IAN C SHANNON Contact Details Personal Details Gardeners cottage Brimpsfield park Brimpsfield Gloucestershire GL4 8LE Tel: 01452 909527 MOBILE: 07849 222 522 E-MAIL; [email protected] Nationality: British/Scottish. Date of Birth: Marital Status: Dependants: Driving Licence: Salary: Languages CSCS: SMSTS & PTS FIRST AID at Work (AED): MEWPs For managers NEC 3 & JCT trained : 27/01/1960 married Both grown up Full (Clean) Negotiable CAREER HISTORY 02/2015 - to 09/2016 MJ Church Saltersford Lane Chippenham Wiltshire SN14 0RN (Newbury racecourse, Rodbourne, M3 upgrade, Bristol ring road A4174) Ref: Steve Daniels(contracts manager 07557651085 Paul whitehead (Contracts Manager Balfour Beatty) 07967578539 POST: Site Manager bridge renewal (Rail) (Sub con to Balfour Beatty) Site manager for M3 motor way & Ring road upgrade.. - Overseeing the MJC personnel on site - Allocating plant/Personnel to site. Ordering material (Cement Etc.) - Acting as first aider on site - Dealing with work packages, task briefs. H&S on site - Report writing. Giving details on work required, work to be done. - Liaison between MJC and Client - M3 Proj Site manager/deputy Contracts manager - Be commercially aware of changes brought about by VI’s or SI’s and cost where appropriate. - Oversee the finance in co-operation with QS assigned. - Look at the costs associated with changes and budget - Attend site and office meetings. - Be No 1 on site and client facing - Issuing of permits on projects 11/2014 to 02/2015 Short term contract Murphy Group Cannock Rail Cannock Ref: Garry Smith Mob: 07921406755 POST: Site Manager bridge renewal (Rail) - Overseeing the trades on site - Doing inductions of new personal allocated to the site - Acting as first aider on site - Dealing with work packages, task briefs. To ORR standard - Report writing. Giving details on work required, work to be done. - Liaison between site and Network Rail. - Be commercially aware of changes brought about by VI’s or SI’s and cost where appropriate. - Oversee the finance in cooperation with QS assigned. - Look at the costs associated with changes and budget - Issuing of permits 06/2014 to 11/2014 Volkerfitzpatrick’ IEP site Filton Stoke Gifford. Bristol Client volkerfitzpatrick construction Allteck recruitment Bristol POST: Site Manager Hitachi IEP maintenance depot Bristol (80 million rail project) - Overseeing the trades on site - Doing inductions of new personal allocated to the site - Acting as first aider on site - Dealing with work packages, task briefs. To ORR standard - Report writing. Giving details on work required, work to be done. - Giving details of work done and any issues on site that should be made aware. - Pre start meeting, progress meeting and daily brief meeting to 05

Upload: ian-shannon

Post on 12-Apr-2017

26 views

Category:

Leadership & Management


1 download

TRANSCRIPT

Page 1: Cv of ian shannon

IAN C SHANNON

Contact Details Personal Details

Gardeners cottageBrimpsfield parkBrimpsfieldGloucestershireGL4 8LE

Tel: 01452 909527MOBILE: 07849 222 522E-MAIL; [email protected]: British/Scottish.

Date of Birth:Marital Status:Dependants:Driving Licence:Salary:LanguagesCSCS: SMSTS & PTSFIRST AID at Work (AED): MEWPs For managersNEC 3 & JCT trained

:

27/01/1960marriedBoth grown upFull (Clean)Negotiable

CAREER HISTORY02/2015 - to09/2016

MJ ChurchSaltersford LaneChippenhamWiltshireSN14 0RN(Newbury racecourse, Rodbourne, M3 upgrade, Bristol ring road A4174)

Ref: Steve Daniels(contracts manager 07557651085 Paul whitehead (Contracts Manager Balfour Beatty) 07967578539

POST: Site Manager bridge renewal (Rail) (Sub con to Balfour Beatty) Site manager for M3 motor way & Ring road upgrade..

- Overseeing the MJC personnel on site - Allocating plant/Personnel to site. Ordering material (Cement Etc.)- Acting as first aider on site - Dealing with work packages, task briefs. H&S on site- Report writing. Giving details on work required, work to be done.- Liaison between MJC and Client- M3 Proj Site manager/deputy Contracts manager- Be commercially aware of changes brought about by VI’s or SI’s and cost where appropriate.- Oversee the finance in co-operation with QS assigned.- Look at the costs associated with changes and budget- Attend site and office meetings.- Be No 1 on site and client facing- Issuing of permits on projects

11/2014 to 02/2015Short term contract

Murphy GroupCannock RailCannock

Ref: Garry SmithMob: 07921406755

POST: Site Manager bridge renewal (Rail)- Overseeing the trades on site - Doing inductions of new personal allocated to the site- Acting as first aider on site - Dealing with work packages, task briefs. To ORR standard- Report writing. Giving details on work required, work to be done.- Liaison between site and Network Rail.- Be commercially aware of changes brought about by VI’s or SI’s and cost where appropriate.- Oversee the finance in cooperation with QS assigned.- Look at the costs associated with changes and budget- Issuing of permits

06/2014 to 11/2014

Volkerfitzpatrick’ IEP siteFilton Stoke Gifford. Bristol

Client volkerfitzpatrick constructionAllteck recruitment Bristol

Ref:Paul Raynor Snr PM07876876066

POST: Site Manager Hitachi IEP maintenance depot Bristol (80 million rail project)- Overseeing the trades on site - Doing inductions of new personal allocated to the site- Acting as first aider on site - Dealing with work packages, task briefs. To ORR standard- Report writing. Giving details on work required, work to be done.- Giving details of work done and any issues on site that should be made aware.- Pre start meeting, progress meeting and daily brief meeting to the supervisors..- Dealing with all HS on site- Progress of work and liaison with other agents on site to ensure work is on schedule and no

hold ups.- Dealing with lift plans and acting temp work supervisor for lifts, mewps and other plant- Be commercially aware of changes brought about by VI’s or SI’s and cost where appropriate.

05/2014 to to 06/2014

Page 2: Cv of ian shannon

- Oversee the finance in cooperation with QS assigned.- Look at the costs associated with changes and budget- Issuing permits

05/2014 to to 06/2014

Gallifordtry ConstructionGainsborough hotel refit

Client Galliford trySphere recruitment Bristol

POST: Site Manager (night shift) (Hotel refit) Fixed term contract. - Overseeing the trades on night shift - Doing inductions of new personal allocated to the night shift- Acting as first aider on site - Allocating work in conjunction with dayshift- Report writing. Giving details on work required for day shift for work to be done.- Giving details of work done and any issues on site that should be made aware- Issuing of permits

04/2014 to 05/14

ISG ConstructionBristol AirportCentral pier project (phase 1)

Client ISG Neil SpurneyMobile:07972 190867 (For ref)Sphere recruitment Bristol

POST: Site Manager/Project Manager (night shift) (Aviation) Fixed term contract. - Overseeing the trades on night shift - Doing inductions of new personal allocated to the night shift- Acting as first aider on site - Allocating work in conjunction with dayshift- Report writing. Giving details on work required for day shift for work to be done.- Giving details of work done and any issues on site that should be made aware- Be commercially aware of changes brought about by VI’s or SI’s and cost where appropriate.- Oversee the finance in cooperation with QS assigned.- Look at the costs associated with changes and budget

01/14 to 04/14 Highlands and island Airports LimitedInverness AirportInvernessIV2 7JB

POST: Project Manager (Aviation) Fixed term contract. - Overseeing a 2.3 million renovation to Sumburgh Airport in Shetland- Being the lead in contractors and designers- Producing reports to the HAIL executive.- Full financial control.- Liaison between HAIL and contractors- Reviewing risk assessments and methods statements.- Chair progress meetings and coordination meetings.- Decision maker on site.

Review bids in line with DfT SMS- Be commercially aware of changes brought about by VI’s or SI’s and cost where appropriate.- Oversee the finance in cooperation with QS assigned.- Look at the costs associated with changes and budget

06/13 to 10/13 BDP Architects/First great western7 Hill StreetBristol

POST: Project Manager (Rail transportation) Fixed term contract. - Overseeing a 3 level multi-storey car park.- Acting as first great western PM on site, and their clerk of works - Producing reports for the rail executive.- Full financial control.- Liaison between BDP and FGW and Network Rail.- Reviewing RAMS prior to submission to network rail.- Chair progress meetings and coordination meetings.- Take responsibility for issues on site, (when things go wrong).- Authorised CRE on site.- Be commercially aware of changes brought about by VI’s or SI’s and cost where

appropriate.- Oversee the finance in cooperation with QS assigned.- Look at the costs associated with changes and budget

09/10 – 11/12 Veritas Architects148 Jalan AmpangKuala LumparMalaysia

POST: Project Manager (Rail transportation. Aviation) - Overseeing the design of 16 elevated and 4 underground stations along with a

maintenance yard. - Coordinate engineers and Electrical engineers. As well as Architects, draught persons and

Design architects.- Attend stakeholder meetings with Prime Minister of Malaysia and attend progress meetings

with client. - Overseeing the new Air Asia HQ at Kuala Lumpur International Airport.- Overseeing the high rise development at Penang. 3 x 5 storey with 5 x 20 storey and 5x 10

storey apartments. Including shopping mall.- Be commercially aware of changes brought about by VI’s or SI’s and cost where

appropriate.- Oversee the finance in cooperation with QS assigned.- Look at the costs associated with changes and budget

05/2009-06/2010

BIFAB FabricatorsWest shore Road Burntisland Fife

POST: Project Co-ordinator/manager (Oil Rig modules. Accommodation Block)- Oversee construction between M&E, Electrical, engineering and architectural fit out to

SOLAS regs.

Page 3: Cv of ian shannon

- Attend progress meeting and stakeholder meetings and chair when required.- Ensure Health and safety standards are met.- Update planning requirement, Hire additional staff when required - Procure equipment and hire all tools required.- Write weekly reports on progress. Any delays, Additional expenditure.- Fix budget requirements- Deal with health and safety, Method and risk assessments prior to commencement of work- Finalise Final hand over documents for client (SAP system)- Put together bid for another accommodation block with Helicopter landing pad.- Be commercially aware of changes brought about by VI’s or SI’s and cost where

appropriate.- Oversee the finance in cooperation with QS assigned.- Look at the costs associated with changes and budget

01/2009-05/2009

06/2007-09/2007

06/2006 – 09/2006

09/2003- 04/200406/2002- 07/2003

RAF Lauchars (MOD)DCRE Building 34ALeucharsNr St Andrews

POST: Snr Architectural technician/Asst Project Manager (MOD Airbase)- Produce working drawings for RAF (Refurb and new build)- Oversee work by sub contractors.- Attend and chair progress meetings with client (MOD DCRE) and sub contractors on site.- Produce reports on progress to MOD and central government- Check work and make sure of value for money requirements set by government.- Deal with health and safety, Method and risk assessments prior to commencement of work- Electrical survey of HV and LV and produce feasibility study for future expansion and all

requirements required.- Legionella survey all RAF bases and RM condor (commando unit)- Prepare drawings for new runway.- Prepare layout for Camp Bastion.

02/2008-01/2009

Wilson DesignPark CircleGlasgow

POST: Project Manager/Snr Designer (Housing Estate 300+ units)- Design Housing types (2 to 5 bedroom) - Design road layout, street lighting, Drainage. - Deal with all local authority requirements (planning, warrants)- Deal with Tender documents (JCT form of contract)- Attend and chair progress meetings on site.- Check all subcontractors drawings and work on site.- Deal with health and safety, Method and risk assessments prior to commencement

08/2007-02/2008

Fairhursts Design GroupFaulkener Street Manchester

POST: Project coordinator /Snr Architectural Technician (BAE Systems) (Offices, warehouse, workshop F16 fighter)

- Design Offices and workshops for new aircraft (F16).- Attend progress meetings and chair when required. Lead kick off meeting on site with all

sub contractors concerned.- Coordinate between services and deal with any environmental issues.- Distribute work between assistant and designers.

04/2007-06/2007.

Jacobs EngineeringGSK Site, Irvine

POST: Snr Architectural Technician. (Chemical plant)- Design offices and laboratory (Clean room)- Produce layouts for pipe runs within plant.- Coordinate with M&E .- method statement and risk assessments to GSK requirements.- Attend progress meetings and reports to GSK requirements.- Be commercially aware of changes brought about by VI’s or SI’s and cost where

appropriate.- Oversee the finance in cooperation with QS assigned.- Look at the costs associated with changes and budget

09/2006-01/2007.

Jacobs EngineeringAldermaston (AWE)

POST: Project Coordinator/Snr Arch Technician. (MOD Weapons research)- Design Explosion proof underground facilities in line with explosives regulations.- Produce layouts M&E layouts and Electrical P&C- Attend stakeholder meetings and produce written progress reports

09/2005-04/2006.

Jacobs EngineeringPrestwick Air traffic control

POST: Project Coordinator (Civil Air traffic control)- Coordinate between Sub contractors on site.- Make sure Security and health and safety where adhered to - Deal with any construction issues redesign where necessary liaise with Head office.- Attend progress meetings and raise any issues.- Cost new work.- Be commercially aware of changes brought about by VI’s or SI’s and cost where

appropriate.- Oversee the finance in cooperation with QS assigned.- Look at the costs associated with changes and budget

04/2005-09/2005

Taylor Woodrow2 Gabbert RoadKirkton Campus

POST: Project Manager/Coordinator/Designer (Housing Development)- Produce new working drawing for site relating to new housing stock.- Review old stock and renew.

Page 4: Cv of ian shannon

01/2004-08/2004

LivingstonWest Lothian

1

- Over see site manager on 2 estates, - Review method statements and risk assessments, review health and safety in regard to new

guidelines.- Review planned layout of roads etc.- Set budget.

08/2004-04/2005

BRH ArchitectsMartins BuildingWater streetLiverpool

POST: Project Coordinator/Snr Architectural Technician, (108 Apartment block with 3 storey under ground parking)

- Produce working detailed drawings. For apartments and car parking.- Oversee assistants under my control. Check work.- Coordinate between sub contractors (engineers, M&E, local authorities).- Set budget

06/2003-09/2003

Foster Wheeler CivilsSeaward RoadGlasgow

POST: Snr Architectural Technician (Refinery, Pharmaceutical/Petrochemical).- Production of working drawings for blast proof buildings in a chemical Refinery setting.- Production of working drawings for clean room and laboratory environment.- Coordinate between M&E, Electrical, and client,- Attend progress meetings on a weekly basis.- Attend site and write reports on progress.

04/2002-07/2002

Waring and NettsArcadia House.Balliol Business Park.Benton Lane Newcastle.

POST: Snr Architectural Technician/Coordinator. PFI, PPP, Schools and sport centre.- Produce off working drawings relating to school and a sports centre.- Coordinate between services.- Attend weekly progress meetings with client.- Delegate work packages.- Attend kick off meetings.- Be commercially aware of changes brought about by VI’s or SI’s and cost where

appropriate.- Oversee the finance in cooperation with QS assigned.- Look at the costs associated with changes and budget

01/2002-04/2002

Aardvark StorageUnit 1630 BankheadEdinburgh

POST: Project manager/Designer for storage facilities, Manchester, Crowley, Leeds, London.- Oversee the design of storage facilities. Planning building warrants.- Coordinate with services.- Ensure drawings sent for tender. And receive bids, Coordinate with winning company.- Chair progress meeting.- Employ additional work force and deal with all health and safety issues.- Deal with all issues arising from construction.

08/2001-01/2002

Jacobs EngineeringGrangemouth refinary

POST: Snr Architectural Technician/Coordinator (refinery, Laboratories, Clean room and fire fighting)

- Produce working detailed drawings for laboratories, Associated offices, new drawings for fire fighting building with up to date equipment.

- Coordinate all construction with other sub contractors- Attend weekly progress meetings

01/2001-08/2001

TPS consult.86 Commercial QuayEdinburgh

POST: Snr Architectural Technician/Coordinator (Police station/SPS)- Produce working detailed drawings for new police station D&B.- Coordinate all construction with other sub contractors- Attend weekly progress meetings with local police force and prison services.

06/2000-01/2001

Tannson design and build2 Randolph TerraceStirlingEdinburgh

POST: Project Manager (Industrial , retail and industrial)- Oversee projects under my control.- Hire additional staff on sites when required.- Redesign where and when necessary pass to draughtsmen under my control.- Chair weekly progress meetings with site manager and deal with health and safety.- Be commercially aware of changes brought about by VI’s or SI’s and cost where

appropriate.- Oversee the finance in cooperation with QS assigned.- Look at the costs associated with changes and budget

02/2000-06/2000

Edinburgh Royal joint ventureEdinburgh royal infirmary

POST: Snr Architectural technician (New build hospital)- Produce working detailed drawings for the construction of hospital.- Coordinate between other sub contractors - Delegate work and hire additional staff if required.- Attend weekly progress meetings and raise any issues.

02/1998-02/2000

Astra/ZeneccaEarls roadGrangemouth

POST: Snr Architectural technician (Chemical/Petrochemical))- Produce working detailed drawings for Electrical, Pipe runs and architectural refurb- Attend weekly progress meeting and raise any issues- coordinate between sub contractors and other areas on site

Education & Qualifications (Relevant)2011 University of Malaysia Prince 21995 - 1998 Glenrothes college of technology HNC Auto CAD.1994 - 1995 SCOTVEC (Advanced course Part 2) Auto CAD Release 13.1986 - 1987 Fife college of technology SCOTVEC Accountancy

Page 5: Cv of ian shannon

1987 - 1990 HND BUILDING - Quantity Surveying. Mechanical, Civil/structural Engineering, Building Management Law, Building Technology, Mathematics & Physics. Topographic Surveys.

1976 - 1979 Glenrothes college of technology Business Management

ICT SkillsMicrosoft Office++----------------------------- Word, Excel, Power point, Access, Microsoft Project Packages: AutoCAD Release 10 to 2013, Building Design Suite (ultimate 2013) , Revit 2013, Cad Duct 2013,

Max3D package, PDMS Cad system. Sketch up, NBS Specification Writer, MOD Software,

Areas of Experience:PPP, PFIProject management/ Coordination/DesignAir traffic control; Airfields (Civil, MOD)Telecom; Commercial, Offices; Retail, Industrial.Housing estates from 20 to 300+ units ( Inc high rise up to 45 stories) Hotels (1 million square foot shopping mall)Oil and Gas; Petro chemical; Refinery; Chemical; Clean roomsRailways; Transportation;

CAREER SUMMARY My career covers all aspects of construction, Rail related projects, Airports including MoD airfield and civilian, petro chemical, oil and gas, refinery, retail, commercial, industrial, and housing (including social, student accommodation, au Fait with NHBC standards), Hotel and shop fit outs, accommodation blocks for oil rigs. I have experience in PFI hospitals and education establishments. Over the years I have gained extensive knowledge M & E, structural and HVAC. My main background is in architecture but the experience I have gained in other fields is very extensive and varied which over the years has proved invaluable. In addition I have over the years dealt with all forms of contracts including the newer NEC 3, JCT, Bespoke contracts and the coloured contracts for petro chemical and very computer literate with all Microsoft and extensively with AutoCAD and Revit including BDS 14Over the years I have become extensively involved in site health safety and also a first aider with AED training.