cv of muhammad anas khan-p&g
TRANSCRIPT
P R O F I L E
Currently I am employed at Proctor & Gamble Pakistan as a Preventive
Maintenance Leader of Bottle Line recently we did the successful startup of
new plant of Hair care. I am responsible for the line commissioning,
Mechanical maintenance activities & refurbishment. My last job was in Indus Motor Company as an Assistant Team Leader in the
Quality Assurance Department. I am involved in the new developments and
projects that will be released into the market at a later stage. My first job was in UNIFEROZ which is a pharmaceutical firm my role is a
supervisor of making department that was a very short time experience but it
boost my learning skills. At PAK-SWISS Training Centre, I actively participated in various
extracurricular events and was the Captain of our Cricket team. I am looking forward to joining an organization in which my leading skills and
knowledge can be actively used and appreciated.
A I M S & O B J E C T I V E S
Short term: Knowledge and skill acquisition from professional experts working in major multinationals
Long term: To gain a leadership position in terms of knowledge and
expertise in the dynamically changing, progressive multinational environment.
A C A D E M I C Q U A L I F I C A T I O N
• B-TECH (PASS) (Mechanical Technology) from NED University of
Engineering and Technology. • 4-Year Specialized DAE (Dies & Mould Technology) from Pak-Swiss
Training Centre Karachi. • Matric from SBTE (Ideal Grammar Higher Secondary School Karachi.
T E C H N I C A L P R O J E C T S
• Group leader, first Semester project (B-tech) – Design & Thesis of
Boiler.
MUHAMMAD ANAS KHAN
House No. F - 2 PCSIR Campus Karachi - 75280
Cell : 0335 - 2259923
• Group leader for Final Semester project (B-Tech) – Design, Thesis &
fabrication of a Solar Sun Seeker Device. MUHAMMAD ANAS KHAN
E X P E R I E N C E • P&G – Working as a Bottle line PM Leader, As P&G follows the
IWS systems so there is both type of learning which systematic &
technical mastery. Core workings: • Implementation of the preventive maintenance program by executing all
the PM program terms at the Specified time. - Taking the initiatives in solving the machine break down/minor failures using
PM tools. - Ensure timely completion of CIL (Cleaning, Inspection & Lubrication) of
Machines. - Ensure machines are running as per centre lines defined in process control
strategy. - Ensure 100% adherence with QA/Safety DMSs. - Conduct / Participate Quality/safety meeting. - Make an spare parts plan as per TBM & CBM maintenance. - Lead IQ/OQ (Installation Qualification/ Operational Qualification) of the owned
equipment. - Responsible to maintain defect list for the floor/ equipment and removing
defects. - Help and collaborate with AM/PM (Autonomous Maintenance/ Progressive
Maintenance) teams to minimize losses, eliminate the breakdowns & Participate in Loss Analysis exercises.
- Lead Installation and validation of new machines. - 100% skill metrics of bottle line & sachet line. - Perform successfully IQ &OQ of Monobloc, Transfer Pump, and Transfer Line
& Pigging unit. - Created SOPs (Standard Operating Procedure) for different operations. - Save Losses through Kaizens
• Organizational & Skilled Trainings:
1: SKF Bearings 10: Ergonomics 2: SKF Alignment & Balancing 11: Isolation of Energized Machines
3: Lubrication 12: PPE for Physical Hazard
4: Autonomous Maintenance Step 1 to 4 13: Equipment Labelling
5: Unified Problem Solving 14 Fundamental of Quality
6: Work Process Improvement 15: Introduction to Microbiology
7: HSE Fall Prevention & Protection 16: QA & You
8: Behaviour & Cultural 17: Quality Risk Prediction 9: Quality Risk Management 18: 06 months TT&T in Dammam
• Indus Motor Company – Assistant Team Leader in the Quality
Assurance Department
According to the Toyota philosophy of developing human resource, I
have received the following trainings from Toyota certified
professionals:
Page 2
MUHAMMAD ANAS KHAN
- Toyota Production System
- PDCA (Plan Do Check Act)
- Toyota Communication System
- Building Consensus In The Workplace
- Team Leader Role
- Group Leader Role
- Toyota Business Practice
• Uniferoz Company – Production Supervisor
S K I L L S Languages:
Verbal and written fluency in English and Urdu.
Technical Knowledge:
Basics of Power Inspect, FARO Arm inspection & General Evaluation &
Inspection Techniques, Can use independently mechanical instruments
operate the packing technology, pump overhauling & troubleshooting, Belts & Coupling alignments & motors balancing.
PERSONAL PROFILE
N A M E : M.ANAS KHAN
F A T H E R N A M E : M. ASHFAQ KHAN
D A T E O F B I R T H : 19-MARCH-1990
N I C # 42501-6089710-7
R E L I G I O N : ISLAM
N A T I O N A L I T Y : PAKISTAN
M A R I T A L S T A T U S : ENGAGED
HOBBIES
I AM OFTENLY PASS MY TIME BY INTERNET SURFING CHATTING WITH
FRIENDS OR READING ARTICLES I AM OF SOCIAL TYPE PERSON MY
OUTDOOR ACTIVITIES INCLUDE FOOTBALL, CRICKET GATHERING WITH
FRIENDS AND DISTANCE RUNNING.
R E F R E N C E : A V A I L A B L E O N R E Q U E S T