analysis, Map Info 8.5, ComMon 3.0 - Monitoring tools : Citrix, Netact, Secure CRT, M2000, LMT,

Upload: fukho-jayanugeraha

Post on 17-Jan-2016

17 views

Category:

Documents


8 download

DESCRIPTION

CV Fathor

TRANSCRIPT

Page 1: CV_Fathor

Phone : +6289603002303E-mail : [email protected]

Fathor Rohman P.

CURRICULUM VITAE

Personal Detail

Name : Fathor Rohman P.Sex : MaleAddress : Jalan Kendang Sari No. 124 B

Surabaya - 60292Phone. 089603002303E-mail : [email protected]

Place / Date of Birth : Surabaya, February 21th 1986Language : Indonesian, Javanese, EnglishMarital Status : SinglePersonality : Fast Learner, hardworker,

able to work under pressure, able to work with team or individu.

Formal Education

Elementary School (SD N Kendang Sari II Surabaya), 1991 – 1997Junior High School (SLTP N 13 Surabaya), 1997 – 2000Senior High School (SMUN 2 Surabaya), 2000 – 2003Electrical Engineering Dept (Bachelor Degree / S1), Majoring Telecommunication Multimedia, Sepuluh Nopember Institute of Technology Surabaya, 2003 – 2008 with GPA 3.24 of 4.0 scaleWith final project “Router Respons Analysis to Traffic at a Bottleneck Link”.

Software/Hardware Abilities

- Operating systems : DOS, Windows

- Office applications : Word, Excel, Power Point, Access

- Transmission tools : Pathloss 4.0, Global mapper

- Drive test tools : TEMS Investigation 8.04, TEMS Route Analysis, Map Info 8.5, ComMon 3.0

- Monitoring tools : Citrix, Netact, Secure CRT, M2000, LMT, Inspur, OMS

- Supporting tools : GPS, handset (MS), Spectrum Analyzer, Netact Plan Editor

- Networking : Cisco router, Mikrotik router, Switch, Hub, Modem and also its setting.

- Computer troubleshooting

Work Track Records

3G RNO Engineer Nexwave Indonesia

Page 2: CV_Fathor

Phone : +6289603002303E-mail : [email protected]

Fathor Rohman P.

August 2012 – PresentMS HCPT – Huawei (East Java Area)

Jobdesk :- Monitoring and responsible KPI performance at Branch level.- Monitoring KPI performance Accessbility (CSSR CS, CSSR PS, CSSR

HSDPA), Retainability (DCR CS, DCR PS, DCR HSDPA), Integrity (ISHO CS, ISHO PS, SHO CS, SHO PS, IFHO), Troughput and Traffic.

- Improving KPI at Branch level based on measurement RSRAN.- Customer complain handling.- Make daily report (PDT tracker), weekly report (NTL remarks,

Dashboard remarks).- Coordination with RF engineer and DT engineer for Grade level

activiry (Improving network based on drive test result).- Coordination with Rigger engineer for site audit / optimasi activity.

2G RNO Engineer Nexwave IndonesiaJanuary 2012 – August 2013MS HCPT – Huawei (East Java Area)

Jobdesk :- Responsible KPI performance at BSC level (BSC owner).- Monitoring KPI performance after BSC activites (Rehoming, Upgrade

software, Upgrade PCU).- Monitoring KPI performance (CSSR, TCH Blocking Rate, SDSR,

HOSR, DCR, PDASR, TBF Drop Rate) of Cluster based level.- Improving Cluster KPI to achive Normal Cluster and National Cluster

KPI baseline.- Customer complain handling.- Analysis DT result from customer complain area.- Make Weekly report: Zero Traffic 2G/3G EJV report, Format Meeting

Report, Weekly KPI report, Utilisasi 2G/3G EJV – BALOM report, Friday report, Achivement Improvement report.

- Coordination with FM team for hardware troubleshooting.- Monitoring site live performance with Citrix and Secure CRT.- Get measurement hourly after FM troubleshoot with Inspur and

Netact.

Jr. 3G RF EngineerNexwave IndonesiaMarch 2013 – May 2013MS HCPT – Huawei (East Java Area)

Jobdesk :- Help RNC owner monitoring KPI performance (Traffic CS, Traffic PS,

CSSR CS, CSSR PS, DCR CS, DCR PS, SHO CS, SHO PS, ISHO CS, ISHO PS, Call Blocking, CE Blocking, Iub Blocking, Code Blocking, Power Blocking) at RNC level.

- Prepare database PES for RNC rehoming activity.- Monitoring Node B live performance with M2000 and LMT.

Analysis and give recommendation from Drive Test result gladiator event (improvement performance network city level).

Page 3: CV_Fathor

Phone : +6289603002303E-mail : [email protected]

Fathor Rohman P.

2G RNO Engineer Nexwave IndonesiaSeptember 2011 – January 2012Swap Common Abis Project NSN – Telkomsel (Sumbagsel Area)

Jobdesk :- Monitoring KPI performance (TCH Drop Rate, SDSR, HOSR, TBF UL,

TBF DL, TBF CR) of BSC based on KPI daily site level and BSC level report, KPI hourly site level and BSC level report, TQM daily site level and BSC level, TQM hourly site level and BSC level..

- Improving BSC KPI as well as site level KPI which have below KPI baseline.

- Analyze degraded KPI on BSC as well as site based on KPI report, TQM report, log Alarm (ZEEI, ZEOL, ZEOH), ND (196, 195, 208, 232, 153, 061, 060).

- Make PCR BSC level as well as site level refers Dump file to improving KPI (SDSR, TCH Drop Rate, HOSR, TBF DL, TBF UL, TBF CR).

- Customer complain handling, troubleshoot customer complain problem by make PCR based on KPI report and drive test logfile.

- Escalate hardware problem to NSN FLM team by making WRF (Work Request Form) and Alarm, KPI, ND as justification.

- Perform presentation site level acceptance report to Telkomsel.- Monitoring and improving KPI (TCH Blocking) all Sumbagsel BSC by

adjust CDED, CDEF, FRL, FRU, GTRX, SD Channel and TCH Channel.

- Making WCL (Worst Cell List) all Sumbagsel BSC and making PCR to improving those sites that have KPI below baseline.

- Make QC rehoming report after rehoming activity and submitted to Telkomsel.

- Make Preliminary report every week to be reported to Telkomsel about performance of BSC include TCH Drop Rate, SDSR, HOSR, TBF DL, TBF UL, TBF CR, TCH Traffic, SD Traffic, SD Blocking, TCH Blocking, Availability.

- Make LAC Splitting and Reboundary Report after LAC Splitting activity.

- Make QC Cluster Acceptance Report cluster that has achived 6 KPI baseline to be submitted and presented to Telkomsel.

- Make justification not achived KPI baseline cluster based on KPI report, alarm, ND and logfile drive test for QC Cluster Acceptance report.

RF Engineer / DT AnalystUCE IndonesiaJune 2011 – September 2011Swap Project Huawei – Telkomsel (Jabodetabek Area)

Jobdesk :- Post-Processing drive test logfile data and produce report using

MapInfo, ComMon and MS Office application, e.g. spread sheets and database.

- Calculating KPI (CSSR, CDR, HOSR) and perform evaluation- Making report for submitted to Telkomsel based on logfile drive test.

Drive Test Analysis / Jr. 2G Optimization EngineerUCE Indonesia

Page 4: CV_Fathor

Phone : +6289603002303E-mail : [email protected]

Fathor Rohman P.

January 2011 – May 2011Swap Project NSN – Indosat (Centre Kalimantan Area)

Jobdesk :- Post-Processing drive test logfile data and produce report using

MapInfo, ComMon and MS Office application, e.g. spread sheets and database.

- Assisting Optimization engineers in defining drive test route and setup the best drive test configuration.

- Calculating KPI (CSSR, CDR, HOSR) and perform evaluation- Perform investigation event such as Blocked call, Dropped Call,

Handover Failure based on layer 3 analysis as well as providing preliminary analysis report.

- Perform investigation bad spot problems such as bad rxlevel, bad rxqual, bad SQI based on contour, structure buildings, distance from site and other things that might degrade BTS.

- Define interference problems C/I or C/A- Make 3 hours and 9 hours report based on OSS KPI (TQM hourly)

and Alarm OSS (ZEOL and ZEOH) after swap activities.- Make daily and hourly report based on OSS KPI (TQM daily and

hourly) and OSS Alarm (ZEOL and ZEOH) until 6 days after swap activities.

- Analyze neigbour relation in inner and outer area with ComMon and data on ND 153, if needed make CR create or add ADCE.

- Make CR ADCE intra and inter BTS (NSN-NSN, NSN-ALU) in swap activities.

- Inform Sr. Optimization Engineer alarm and operation state per BTS based data on ZEOH, ZEOL and ZEEI.

- Make CR to solve discrepancies and one-way adjacent problem.- Make CR to solve alarm 7712 (add time slot for SDCCH).- Inform Sr. Optimization Engineer if occur alarm 7745 and make

suggestion report to solve it based on Dump file and ND 196.

Drive Tester EngineerUCE IndonesiaJanuary 2010 – Desember 2010

Jobdesk :- Perform Drive Test for 2G new site (PLO), Upgrade High Capacity.- Perform Drive Test for BSC Activity such as : Rehoming,

Reparenting, LAC Splitting, By Pass Combiner.- Involved in cut over ZTE to NSN Swap project in Serang Banten.- Make 2G PLO Drive Test Report for new site and Upgrade High

Capacity for 2G site.- Make Drive Test Report for BSC activity.- Perform cross feeder, low power, sleeping cell, cell dragging,

overshooting cell analysis.- Process Drive Test logfile to analyze and make suggestion for

network quality improvement.

LOS Survey EngineerPT. Lakemba Citra IndonesiaSeptember 2008 – Desember 2009

Page 5: CV_Fathor

Phone : +6289603002303E-mail : [email protected]

Fathor Rohman P.

Jobdesk :- Perform LOS Survey for new site (TSS).- Perform Site Audit and LOS Survey on the existing site.- Perform RF Field Survey for 3G site.- Perform Scan Frequency for MW Frequency on the existing site.- Make LOS Survey and Site Audit report.- Make RF Survey Report.- Make Scan Frequency Survey Report.

Skill and Competency

GSM ConceptExcellent knowledge about GSM architecture, Transmission principle, GSM interface, GSM procedure, GSM protocol and signaling.

WCDMA Concept

Excellent knowledge about WCDMA architecture, WCDMA interface

2G Optimization

Perform 2G optimization. Monitoring and improving KPI BSC and Site based on KPI daily report and alarm.

2G Drive Test and Post Processing

Perform 2G/3G drive test, analyze and produce optimization report and some recommendation to improve Network Quality using TEMS Investigation, TEMS Route Analysis.

Customer Complaint Handling

Fully understand and listen what the customer complaint and handling the complaint through fast analysis and give some recommendation and report. Cooperate with Customer Care to ensure the best feedback for end-users.

Transmission Project Handling

Perform transmission project such as LOS survey to make link transmission between sites. Analysis in the field to make LOS/NLOS decision and reporting summary to the coordinator project. Determining height and azimuth of microwave antenna using Path loss tool based on field condition.

TCP/IP Concept

Excellent knowledge about TCP/IP fundamental, LAN/WAN architecture, network topology. Able to set up data network by wired or wirelles connection using network device such as Switch, Access Point and Router. Able to configure Cisco Router and PC router (Mikrotik Router OS), VoIP server (asterisk).

Reference

Leo Siwy : Project Manager UCE, Telkomsel – NSN Project

Page 6: CV_Fathor

Phone : +6289603002303E-mail : [email protected]

Fathor Rohman P.

(081281099311)

Denny Sentosa : Project Manager UCE, Indosat – NSN Project (081317717271)

Puguh Ariyanto : Team Leader UCE, Indosat – NSN Swap Project (08121610108)

I Gusti Ngurah Mulyartha : Team Leader NW, Telkomsel – NSN Swap Common Abis Project (08111082582)

Eko Sudjatmiko : Team Leader HCPT – Huawei Project EJV – BALOM (08983999071)

Dana Saputra : 2G – 3G RNO coordinator HCPT – Huawei Project EJV – BALOM (08983999075)

All information explained in this curriculum vitae is true, If later on day there are mistake in intended writing or found a inappropriate fact, I’ll be ready to justify.

Surabaya, October 2013Sincerely yours,

Fathor Rohman P.