c.v - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/... · government...
TRANSCRIPT
GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY
From P. Raja Babu, M.Sc (Tech), /C KCVR Projects, /~~~~~.C.V.R Infra Projects Pvt Ltd., Deputy Director of Mines & Geology, KURNOOL. Rep.by Director: Sri K.V Jagan Mohan
Reddy, S/o. K.C Venkata Reddy, H.No: 10-96, B.C Gurreddy Complex, Near Old Bus stand,
Sir,
Banaganapalle (V &M), Kurnool District.
Letter No.2724/MP-BPL/2017, dt: I Z. -09-2017
Sub:- Mines & Minerals - Approval of Mining Plan (including Progressive Mine Closure Plan) for the period of five years for Road Metal and Gravel over an extent of21.999 Hectares in Sy.No: 408/P, 409/P & 410/P ofPinnapuram Village, Panyam Mandai, Kurnool District in favour of M/s. JRC KCVR Projects, Partner: K.C.V.R Infra Projects Pvt Ltd., Rep.by Director: Sri K.V Jagan Mohan Reddy, prepared by Sri P. Veeran Goud, R.Q.P. - Mining Plan - Approved -Regarding.
Ref:- 1) G.O. MS. No: 56, Industries & Commerce (M.II), dated: 30.04.2016. 2) Prodgs No. 28594/P.RQP/2001, dt: 13.05.2016 of the Director of Mines and
Geology, AP, Hyderabad. 3) Prodgs No. 1132/QL/2016, dt: 05.07.2016 of the Asst. Director of Mines and
Geology, Banaganapalle addressed to the applicant. 4) Letter dated: Nil, along with Mining Plan from the applicant I Lessee
received in this office on 19.07.2017.
* * * * In exercise of the powers conferred as per amended Rule 7 A (I), (II), (III) and (IV) of
APMMC Rules, 1966 read with Prodgs No. 28594/P.RQP/2001 , dt: 13.05.2016 of the Director of Mines and Geology, GoAP and G.O.Ms.No: 56, Industries & Commerce (M.Il), dated: 30.04.2016, I hereby approve the Mining Plan (including Progressive Mine Closure Plan) for the period of five years for Road Metal and Gravel over an extent of 21.999 Hectares in Sy.No: 408/P, 409/P & 410/P of Pinnapuram Village, Panyam Mandai, Kurnool District in favour of M/s. JRC KCVR Projects, Partner: K.C.V.R Infra Projects Pvt Ltd., Rep.by Director: Sri K.V Jagan Mohan Reddy, prepared by Sri P. Veeran Goud, R.Q.P, submitted under Rule 7 (A) of APMMC Rules, 1966 & Progressive Mine Closure J:»lan under Rule 23(B) of MCDR, 1988. This approval is subject to the following conditions.
1. Keeping in view of the Environmental Clearance norms compliance, this Mining Plan including Progressive Mine Closure Plan is approved without causing inspection of the Mining Plan applied area. Any dislocation of subject area or any encroachment is noticed, the lessee is held responsible. This Mining Plan is approved basing on the executed sketch and RQP report.
2. This Mining Plan (including Progressive Mine Closure Plan) is approved without prejudice to any other laws applicable to the mine area from time to time whether made by the Central Government, State Government or any other authority.
3. It is clarified that this approval of the Mining Plan (including Progressive Mine Closure Plan) does not in any way imply the approvai of the Government in terms of any other provisions of the Mines and Minerals (Development and Regulation) Amendment Act, 2015 and any other laws including the Forest Conservation Act, 1980 and APMMC Rules, 1966.
4. The approval authority does not owe responsibility with regard to recovery factor of Road Metal & Gravel and assessment of reserves, any erroneous certification made by the R.Q.P. if any, since the evaluation is done on random basis.
5. The Mining Plan (including Progressive Mine Closure Plan) is approved subject to strictly adhering to the relevant Regulations of MMR, 1961 and obtaining prior permission from the Director General Mines Safety whenever and wherever it is required.
Contd ... 2
r
-2-
6. The applicant/lessee shall safeguard the structures, public buildings, roads, railway line, electric line and water bodies exists if any as per regulations 109 & 127 of MMR, 1961.
7. The approval of Mining Plan (including Progressive Mine Closure Plan) shall be subjected to vacation of prohibitory orders or notices or determination orders etc., if any issued by the competent authority.
8. If anything is found to be concealed as required by the Mines Act in the contents of the approved Mining Plan and the proposal for rectification has not been made or if at later stage the information furnished in the document to be incorrect or misrepresentation of facts, the approval shall be revoked with immediate effect.
9. This Mining Plan was approved as per the quarry lease executive sketch of the subject area. Any deviation found later, approval authority does not owe responsibility.
I 0. The approval authority does not owe responsibility with regard to erroneous certification made by the R.Q.P if any and approval is tentative subject to modification of new findings at a later date as per the provisions of Rules inforce, since the evaluation is done on random basis.
Yours faithfully, Encl: (2 copies of A.M.P.)
Copy submitted to the Director of Mines and Geology, Govt., of A.P along with A.M.P.
Copy to Sri P. Veeran Goud, R.Q.P., D.No.4-1308, Kalyandurg Road, Anantapur -515001 for information.
Copy submitted to the Regional Controller of Mines, IBM, Sultan Bazar, Hyderabad for favour of kind information.
Copy submitted to the Director of Mines Safety, Bellary for favour of kind information.
Copy submitted to the Zonal Joint Director of Mines and Geology, Kadapa for favour of information.
Copy to the Asst. Director of Mines & Geology, Banaganapalle along with A.M.P.
' .,
~~----------------------------------~~--~--------------------~ r;
r
MINING PLAN FOR ROAD METAL & GRAVEL Over an extent of 21.999 Hects. in Sy. Nos.408/P,409/P &410/P Pinnapuram(V), PANYAM MANDAL (M), Kurnool District,AP
Mines & Minerals (Development & Regulation) Act, 1957 (Under Rule 7(A) of A.P.M.M.C.R., 1966)
Partner: KCVR Infra Projects Pvt Ltd,
Rep.by Director:Sri K.V.Jagan Mohan Reddy,
H.No:10-96, B.C. Gureddy Complex,
Near Old Bus stand,
Banaganapalle Village & Mandai,
Kurnool Dist.
Prepared by
P. Veeran Goud, M.Sc., R.Q.P.
RQP /DMG/HYD/060/2002 D.No.4-1308
Kalyandurg Road Ananatapuramu, (A.P.), PIN:515004.
CELL: 9440686659, Phone No: 08554 246659 Email: [email protected]
July- 2017
1
r .
--~":.:~
r======-=--~-----~~--~/ ;~{~~'~.--· ~\::..r. /'',_··;-;-... • '( ' ,._.: .:"' ~ }- 4 ;·~-:-
• ¥ .. ~ • ,"~,.'
\\ ~ ~: .. ... ~.,, /': :··-. .. ~ __ ... .. . :" .~~ ~ --- .. 7 ./~~/
S.NO. CONTENTS ' .. ii_:··+·i f~,':, .-\ -_, .··· ·.1,.-· . . .... .. / .... :.:· ., . ' . ....... ~ . ,. -_,· PAGE No.
1 2 ··<:· ... _,.
-~~~/. :~.)·.~·~ ·, 3 ·.:;-·;.'
I INTRODUCTION -- ... .... __ .; .... --- -
5
II GENERAL LOCATION AND ACCESSIBILITY 6
III GEOLOGY 7
IV EXPLORATION 9
v RESERVES 11
VI MINING 12
VII DRILLING AND BLASTING 18
VIII SITE SERVICES 19
IX SCHEME OF WASTE MANAGEMENT PLAN 20
X ENVIRONMENTAL MANAGEMENT PLAN 21
XI ANY OTHER RELEVENT INFORMATION 25
LIST OF PLATES Scale
PLATE-I LOCATION CUM KEY PLAN 1:50000
PLATE - 2 LEASE SKETCH 1 Cm:400.links
PLATE-3 SURF ACE GEOLOGICAL PLAN 1:2000
PLATE - 4 GEOLOGICAL SECTION 1:2000
PLATE-S YEAR WISE WORKING PLAN & SECTIONS 1:2000
PLATE - 6 CONCEPTUAL PLAN & SECTION 1:2000
PLATE - 7 ENVIRONMENT PLAN 1:5000
LIST OF ANNEXURES
ANNEXURE-I Photographs of the Area.
ANNEXURE- II Copy of the Notice & Proceedings No. 1132/QL/2016
Dated : 05 -07-2016, of ADMG,Banaganapalli .
ANNEXURE- III Copy Of the Registration Certificate ofR.Q.P
2
-):.;·_ ~:-- .--~ .: .-·:_>.> . ':. ·-.._ .. ; )' : ~: '; It_{_, ., f ~ -, ) . ~. ~ , '_ • ' • :. ~ '· ""r ""'-, ,
If:~2 ~. ~ : ~ !~ . :· -~ ..::~:·~ :_ ~ · ~ ~ .. . . ·:1 } , ! :-!.} 1...- l•:. : . . ' · ·.··:·1 , .... t ,'\;
~~~c,~~~!!~51J)/ This mining plan for~~);ij~r~~~~~rea for Road Metal &
Gravel over an extent of 21.99~d·:f.!s~o/:·~~\;§~:: ::-Nos.408/P,409/P &410/P of ........... ~ _,.... ., . .-
Pinnapuram Village, Panyam Mandaf;'-·Rl:Imool District, Andhra Pradesh
State, prepared in consultation with me and I understand its contents and
agreed to implement the same in accordance of APMMC Rule 28.
Place : Kumool.
Date : 12-07-2017 for M/t~TpROJECTS
l<~\f-~ (M/s J RC K6~NSjb~itJ1tltory
Partner: KCVR Infra Projects Pvt Ltd, Rep.by Director:Sri K.V.Jagan Mohan Reddy)
CERTIFIACTE
This is to certify that Mining Plan in respect of quarry lease applied
area for Road Metal & Gravel over an extent of 21.999 Hects. in Sy.
Nos.408/P ,409/P &41 0/P of Pirmapuram Village, Pan yam Mandai, Kumool
District, Andhra Pradesh State, prepared by P.veeran goud.R.Q.P.
The applicant agrees to follow the same in accordance to the provisions
of law.
Place : Kumool.
Date : 12-07-2017. For.u~q~x~PRoJecrs
k.\J,~ .-A.u1horis~d Sigr.atui Y
(M/s JRC K(,"VR.ProJects , Partner: KCVR Infra Projects Pvt Ltd,
Rep.by Director:Sri K.V.Jagan Mohan Reddy)
3
,{;· ~· ;::~ X.':f:~~:~\~:~, cliB:riF1iC.A$Jt/':··~·! ":: ?/j {:;l
'('~6\{j \ \:i ~.\:F:i;:,~~::;}/ },-. f :~·i The provisions of Granite ·,~4l'lse:~~ii6=&~f{d~~(r~~pment Rules 1999 &
''<O!;·>:;.'";~~i ~ .~·" ....... : ~--;···<~::. :, ':~.~: .. ;i:) ;; APMMC Rule 28 observed in prepara~ioi!':::Q.f.}vfipijlg Plan for quarry lease
<:·-:'i ' '· .• ,r-) \:::;.>~ applied area for Road Metal & Gravei'Bvet: ittr:~xtent of 21 .999 Hects. in Sy.
Nos.408/P ,409/P &41 0/P of Pinnapuram Village, Pan yam Mandai, Kumool
District, Andhra Pradesh State Wherever specific permissions are required the
applicant will approach the concerned authorities.
Certified that the information provided in the mining plan is correct to the
best of my knowledge.
DATE : 12-07-2017.
PLACE : Kurnool.
SIGNATURE OF THE RQP) ;1 ~ . ..D_Q -= -=- /J
-IT P. VEERAN GOUD V
4
Introduction
FOR
M/s JRC KCVR Projects,
Partner: KCVR Infra Projects Pvt Ltd,
Rep.by Director:Sri K.V.Jagan Mohan Reddy,
H.No:1 0-96, B.C. Gureddy Complex,
Near Old Bus stand,
Banaganapalli Village & Mandai,
Kurnool Dist.
M/s JRC KCVR Projects , Partner: KCVR Infra Projects Pvt
Ltd,Rep.by Director:Sri K.V.Jagan Mohan Reddy has applied for grant of
Quarry Lease for Road Metal and Gravel over an extent of 21.999 Hectares in
Sy. Nos.408/P,409/P &410/P of Pinnapuram village, Panyam Mandai,
Kumool District. The Asst. Director of Mines & Geology, Banaganapalle has
submitted proposals duly recommending for grant of quarry lease for Road
Metal and Gravel over an extent of 21.999 Hectares in Sy. Nos.408/P,409/P
&41 0/P of Pinnapuram village, Pan yam Mandai, Kumool District for a period
of 10 years.
The Deputy Director of Mines & Geology after careful
examination of the proposals of the Asst. Director of Mines & Geology,
Kumool has proposed to grant Quarry Lease for Road Metal & Gravel over an
extent of 21.999 Hectares in Sy. Nos.408/P,409/P &410/P of Pinnapuram
village, Panyam Mandai, Kumool District in favour of M/s JRC KCVR
Projects , Partner: KCVR Infra Projects Pvt Ltd,Rep.by Director:Sri
K.V.Jagan Mob~.ry •. 8~9o<\xevide Notice No.1132/QL/2016,Dated :05-07-2016 up to Tbis M.n..ug .- ::.~:-: ?.S Apfil'M·.u st.uJ ·,c - ~ ed Conrlitlcns/SopJh?iilm 1'H':t1'.trl m tile ~o ~ 0 ~ t l OV
PI A. . ., l ' .• -.. iT No. d.·::\ ::2-.~ •• u"'\ -- f P. RAJA BABU 5 an •1-· ' 1
• · ... • of Mines&;
()ated •• .. • - ~-- ~(7 ~URNOOL,
/
;/.;;,_· ··~ . .:.. . ~ . . -.. ~ .. \'-.;·} ~. j ( -: ' I '· ·· i · · . - · \tl t :::,.,' . \
!?:< ~-{ -> ,;::-... ·.:/::)\! 1 F'}~_sJ \ • • 1 · ·I ' · ·· _/ 'fr' ' . '/, 1 f 1 ,..,/t
04-07-2026 (Annexure'lflt.,dir.~dbjg ~ ·thf, c;lpP/ic~ht to submit the Approved
Mining Plan under Rul~\~},(A;j:j~~\:~~it-Jlules, 1966 and to obtain the • :..~~~ _; .. ,,_:· .. ~ ··~ \ ' .... ~r
Environmental Clearance from .... M0EF-;' CFE from APPCB under EIA
Notification S.O. 1533, dated: 14-09-2006 within a period of six months.
In this connection it is submitted that as envisaged in the Environment
Impact Assessment (EIA Notification, 141h September, 2006, the mining
projects with lease area of 5Ha and above irrespective of the mineral ( major or
minor) to obtain prior environment clearance under the provisions thereof.
Further all Category A and Category B 1 projects shall under take public
consultation in accordance to EIA Notification, 2006. Further the Government
of India, Ministry of Environment & Forest vide office memorandum No. L-
11011147/2011- IA.II(M), Dated: l81h May, 2012 in order to ensure compliance
of the Honourable Supreme Court Dated:27.02.2012 in I.A.12-13 of 2011 in
SLP( C ) No. 19628-19629 of 2009, instruction were issued that all the mining
projects of minor minerals including their renewal, irrespective of the size of
the lease would hence forth require prior environment clearance.
The Government of India vide Notification No. 141 (E), Dt: 15.01.2016
notified guidelines for construction of District Level Environment Impact
Assessment Authorities and other guidelines for issue of Environmental
clearances for minor mineral leases for an extent of less than 5.00 hec. etc.,
accordingly, mining plan become a prerequisite for obtaining Environmental
clearance. Hence a Provision to the effect that quarry operations for minor
minerals shall be conducted in accordance with the approved mining plan has
to be incorporated by the State Government vide G .. O.MS. No. 56, Inds.&
Comm. (M.II) Department, Dated:30.04.20 16.
M/s JRC KCVR Projects, Partner: KCVR Infra Projects Pvt
Ltd,Rep.by Director:Sri K.V.Jagan Mohan Reddy approached.P.Veeran
Goud, Consultant Geologist &RQP to prepare the Mining Plan following the
6
-.. ~ ... ~ ... ..... ··-::: -· ... ..
1.1 M/s JRC KCVR Projects ,
Partner: KCVR Infra Projects Pvt Ltd,
Name and Address of the applicant Rep.by Director:Sri K.V.Jagan Mohan
Reddy,
H.No:10-96, B.C. Gureddy Complex,
Near Old Bus stand,
Banaganapalli Village & Mandai,
Kurnool Dist.
1.2 Status of the Applicant (Individual/
Private Company I Firm) Limited Company
1.3 Mineral (s) which are included in the ROAD METAL & GRAVEL
Letter of Intent
1.4 Name and Details of person employed P. Veeran Goud, M.Sc., ifor preparing Mining Plan
R.Q.P. RQP/DMG/HYD/060/2002
D.No.4-1308
Kalyandurg Road
Ananatapur. (A.P.) 515004.
1.5 E-Mail & Website Email : pvgrocks @gmail.com
1.6 RQP Registration No. & Validity RQP/DMG/HYD/060/2002
30-06-2022
1.1 Topography
The Lease area exhibits hilly terrain to a height of about 8.0mts, raising in the Eastern side elevated with 3-5M difference of Low to High Level.
7
. /~~p:::: .. ~·;x~~t·~,l~f~~l,, Topographical Survey ~ ~·y~:n t ?: ''~i: : '··.;.:·.;:~; ~ n .i ·:b
l.:. .! <1·-M- i_ -. :\V.~:. -._. ·;, ... ~-:- c ~.: i ~ ~..- j .. -"'-; ,
The baseline is consider~tr.f.t<;ui\.th~;tGP~f~.iditl~i;f;{ co-relation with , \.- . "'. ' I • ' ' -, ":./" ' .:.· ........ I
Toposheet contours, coverirt~· the. totatarea· ... -\-\-}" -.... ... , .... .. ; .... ' _:. . ~ :/:r"":_ .. ·~~" ... ) .. ·
The geo co-ordinates were fixea·.us.Pl_g:_~e:J1 channel handheld GPS, GARMIN make.
II . LOCATION AND ACCESSIBILITY
l.Toposheet No. with latitude and longitude of all corner boundary
pillars: The Quarry lease area falls on SOl Toposheet No. 57 l/2 the Geo Co
ordinates of the boundary pillars are tabulated below:
Table : GPS READING OF BOUNDARY POINTS
GCP LATITUDE LONGITUDE I 15° 35' 16.8"N 78° 11 ' 17.2"E J 15° 35'20.2"N 78° 11 ' 18.7"E K 15° 35'38.2"N 78° 11 ' 20.6"E L 15° 35 '38.7"N 78° 11 ' 30.4"E M 15° 35 '36.2"N 78° 11 ' 40.4"E N 15° 35 '39.6"N 78° 11 ' 22.8"E 0 15° 35 ' 36.8"N 78° 11' 20.6"E p I 5° 35 '28.6"N 78° 11 ' 18.3"E Q 15°35'26.S"N 78° 11' 20.8"E R 15° 35'26.2"N 78° 11 ' 18.0"E s 1 5° 3 5' 1 9 .1 "N 78° 11 ' 18.1 "E T 15° 35 ' 19.4"N 78° 11 ' 18.3"E u 15° 35 ' 18.9"N 78° 11' 17.8"E v 15° 35 ' 18.4"N 78° 11 ' 17.S"E w 15° 35 ' 18.6"N 78° 11 ' 17.8"E X l5°35' 17.9"N 78° 11 ' 17. l"E y 15°35 ' 17.8"N 78° 11 ' 16.9"E z 15° 35 ' 1 5.9"N 7 8° 1 1 ' 1 5. 7"E
8
*Map Datum : WGS-84 )~aP.uBiiB~v._Ul~g~.W.W?-~ Mandai Kumool(Dt) . • • '" • ' ., ·-- ·''·-"'} 1. ~ Jr-.. . :{\~· ...... ;~\~·:,'~~~:~:~'c .. _., I ; t_J
State& Mandai Villa~~\ .. ,. \sv~~-N:ch.~'
~I::i'~Iff2 00 Whether the area is in Land
District ·- ~~ · .. .... ~~:~:\: -~~-::, r forest I Non-forest, Use
~ .: J' ,-' ,..y )I I
Ownership I Patter ...... t:t~~ts • ~- Occupancy n
·---~::::.':.:!;~=----
A.P., 21.999 Waste Kurnool Pan yam Pinnapuram
~08/P ,409/P Government land
&410/P land
2. Attach a general location map showing area and access routes: The QL applied area is located at a distance of 34.0 kms
from the District Headquarter town of Kumool . The applied area can be approached after traveling 31 .0 kms from Kumool on Nandyal NH Road
via Nanuur and Vorvakal and a East diversion will be taken and a metel road of 3.0 Kms leads to the applied Q.L area. The applied is 1.4 Kms North-East
of Somayajulapuram Village. The applied area has got good accessibility as the Kalvabugga to Nandyal NH Road road is about 3.0 kms to the Q.L.
recommended area.
Power connections are available near to quarry site. The company will
draw power lines from the village. Telecommunication facility is available
at Somayajulapuram which is at a distance of about 1.4 kms and all networks
can function in the site area. The nearest railway station is at Panyam which
is about 18.0 kms. Nearest Port facilities are at Chennai, Krishnapatnam,
Mangalore and Tuticoreine. The processing of the raw blocks unite is under
construction near the mine site. High school is present in the village
Somayajulapuram.Degree level Educational facility is available at
Bethamcherla which is 20.0 kms. and Hospital facility is available at
Orvakal which is 8.0 kms from the quarry.
The Mandai Headquarter Panyam is about 18.0 Kms from the QL
applied area. The State capital, Amaravathi is about 610 Kms.
III DETAILS OF APPROVED MINING PLAN I SCHEME OF MINING IF
ANY
This is the first Mining plan being submitted.
9
' -
' ~,;0?:~?:::;:·~~~~;-,;~;f~~ :I'~'- · ' '' ;PAR.t··:_';·;A ., ~ .. -.. , ... I\ ::)_;',.,.- \ . . ·., <.: \>: .. ,i) .~j~l
1. General details of the-:Applied a rei:,.( / /.':;/ ·v· · · --.. - · · . · -~- : .. ... ·'""' :·r/
The subject area covers the, .. j)al} of die Pe9~ihent comprising negligible soil - . ·- •• . • · - • • ' "~· ~ .,.J • ·:.. • '
cover along the depressions of the she~t-'rock exposed over the subject area.
The proposed quarry lease area is elevated on Northern side and it is sloping
towards South . It is having maximum relief of 8 m from the base. The
drainage pattern is dendritic to sub- dendritic. The applied area belongs to
rocky terrain it does not have much vegetation. The climate is tropical with
temperatures ranging from 26 oc to 43 °C in the summer and 19 oc to 28 oc in the winter. The average annual rainfall is about 550 mm.
2. GEOLOGY AND EXPLORATION:
a) Regional Geology:
Rocks of Archaean,Proterozoic,Jurassic-Cretaceous and Tertiary
Quaternary ages are exposed in the district The oldest rocks in the area
belong to migmatite complex,represented by migmatised quartzo
felspathic gneiss and are exposed in the district.Regionally the area
represents part of the Archaean Granite Greenstone terrain of the
Dharwar Craton. It has Schistose rocks of Greenstone belts. These are
referred to as Archaean Greenstone belts. This has been included by the
rocks of Peninsular Gneissic Complex (PGC) which has Gneisses,
Migamatite and Migmatized granite suit of rocks. Gneissesand
Migamatites include Porphyroblastic hornblende gneiss,Hornblende
BiotiteNeiss,Nebulitic to Homophenus Hornblende Gneiss, pink and
green Migamatitic Gneiss Closepet Granite and its equivalents, namely
black granites Porphyritic alkali feldspar granite and Granodiorite,
belong to the Proterozoic age have intruded the above setup.The
Greenstone belts, Gneisses, Migamatites and younger Granitoids are
intruded by the mafic dyke swanns.
10
b)
Younger Intrusive
Archean
Peninsular gneissic complex
Dharwar Super Group
c) Local Geology:
Veins of alkali feldspar
Dolerite/Basalt/Gabbro Dykes
Biotite Granite
Homblend granite
Biotite granite gneiss
Homblend granite gneiss
Porphyritic homblend granite
Amphibolite,
schist
Homblend
The subject area is Granite belonging to Archaean age. The outcrop
exhibits multiple sets of joints both closely spaced and widely spaced as such
it is most suitable for quarrying Road metal and Gravel (Plate-3).
d) Details of the Prospecting License Holder: N.A.
e) Details of the Prospecting carried out:
The subject area is demarcated on the ground with reference to Revenue
Pillars. Later the topographical survey of the area was carried out. The ABM
(BP-D) is connected to Grid ofN 15° 35' 15.9" & E 78° 11' 15.7" located on
the SW of the QL applied area~ Based on topographical survey and geological
features, collected from the surface data, the surface geological plan is
prepared on 1 :2000 scale with 2.0 m contour interval and enclosed as Plate -3.
11
;-- : ' •' ~-. '<'' '\ .~~~. ·' ;'' . . ...... ~- · ...... : ~ ... "'- ''\ ~~· .. \ ,_ - I , .f J':',A , ., ~ '-• \~
'}_ ..... .. ~· ':·-'.· ·' ·.· .. \:···: 1'~-;:-\ "":·/•,-:, \ ' · I: · . ; · · · . · .. j ; \ ~ ·: I \ I·
'·. ' : i . . ,. ·: · , . 1 ·.'1" i \,,' l
f) Surface Pl~n are~: : ~~· t:~OOO. ~:~~l~~~rface cum G~ological Plan
and Cross SectiOns of the QL JS·pr~p~re.~.:,~~~hooo scale and ts enclosed as '• . '· .·· .. '•/ Plates-3 & 4. ·' · · ... ·. ··.> .......
g) Geological plan is enclosed ~s Pfat~:.3. h) Geological cross sections have been shown on Plate-4.
i) Future Program of Exploration programme planned in next five
years:
As this Quarry Lease is being granted for Road Metal and Gravel for the
purpose to use as raw material to company own Crusher,
j) Reserves and Resources as per UNFC :
(i) Type of Deposit as per UNFC Guidelines
Road metal and Gravel is not failing in any category of UNFC classification.
It is localized mineral available anywhere utilized for construction purpose
such as laying roads, construction of buildings etc., depending upon the
characteristics of the rock. Granites, dolerites etc which are highly disturbed
and dolomites, quartzite etc., which are not useful for any other their specific
purpose of their characteristics in specified area useful for construction as
road metal and Gravel as locally.
ii) Parameter- Grade, Threshold value, Sectional Area and Bulk
Density:
As the ROM is intended for use in the Road metal and Gravel no specific
parameters were considered. The bulk density of 2.5 is adopted for
estimating the reserves.
The sectional area was considered and assumed thickness of sheet rock 49 m on either side of the leased area. The Bulk Density was considered at 2.5.
12
1
i/~tt:!-L~;~i~:~~~J~\ iii) Status of exploratkn•:··Gl ~. '.: ··.; .. .:.:-,: .. ·x .. ::~-n.: . •-;;.._\
;: ... :.,. ~ l ~ ; . i : .. · . ~: ·t\· ... r~-~: T ! \ ... ..: } ) . { / 1. 4
... ~ '· ~ -~ ... . · ! : ·~-·-,., : ! •. . : - .. l GEOLOGICAL ~IS.;'' \·>::.':·{·,-\·.;;·.::_,:-'; I LV~· \ ;j
. / ·. ~:.·: . -~ ·> ·.: _' ~::·~·.::':>·:: r\?;s) 1. Geological Survey: ··-,:··:·_·-::::· · '.· ... .- .· ' .·</
•, :. ,:~·. ;~· .:, .. ::~-,- .~ ... -·:.:_-->;' .. <:~::,-i / The topographical cum Geg~qgi:?iiJ~ma'p including all surface Geological
features, extent of deposit, structures, have been prepared on 1 :2,000 scale
duly marked with surface geological features, GCP's etc. (Plate-3).
i) Topo grid I Triangulation stations: The topo grid with Geological
cross sections has been prepared on prescribed scale showing litho-units.
Relevant plans are enclosed as Plate-3.
2. Geo-Chemical Survey: Geo Chemical survey IS not warranted. The suitability for aggregates was tested.
3. Geophysical survey: Not carried out.
4. Technological survey:
• Detailed topographical and geological survey was carried out on 1:2,000
scale showing all the surface features, contours at 2.0 m interval, the lease
boundary, surface Geology & Structural features.
• The entire thickness of Road metal & Boulding stone found to be more than
50m which was correlated from the bore hole inventory data in the adjacent
lands.
• Reserves are estimated by cross section method .
• FEASIBILITY AXIS:
1. Geology:
The Geology has been ·detailed in Part-A, Para-2 which may kindly be referred
to.
2. Mining:
Road Metal and Gravel will be exploited through opencast other than fully
mechanized mining methods with drilling & Blasting. ROM will be directly
consumed by the applicant for the crushing plant and intended for the highways
13
:fi:,.,,:-· e'f ·:"!\> \''fS: Project. The applicant ha~s al~ea.dy :e~gblishe9!·tb,:e crusher and hot mix plant
~· - .. ,... ·): -.. . · ... ~.~ - :,. ... ~ · _,-:~ ."'~ ,:
adjacent to the proposed quarry:Je~~- are~>:-.:--~:,/:- ; :-: · ~-· .. ·: -.. : .. ,~: :> < -·,/:~---''
3. Environment: -----:: __ · · · · ·
The deposit will be mined adopting conventional opencast semimechanized
mining methods without any adverse environmental impact. The applicant will
obtain statutory clearances as soon as this Mining Plan is approved. Mining in
the leasehold does not disturb any human settlements as they are far away from
the lease area. On the other hand the mining operations will create livelihood to
the villagers nearby. The Applicant will develop green belt around the ML area
as part of his commitment to environment protection.
4. Processing:
After blasting the ROM will be fed directly on to the crusher for crushing in to
desired sizes of aggregates. The crusher is not established in the quarry lease
area.
Mining operations will be carried out by deploying the following
machinery:
s.no Type of Macbnie Dia of bole Sixe/ Make Nos (inches) Capacity Motive power
1 Excavator 3 ----- 1.2cu m L&T Diesel 2 Tippers 5 - 17 tons Diesel
3 Drilling Machine 3 2" Diesel
Tractor 4 Mounterd 5 2" Diesel
Compressors
5 Water Tankers 3
6 Loaders 3 3cu m
H.P
200 60
2
5. Infrastructure: The entire necessary infrastructure such as office, rest
shelter, magazine, explosive van, water tankers, power connection etc., will
14
I"'
"I
-... I
~f;{t~~tf':::.rfr1f~),~) be provided once the mini~g -~p:hiq ·:.fs· . ~:appt{?...*¢9/,\Jhe QL applied area 1s
·v ··~~~ - --. ..... -. t :-J
connected with roads to the Ma;;>&X1il\~rDifuft).-Wdquarters . ·,. --~~[t~_t·f ·~-\~:.f:::~)~~~-;., .
6. Costing: The cost of productioii' 'Oftt-oa(f'Metal & Gravel works out to be
Rs. 250/- per ton.
7. Marketing: Road Metal and Gravel is not intended for outside sale. It is
for captive purpose for the crusher and Hot mix plant intended to put for
use in the Highways road project.
8. Economic Viability: As the proposed quarry lease is in the near vicinity
and captive use it is surely economic and viable.
9. Other factors: Relevant clearances shall be obtained for continuing the
mining operations in the QL applied area. ECONOMIC AXIS:
1) Detailed exploration:
Detailed topographic survey and geological mapping the applied QL area
was subjected to detailed exploration by field traverses and well inventory
data. The depth of sheet rock is assessed by the litho log observed in the
boreholes of agricultural lands. Two representative composite samples so
obtained were analyzed in the Laboratory at site.
2) Mining Reports/Mining Plan
This is the first Mining plan being submitted.
3) Specific end-use grades of reserves (above economic cutoff grade)
ROM is intended for crushing to use in the aggregates for roads.
U) Feasibility Report along with financial analysis per economic
viability of the deposit: The cost of production of road metal and Gravel is
arrived at Rs 250/- per ton inclusive of taxes and royalty. The entire ROM
is for only captive purpose as such it is surely economic and profit oriented.
(k) RESERVES
(i) Mode of Mining, recovery Factor, Mining Losses, Processing Losses
etc., Road Metal and Boulder stone will be mining by open cast other than
fully mechanized method with drilling and blasting. The recovery factor is
15
-;: ~ ··".:"!' :.: .. · .. .. ;t--~, ....... · · ··..-: •. ~. : .: . .• ·• •. ~. ~ c..r-· . ' ~ ,._- , • ......_ l . .... ~~., / •
l ".e ... ... ~' .. ,4· • .. ....... .,. .. • •• ' 1':';~ ; .... . - \
~ • ~ • . ....... . / . ...... ,. .. . • ... -· • 1 ~;., I ~ ll~ ;_ '/·~.::-/ :- :0:~~~ -:·,{ ·:>.~:-~~{ f~, \'~· .:_:J·,. ·:;·: .. \
considered as 90% witk~i:~.d i~i~~~;i'~'iir~i~i~J~~l~ fractures. There will not 0° { I · . ~ I -•- ' • . ,I 0 ' , .. (
be any mining losses ex~~~~,i~g· h.~h·d.liiig)O'S~~~6{ch will be again recovered l .: '.: ~ ~· -·: ~--..... , •. • ~ ....... ~ ,·, ,_, . .
during further loading. : . ... ~~'< . .'~ . ~ . :.:'· ··:::. ;t . -• • :) .... _ •• . I'
(ii) Cut off grade and Ultinia'te:· P~t ~epth£ There is no cut off grade as the
ROM will be put to use for road metal as aggregates.
(iii) Mineral blocked due to the presence of I maintenance of benches,
barriers, internal roads, electrical lines etc,: The mineral will be blocked in
7 .5m safety barrier zone, Roads, Benches which is computed separately and
tabulated in the succeeding paragraphs.
(iv) Total Mineral reserves:
The reserves are estimated basing field traverses and the litho log of the well
inventory in the adjacent agricultural fields and cross sections drawn on the
ore body. The area of the influence and the cross sections were taken at 40 m
on an_average i.e. 40 m on either side of the Cross section. The occurrence of
the Granitoid gneiss is more than 50.0 m BGL. Based on the field traverses
and correlated data from the boreholes in the adjacent agricultural lands to a
depth of90.0m, the estimated reserves are considered as Proved reserves. The
cross sections A-A',B-B',&C-C' are considered for computation of reserves.
The present area which is explored is considered for computation of reserves
under G-1 category.
Section UNFC Sectional Influen Volume Recoverable Intercalated CODE ce Reserves(90 Waste&
(m) %) M3 Voids( 10%) M3
Area(m 2)
(m3)
A-A' G1 15920 227 3613840 3252456 361384
B-B' G1 15680 152 2383360 2145024 238336
C-C' Gl 15520 227 3523040 3170736 352304
TOTAL 8568216 952024
16
:~ '- • M . t I . ' . ~ i> • ~· • • • i .- • \ t ; ""'' l ·' 1 .· I •, ' . •1' '1\ 4 ' _,•. ·,, f ·. ,.,.\
~¥ ' ' ··'"·, " '' t• .:.f..h ~ i I • ~ · J" ' • .:. ; r -~ ~~ 1( : "~ \
=· .... ~- . . · .... • .• ~ ~ ~~ i ~ ...... ~ ::c:: . ' ' ' :· ' J ..... '
Geolological Recoverable':R.eserves .· · .··': '~;, /f.': .J:,;'} = 9520240 M3
. ·~- ' _,.... - .: . ,,:' ,;I .... . Reserves blocked in 7.5m ~uffer Zone re<Ju~t~~n'~ _:; = 8819740M3
. . .r }-~.
Reserves of after deducation of ~eiiciHiop·e,: _;.- = 8258990 M3
~. ' I ............
Net Reserves available @95% for Mining-· = 7433091 M3(18582728Tons)
Life of the Quarry = 7433091 m3/ 161698m\Avg)= 45.9or 46 Years
tentatively
J3~0..MINING-- ---····--------·--·-----
{i) OPEN CAST MINING METHOD (Mining Carried out) i) This is a fresh mine. The proposed mining will be carried out by opencast other than fully
mechanized mining method with drilling and blasting. The ROM will be sized
and sorted in the crusher established outside the quarry lease area and loaded
on to tippers and tractors using JCB. Mining will be carried out by formation
of benches of height of 6 mts each. The details and sections are depicted on
Plate-5 .
Dump Management: The Eastern side of the area is selected for dumpyard
for next five years and the waste will be stocked over an extent of 81 Om2as
enmarked in plate no.5 ..
Lay out of Mine Working, pits, roads, etc.
During this period, it is proposed to exploit to the tune of 808490m3 sealable
Granite to an average depth of 12m over the lease area from RL of 102 to 108
as shown on Plate 5.
There is no problem in the quality of Road Metal & Boulder Stone which
confirms to the specifications Aggregates.
The applicant proposes to carry out mining by opencast other than fully
mechanized method with drilling and blasting. The mineral will be sized and
sorted in crusher for desired size separation. Trucks I tippers will be deployed
for transportation.
17
ID: f>;:1f;J?:')!.;~:;~:\ . ~ .'. . . . . , > •. '~·. ' • I .• .-! • •• f .. " I . ;' . : ;· ., ~~~. . 1: .. ·:·: ! ,~...,., ,: :...-.L.
Year wise.devolilptiien·t Plan'for Five years • .. ·.,.:·:: .... ·:- / -~ :_.~ ':.: .. ... :.,':.:..: .. _.~ .. l .. · i'~ : ( , i
First Year: The mining wii"l:~~.~0/~~~~1~~~wstern side side(Eastern Side
of pit-1) of the lease hold area leayjng:·liti~~r.-~ione with formation of benches .·. ''": - : ·;::::,_,...,-
of 6m height (Two benches one of 6m) covering an area of 15200 m2
excavating 179664m3 of rock mass from which 161698 m2 usable Road Metal
& Boulder Stone recovery. About 17966m3 comprising of intercalated waste
or interstitial voids is anticipated. The waste if at all generated will be used for
formation of roads and as safety barrier around the lease boundary.
Second Year: The mining will be continued towards Eastern side of the first
Year's working with two benches of height 6.0m and 6.0m over an area of
15200 m2 excavating 179664m3 of rock mass from which 161698 m2 usable
Road Metal & Boulder Stone recovery. About 17966m3comprising of
intercalated waste or interstitial voids is anticipated. The waste if at all
generated will be used for formation of roads and as safety barrier around the
lease boundary.
Third Year: The mining will be continued towards Eastern side of the second
Year's working with two benches of 6.0m and 6.0m height over an area of
15200 m2 excavating 179664m3 of rock mass from which 161698 m2 usable
Road Metal & Boulder Stone recovery. About 17966 m3 comprising of
intercalated waste or interstitial voids is anticipated. The waste if at all
generated will be used for fonnation of roads and as safety barrier around the
lease boundary.
Fourth Year: The mining will be continued towards Southern side of the
First Year's working with two benchs of height 6.0m over an area of 15200
m2 excavating 179664m3 of rock mass from which 161698 m2 usable Road
Metal & Boulder Stone recovery. About 17966m3 comprising of intercalated
waste or interstitial voids is anticipated. The waste if at all generated will be
used for formation of roads and as safety barrier around the lease boundary.
Fifth Year: The mining will be continued towards Northern side of the 1 5',2nd
18
~t (. • ~ - ~~· .... ( .,...... .... • • ~ ... --.llf r "··. '- • ,.»·.·•, fl ,.,, 1'""- \' ' \
tlt-;/t_ .~ ... , ~~" /-~-.~ .. ~~~-.r ·~ ~~ - :;;:Jl~ .. :._ ·, .... ;~-_, , ... , ; ·, . 1 : •. •,·,·:.:l !'f'.:flt ·,. J'I' ' :) ~ .. \ ~f''' · , 'I· :• _' ·';'I ,."'.• ; ' ,/- ,,· • ., .:. . • ,t-1, ... ,...,. ............ , ... . :-~ • .• , ", ·-;:. '<'.<· ·-: . ... 1;(· ' I"''{ I
and 3rd Year working wiili\~B~beb~he:S~~~jg-~t;·bf6.,0m over an area of 15200 .. ... ~.-~· \ . ,,_,. .. _ . .. . ....... I" t .!.·· ·-.1·
m2
excavating 179664m3 :~~-~~1~~-~~~~~R{£~§~~-h 161698 m
2 usable Road
Metal & Boulder Stone recoveiy_~--~~~it.·w~3,66in3 comprising of intercalated . . -·
waste is anticipated. The waste if at all generated will be used for formation
of roads and as safety barrier around the lease boundary
The year wise development is tabulated in the following table:
Bench Volume Production m3
Year Working Areas m2
height m3 R.F. Granite Waste
200x 76 = 15200 6m 91200 0.90 82080 9120 1st year
194x 76 = 14744 6m 88464 0.90 79618 8846 2017-18
179664 161698 17966
200x 76 = 15200 6m 91200 0.90 82080 9120
2"d year 194x 76 = 14744 6m 88464 0.90 79618 8846
2018-19 179664 161698 17966
200x 76 = 15200 6m 91200 0.90 82080 9120 3'd year
194x 76 = 14744 6m 88464 0.90 79618 8846 2019-20
179664 161698 17966
200x 76 = 15200 6m 91200 0.90 82080 9120 4th year
194x 76 = 14744 6m 88464 0.90 79618 8846 2020-21
179664 161698 17966
200x 76 = 15200 6m 91200 0.90 82080 9120 5th year
194x 76 = 14744 6m 88464 0.90 79618 8846 2021-22
179664 161698 17966
Grand Total = 808490 89830
224575
2021225 Tons Tons
19
, 1
,/!:'1' ••. ' --"" :. ·,.. -. ,····~ .... · :"..,_\
(:~{~(~ ~~·~::.~;;~-$.~:-:;;~l;·~k~::~;~~§i~, ~ ~ . 't·.: . : ,J;., :It.l J !., .·,;~·:. ·.~_..:,~t.'t-.:.~ if"1l~
Year Wise tentative exca\{ati~~;·~,n. :~06i·~·.:~·~:~ej~~~~j~tinq Pit Wise ore to 08 ratio
bv formina benches of 6.0'{m-eaich .. Tf:lave'cir. .. wfs~~ails are tabulated below: ...... .... . ,,..1..?1 \.... . .. tl . .. ..... ......... .. ,..~ ...... , "!'..,'..,."' too\<''·! . . ............. \ ~
'· ~, ·. • ... 1 . ,• . -::/'' ..
··:., / · .'· .:~ :: .. '~: ....... ~·?~~~-~;~-·
Total ·--...:.....:-.:. .. __ -:· - ::-: _-.... ~ ROM
tentative Top ROM From Mineralized Zone( Cum) Waste
Year Pit. No excavation Soil(Cu OB/SB/1 Ratio
(cum) m) B (Cum) Clean Sub Voids/Min era!
ore( Cum) grade( cum) Reject( cum)
179664 Niii 82080 Niii 9120 9:1 Niii -
First 79618 8846 9:1
179664 82080 9120 - Niii
Niii Niii 9 :1 -
Second 79618 8846 9:1
179664 Nill
82080 9120
Niii Niii I 9:1 -
Third 79618 8846 9:1
179664 82080 9120 Niii
Niii Niii 19: 1 -
Fourth 79618 8846 9:1
179664 Nill
82080 9120
Niii Nil! 9:1 -
Fifth 79618 8846 9:1
898320 9:1 Total 868490 89830
20
. ,
. . J}t:;~f;;;·1j~::; ;,;;~~~;~\ l.l Drdlmg and Blasti~ii;·~_,-; ,_;-_: ~j:_ .. ~·. ~-~ .:?.:-?~~ ;.:-.1 ttl
~-/. -• '' t •,:r .. • .. ·, .• :J._-,f'(oj '~~,;~·;; ·•> :; . ·~.:1J~-\ ··.~··1~·:··~~ .. ~~··:~.~;' I~ ··:;.~:·;t6~·,\. '.:.·-:.,.:r:~;:/ ~ftl. 1
Drilling and blasting p{*¥,!~~~~~-~~)\.~:~-~!~ for ext~action Rom o~ Road
metal and Gravel. The pt11~·ary Qfi}}t~ts done w1th Crawler dnlls of , .. _ -:..:.;:: • ...: .•• ~.;: • •• .F
4.5"diameter and secondary drilling 1s done with jackhammers and
compressor. The compressor attached to the wagon drill has 450CFM
capacity and compressor attached to jacks can cater needs of 2 jackhammers.
Tippers are of 20 T capacity will be utilized for transportation from the leased
area to crusher.
Broad parameters of blasting:
H =Height of bench= 10m L = Length of drill hole= 11 m B =Burden= 3.0
m S = Spacing = 3.5 m D = Diameter of the blast hole = 100 mm VR = VoL,
of broken Rock = B * S * L = 3.5 * 3 * 10 = 105 m3 Volume of rock
generated from one hole = 105 x 2.5 sg = 262.5 T
After blasting the rock, the excavator is used for loading rocks. The oversize
boulders are dealt with secondary blasting. The material thus transported is
fed to 250 TPH capacity crushing plant. The products are stored separately
from where they are dispatched to customers.
Explosive Consumption :
Taking on powder factor basis, with a PF of 4 total explosive needed per year
is 10,00,000/4 = 250 Tons.
Explosive used :
The proponent has pennission to use ANFO and also got pennission under
MMR 106 (2(b)) for deep hole drilling and blasting. The explosives that are
used in the quarry are ANFO, cartridge slurries for booster, Pentolite boosters
and other blasting accessories.
Storage of Explosive/ Ammonium Nitrate:
The client has an approved explosive magazine 2 in numbers each of capacity
4.5 tons. Thus each magazine has filling pennission for 10 times per month
21
.r"\
.......
""" r.
........
""'\
""''
(:." l . ~ ·~>} , • " . . .j l ~~' i •. } t ~ , • ,.~....... ..~J. .._ ;. ; ' .. ·' .. ..,.. ' · .... ~, :
.:,, · .. :. ·~· ~ ~f. ~/ ·~, ... ~~ ~<:.. ...... ! ... ) i
·: ·~. \~t>-~··.:.· .. :;~ .L·:_ .. /(~>~~~.:::./ i.e. 90 tons the magazines· :;e:~ .. ~.:~.ater)ttj_e/~eed of explosive storage
,:;. : .· · .'c'"::r;·t-r;_ ~ (···.{ ~-:-~ requirement. Ammonium Nitrate storage~liceifse of 100 tons at time and twice
in a month i.e., 200 tons of Ammonium Nitrate can be used in a month The
client has also obtained permission for ANFO mixing shed, where the ANFO
is mixed.
Manpower Requirement :
A total of 4 7 persons shall be engaged to carry out the various operations at
the QL applied area. The man power required for the mining operations
shall be as per Table given below.
Cate o Number
First class, Second class managers, and foreman 1
Su ervtsors 2
Crushing operation 6
Compressor operators 6
Deployment of Machinery
The mining machinery and equipment proposed to be deployed in the mine
for different mining operations during the Scheme period are described in the
table below:
22
l '· .. ; .. r'" .? · . ' "~ i J ..... 1( \~
Purpose ,! ·t ··. ~ (-'--~ :- /f..,v lc:%iipacity & Nos Make , .. -ype-Q . . . / ··:·· ., _,. . ,, . ' '.-.r: .:~/ ) j, ,
.. M.~chinerY. .·-;> ·')·~~· I ...
~ ... ~ ' . . ~ _•'
Crawler 1iiill4.5" IOOmm dia Atlascapco/ cp !.Breaking 450cfm/3nos
Loader/Excavator 3no. 2.Loading
Tippers 25-tonner, 5nos 2.Haulage
Tractor type 2no 4. Water tanker
a) Conceptual Mine Planning: The worked out pit will occupy an area of
76000 m2 or 7.6000Hectares to a depth of 12 m reaching 108m (FRL) at the
Western portion of the quarry lease area. The area occupied by internal roads
would be 0.095 Hectares, while plantation will be occupying an area of
0.1875Hectares on the Southern side of the applied QL Area. The Conceptual
plan with Sections is enclosed as Plates 6.
(b) UNDERGROUND MINING: NOT APPLICABLE
4.0 MINE DRAINAGE
a) The QL applied area is over an elevated mound to a height of 8.0m
above ground level. Rain water constitutes the drainage system of the area.
Nonnal course of drainage is a sheet wash over lower reaches and flows
through the seasonal nala located on south of applied QL Area. Groundwater
level is observed to be ranging in depth from 55-60 m bgl in the nearby
agricultural fields.
b) The maximum height of the working level is 40 m while the minimum
level of working would be 12 m.
c) Quantity and Quality of Water: The quality and quantity of water cannot
be estimated as the mine workings are at much higher levels of the
23
,~ L- /;i::::·: - ::t:-:~,·:~; 2~~1 groundwater table. Howevir/'~h~;-.~~t~r.,~i~:t~si~<(\idfje nearby agricultural field
\(" :\ ~ .. ~,; .. .: . ·,: '"' -:~~.:.·· / '..,;.:,: ;:· ...... ) 1
and the quality of water is f'ound;~tc>:·be,:po"tati1e'?../1/7 • ./ \\, • 4 ' ·.,,:, ' -_ , • _" I~'. :. . • "' ... ~Jo"~,\~."'-;~~
d) The entire applied QL area :k.qy~r -~: ~\6Jiii!Jfierrain and only sheet wash is ~. ;-~· ... :!'. !..!.~ .. ':'1:~ .. :;~ ... r~·
anticipated during monsoon in the applied QL area. Regional drainage pattern
is observed to be dendritic to sub-dendritic in nature.
5.0 STACKING OF MINERAL REJECTS, SUB-GRADE & DISPOSAL OF WASTE
There is no mineral reject or sub-grade mineral in this quarry. However, about
10% interstitial voids and intercalated waste is anticipated which is computed
separately. This will be utilized for the formation of internal roads and balance
utilized to form a barrier all along the 7.5m buffer zone of the QL applied area
to a height of 1 O.Om.
""" 6.0 USE OF MINERAL & MINERAL REJECTS
'""' The ROM will be fed in to the crusher established outside the applied QL area
where it will be crushed to desired sizes and utilized for the State Highway
projects. Entire ROM is intended for captive consumption.
7.0 PROCESSING OF ROM & MINERAL REJECTS
In this area ROM will be sized and sorted in crusher for road metal and input
to hot mix plant. There is no Mineral Reject from this Quarry.
8.0 OTHERS
a) SITE SERVICES: Site services such as office Room cum First Aid,
Separate Shelter and toilets for Gents & Ladies will be provided at the applied
QL area.
24
' J, 4 o •' .. \\- .. :\ .. ,- ;".t.r.. , ·.:: t. :~· .. • • : .:.
!' ~~)i ,, ' :t. (/ ;-..,~ .. . ,_.., .Jf'"" ~.rr'·~~-r;;·~~~· [;toiSTAN s. VILLAGE -:~ ;}'. '·{ · Dfr.~~~~t ;. POPULATI , ....... :' , ·,,.~, ! 1..- '.. • !."--"\'
No. "·: t -· ... :·r-a-00"-1"!'-'- ''I': ).. ;..~ ON i~ r ., j •-, : ~ ~-". : ;-~,J~;# CE ·-... ·:...~~-~! . -
1 Somayajulapuram South-West 1.4 950
2 Gudembai Tanda North- East 1.6 800
3 Husainapuram North-West 4.6 900
4 Chinnam Chettipalli South-West 2.6 840
C) Public buildings, places of Workship and Monuments: No buildings or
places and Monuments are witnessed in the applied QL Area.
d) Indicate any Sanctuary is located in the vicinity of the leasehold :
No Sanctuary, ceo-sensitive areas etc. are located in the vicinity of the
leasehold.
2. ENVIRONMENTAL IMP ACT ASSESSMENT:
a) Land Area Degraded : An area of about 76000 m2 will be degraded for the
working pit; and Roads .095 m2 •
b) Air Quality: Road metal & Gravel mining do to some extent generates dust
during drilling and blasting. This would be minimized by usage of moist clay,
sprinkling of water at blasting site and haulage roads. Masks, earplugs and safety
goggles will be provided to the workmen at mine to avoid the negative impacts of
dust arising.
c) Water Quality: The subject area is far from industries and as such water is not
polluted. The water drawn from bore wells will be supplied to workmen for
drinking
d) Noise Levels: The applied QL Area is quite far from the habitation area
situated. Noise is anticipated from drilling, blasting and movement of vehicles. As
the quantum of mining is on a small scale the noise generation would be well
within the limits. Therefore, the noise pollution is expected to be negligible in the
area. However, the applicant will take all precautions during drilling and blasting
by providing mufflers.
26
f) Water Regime: Mining of road metal will be carried out on top portion of
the mound in the applied QL area to a depth of 45.0m and in a closed environment
limited to working pit. The mining activity proposed would not intersect water
table of the area. The water table is observed to be 48-58 m in the adjacent
boreholes of agricultural lands.
g) Acid Mine Drainage: Not applicable.
h) Surface subsidence: There will not be any surface subsidence as all the
benches and ramp ways will be thoroughly rolled for hard surface.
i) Socio Economics: Mining of road metal and Gravel will create some
employment opportunities to local villagers thereby generating income and
improvement in livelihood of local villagers and revenue to Government by way of
paying royalty. J) Historical Monuments: No Historical monuments are located near and
around the applied ML area.
(k) Bio-diversity: The slopes of the subject area consist of scattered bushes.
There is no report of existence of wild animals in this region.
3. Progressive Reclamation Plan: Mining activity will be carried out till the
completion of state highway project and the worked out pit will be protected
with barbed wire and the mined out pit will be used as storage water pit.
Hence, Progressive reclamation is not studied and will be planned in the first
scheme of mining.
4. Mined out Land: No mined out land will be fonned during this Plan
period as mineral is existing much below the proposed workings during this
plan period.
5. Top Soil Management: There is no top soil generation from the applied
Q L area as such management does not arise.
6. Tailing Dam Management: No tailing dam is required.
27
-
>: .:.: .•. ,,.:i .. ; .- · ;:.•\:;,,\ \I..- · l , •.'. : 1 -:, , ,, : . ; ' •• f-'_, .~ f' f .;,," I
7. Disaster Managerpe~.i ;~~d . .J#~.~~:~~~,Cfl,~ent: In this area mining does
not involve disaster of'·{~h,ii;~~ct~~~-;~(e'~~dation of land. No flooding, •, ~·< . ~.~ .......... , ,~ ::~r..t.~~~·;~\ / . : :;"
subsidence, land slide occur'·in1::tb_e.;:~.~,gJ6If .The Mines Manager will take the
responsibility in the event of any unto ward incident.
In event of any emergency the Contact person is:
M/s JRC KCVR Projects ,
Partner: KCVR Infra Projects Pvt Ltd,
Rep.by Director:Sri K.V.Jagan Mohan Reddy,
H.No:1 0-96, B.C. Gureddy Complex,
Near Old Bus stand,
Banaganapalli Village & Mandai,
Kurnool Dist.
8.Care and Maintenance during temporary discontinuance: An emergency plan to deal with the situation of temporary discontinuance or
incomplete programme due to court order I due to statutory requirements or
any other unforeseen circumstance will be drawn by the technical and
managerial person to suit the specific situation of this mine. This would be
reviewed and modified to suit changing conditions and needs. This would take
care of preventing of access to dangerous places, pits and prevent accidental
fall in to the water logged pit of animals and men. Security is also to be looked
in to the safety measures placed at various places like firefighting equipment,
main switches etc. Security to be deployed at Explosive storage.
The mining is yet to commence. As mining continues till then the question of
discontinuance does not arise. However, any untoward incidence happens the
safety of the mining area will not be disturbed. Security I Watchmen will be
posted at the mine site for watch and ward.
Items Details Proposed Actual Remarks
Area afforested (Hect.)No. of About SOmts About SOmts Small
Dump Saplings planted cumulative length and length and dumping
28
Management
.. -.~~·: .. . • . , .... f
number ~Jplants .\<.'~'/);·-' .. :).- Ji>~J~ i; l ~~z,smts width ( ,·.,:.>',.. v:,·,{'!_"l'r;./1..~-·~- ~ l'l
Cost incfud.llfi,-1:\ w .-. -.'iJ. ' ~-·1875Ha) of r; \ ,. j...... /- '
-# - ·. ~--~-~· f'. r J during the ye~r ' .•. /: ·: i··: ~ :\ ... ·~/\-~..f.:.J buffer zone on
. ·~ ·-·-=·- ....... • J., ... ·,__ . · : .-., · / '0· Eastern side.
~"-.... : ...... ~ .. .:,. ..... :.:....·-·~ Neem & Teak
plants will be
planted, per
year about 33
plants at 2
mts. Grid
7.5mts width area on
(0.1875Ha) of Eastern
buffer zone on side .
Eastern side.
Neem & Teak
plants will be
planted, per
year about 33
plants at 2
mts. Grid
interval. Cost of interval. Cost of
plantation,
watch and
care is
Rs.24000
Area available for rehabilitation About 33
Management (specify) No. of saplings planted in Saplings of
of work out the year
benches Cumulative number of Plants
Any other method of
rehabilitation ( Specify) cost
including watch and care during
the year.
Neem, Teak
will be planted
per year
Void available for back filling In rainy
Reclamation (LXBXD ) pit wise/slope wise seasons the
and Void filled by waste/ trailings seepage water
Rehabilitation Afforestation on the back filled from working
by b k pit is being ac area
pumped out to filling Rehabilitation by making water
Schemetation reservoir
of the lease Any other means (Specify) area.
plantation,
watch and
care is
Rs.24000
About 33
Saplings of
Neem, Teak
will be planted
per year
In rainy
seasons the
seepage water
from working
pit is being
pumped out to
Schemetation
of the lease
area.
No other
mineral is
being
worked
from the
benches.
proposals
are made
as the
worked out
pit will be
utilized as
water
harvesting
pit
29
8. Financial Assura N.A
9. Afforestation: In ~'"""'K'L.I&l_,,~~~~r?J .•. f!l'l,.,"''· of buffer zone will be
··of the area. About 33 Saplings planted along the
consisting of N eem, T
at 3m grid interval. Year wise plantation area is shown in Plate No.5
10. Certificate :
Certified that the above mentioned points will be taken care in the Mining
Plan for Road Metal and Gravel over an extent of 21.999 Hectares in Sy.
Nos.408/P,409/P &410/P of Pinnapuram Village, Panyam Mandai, Kumool
District, Andhra Pradesh.
All statutory organizations, courts etc. have been taken into consideration
and wherever any specific permission is required the applicant will approach
the concerned authorities.
All the measures proposed in this Mining Plan will be implemented in a
time bound manner as proposed.
9.1 Plan, Section etc,
Plans and sections are submitted along with Mining Plan.
Date : 12-07-2017
Place :Kurnool.
Mlt!l var.J~ PROJECT~
For ~-...
~.v~ (" Authorised Signatory
(M/s JRC KCVR Projects , Partner: KCVR Infra Projects Pvt Ltd, Rep.by Director:Sri K.V.Jagan Mohan Reddy)
... lltis M m:n~ r:::m IS A:>proved sUJ• •• ConditJOr:s/SnpwaticlllSm~1,. M ... "' .
PlanApprova~ Letkr N~411.£;;~L\ \} Oatfd ...... . .;;:Q-;-~l :r
SIGNATURE OF RQP.
-P (P.VEERAN GOUD)
AppJOted
P. RAJA BAIIU Depary Director of Mines a C Sit,
KUilNOOL,
30
t"')
v"""' \ .,......
~
~
PHOTO SHOWS THE SHEET ROCK OF APPLIED Q.L. AREA
32
-
.,. . ~pri--:=::-... .. -7: ...... ,'d l._ \ ~f!'>o~. · .. . .... ~ .. ~.,_~ . •.;) { ~
·:~· ·· ,., ..... I'" .· .a,._..,, r ·f(.' .. ,•: .· . .. . . ,_~""", . ,,
:: ;::'.. :': ~ . .:;~: > :\:~\ : . ! . ; ·~. . . .. .. . . ,
'.. . ' .. ~-- <~--~ ~.)_:·:-; . ,:.·>~/ '-: .j,~ ~~;;l ~~~-f·"'"'~·':l . ······ ,.•!o]?J'/ttf •• ?Jl-11.~ 'r·
• - I • ,•t .... ~.· ,;.· • , _. 'lt-7·"' · GOVER,Nf1E;~;· .Of."ANJ?.., ..-.p, SH • r.
. DEPARTMEN'f.~.c;>F ,MlR~~ . . LOGY . PROCE.EDINGS OF THE ASST.DIR ECTQR OF_..MJ;tjES·~~b; Ol..OGY (FA<;), BANA~AN.APAL~E
(Present:: Sri T.'Nataraja/ M.S(;;/ 'Asst. Geologist) \: :"~:; ·, • ..,· . ~ · ~ ·· : : • . _ proceedings No:1132/0LI2G16 • . ..,. .. :.'~- _._.. Pate; W]t.'io~i6· ·
ORDER;
Sub: Mines and Quarries - Quarry lease for Road Metal & Gravel over an extent · of 21.999 Hectares In Sy.Nos.408/P, 409/.P & 410/P of Plnnapuram
(V), Panyam (M), Kurnool District- Granted in favour of M/s JRC KCVR Projects, Partner: K.C.V.R. Infra Projects Pvt Ltd, Rep.by Director: Sri K.V. lagan Mohan Reddy for a period of 10 years - Work order -Issued- Reg. · ·
Ref: 1. Proceedings No.1645/Q2/2016, dated:20-06-2016 of the Deputy Director of Mines and Geology, Kurnool .
2. Letter dated:OS.07.2016 of M/s JRC KCVR Projects, Partner: K.C.V.R. :Infra Projects - Pvt Ltd, Rep.by Director: Sri ~.v. lagan Mohan Reddy.
@@@@ .
Through the reference 1st cited the Dy. Director of Mines and Geology, Kurnool has d
granted a Quarry Lease for Road Metal & Gravel over an extent of 21.999, Hectares in
Sy.Nos.408/P, 409/P & 410/P of Plnnapuram Village, Panyam Mandai, Kurnool
District for a period of 10 years In favour of M/s JRC KCVR Projects, Partner:
K.C.V.R. Infra Proje~ Pvt Ltd, Rep.by Director: Sr~ K.V. Jagan l...,ohan Reddy.
In the reference 2"d cited, the grantee M/s JRC KCVR Projects, Partner: K.C.V.R.
Infra Projects Pvt Ltd, Rep.by Director: Sri K.V. lagan Mohan Reddy has submitted
required documents and requested to execute the Quarry lease deed.
In the light of the circumstances stated above, the lease deed is executed in favour
of M/ s JRC KCVR Projects, Partner: K.C. V.R. Infra Projects Pvt Ltd, Rep.by
Director: Sri K.V. lagan M~han Reddy on QS:.07.2016 and hereby : permitted to
commence the quarrying operations for Road Metal & Gravel over an ext~nt of 21.999
Hectares In Sy.Nos.408/P, 409/P & 410/P of Plnnapuram Village, Panyam Manda.l,
Kurnool District for a period ~f 10 years I.e. from 0'5:07.2016 to () ll-,07.2026, !
subject to the provisions of Andhra Pradesh Minor Mineral Concession Rules 1966 and also
subject to conditions specified In the appendix enclosed to the lease deed. Subject to the
satisfaction of Government orders issued from time to time.
The lessee should maintain all the records and accounts in the prescribed forms
specified by the Government and submit necessary quarterly returns in Form-e so as to
reach the Director of Mines and Geology., Hyderapa9, Dy. Director of Mines and Geology,
Kurnool and Asst. Director of Mines. and Geology, Banaganapalle for each and every
quarter as per Rules.
1 \.. /\,.., \ r-.:s,.J. ,·j \~ -/
Asst. Director of Mines & Geology (FAC), Banaganapa~e, Kurnool-2.
:: 2 ::
~~~~~ Z~·c.:·~ . · ... , .... 1····~ .. ) ' . .;:. ;.\-.. ... !·'''
., .; ... '' · :. ·· tt::~·t·.;];:.·. .. .;;._SPECIAL CONDITIONS ~· ::~_!r·::~~~~t;h'~i; . 2,';,;;t~~·:, ·.. I'"'\
· :~·~~'1e'S~:~~~i~all ·not work within 4s meters of any railway ·une or of any public works .or of
any public rOads or buildings or of other permanent structures· as per· Regulation 109 of ·
Metalliterous Mines Regulations 1961. Horizontal distance of 15 meters from either bank of
a River or Canal or from the boundaries of Lake, Tank or other surface reservoirs as per
Regulations 127 of M.M. Regulations 1961 and also with regard to the safety margins to be
left to the highway and other Villages roads.
I2 M/s JRC KCVR Projects,
Asst. Director of Mines & Geology (FAC), Banaganapalle, Kumool-2.
Partner: K.C.V.R. Infra Projects Pvt Ltd, Rep.by Director: Sri K.V. Jag.:m Mohan Reddy, S/o K.C. Venkata Reddy, H.No.l0-96, B.C. Gureddy ~omplex, Near Old Bus Stand, Banaganapalle Vg & Mdl, Kurnool Dist.
Cooy Submitted to
*The Director of Mines and Geology, Hyderabad for favour of information.
*The Deputy Director of Mines and Geology, Kurnool for favour of information.
* Copy to the Tahsildar, Panyam (Mandai) for Information.
-
, .....
(
.C'
I'
r
UNDER RULE 14(3) OF GRANITE CONSERVATION AND DEVELOPMENT RULES 1999
... * * * -.;' SRI. P. Veeran Goud, 5/o. Late P.Basavan Goud, R/o. 4-261-2,
Kalyanadurg Road, Behind Raja Hotel, Anantapur is hereby granted
renewal of recognition under Rule 14(3) of the Granite Conservation
and Development Rules 1999 for further period as a Qualified person
to prepare Mining Plans.
Registration Number is: §P I DI'1G I HYD I 060 I 2002
This renewal of Recognition is valid uoto 30.06.2022
Place : ~J;.J~~~~-~ "'- . ~,. -"l \ \ l\ I -~/
Date: / fi.6':-:" ~ , .f(..,\~, k\t,. Y. - I { "" ' ,o ,\ ~
~ ~ \ . \ ~ i 7) DIRECTdR 6F MINES & GEOLOGY ~ *".... ~ ~-:
~ ~
60v. ' - -· •' ' ~ ·, / ~ .~rnm·· · -y
'....;.. ...,._, ,
il ,, 'j
I
I .I j ! I I
I· i' II
31
-'
f/
I
''
-0- 4 !", ........ -·--· ,,., ___ ,..__,.._ ..... _ .. __________ .,._.,_, ____ -_ .. __________ ---------------------·---=-'------3-_________ ..,. 9 20 i ~~!~~-~~~~--------------------------------
\ 368
\
For : JRC .. ~t\CVR Projects
SignatuFe:mtlm applicant. (K. V.Jaga n Mohan Reddy) (File No: 1132/QL/2016)
..
L-___ ,. ·-
410
Pinnapuram (V) PANYAM(M)
409
409/P
HILL
1 I. 92p
J.,--
l.
r / I
t . l f 1
lj It "' "'
• I
-----------------------------------------The Gee Co Ordinates af. follows. Datum: W.G.S- 84, Units: De.cimal Qegrees. ------------··----------------------------10 : N 15.58776 E 78.18770 11 : N 15.58800 E 78.18810 12 : N 15.58894 E 78.18852 13 : N 15.58934 E 78.18856 14 : N 15.59030 E 78.18869 15 : N 15.58980 E 78.18980 17 : N 15.59394 E 78.19279 18 : N 15.59353 E 78.1~~442
-----------------------------------··-----H.T.L Tower- 1
N 15.58610 E 78.19290 H.T.L. Tower- 2
I N 15.58862 E 78.19556 -.L. Tower ·· 3
N 15.59059 E 78.19690
r .• , ..
--------------------------------------
Asst. . Director of Mines & Geology, Banagana pall e.
File No: - 1132/ QL/2016. Quarry Lease application filed in Mee Seva Centre on 13.05.2016. ----------------------------------------------Surveyed on : 16.05.2016, Scale: - 1 C.m:- 400 Links. -----------------------··---------------------- . District Mandai :\1illage :-sv No'c ·-t. . .. .
Kurnool, Panyam, Pinnapuram, 408/P, 409/.P, 410/P.
----------------------------------------------. Name of the applicant:-
Sri K.V.Jagan Mohar:l Reddy, S/o K.Chinna Venkata Reddy; Director of M/ s J.R.C & K.C.V.R. Projects. ,
. ~ . -------- __ .;,.. -·· ---------·-.l·--~---------------:-·---Mfneral: ·Road Metal and· Gravel, -----~--------------------------~---~---------' . ,--., Sv No·· 175 of SOI"""·~"~; , ,i :i l':'::llla ~ ' ' 1 I • _ • : · • J: .-~ -J\oo4•'• t-"" •:<. t'-'
U Village,' Orvakal Mandc; Deleted Area: 1. 96 Acres.
-----··---------------------------------______ ... Tie Lines:- 17- M:1088, i8- rv1:1007 and :18 - N: i865 Links. -----··----------------------------------------
I I i PROV:D
Note: F.M.B.Sheets of Sy.No:.~~t-~Q~ .~ : and 410 of pini~apuram Yi~_!.;r~~~y-.~: t"~· -) :~ ~=- l enclosed. :· l~~/'-..,:.~ ... ... -····-~:: ~~ ··, · · \ l
! i~ /!. / ,. ·:--:- '::~. ~-.. :. '<r.', ,-~ - --- - -------- ----------------- ... ~-'lit.-,. """"'_:.:"'--.- 4. _ .. _.'\... L ..,""f. .. -~ ' ir { ~ . .,.,. J1 '· • -+'<' - u -. ,,-J ...... , .... ~
Survey Number wise e~~as foU'6ws:-~_:;:· ~ .' . .ri"):-;i 408/Part is 08.30 Ac \}0~~\t. ~:. ·~.> .o-;~;l ~; ~lfJq,~ 409/Part is 37.58 Ac \~~~;;> _--~~.;~.-~.;~ ·:~ ~:~/.l1 410/p
. 0 '-.f),,.._. , . - '-~· /...41 1
art JS 8.48 Ac -~ ~-:t~}f.;·~~,:: -:: -. / ! Total Extent: 54.36 Acres or ~~:-<,~' · ~· ': ~ · : . --~~ .... {,..... (
21.999 hectares. · ~---------------------------------------------
0' Surveyed for Grant of
Quarry Lease 21.999 hectares.
-----------------·-----------------------------
P.VE GEOLOGI
RQP/DMG/HY-0/ F'lllrly
..
Index . ·. . ,,.·, .. .,. ·, ,. ~ ;-~~;( ... ··:;.s·;, .""·1 ..... ' • • . .~. •-to ......... ~\
D C>
, ~ . . .. ,... .. , ' .. ~ \
Lease Bounda~·r;:~}:·/~> ~:.~ <\~~\;\\ : \ ••• ~ \_.r \ Contour · .. ·-!,',: , ... '·; .' .. _,_:,.,·-,!, · ... -.... :.~.
LOCATION CUM KEY PLAN TOPO SHEET N0:57 I/2
., A . L
N
.;L ··ca
\ c(. ;. ::··. .''··:··::.. . . ·. ::·: J:...~~/i Road " . \':'"', ·,_ PlaJ1 -shcwing ·QJ:~";Area Granted to M/S JRC KCVR Projects, Partner KCVR Infra Porjects Pvt Ltd.,
St ' /C I -..,··.~· ~, :~···p;-~::~---~-.:.:_.·;;·~ep, by Director Sri K:v.Jagan Mohan Reddy1 H.No :10-961
BC Gureddy Complex . ream ~na · ··.):_.:;·.: :~.~·::: ., .:~:.···. ·' Banganapalli Villege & Mandai Kurnool District.
V'll · .' t'"Sy-No:<J·.d6/P.409/PI410/P in Pinnapuram Villegel I Panyam Mandalam 1 Kurnool District for :21.999 Hectares. 1 age /.
:0 s ~m Radius ,,. ··4 -.·· Hiiis
WIND DIRECTION: EAST- WEST TOPO SHEET NO: 57 I/ 2
>
c
c
INDEX WEATHERED GRANITE
120 110 100 090 080 070 060 050
120 110 100 090 080 070 060 050
120 110 100 090 080 070 060 050
A
B
c
r- 120
----------------------~l~110 1- 100
---- ------ --------------~--..;;;r;-----
~~ 090 8._ 080 0:::
-- ~..._ 070 ~~ 060
-----------------------------------------~A1 050
r- 120
---------------------------------------~j_~110 100
-------------~- -- -------
- - - - - - - - - - - - - - - - - - - - - - - - - - -
~~ 090 0 ~~ 080 ~- 070
- - - ~ - - - - ----=-= 15-co~ 060 ... ---- ---------
-------------------------------~~050
r- 120
------------------------------------~L~110 t- 100
- - -- - - - - - - - - - - - - - - - - - - - - - - - -- - -
~~--- 090 0 ~~ 080 w lt r- 070 D co~ 060
------------------------------------~cLo5o
APPROVED
MINING PLAN FOR ROAD METAL AND GRAVEL
For UIS· JRC KCVR PROJECTS
. ML Area applied in Sy No.408/P 409/P,410/P in Pinnapuram V1llege,Panyam Mandalam, Kurnool District for :21.999 Hectares.
GEOLOGICAL CROSS SECTIONS k.~-~ SOIL COVER
COLOUR GRANITE P. VEE RAN GO UD PROVED ZONE GEOLOGIST M.Sc., APPL.IC.a.t.wthorised Signatory M/S JRC KCVR Projects, Partner KCVR Infra Porjects Pvt Ltd., PROBABLE ZONE P.Q' J OMG 1 HYOl060 /200:~ P\n·a Rep, by Director Sri K. V.Jagan Mohan Reddy,H.No: 10-96, BC Gureddy POSSIBLE ZONE Complex Banganapalli Villege & Mandai Kurnool District.
~======================~=========================================================-============================~========~S~C~AL~E~~1~:2~0~0~0======~C~O~N~T~O~U~R~I~N~T~ER~V~A~L~-2~.~0~M~======u
I
I
I
I
I
I
, ,
, ,
1 DRY LAND
I )C)C
DRY· LAND
' '
' '
, , ,
GRAZING LAND
GRAZING LAND
- - -
DRY LAND
.... - - - - -APPROVED
INDEX 0 ASSUMED BENCH MARK
LEASE BOUNDARY CONTOURS
ULTIVATION LAND OM BUFFER ZONE OOM BUFFER ZONE
P. VEERAN G GEOlOGIST
P.QP I OM G 1 HY0/1)60/200:7 -~
- - - - - - -- - ---DRY LAND D~LAND
HILLS
GRAZING LAND
, I
.... - - -M
--
' -
- - -
~
I
I
- -DF.Y LAND
' ' ' ' ' '
DRffiND
GRAZING LAND
DRY tAliiD
\
\
DRY LAND I
I
)C)( ,
Ii)RY LAND ,
, , H!I.'.S ,
)C)( , . . . . "' " -• ; :;.r-
---
MINING PLAN FOR ROAD METAL AND GRAVEL
For MJS. JRC KCVR PROJECT
(' Jvv-~ ENVIRONMENT PLAN
ML Area appl ied in Sy No.408/P 409/P,410/P in Pinnapuram Villege,Panyam Mandalam , Kurnool District for :21.999 Hectares.
A Pp LI~Iilmised S ignat:Of..,...----:M:-:/:::-S~J~RC::-:K;::::cv:::R::-::-Pr-oj:-e-:ct:-s-:, P::-a-:rt:-n...:er~K::-:C:::-V:::R-:I...:nf:-ra-:P::-o-:rj:-ects-:-::-Pv:-t -:-Lt-:d-. ,--~ g,.IT'I Rep, by Director Sri K.V.Jagan Mohan Reddy,H.No:l0-96, BC Gureddy
Complex Banganapa lli Villege & Mandai Kurnool District.
SCALE : 1: 10000 CONTOUR INT_ERVAL-2 .0 M
N X IIlJ ASSUMEO IIENCH HAAl<
!2J LEASE IIOUIIDAAY
E:l COIITDUR
li2J PIT
i!I ROAO ICI BUf FER ZDII!
!iii secnoo UNe 6i) SOIL COVBI
Q COlOUR GIWim: D DUMPYAAD
I
I I
I, I
I
I
N60~----------r----------+----------~----------+----------4----------~-----/ + + + + + + + + + + + + +
+ + + + + + + + +
+ + +
N 550•r---------~-----------r----------+---------_,-----------r----------+-~
+ + ' + + + +
+ + +
N45or----------~----------~----------+-----------+-----------~--~
N40Gr----------+---------_, __________ -r----------+----------4~
N35or----------~----------~----------+-----------+-------~
N30or----------~----------~----------+-----------+-~
I I
I I
I
• I
I
N20~~------~~--------~----~~ I
+ ... + .... +
.... "'+ .... + + "'+ .... "'+ +
+ -i7"'-t.-"" + + + ................ + +
4 ........ + + + + + ........ .t ?.(. + + +
+ + +.,."' + + + +
+ + + +
+ + + + + +
+ + + + + +
+ + + + +
+ + + + + +
+ + + + + + +
+
+ + +
+ +
+ + + + + + +
+ + + + + + + + +
+ + + + + + + +
+
+ + + +
+
+
+
+ + + + + + +
+ + -f + +
+ + + + + + + + + +
+ + + + + + + + + + +
+ + +
+ +
+ + +
+
+
+ + + + + + + + + + + +
+ + +
+ -f +
+ + +
+ + + +
+ +
+ + + + + +
+ + + + + + + +
+ + + + +
+ + + + + + +
+ + + + + + + + + +
+ + + + + + + +
+ +
+ + + +
+ + + + + + + + + + + + +
+ + + + + + + + +
+ + + + + + +
+ + +
+ + + +
+ + + ~ .... + + + + +
+ + .. +---1- j--'+ + _+_,..-4 f---f
+- - :f. +- - -f I
I
~ 150
+ + + 7"' + + + + +_- 4- -
+ + + A + + + + + + + .... ....~ + + + +
+ + + + + .... ~ .... ~ + + + .... .... + + + + .... + .... + + +
+ .. -- +--+_ +-- -+- - ... - ,r /-.;'l~-.J.-"/
.... - -+ + + + y 1'"' + + -l:. - + +_ - + + + + + .,.-¥ .,.+' + -!_:. - -+- +_- +- +
+ + + .... 4 .... + - .....,. + - .r- + + + 1 1 N 1oo+----t
+ + + ....... + .... "'+ - A" - .r- - + + + + + + .... .... + .... "'-+" - + .:f'- + + + + + + --' L ____ _
... ------ ----+- - ~ _... + .. + ;1-- - + + + + +
+ · + .;r--+ + + + + --+-+ + + + + +
+ + + + +
+ + + + +
+ +
E 100 E 150 E 200 E 250 E 300 E 350 E 400 E 450 E 500
+ + + +
+ + + +
+ + + +
+ + + +
+ +
+ + +
+ + + + + +
+ + + + + + +
+ + + + + + + +
+ + + + + + + +
+ + + +
+ + + + +
+ + + +
+ + +
+ + +
+ + + + +
+ + + + + +
+ + + + +
+ + + +
+ + + + +
+ +
E 550 E 600 E 650 E 700
APPROVED
~- . ;~ c'.;;( . ..,/ , ...-r~, .... \jc_ .l ,..:..,.
~\:.r" '-;/.." ... ~ -- ..,. •. .' <./ <(~ ;.; /........ ,.. ' . '" I.e-~--.. . .. , ,.__' It'§· . . .... ·- ···. ·,) ) \ ,_-, .\. fC . ..• . ; ",.\ c.. 1' , •• . - . ,. \ _,.I
I .. .. . -· .•. , IJ{ t .. · . ~. ~ r 1 I-· t 1'"" 'f' J
I ,.. • I ~ I ;• ... •• 1 .. ' ~ ~J
\- I .· ' t . , . . . . rr -. ' .... ... )')., 2 •"'\• ~ .; . . , ,' .., ·)'
· ' r - , .'/J :;·- . >· ~- . . -2. < '/)I '-"" ·., .. · .. " , J~V• . " .'l.~ / ' - "' ··- " :\ · . ·- • ~ ; ,_ . . '· I '')'--- . . . . . '"• ...J •••.. _:-;-, . .. ~ .. ·. -'·
''..Jt • ' '··-l · '' \ .. ... ,.·::!.! \..~ --.:~ ... /
P.VEERAN GOUD GEOLOGIST M.sc.,
P.QP I DMG/ HYD/Ob0/ 200]
APPLICANl
STATION LATITUDE I 15 35' 16.8" J 15 35' 20.2" K 15 35' 38.2" l 15 35' 38. 7" M 15 35' 36.2" N 15 35' 39.6" 0 15 35' 36.8" p 15 35' 28.6" Q 15 35' 26.5" s 15 35' 19.1" T 15 35' 19.4" u 15 35' 18.9" v 15 35' 18.4" w 15 35' 18.6" X 15 35' 17.9" y 15 35' 17.8" z 15 35' 15.9"
LONGITUDE
78 11' 17.2" 78 11 ' 18.7" 78 11 ' 20.6" 78 11' 30.4" 78 11' 40.4" 78 11 ' 22.8" 78 11' 20.6" 78 11' 18.3" 78 11' 20.8" 78 11' 18.1" 78 11' 18.3" 78 11' 17.8" 78 11 ' 17.5" 78 11' 17.8" 78 11' 17.1" 78 11 ' 16.9" 78 11' 15.7"
PLATE-3
MINING PLAN FOR ROAD METAL AND GRAVEL Ml Area applied in Sy No.408/ P 409/P.410/P in Pinnapuram
Villege,Panyam Mandalam , Kurnool Distnct foc :21.999 Hectares.
SURFACE GEOLOGICAL PLAN M/ S JRC KCVR Projects, Partner KCVR Infra Pol)ects Pvt Ltd .,
Rep, by Director Sri K.V.Jagan Mohan Reddy,H.No:l0-96, BC Gureddy Complex Banganapaiii Vii lege & Mandai Kumool Dist rict.
SCALE : 1:2000 CONTOUR INTERVAL·3.0 M
Y.\ · c ;o z 0 CD r
t ~
' A)
IND
;o 0 )> ' 0
I
[CJ ASSUM(O BENCH KAIU(
!l!l lEASf IIOUNIWIY
e:::l COH10U!<
li2lm i!!!I OOAD a IUfflOZOH'
Iii) SfCTION UH. EJ SOil<XMJI
CJcot.ou•-0 DUM•YAAD
I I
IT
N60~----------r----------+----------~----------r----------+----------+-----~
NSSO·r-----------r----------;-----------+-----------+----------~----------~~
N SO
N 4S
N40ar-----------+-----------+----------~------------r-----------+4
N3S~----------;-----------+-----------r---------~r-----~
I
I
I I
I I
N 30
N 2S
I
N12o
I I
I
I I I
I
I I
1 N 1 oo,+------t L _ __ _ _
I
+ + + + +
+ + + + + + +
+ + + + + + + .J
+ + + + +
; -- ~ ----...., + + + +
+ + +
E SO E 100 E 1SO E 200 E 2SO E 300
+
1~
+
+ +
E 3SO
130 120 110 100 090 080 070
----------------- - - -
Worldng PlantatiOn
0 1stYEAR 0 0 2ndYEAR 0 D 3 rdYEAR D e:J 4 th YEAR D D Sth YEAR D
P. VEERAN GOuu GEOlOGIST M.Sc.,
P.QP I DMG 1 HYD/'060 /2007
'
+ + + + + +
i!l
+ + + + + +
+ + + + +
+ +
+
E 400
-----------
+ +
+ +
+
E 4SO
+
+
+ +
+ + + + + + +
+ + + + + + +
+ + + + + + +
+ +
E SOO E SSO
APPROVED
+ +
+ + +
+
+
+ +
+ +
E 600
+ + +
+ +
+ + +
+ + +
+ + +
+ + +
+ + +
+ + +
+ + +
+ + +
II
-$-
+
+ + +
+ + + +
+ + +
+ + + + +
+
E 6SO E 700
PLATE-6
MINING PLAN FOR ROAD METAL AND GRAVEL
ML Area applied In Sy No.408/ P 409/P,410/P In Plnnap<Jram Vlllege,Panyam Mandalam, Kumool District for :21.999 Hectares.
CONCEPTUAL PLAN M/S JRC KCVR Projects, Partner KCVR Infra Porjects Pvt Ltd.,
Rep, by Director Sri K.V.Jagan Mohan Reddy,H.No:l0-96, BC Gureddy Complex Banganapalll Villege & Mandai Kumool DistriCt.
SCALE : 1:1000 CONTOUR INTERVAL-2.0 M
INDEX IIlJ ASSuoiEO I!EHOt .......
1!11 L£ASE """""""" E:l COHTO<JO.
!a orr
E!!l """" a BUFFtR ZOHf
(iiJ SEcnOH UNE
EJ SOILCOYt.R
c::Jc:owu• ...,.m CJ DUN, YARD
'? ICM 'f ' 'II
N 650
N60Gr----------4-----------+-----------~---------4~---------4-----------+------l
_ ...J
I
I
I I
I
I
'
I I
I
I
N55o,r---------~------~--~----------~---------+----------4-----------~
N50Gr----------4-----------+-----------~---------4~---------4---------4
N45Gr-----------+-----------+-----------4----------~~----------~---4
N40Gr-----------+-----------+-----------4----------~~----------rl
N 30
N 25
I
N12o
'
I I
I
I I
I
I I
I
I
I
+ + + +
+ + + + +
+ + + J
+ + + 1 N loo+------t L ____ _ + + .. , ..... + ____ _.,.,.
+ + + + +
+ +
E 100 E 150 E 200 E 250 E 300 E 350 E 400
+ + + +
+ + + + + + + + + +
+ + + + + + + + + + +
+ + + + + + + + + + +
E 450 E 500
+
+ +
+
+
+
+ + +
+ +
E 550 E 600
+
+ + +
+ + +
+ + + +
+ + + +
+ + + +
+ + + +
+ + + +
+ +
+ +
+
+
+
+ +
+
+
E 650
130 120
E 700
130 120 110 100 090 080 070
---- ...,-----~---______ [110
~-=-~-------~-=-=-=-~-~-=-~-=-~---------------~----~~-~-~-~-~-~---1 ~~~
Working Plantation
0 l stYEAR 0 0 2ndYEAR 0 0 3 rdYEAR 0 D 4thYEAR D D Sth YEAR D
080 ~x~----------------------~~--------------------------------------------------------------------------------------~yo7o
For MJS. JRC KCVR PROJECTS
}(. \J ~~ r; APPLICA.Nll>rised Signatory
~. P.VEERAN GO
GEOLOGIST tt1
P.Q~ I oMG/ HYD/060/ 200] APPR~:7ED
PLATE-S
MINING PLAN FOR ROAD METAL AN D GRAVEL
ML Area applied In Sy No.408/ P 409/ P,410/ P In Pinnapuram Villege,Panyam Mandalam, Kumool District for :21.999 Hectares.
Five YEARS WORKING PLAN M/5 JRC KCVR Projects, Partner KCVR In ra Porjects Pvt Ud.,
Rep, by Director S ri K.V.Jagan Mohan Reddy,H.No: l 0-96, BC Gureddy Complex Banganapalll Villege & Mandai Kumool District.
SCALf : 1:1000 CONTOUR INTERVAL·2.0 M