CURRICULUM VITAE | KAMRAN HAIDER Name : Kamran Haider Father Name : Munawar Hussain Date of Birth : 16-10-1980 Nationality : Pakistani Religion : Islam Present Address : P.O Box: 16750 Doha Qatar Contact No : +974-33765981 / +92-3066710899 : [email protected], [email protected] U1T Skype ID : eng-kamran Languages : English, Urdu and Punjabi Qatari driving License No : 28058602251 Arrival date in Doha : 16 Nov 2007 Present Position : QA / QC Manager UProfessional Experience (17 Years ) Having 17 years of experience in civil construction work in different kinds of projects such as High rise buildings, Earth works, Precast (production and erection) and Infrastructure works with in Pakistan (9 Years plus) and in Qatar (7 Years plus) at different Levels and designations. UQualification: 1. Matriculation (1995) 2. DAE Civil 1998 3. Bachelor of Arts (2003) 4. MS Office
Career Objectives: To Continue to develop my Career in a post of Greater Potential and Responsibility, which will Challenge and stimulate a high degree of job Satisfaction, Seeking job in a Dynamic Environment with growth potential, where the Creativity and team Spirit, hard work dedication and sincerity are appreciated, a well Established Organization where I can utilize my Professional skill to Contribute and achieve Professional goal of my Employer, a challenging position of my status as a QA/QC Manager.
EXPERIENCE IN QATAR 7 YEARS Plus
March 2015 to Till Date
Position: QA/QC Manager Client: Qatar Rail / HLG / Kaharama / QDVC Contractor: Redco International w.l.l Projects: Precast Production and Erecrtion
November 2013 to Till March 2015
Position: QA/QC Manager Client: KCT Consultant: KEO International Sub-Contractor: Redco International Precast Erection: 1. Mall of Qatar Cost: 136 Millions
May 2013 to November 2013
Position: QA/QC Manager Client: UCC and Lusail Consultant: Parsons and KEO Sub-Contractor: Redco Precast Factory Precast Projects: 1. Souq Waqif Carpark 2. Mall of Qatar Cost: 172 Millions
April 2012 to May 2013
Position: QA/QC Manager Client: Kahrama Consultant: Lahmeyer International Main Contractor SIEMENS Sub-Contractor: Redco International w.l.l. Project: Substation Doha Industrial F Cost of Project: QR 15 Millions
August 2011 to April 2012
Position: Sr. QA/QC Engineer Client: Ashghal Consultant: CEG Main Contractor: Redco International w.l.l. Project: Construction of 5 Schools around Doha and Villages Cost of Project: QR 250 Millions
June 2010 to August 2011
Position: Sr. QA/QC Engineer Client: Lusail Consultant: Halcrow Main Contractor: Redco Pearl NLC jv Project: Construction of Deepening of Lagoons and Dry Outfall (CP 12 Ph 1) Cost of Project: QR 125 Millions
February 2010 – June 2010 Position: QA/QC Engineer Client: Qatari Diar Project Management: Parsons Consultant : Halcrow Main Contractor: Sino Hydro Sub-Contractor : Redco International Project: Construction Package - 1
Cost of Project: QR 280 Millions May 2009 – To February 2010
Position: QA/QC Engineer Client: Ashghal Consultant: Stanley Main Contractor: Vinci Construction Sub-Contractor : Redco International Project: Doha North Sewerage Treatment Plant and Associated Works
Cost: QR 51 Millions
November 2007 – To May 2009
Position: QA/QC Engineer Client: Ashghal Consultant: GEIC
Project Management: Projacs Main Contractor: Redco Pearl NLC jv Project: 10 No’s Kindergarten Schools in Doha & Villages
Cost of Project: QR 168 Millions Job Responsibilities:
• Responsible for the implementation of the project quality system.
• Monitor daily inspections among quality inspectors within his area(s); organize inspections as appropriate to ensure all are done in timely manner and without delays.
• To ensure that RFIs been submitted for each activity to Consulting Engineer for approval.
• Coordination with Project team and consulting engineer • Plan routine sampling and testing of all materials • Follow up the independent testing laboratory activities
relevant; ensure all required tests are carried out as specified (type and frequency); check results to verify compliance to project requirements; ensure test reports are submitted (from laboratory to REDCO and from REDCO to Consultant) without delays.
• To prepare Method statements for each activity and get it Approved by Consultant. • To prepare all ITPs and to ensure that all the activities been
checked. • Collect and compile signed Inspection Records and relevant
test reports. • Maintain an orderly and up to date ‘databases’ of all
inspections, testing and materials. • Monitor materials received at site; carry out inspection of
materials to verify compliance to project requirements. • Report non-conformances; issue NCRs; follow up on corrective
actions and follow up inspection / rectification; ensure close out of NCRs.
EXPERIENCE IN PAKISTAN 9 YEARS Plus
August 2005 to November 2007
Deputy Project Manager Bahria Town (Pvt.) Ltd.
1) Project : Construction of Residential Banglo at Gomal Road E-7 Islamabad Contractor: MIDJAC (Pvt.) Ltd.
2) Project : Construction of multi storey building at bahria heights-2 phase 6
Contractor: DASCON (Pvt.) Ltd. 3) Project : Construction of 54 units of residential houses “MEADOWS” in Ph 3 and 6 Contractor: MIDJAC (Pvt.) Ltd.
Job Responsibilities:
• Ensure that the works is executed as per contract scope of work & specifications.
• Monitor progress of work as per schedules and obtain clarifications from the Contractor as required.
• Coordinate with Contractor and Client. • Arrange site instructions, technical specification, details and
review submission of contractor’s claim. • Certify payment for the work done by the contractor. • Implement the QA/QC procedure and work instructions. • Review and recommend on RFI for the construction activities
submitted by the Contractor • Monitor and Implement safety practice at site.
May 2003 to June 2005
Site Engineer Choudhary Construction Company
Project: Bahria University E-9 Islamabad Client: MES
Job Responsibilities: • Site supervision of works • Planning and scheduling of activities • Preparation of progress reports • Arrangement of necessary resources for timely completion of
work • Co-ordination with subcontractors including checking bills
August 1998 to May 2003
Site Engineer Fayyaz Assosiates
Project: Navel Complex E-8 Islamabad Client: MES Job Responsibilities:
• Site supervision of works • Planning and scheduling of activities • Preparation of progress reports
• Arrangement of necessary resources for timely completion of work
• Co-ordination with subcontractors including checking bills