cv-michael yuen 02.16.17 1.3 - andrews engineer · c michael yuen • 017.02.16 michael yuen...
TRANSCRIPT
222 Laurier Avenue East, Suite 200, OTTAWA Ontario Canada K1N 6P2 • 55 Horner Avenue, Suite 2a, TORONTO Ontario Canada M8Z 4X6 CV – MICHAEL YUEN • [email protected] • + 1 416.761.9960
Michael Yuen
CV
– M
icha
el Y
uen
• 20
17.0
2.16
education and training2014 Honours Bachelor of Applied Science in Environmental Engineering, Water Resource Option, University of Waterloo
Pipeline & Manhole Assessment Certification Program (PACP/MACP/LACP), NASSCO
Confined Space Safety & Rescue Program, Acute Environmental & Safety Services
professional backgroundAndrews.engineer, Toronto Project Engineer
AECOM (Environmental), Hong Kong Engineering Intern
municipal clientsPeelTorontoYork
Michael Yuen brings his extensive experience preparing technical reports, condition assessments, and data analysis to a wide range of projects. He also plays a key role in planning, managing and executing field investigation programs.
Michael coordinates contractors, sub-contractors, and consultants on a wide range of condition assessment and rehabilitation projects. He has a solid understanding of coding and grading assessment standards having been directly responsible for the processing and reporting for the projects. Michael employs a working knowledge of data processing and asset management software such as Microsoft Access, GraniteNET, and InfoNet. Michael is PACP, MACP and CACP certified.
Currently, Michael plays a vital role in the overall planning, management, coordination, and execution of the sanitary sewer and MH assessment programs for the Region of Peel.
project engineer
CV
– M
icha
el Y
uen
• 20
17.0
2.16
[email protected] Yuen
222 Laurier Avenue East, Suite 200, OTTAWA Ontario Canada K1N 6P2 • 55 Horner Avenue, Suite 2a, TORONTO Ontario Canada M8Z 4X6 CV – MICHAEL YUEN • [email protected] • + 1 416.761.9960
project experience Region of Peel Sewer and Manhole Inspection and Assessment 2015 to present
• Inspection and condition assessment of 2200 MHs and 138 km of sanitary sewers ranging between 450mm – 3000 mm in diameter according to PACP/MAPCP standards and specifications
• Preparation of all project management documentation (scope, time, cost, quality, communication, risk, and project resource plans)
• Planning and coordination of field inspection activities and site assessments
• Preparation of sewer and MH inspection findings, rehabilitation recommendations, action plans and cost estimates for all inspected assets
Region of Peel Storm Sewer Infrastructure Inventory Collection and GIS Mapping 2016 to 2017
• Conducted field surveys to collect GPS locations, manhole component features, dimensions, and photos
• Consolidated field inspection results with other background information such as as-built drawings
Region of York Sewer and Manhole Inspection and Assessment 2015 to present
• Inspection and condition assessment of 444 MHs and 38 km of sanitary sewers ranging between 200 – 2744 mm in diameter according to WRc standards and specifications
• Planning and coordination of field inspection activities and site assessments
• Preparation of sewer and MH inspection findings, rehabilitation recommendations, action plans and cost estimates for all inspected assets
City of Toronto Local and trunk sewer inspection and assessment 2014 to present
• Developing, processing, and coordinating the data tracking system of the entire sewer and MH scope
• Performed condition assessment and rehabilitation grading of critical sewer sections and MHs
• Assisted with management of project QA/QC processes and policies
• Analyzed existing sewer CCTV data for planning and coordination of flushing and reaming program