c.v - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/... · government...

42
GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech), /C KCVR Projects, Infra Projects Pvt Ltd., Deputy Director of Mines & Geology, KURNOOL. Rep.by Director: Sri K.V Jagan Mohan Reddy, S/o. K.C Venkata Reddy, H.No: 10-96, B.C Gurreddy Complex, Near Old Bus stand, Sir, Banaganapalle (V&M), Kurnool District. Letter No.2724/MP-BPL/2017, dt: I Z. -09-2017 Sub:- Mines & Minerals - Approval of Mining Plan (including Progressive Mine Closure Plan) for the period of five years for Road Metal and Gravel over an extent of21.999 Hectares in Sy.No: 408/P, 409/P & 410/P ofPinnapuram Village, Panyam Mandai, Kurnool District in favour of M/s. JRC KCVR Projects, Partner: K.C.V.R Infra Projects Pvt Ltd., Rep.by Director: Sri K.V Jagan Mohan Reddy, prepared by Sri P. Veeran Goud, R.Q.P. - Mining Plan - Approved - Regarding. Ref:- 1) G.O. MS. No: 56, Industries & Commerce (M.II), dated: 30.04.2016. 2) Prodgs No. 28594/P.RQP/2001, dt: 13.05.2016 of the Director of Mines and Geology, AP, Hyderabad. 3) Prodgs No. 1132/QL/2016, dt: 05.07.2016 of the Asst. Director of Mines and Geology, Banaganapalle addressed to the applicant. 4) Letter dated: Nil, along with Mining Plan from the applicant I Lessee received in this office on 19.07.2017. * * * * In exercise of the powers conferred as per amended Rule 7 A (I), (II), (III) and (IV) of APMMC Rules, 1966 read with Prodgs No. 28594/P.RQP/2 001 , dt: 13.05.2016 of the Director of Mines and Geology, GoAP and G.O.Ms.No: 56, Industries & Commerce (M.Il), dated: 30.04.2016, I hereby approve the Mining Plan (including Progressive Mine Closure Plan) for the period of five years for Road Metal and Gravel over an extent of 21.999 Hectares in Sy.No: 408/P, 409/P & 410/P of Pinnapuram Village, Panyam Mandai, Kurnool District in favour of M/s. JRC KCVR Projects, Partner: K.C.V.R Infra Projects Pvt Ltd., Rep.by Director: Sri K.V Jagan Mohan Reddy, prepared by Sri P. Veeran Goud, R.Q.P, submitted under Rule 7 (A) of APMMC Rules, 1966 & Progressive Mine Closure J:»lan under Rule 23(B) of MCDR, 1988. This approval is subject to the following conditions. 1. Keeping in view of the Environmental Clearance norms compliance, this Mining Plan including Progressive Mine Closure Plan is approved without causing inspection of the Mining Plan applied area. Any dislocation of subject area or any encroachment is noticed, the lessee is held responsible. This Mining Plan is approved basing on the executed sketch and RQP report. 2. This Mining Plan (including Progressive Mine Closure Plan) is approved without prejudice to any other laws applicable to the mine area from time to time whether made by the Central Government, State Government or any other authority. 3. It is clarified that this approval of the Mining Plan (including Progressive Mine Closure Plan) does not in any way imply the approvai of the Government in terms of any other provisions of the Mines and Minerals (Development and Regulation) Amendment Act, 2015 and any other laws including the Forest Conservation Act, 1980 and APMMC Rules, 1966. 4. The approval authority does not owe responsibility with regard to recovery factor of Road Metal & Gravel and assessment of reserves, any erroneous certification made by the R.Q.P. if any, since the evaluation is done on random basis. 5. The Mining Plan (including Progressive Mine Closure Plan) is approved subject to strictly adhering to the relevant Regulations of MMR, 1961 and obtaining prior permission from the Director General Mines Safety whenever and wherever it is required. Contd ... 2

Upload: others

Post on 19-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY

From P. Raja Babu, M.Sc (Tech), /C KCVR Projects, /~~~~~.C.V.R Infra Projects Pvt Ltd., Deputy Director of Mines & Geology, KURNOOL. Rep.by Director: Sri K.V Jagan Mohan

Reddy, S/o. K.C Venkata Reddy, H.No: 10-96, B.C Gurreddy Complex, Near Old Bus stand,

Sir,

Banaganapalle (V &M), Kurnool District.

Letter No.2724/MP-BPL/2017, dt: I Z. -09-2017

Sub:- Mines & Minerals - Approval of Mining Plan (including Progressive Mine Closure Plan) for the period of five years for Road Metal and Gravel over an extent of21.999 Hectares in Sy.No: 408/P, 409/P & 410/P ofPinnapuram Village, Panyam Mandai, Kurnool District in favour of M/s. JRC KCVR Projects, Partner: K.C.V.R Infra Projects Pvt Ltd., Rep.by Director: Sri K.V Jagan Mohan Reddy, prepared by Sri P. Veeran Goud, R.Q.P. - Mining Plan - Approved -Regarding.

Ref:- 1) G.O. MS. No: 56, Industries & Commerce (M.II), dated: 30.04.2016. 2) Prodgs No. 28594/P.RQP/2001, dt: 13.05.2016 of the Director of Mines and

Geology, AP, Hyderabad. 3) Prodgs No. 1132/QL/2016, dt: 05.07.2016 of the Asst. Director of Mines and

Geology, Banaganapalle addressed to the applicant. 4) Letter dated: Nil, along with Mining Plan from the applicant I Lessee

received in this office on 19.07.2017.

* * * * In exercise of the powers conferred as per amended Rule 7 A (I), (II), (III) and (IV) of

APMMC Rules, 1966 read with Prodgs No. 28594/P.RQP/2001 , dt: 13.05.2016 of the Director of Mines and Geology, GoAP and G.O.Ms.No: 56, Industries & Commerce (M.Il), dated: 30.04.2016, I hereby approve the Mining Plan (including Progressive Mine Closure Plan) for the period of five years for Road Metal and Gravel over an extent of 21.999 Hectares in Sy.No: 408/P, 409/P & 410/P of Pinnapuram Village, Panyam Mandai, Kurnool District in favour of M/s. JRC KCVR Projects, Partner: K.C.V.R Infra Projects Pvt Ltd., Rep.by Director: Sri K.V Jagan Mohan Reddy, prepared by Sri P. Veeran Goud, R.Q.P, submitted under Rule 7 (A) of APMMC Rules, 1966 & Progressive Mine Closure J:»lan under Rule 23(B) of MCDR, 1988. This approval is subject to the following conditions.

1. Keeping in view of the Environmental Clearance norms compliance, this Mining Plan including Progressive Mine Closure Plan is approved without causing inspection of the Mining Plan applied area. Any dislocation of subject area or any encroachment is noticed, the lessee is held responsible. This Mining Plan is approved basing on the executed sketch and RQP report.

2. This Mining Plan (including Progressive Mine Closure Plan) is approved without prejudice to any other laws applicable to the mine area from time to time whether made by the Central Government, State Government or any other authority.

3. It is clarified that this approval of the Mining Plan (including Progressive Mine Closure Plan) does not in any way imply the approvai of the Government in terms of any other provisions of the Mines and Minerals (Development and Regulation) Amendment Act, 2015 and any other laws including the Forest Conservation Act, 1980 and APMMC Rules, 1966.

4. The approval authority does not owe responsibility with regard to recovery factor of Road Metal & Gravel and assessment of reserves, any erroneous certification made by the R.Q.P. if any, since the evaluation is done on random basis.

5. The Mining Plan (including Progressive Mine Closure Plan) is approved subject to strictly adhering to the relevant Regulations of MMR, 1961 and obtaining prior permission from the Director General Mines Safety whenever and wherever it is required.

Contd ... 2

Page 2: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

r

-2-

6. The applicant/lessee shall safeguard the structures, public buildings, roads, railway line, electric line and water bodies exists if any as per regulations 109 & 127 of MMR, 1961.

7. The approval of Mining Plan (including Progressive Mine Closure Plan) shall be subjected to vacation of prohibitory orders or notices or determination orders etc., if any issued by the competent authority.

8. If anything is found to be concealed as required by the Mines Act in the contents of the approved Mining Plan and the proposal for rectification has not been made or if at later stage the information furnished in the document to be incorrect or misrepresentation of facts, the approval shall be revoked with immediate effect.

9. This Mining Plan was approved as per the quarry lease executive sketch of the subject area. Any deviation found later, approval authority does not owe responsibility.

I 0. The approval authority does not owe responsibility with regard to erroneous certification made by the R.Q.P if any and approval is tentative subject to modification of new findings at a later date as per the provisions of Rules inforce, since the evaluation is done on random basis.

Yours faithfully, Encl: (2 copies of A.M.P.)

Copy submitted to the Director of Mines and Geology, Govt., of A.P along with A.M.P.

Copy to Sri P. Veeran Goud, R.Q.P., D.No.4-1308, Kalyandurg Road, Anantapur -515001 for information.

Copy submitted to the Regional Controller of Mines, IBM, Sultan Bazar, Hyderabad for favour of kind information.

Copy submitted to the Director of Mines Safety, Bellary for favour of kind information.

Copy submitted to the Zonal Joint Director of Mines and Geology, Kadapa for favour of information.

Copy to the Asst. Director of Mines & Geology, Banaganapalle along with A.M.P.

Page 3: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

' .,

~~----------------------------------~~--~--------------------~ r;

r

MINING PLAN FOR ROAD METAL & GRAVEL Over an extent of 21.999 Hects. in Sy. Nos.408/P,409/P &410/P Pinnapuram(V), PANYAM MANDAL (M), Kurnool District,AP

Mines & Minerals (Development & Regulation) Act, 1957 (Under Rule 7(A) of A.P.M.M.C.R., 1966)

Partner: KCVR Infra Projects Pvt Ltd,

Rep.by Director:Sri K.V.Jagan Mohan Reddy,

H.No:10-96, B.C. Gureddy Complex,

Near Old Bus stand,

Banaganapalle Village & Mandai,

Kurnool Dist.

Prepared by

P. Veeran Goud, M.Sc., R.Q.P.

RQP /DMG/HYD/060/2002 D.No.4-1308

Kalyandurg Road Ananatapuramu, (A.P.), PIN:515004.

CELL: 9440686659, Phone No: 08554 246659 Email: [email protected]

July- 2017

1

Page 4: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

r .

--~":.:~

r======-=--~-----~~--~/ ;~{~~'~.--· ~\::..r. /'',_··;-;-... • '( ' ,._.: .:"' ~ }- 4 ;·~-:-

• ¥ .. ~ • ,"~,.'

\\ ~ ~: .. ... ~.,, /': :··-. .. ~ __ ... .. . :" .~~ ~ --- .. 7 ./~~/

S.NO. CONTENTS ' .. ii_:··+·i f~,':, .-\ -_, .··· ·.1,.-· . . .... .. / .... :.:· ., . ' . ....... ~ . ,. -_,· PAGE No.

1 2 ··<:· ... _,.

-~~~/. :~.)·.~·~ ·, 3 ·.:;-·;.'

I INTRODUCTION -- ... .... __ .; .... --- -

5

II GENERAL LOCATION AND ACCESSIBILITY 6

III GEOLOGY 7

IV EXPLORATION 9

v RESERVES 11

VI MINING 12

VII DRILLING AND BLASTING 18

VIII SITE SERVICES 19

IX SCHEME OF WASTE MANAGEMENT PLAN 20

X ENVIRONMENTAL MANAGEMENT PLAN 21

XI ANY OTHER RELEVENT INFORMATION 25

LIST OF PLATES Scale

PLATE-I LOCATION CUM KEY PLAN 1:50000

PLATE - 2 LEASE SKETCH 1 Cm:400.links

PLATE-3 SURF ACE GEOLOGICAL PLAN 1:2000

PLATE - 4 GEOLOGICAL SECTION 1:2000

PLATE-S YEAR WISE WORKING PLAN & SECTIONS 1:2000

PLATE - 6 CONCEPTUAL PLAN & SECTION 1:2000

PLATE - 7 ENVIRONMENT PLAN 1:5000

LIST OF ANNEXURES

ANNEXURE-I Photographs of the Area.

ANNEXURE- II Copy of the Notice & Proceedings No. 1132/QL/2016

Dated : 05 -07-2016, of ADMG,Banaganapalli .

ANNEXURE- III Copy Of the Registration Certificate ofR.Q.P

2

Page 5: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

-):.;·_ ~:-- .--~ .: .-·:_>.> . ':. ·-.._ .. ; )' : ~: '; It_{_, ., f ~ -, ) . ~. ~ , '_ • ' • :. ~ '· ""r ""'-, ,

If:~2 ~. ~ : ~ !~ . :· -~ ..::~:·~ :_ ~ · ~ ~ .. . . ·:1 } , ! :-!.} 1...- l•:. : . . ' · ·.··:·1 , .... t ,'\;

~~~c,~~~!!~51J)/ This mining plan for~~);ij~r~~~~~rea for Road Metal &

Gravel over an extent of 21.99~d·:f.!s~o/:·~~\;§~:: ::-Nos.408/P,409/P &410/P of ........... ~ _,.... ., . .-

Pinnapuram Village, Panyam Mandaf;'-·Rl:Imool District, Andhra Pradesh

State, prepared in consultation with me and I understand its contents and

agreed to implement the same in accordance of APMMC Rule 28.

Place : Kumool.

Date : 12-07-2017 for M/t~TpROJECTS

l<~\f-~ (M/s J RC K6~NSjb~itJ1tltory

Partner: KCVR Infra Projects Pvt Ltd, Rep.by Director:Sri K.V.Jagan Mohan Reddy)

CERTIFIACTE

This is to certify that Mining Plan in respect of quarry lease applied

area for Road Metal & Gravel over an extent of 21.999 Hects. in Sy.

Nos.408/P ,409/P &41 0/P of Pirmapuram Village, Pan yam Mandai, Kumool

District, Andhra Pradesh State, prepared by P.veeran goud.R.Q.P.

The applicant agrees to follow the same in accordance to the provisions

of law.

Place : Kumool.

Date : 12-07-2017. For.u~q~x~PRoJecrs

k.\J,~ .-A.u1horis~d Sigr.atui Y

(M/s JRC K(,"VR.ProJects , Partner: KCVR Infra Projects Pvt Ltd,

Rep.by Director:Sri K.V.Jagan Mohan Reddy)

3

Page 6: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

,{;· ~· ;::~ X.':f:~~:~\~:~, cliB:riF1iC.A$Jt/':··~·! ":: ?/j {:;l

'('~6\{j \ \:i ~.\:F:i;:,~~::;}/ },-. f :~·i The provisions of Granite ·,~4l'lse:~~ii6=&~f{d~~(r~~pment Rules 1999 &

''<O!;·>:;.'";~~i ~ .~·" ....... : ~--;···<~::. :, ':~.~: .. ;i:) ;; APMMC Rule 28 observed in prepara~ioi!':::Q.f.}vfipijlg Plan for quarry lease

<:·-:'i ' '· .• ,r-) \:::;.>~ applied area for Road Metal & Gravei'Bvet: ittr:~xtent of 21 .999 Hects. in Sy.

Nos.408/P ,409/P &41 0/P of Pinnapuram Village, Pan yam Mandai, Kumool

District, Andhra Pradesh State Wherever specific permissions are required the

applicant will approach the concerned authorities.

Certified that the information provided in the mining plan is correct to the

best of my knowledge.

DATE : 12-07-2017.

PLACE : Kurnool.

SIGNATURE OF THE RQP) ;1 ~ . ..D_Q -= -=- /J

-IT P. VEERAN GOUD V

4

Page 7: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

Introduction

FOR

M/s JRC KCVR Projects,

Partner: KCVR Infra Projects Pvt Ltd,

Rep.by Director:Sri K.V.Jagan Mohan Reddy,

H.No:1 0-96, B.C. Gureddy Complex,

Near Old Bus stand,

Banaganapalli Village & Mandai,

Kurnool Dist.

M/s JRC KCVR Projects , Partner: KCVR Infra Projects Pvt

Ltd,Rep.by Director:Sri K.V.Jagan Mohan Reddy has applied for grant of

Quarry Lease for Road Metal and Gravel over an extent of 21.999 Hectares in

Sy. Nos.408/P,409/P &410/P of Pinnapuram village, Panyam Mandai,

Kumool District. The Asst. Director of Mines & Geology, Banaganapalle has

submitted proposals duly recommending for grant of quarry lease for Road

Metal and Gravel over an extent of 21.999 Hectares in Sy. Nos.408/P,409/P

&41 0/P of Pinnapuram village, Pan yam Mandai, Kumool District for a period

of 10 years.

The Deputy Director of Mines & Geology after careful

examination of the proposals of the Asst. Director of Mines & Geology,

Kumool has proposed to grant Quarry Lease for Road Metal & Gravel over an

extent of 21.999 Hectares in Sy. Nos.408/P,409/P &410/P of Pinnapuram

village, Panyam Mandai, Kumool District in favour of M/s JRC KCVR

Projects , Partner: KCVR Infra Projects Pvt Ltd,Rep.by Director:Sri

K.V.Jagan Mob~.ry •. 8~9o<\xevide Notice No.1132/QL/2016,Dated :05-07-2016 up to Tbis M.n..ug .- ::.~:-: ?.S Apfil'M·.u st.uJ ·,c - ~ ed Conrlitlcns/SopJh?iilm 1'H':t1'.trl m tile ~o ~ 0 ~ t l OV

PI A. . ., l ' .• -.. iT No. d.·::\ ::2-.~ •• u"'\ -- f P. RAJA BABU 5 an •1-· ' 1

• · ... • of Mines&;

()ated •• .. • - ~-- ~(7 ~URNOOL,

Page 8: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

/

;/.;;,_· ··~ . .:.. . ~ . . -.. ~ .. \'-.;·} ~. j ( -: ' I '· ·· i · · . - · \tl t :::,.,' . \

!?:< ~-{ -> ,;::-... ·.:/::)\! 1 F'}~_sJ \ • • 1 · ·I ' · ·· _/ 'fr' ' . '/, 1 f 1 ,..,/t

04-07-2026 (Annexure'lflt.,dir.~dbjg ~ ·thf, c;lpP/ic~ht to submit the Approved

Mining Plan under Rul~\~},(A;j:j~~\:~~it-Jlules, 1966 and to obtain the • :..~~~ _; .. ,,_:· .. ~ ··~ \ ' .... ~r

Environmental Clearance from .... M0EF-;' CFE from APPCB under EIA

Notification S.O. 1533, dated: 14-09-2006 within a period of six months.

In this connection it is submitted that as envisaged in the Environment

Impact Assessment (EIA Notification, 141h September, 2006, the mining

projects with lease area of 5Ha and above irrespective of the mineral ( major or

minor) to obtain prior environment clearance under the provisions thereof.

Further all Category A and Category B 1 projects shall under take public

consultation in accordance to EIA Notification, 2006. Further the Government

of India, Ministry of Environment & Forest vide office memorandum No. L-

11011147/2011- IA.II(M), Dated: l81h May, 2012 in order to ensure compliance

of the Honourable Supreme Court Dated:27.02.2012 in I.A.12-13 of 2011 in

SLP( C ) No. 19628-19629 of 2009, instruction were issued that all the mining

projects of minor minerals including their renewal, irrespective of the size of

the lease would hence forth require prior environment clearance.

The Government of India vide Notification No. 141 (E), Dt: 15.01.2016

notified guidelines for construction of District Level Environment Impact

Assessment Authorities and other guidelines for issue of Environmental

clearances for minor mineral leases for an extent of less than 5.00 hec. etc.,

accordingly, mining plan become a prerequisite for obtaining Environmental

clearance. Hence a Provision to the effect that quarry operations for minor

minerals shall be conducted in accordance with the approved mining plan has

to be incorporated by the State Government vide G .. O.MS. No. 56, Inds.&

Comm. (M.II) Department, Dated:30.04.20 16.

M/s JRC KCVR Projects, Partner: KCVR Infra Projects Pvt

Ltd,Rep.by Director:Sri K.V.Jagan Mohan Reddy approached.P.Veeran

Goud, Consultant Geologist &RQP to prepare the Mining Plan following the

6

Page 9: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

-.. ~ ... ~ ... ..... ··-::: -· ... ..

1.1 M/s JRC KCVR Projects ,

Partner: KCVR Infra Projects Pvt Ltd,

Name and Address of the applicant Rep.by Director:Sri K.V.Jagan Mohan

Reddy,

H.No:10-96, B.C. Gureddy Complex,

Near Old Bus stand,

Banaganapalli Village & Mandai,

Kurnool Dist.

1.2 Status of the Applicant (Individual/

Private Company I Firm) Limited Company

1.3 Mineral (s) which are included in the ROAD METAL & GRAVEL

Letter of Intent

1.4 Name and Details of person employed P. Veeran Goud, M.Sc., ifor preparing Mining Plan

R.Q.P. RQP/DMG/HYD/060/2002

D.No.4-1308

Kalyandurg Road

Ananatapur. (A.P.) 515004.

1.5 E-Mail & Website Email : pvgrocks @gmail.com

1.6 RQP Registration No. & Validity RQP/DMG/HYD/060/2002

30-06-2022

1.1 Topography

The Lease area exhibits hilly terrain to a height of about 8.0mts, raising in the Eastern side elevated with 3-5M difference of Low to High Level.

7

Page 10: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

. /~~p:::: .. ~·;x~~t·~,l~f~~l,, Topographical Survey ~ ~·y~:n t ?: ''~i: : '··.;.:·.;:~; ~ n .i ·:b

l.:. .! <1·-M- i_ -. :\V.~:. -._. ·;, ... ~-:- c ~.: i ~ ~..- j .. -"'-; ,

The baseline is consider~tr.f.t<;ui\.th~;tGP~f~.iditl~i;f;{ co-relation with , \.- . "'. ' I • ' ' -, ":./" ' .:.· ........ I

Toposheet contours, coverirt~· the. totatarea· ... -\-\-}" -.... ... , .... .. ; .... ' _:. . ~ :/:r"":_ .. ·~~" ... ) .. ·

The geo co-ordinates were fixea·.us.Pl_g:_~e:J1 channel handheld GPS, GARMIN make.

II . LOCATION AND ACCESSIBILITY

l.Toposheet No. with latitude and longitude of all corner boundary

pillars: The Quarry lease area falls on SOl Toposheet No. 57 l/2 the Geo Co­

ordinates of the boundary pillars are tabulated below:

Table : GPS READING OF BOUNDARY POINTS

GCP LATITUDE LONGITUDE I 15° 35' 16.8"N 78° 11 ' 17.2"E J 15° 35'20.2"N 78° 11 ' 18.7"E K 15° 35'38.2"N 78° 11 ' 20.6"E L 15° 35 '38.7"N 78° 11 ' 30.4"E M 15° 35 '36.2"N 78° 11 ' 40.4"E N 15° 35 '39.6"N 78° 11 ' 22.8"E 0 15° 35 ' 36.8"N 78° 11' 20.6"E p I 5° 35 '28.6"N 78° 11 ' 18.3"E Q 15°35'26.S"N 78° 11' 20.8"E R 15° 35'26.2"N 78° 11 ' 18.0"E s 1 5° 3 5' 1 9 .1 "N 78° 11 ' 18.1 "E T 15° 35 ' 19.4"N 78° 11 ' 18.3"E u 15° 35 ' 18.9"N 78° 11' 17.8"E v 15° 35 ' 18.4"N 78° 11 ' 17.S"E w 15° 35 ' 18.6"N 78° 11 ' 17.8"E X l5°35' 17.9"N 78° 11 ' 17. l"E y 15°35 ' 17.8"N 78° 11 ' 16.9"E z 15° 35 ' 1 5.9"N 7 8° 1 1 ' 1 5. 7"E

8

Page 11: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

*Map Datum : WGS-84 )~aP.uBiiB~v._Ul~g~.W.W?-~ Mandai Kumool(Dt) . • • '" • ' ., ·-- ·''·-"'} 1. ~ Jr-.. . :{\~· ...... ;~\~·:,'~~~:~:~'c .. _., I ; t_J

State& Mandai Villa~~\ .. ,. \sv~~-N:ch.~'

~I::i'~Iff2 00 Whether the area is in Land

District ·- ~~ · .. .... ~~:~:\: -~~-::, r forest I Non-forest, Use

~ .: J' ,-' ,..y )I I

Ownership I Patter ...... t:t~~ts • ~- Occupancy n

·---~::::.':.:!;~=----

A.P., 21.999 Waste Kurnool Pan yam Pinnapuram

~08/P ,409/P Government land

&410/P land

2. Attach a general location map showing area and access routes: The QL applied area is located at a distance of 34.0 kms

from the District Headquarter town of Kumool . The applied area can be approached after traveling 31 .0 kms from Kumool on Nandyal NH Road

via Nanuur and Vorvakal and a East diversion will be taken and a metel road of 3.0 Kms leads to the applied Q.L area. The applied is 1.4 Kms North-East

of Somayajulapuram Village. The applied area has got good accessibility as the Kalvabugga to Nandyal NH Road road is about 3.0 kms to the Q.L.

recommended area.

Power connections are available near to quarry site. The company will

draw power lines from the village. Telecommunication facility is available

at Somayajulapuram which is at a distance of about 1.4 kms and all networks

can function in the site area. The nearest railway station is at Panyam which

is about 18.0 kms. Nearest Port facilities are at Chennai, Krishnapatnam,

Mangalore and Tuticoreine. The processing of the raw blocks unite is under

construction near the mine site. High school is present in the village

Somayajulapuram.Degree level Educational facility is available at

Bethamcherla which is 20.0 kms. and Hospital facility is available at

Orvakal which is 8.0 kms from the quarry.

The Mandai Headquarter Panyam is about 18.0 Kms from the QL

applied area. The State capital, Amaravathi is about 610 Kms.

III DETAILS OF APPROVED MINING PLAN I SCHEME OF MINING IF

ANY

This is the first Mining plan being submitted.

9

Page 12: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

' -

' ~,;0?:~?:::;:·~~~~;-,;~;f~~ :I'~'- · ' '' ;PAR.t··:_';·;A ., ~ .. -.. , ... I\ ::)_;',.,.- \ . . ·., <.: \>: .. ,i) .~j~l

1. General details of the-:Applied a rei:,.( / /.':;/ ·v· · · --.. - · · . · -~- : .. ... ·'""' :·r/

The subject area covers the, .. j)al} of die Pe9~ihent comprising negligible soil - . ·- •• . • · - • • ' "~· ~ .,.J • ·:.. • '

cover along the depressions of the she~t-'rock exposed over the subject area.

The proposed quarry lease area is elevated on Northern side and it is sloping

towards South . It is having maximum relief of 8 m from the base. The

drainage pattern is dendritic to sub- dendritic. The applied area belongs to

rocky terrain it does not have much vegetation. The climate is tropical with

temperatures ranging from 26 oc to 43 °C in the summer and 19 oc to 28 oc in the winter. The average annual rainfall is about 550 mm.

2. GEOLOGY AND EXPLORATION:

a) Regional Geology:

Rocks of Archaean,Proterozoic,Jurassic-Cretaceous and Tertiary­

Quaternary ages are exposed in the district The oldest rocks in the area

belong to migmatite complex,represented by migmatised quartzo­

felspathic gneiss and are exposed in the district.Regionally the area

represents part of the Archaean Granite Greenstone terrain of the

Dharwar Craton. It has Schistose rocks of Greenstone belts. These are

referred to as Archaean Greenstone belts. This has been included by the

rocks of Peninsular Gneissic Complex (PGC) which has Gneisses,

Migamatite and Migmatized granite suit of rocks. Gneissesand

Migamatites include Porphyroblastic hornblende gneiss,Hornblende

BiotiteNeiss,Nebulitic to Homophenus Hornblende Gneiss, pink and

green Migamatitic Gneiss Closepet Granite and its equivalents, namely

black granites Porphyritic alkali feldspar granite and Granodiorite,

belong to the Proterozoic age have intruded the above setup.The

Greenstone belts, Gneisses, Migamatites and younger Granitoids are

intruded by the mafic dyke swanns.

10

Page 13: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

b)

Younger Intrusive

Archean

Peninsular gneissic complex

Dharwar Super Group

c) Local Geology:

Veins of alkali feldspar

Dolerite/Basalt/Gabbro Dykes

Biotite Granite

Homblend granite

Biotite granite gneiss

Homblend granite gneiss

Porphyritic homblend granite

Amphibolite,

schist

Homblend

The subject area is Granite belonging to Archaean age. The outcrop

exhibits multiple sets of joints both closely spaced and widely spaced as such

it is most suitable for quarrying Road metal and Gravel (Plate-3).

d) Details of the Prospecting License Holder: N.A.

e) Details of the Prospecting carried out:

The subject area is demarcated on the ground with reference to Revenue

Pillars. Later the topographical survey of the area was carried out. The ABM

(BP-D) is connected to Grid ofN 15° 35' 15.9" & E 78° 11' 15.7" located on

the SW of the QL applied area~ Based on topographical survey and geological

features, collected from the surface data, the surface geological plan is

prepared on 1 :2000 scale with 2.0 m contour interval and enclosed as Plate -3.

11

Page 14: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

;-- : ' •' ~-. '<'' '\ .~~~. ·' ;'' . . ...... ~- · ...... : ~ ... "'- ''\ ~~· .. \ ,_ - I , .f J':',A , ., ~ '-• \~

'}_ ..... .. ~· ':·-'.· ·' ·.· .. \:···: 1'~-;:-\ "":·/•,-:, \ ' · I: · . ; · · · . · .. j ; \ ~ ·: I \ I·

'·. ' : i . . ,. ·: · , . 1 ·.'1" i \,,' l

f) Surface Pl~n are~: : ~~· t:~OOO. ~:~~l~~~rface cum G~ological Plan

and Cross SectiOns of the QL JS·pr~p~re.~.:,~~~hooo scale and ts enclosed as '• . '· .·· .. '•/ Plates-3 & 4. ·' · · ... ·. ··.> .......

g) Geological plan is enclosed ~s Pfat~:.3. h) Geological cross sections have been shown on Plate-4.

i) Future Program of Exploration programme planned in next five

years:

As this Quarry Lease is being granted for Road Metal and Gravel for the

purpose to use as raw material to company own Crusher,

j) Reserves and Resources as per UNFC :

(i) Type of Deposit as per UNFC Guidelines

Road metal and Gravel is not failing in any category of UNFC classification.

It is localized mineral available anywhere utilized for construction purpose

such as laying roads, construction of buildings etc., depending upon the

characteristics of the rock. Granites, dolerites etc which are highly disturbed

and dolomites, quartzite etc., which are not useful for any other their specific

purpose of their characteristics in specified area useful for construction as

road metal and Gravel as locally.

ii) Parameter- Grade, Threshold value, Sectional Area and Bulk

Density:

As the ROM is intended for use in the Road metal and Gravel no specific

parameters were considered. The bulk density of 2.5 is adopted for

estimating the reserves.

The sectional area was considered and assumed thickness of sheet rock 49 m on either side of the leased area. The Bulk Density was considered at 2.5.

12

Page 15: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

1

i/~tt:!-L~;~i~:~~~J~\ iii) Status of exploratkn•:··Gl ~. '.: ··.; .. .:.:-,: .. ·x .. ::~-n.: . •-;;.._\

;: ... :.,. ~ l ~ ; . i : .. · . ~: ·t\· ... r~-~: T ! \ ... ..: } ) . { / 1. 4

... ~ '· ~ -~ ... . · ! : ·~-·-,., : ! •. . : - .. l GEOLOGICAL ~IS.;'' \·>::.':·{·,-\·.;;·.::_,:-'; I LV~· \ ;j

. / ·. ~:.·: . -~ ·> ·.: _' ~::·~·.::':>·:: r\?;s) 1. Geological Survey: ··-,:··:·_·-::::· · '.· ... .- .· ' .·</

•, :. ,:~·. ;~· .:, .. ::~-,- .~ ... -·:.:_-->;' .. <:~::,-i / The topographical cum Geg~qgi:?iiJ~ma'p including all surface Geological

features, extent of deposit, structures, have been prepared on 1 :2,000 scale

duly marked with surface geological features, GCP's etc. (Plate-3).

i) Topo grid I Triangulation stations: The topo grid with Geological

cross sections has been prepared on prescribed scale showing litho-units.

Relevant plans are enclosed as Plate-3.

2. Geo-Chemical Survey: Geo Chemical survey IS not warranted. The suitability for aggregates was tested.

3. Geophysical survey: Not carried out.

4. Technological survey:

• Detailed topographical and geological survey was carried out on 1:2,000

scale showing all the surface features, contours at 2.0 m interval, the lease

boundary, surface Geology & Structural features.

• The entire thickness of Road metal & Boulding stone found to be more than

50m which was correlated from the bore hole inventory data in the adjacent

lands.

• Reserves are estimated by cross section method .

• FEASIBILITY AXIS:

1. Geology:

The Geology has been ·detailed in Part-A, Para-2 which may kindly be referred

to.

2. Mining:

Road Metal and Gravel will be exploited through opencast other than fully

mechanized mining methods with drilling & Blasting. ROM will be directly

consumed by the applicant for the crushing plant and intended for the highways

13

Page 16: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

:fi:,.,,:-· e'f ·:"!\> \''fS: Project. The applicant ha~s al~ea.dy :e~gblishe9!·tb,:e crusher and hot mix plant

~· - .. ,... ·): -.. . · ... ~.~ - :,. ... ~ · _,-:~ ."'~ ,:

adjacent to the proposed quarry:Je~~- are~>:-.:--~:,/:- ; :-: · ~-· .. ·: -.. : .. ,~: :> < -·,/:~---''

3. Environment: -----:: __ · · · · ·

The deposit will be mined adopting conventional opencast semimechanized

mining methods without any adverse environmental impact. The applicant will

obtain statutory clearances as soon as this Mining Plan is approved. Mining in

the leasehold does not disturb any human settlements as they are far away from

the lease area. On the other hand the mining operations will create livelihood to

the villagers nearby. The Applicant will develop green belt around the ML area

as part of his commitment to environment protection.

4. Processing:

After blasting the ROM will be fed directly on to the crusher for crushing in to

desired sizes of aggregates. The crusher is not established in the quarry lease

area.

Mining operations will be carried out by deploying the following

machinery:

s.no Type of Macbnie Dia of bole Sixe/ Make Nos (inches) Capacity Motive power

1 Excavator 3 ----- 1.2cu m L&T Diesel 2 Tippers 5 - 17 tons Diesel

3 Drilling Machine 3 2" Diesel

Tractor 4 Mounterd 5 2" Diesel

Compressors

5 Water Tankers 3

6 Loaders 3 3cu m

H.P

200 60

2

5. Infrastructure: The entire necessary infrastructure such as office, rest

shelter, magazine, explosive van, water tankers, power connection etc., will

14

Page 17: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

I"'

"I

-... I

~f;{t~~tf':::.rfr1f~),~) be provided once the mini~g -~p:hiq ·:.fs· . ~:appt{?...*¢9/,\Jhe QL applied area 1s

·v ··~~~ - --. ..... -. t :-J

connected with roads to the Ma;;>&X1il\~rDifuft).-Wdquarters . ·,. --~~[t~_t·f ·~-\~:.f:::~)~~~-;., .

6. Costing: The cost of productioii' 'Oftt-oa(f'Metal & Gravel works out to be

Rs. 250/- per ton.

7. Marketing: Road Metal and Gravel is not intended for outside sale. It is

for captive purpose for the crusher and Hot mix plant intended to put for

use in the Highways road project.

8. Economic Viability: As the proposed quarry lease is in the near vicinity

and captive use it is surely economic and viable.

9. Other factors: Relevant clearances shall be obtained for continuing the

mining operations in the QL applied area. ECONOMIC AXIS:

1) Detailed exploration:

Detailed topographic survey and geological mapping the applied QL area

was subjected to detailed exploration by field traverses and well inventory

data. The depth of sheet rock is assessed by the litho log observed in the

boreholes of agricultural lands. Two representative composite samples so

obtained were analyzed in the Laboratory at site.

2) Mining Reports/Mining Plan

This is the first Mining plan being submitted.

3) Specific end-use grades of reserves (above economic cutoff grade)

ROM is intended for crushing to use in the aggregates for roads.

U) Feasibility Report along with financial analysis per economic

viability of the deposit: The cost of production of road metal and Gravel is

arrived at Rs 250/- per ton inclusive of taxes and royalty. The entire ROM

is for only captive purpose as such it is surely economic and profit oriented.

(k) RESERVES

(i) Mode of Mining, recovery Factor, Mining Losses, Processing Losses

etc., Road Metal and Boulder stone will be mining by open cast other than

fully mechanized method with drilling and blasting. The recovery factor is

15

Page 18: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

-;: ~ ··".:"!' :.: .. · .. .. ;t--~, ....... · · ··..-: •. ~. : .: . .• ·• •. ~. ~ c..r-· . ' ~ ,._- , • ......_ l . .... ~~., / •

l ".e ... ... ~' .. ,4· • .. ....... .,. .. • •• ' 1':';~ ; .... . - \

~ • ~ • . ....... . / . ...... ,. .. . • ... -· • 1 ~;., I ~ ll~ ;_ '/·~.::-/ :- :0:~~~ -:·,{ ·:>.~:-~~{ f~, \'~· .:_:J·,. ·:;·: .. \

considered as 90% witk~i:~.d i~i~~~;i'~'iir~i~i~J~~l~ fractures. There will not 0° { I · . ~ I -•- ' • . ,I 0 ' , .. (

be any mining losses ex~~~~,i~g· h.~h·d.liiig)O'S~~~6{ch will be again recovered l .: '.: ~ ~· -·: ~--..... , •. • ~ ....... ~ ,·, ,_, . .

during further loading. : . ... ~~'< . .'~ . ~ . :.:'· ··:::. ;t . -• • :) .... _ •• . I'

(ii) Cut off grade and Ultinia'te:· P~t ~epth£ There is no cut off grade as the

ROM will be put to use for road metal as aggregates.

(iii) Mineral blocked due to the presence of I maintenance of benches,

barriers, internal roads, electrical lines etc,: The mineral will be blocked in

7 .5m safety barrier zone, Roads, Benches which is computed separately and

tabulated in the succeeding paragraphs.

(iv) Total Mineral reserves:

The reserves are estimated basing field traverses and the litho log of the well

inventory in the adjacent agricultural fields and cross sections drawn on the

ore body. The area of the influence and the cross sections were taken at 40 m

on an_average i.e. 40 m on either side of the Cross section. The occurrence of

the Granitoid gneiss is more than 50.0 m BGL. Based on the field traverses

and correlated data from the boreholes in the adjacent agricultural lands to a

depth of90.0m, the estimated reserves are considered as Proved reserves. The

cross sections A-A',B-B',&C-C' are considered for computation of reserves.

The present area which is explored is considered for computation of reserves

under G-1 category.

Section UNFC Sectional Influen Volume Recoverable Intercalated CODE ce Reserves(90 Waste&

(m) %) M3 Voids( 10%) M3

Area(m 2)

(m3)

A-A' G1 15920 227 3613840 3252456 361384

B-B' G1 15680 152 2383360 2145024 238336

C-C' Gl 15520 227 3523040 3170736 352304

TOTAL 8568216 952024

16

Page 19: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

:~ '- • M . t I . ' . ~ i> • ~· • • • i .- • \ t ; ""'' l ·' 1 .· I •, ' . •1' '1\ 4 ' _,•. ·,, f ·. ,.,.\

~¥ ' ' ··'"·, " '' t• .:.f..h ~ i I • ~ · J" ' • .:. ; r -~ ~~ 1( : "~ \

=· .... ~- . . · .... • .• ~ ~ ~~ i ~ ...... ~ ::c:: . ' ' ' :· ' J ..... '

Geolological Recoverable':R.eserves .· · .··': '~;, /f.': .J:,;'} = 9520240 M3

. ·~- ' _,.... - .: . ,,:' ,;I .... . Reserves blocked in 7.5m ~uffer Zone re<Ju~t~~n'~ _:; = 8819740M3

. . .r }-~.

Reserves of after deducation of ~eiiciHiop·e,: _;.- = 8258990 M3

~. ' I ............

Net Reserves available @95% for Mining-· = 7433091 M3(18582728Tons)

Life of the Quarry = 7433091 m3/ 161698m\Avg)= 45.9or 46 Years

tentatively

J3~0..MINING-- ---····--------·--·-----

{i) OPEN CAST MINING METHOD (Mining Carried out) i) This is a fresh mine. The proposed mining will be carried out by opencast other than fully

mechanized mining method with drilling and blasting. The ROM will be sized

and sorted in the crusher established outside the quarry lease area and loaded

on to tippers and tractors using JCB. Mining will be carried out by formation

of benches of height of 6 mts each. The details and sections are depicted on

Plate-5 .

Dump Management: The Eastern side of the area is selected for dumpyard

for next five years and the waste will be stocked over an extent of 81 Om2as

enmarked in plate no.5 ..

Lay out of Mine Working, pits, roads, etc.

During this period, it is proposed to exploit to the tune of 808490m3 sealable

Granite to an average depth of 12m over the lease area from RL of 102 to 108

as shown on Plate 5.

There is no problem in the quality of Road Metal & Boulder Stone which

confirms to the specifications Aggregates.

The applicant proposes to carry out mining by opencast other than fully

mechanized method with drilling and blasting. The mineral will be sized and

sorted in crusher for desired size separation. Trucks I tippers will be deployed

for transportation.

17

Page 20: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

ID: f>;:1f;J?:')!.;~:;~:\ . ~ .'. . . . . , > •. '~·. ' • I .• .-! • •• f .. " I . ;' . : ;· ., ~~~. . 1: .. ·:·: ! ,~...,., ,: :...-.L.

Year wise.devolilptiien·t Plan'for Five years • .. ·.,.:·:: .... ·:- / -~ :_.~ ':.: .. ... :.,':.:..: .. _.~ .. l .. · i'~ : ( , i

First Year: The mining wii"l:~~.~0/~~~~1~~~wstern side side(Eastern Side

of pit-1) of the lease hold area leayjng:·liti~~r.-~ione with formation of benches .·. ''": - : ·;::::,_,...,-

of 6m height (Two benches one of 6m) covering an area of 15200 m2

excavating 179664m3 of rock mass from which 161698 m2 usable Road Metal

& Boulder Stone recovery. About 17966m3 comprising of intercalated waste

or interstitial voids is anticipated. The waste if at all generated will be used for

formation of roads and as safety barrier around the lease boundary.

Second Year: The mining will be continued towards Eastern side of the first

Year's working with two benches of height 6.0m and 6.0m over an area of

15200 m2 excavating 179664m3 of rock mass from which 161698 m2 usable

Road Metal & Boulder Stone recovery. About 17966m3comprising of

intercalated waste or interstitial voids is anticipated. The waste if at all

generated will be used for formation of roads and as safety barrier around the

lease boundary.

Third Year: The mining will be continued towards Eastern side of the second

Year's working with two benches of 6.0m and 6.0m height over an area of

15200 m2 excavating 179664m3 of rock mass from which 161698 m2 usable

Road Metal & Boulder Stone recovery. About 17966 m3 comprising of

intercalated waste or interstitial voids is anticipated. The waste if at all

generated will be used for fonnation of roads and as safety barrier around the

lease boundary.

Fourth Year: The mining will be continued towards Southern side of the

First Year's working with two benchs of height 6.0m over an area of 15200

m2 excavating 179664m3 of rock mass from which 161698 m2 usable Road

Metal & Boulder Stone recovery. About 17966m3 comprising of intercalated

waste or interstitial voids is anticipated. The waste if at all generated will be

used for formation of roads and as safety barrier around the lease boundary.

Fifth Year: The mining will be continued towards Northern side of the 1 5',2nd

18

Page 21: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

~t (. • ~ - ~~· .... ( .,...... .... • • ~ ... --.llf r "··. '- • ,.»·.·•, fl ,.,, 1'""- \' ' \

tlt-;/t_ .~ ... , ~~" /-~-.~ .. ~~~-.r ·~ ~~ - :;;:Jl~ .. :._ ·, .... ;~-_, , ... , ; ·, . 1 : •. •,·,·:.:l !'f'.:flt ·,. J'I' ' :) ~ .. \ ~f''' · , 'I· :• _' ·';'I ,."'.• ; ' ,/- ,,· • ., .:. . • ,t-1, ... ,...,. ............ , ... . :-~ • .• , ", ·-;:. '<'.<· ·-: . ... 1;(· ' I"''{ I

and 3rd Year working wiili\~B~beb~he:S~~~jg-~t;·bf6.,0m over an area of 15200 .. ... ~.-~· \ . ,,_,. .. _ . .. . ....... I" t .!.·· ·-.1·

m2

excavating 179664m3 :~~-~~1~~-~~~~~R{£~§~~-h 161698 m

2 usable Road

Metal & Boulder Stone recoveiy_~--~~~it.·w~3,66in3 comprising of intercalated . . -·

waste is anticipated. The waste if at all generated will be used for formation

of roads and as safety barrier around the lease boundary

The year wise development is tabulated in the following table:

Bench Volume Production m3

Year Working Areas m2

height m3 R.F. Granite Waste

200x 76 = 15200 6m 91200 0.90 82080 9120 1st year

194x 76 = 14744 6m 88464 0.90 79618 8846 2017-18

179664 161698 17966

200x 76 = 15200 6m 91200 0.90 82080 9120

2"d year 194x 76 = 14744 6m 88464 0.90 79618 8846

2018-19 179664 161698 17966

200x 76 = 15200 6m 91200 0.90 82080 9120 3'd year

194x 76 = 14744 6m 88464 0.90 79618 8846 2019-20

179664 161698 17966

200x 76 = 15200 6m 91200 0.90 82080 9120 4th year

194x 76 = 14744 6m 88464 0.90 79618 8846 2020-21

179664 161698 17966

200x 76 = 15200 6m 91200 0.90 82080 9120 5th year

194x 76 = 14744 6m 88464 0.90 79618 8846 2021-22

179664 161698 17966

Grand Total = 808490 89830

224575

2021225 Tons Tons

19

Page 22: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

, 1

,/!:'1' ••. ' --"" :. ·,.. -. ,····~ .... · :"..,_\

(:~{~(~ ~~·~::.~;;~-$.~:-:;;~l;·~k~::~;~~§i~, ~ ~ . 't·.: . : ,J;., :It.l J !., .·,;~·:. ·.~_..:,~t.'t-.:.~ if"1l~

Year Wise tentative exca\{ati~~;·~,n. :~06i·~·.:~·~:~ej~~~~j~tinq Pit Wise ore to 08 ratio

bv formina benches of 6.0'{m-eaich .. Tf:lave'cir. .. wfs~~ails are tabulated below: ...... .... . ,,..1..?1 \.... . .. tl . .. ..... ......... .. ,..~ ...... , "!'..,'..,."' too\<''·! . . ............. \ ~

'· ~, ·. • ... 1 . ,• . -::/'' ..

··:., / · .'· .:~ :: .. '~: ....... ~·?~~~-~;~-·

Total ·--...:.....:-.:. .. __ -:· - ::-: _-.... ~ ROM

tentative Top ROM From Mineralized Zone( Cum) Waste

Year Pit. No excavation Soil(Cu OB/SB/1 Ratio

(cum) m) B (Cum) Clean Sub Voids/Min era!

ore( Cum) grade( cum) Reject( cum)

179664 Niii 82080 Niii 9120 9:1 Niii -

First 79618 8846 9:1

179664 82080 9120 - Niii

Niii Niii 9 :1 -

Second 79618 8846 9:1

179664 Nill

82080 9120

Niii Niii I 9:1 -

Third 79618 8846 9:1

179664 82080 9120 Niii

Niii Niii 19: 1 -

Fourth 79618 8846 9:1

179664 Nill

82080 9120

Niii Nil! 9:1 -

Fifth 79618 8846 9:1

898320 9:1 Total 868490 89830

20

Page 23: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

. ,

. . J}t:;~f;;;·1j~::; ;,;;~~~;~\ l.l Drdlmg and Blasti~ii;·~_,-; ,_;-_: ~j:_ .. ~·. ~-~ .:?.:-?~~ ;.:-.1 ttl

~-/. -• '' t •,:r .. • .. ·, .• :J._-,f'(oj '~~,;~·;; ·•> :; . ·~.:1J~-\ ··.~··1~·:··~~ .. ~~··:~.~;' I~ ··:;.~:·;t6~·,\. '.:.·-:.,.:r:~;:/ ~ftl. 1

Drilling and blasting p{*¥,!~~~~~-~~)\.~:~-~!~ for ext~action Rom o~ Road

metal and Gravel. The pt11~·ary Qfi}}t~ts done w1th Crawler dnlls of , .. _ -:..:.;:: • ...: .•• ~.;: • •• .F

4.5"diameter and secondary drilling 1s done with jackhammers and

compressor. The compressor attached to the wagon drill has 450CFM

capacity and compressor attached to jacks can cater needs of 2 jackhammers.

Tippers are of 20 T capacity will be utilized for transportation from the leased

area to crusher.

Broad parameters of blasting:

H =Height of bench= 10m L = Length of drill hole= 11 m B =Burden= 3.0

m S = Spacing = 3.5 m D = Diameter of the blast hole = 100 mm VR = VoL,

of broken Rock = B * S * L = 3.5 * 3 * 10 = 105 m3 Volume of rock

generated from one hole = 105 x 2.5 sg = 262.5 T

After blasting the rock, the excavator is used for loading rocks. The oversize

boulders are dealt with secondary blasting. The material thus transported is

fed to 250 TPH capacity crushing plant. The products are stored separately

from where they are dispatched to customers.

Explosive Consumption :

Taking on powder factor basis, with a PF of 4 total explosive needed per year

is 10,00,000/4 = 250 Tons.

Explosive used :

The proponent has pennission to use ANFO and also got pennission under

MMR 106 (2(b)) for deep hole drilling and blasting. The explosives that are

used in the quarry are ANFO, cartridge slurries for booster, Pentolite boosters

and other blasting accessories.

Storage of Explosive/ Ammonium Nitrate:

The client has an approved explosive magazine 2 in numbers each of capacity

4.5 tons. Thus each magazine has filling pennission for 10 times per month

21

Page 24: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

.r"\

.......

""" r.

........

""'\

""''

(:." l . ~ ·~>} , • " . . .j l ~~' i •. } t ~ , • ,.~....... ..~J. .._ ;. ; ' .. ·' .. ..,.. ' · .... ~, :

.:,, · .. :. ·~· ~ ~f. ~/ ·~, ... ~~ ~<:.. ...... ! ... ) i

·: ·~. \~t>-~··.:.· .. :;~ .L·:_ .. /(~>~~~.:::./ i.e. 90 tons the magazines· :;e:~ .. ~.:~.ater)ttj_e/~eed of explosive storage

,:;. : .· · .'c'"::r;·t-r;_ ~ (···.{ ~-:-~ requirement. Ammonium Nitrate storage~liceifse of 100 tons at time and twice

in a month i.e., 200 tons of Ammonium Nitrate can be used in a month The

client has also obtained permission for ANFO mixing shed, where the ANFO

is mixed.

Manpower Requirement :

A total of 4 7 persons shall be engaged to carry out the various operations at

the QL applied area. The man power required for the mining operations

shall be as per Table given below.

Cate o Number

First class, Second class managers, and foreman 1

Su ervtsors 2

Crushing operation 6

Compressor operators 6

Deployment of Machinery

The mining machinery and equipment proposed to be deployed in the mine

for different mining operations during the Scheme period are described in the

table below:

22

Page 25: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

l '· .. ; .. r'" .? · . ' "~ i J ..... 1( \~

Purpose ,! ·t ··. ~ (-'--~ :- /f..,v lc:%iipacity & Nos Make , .. -ype-Q . . . / ··:·· ., _,. . ,, . ' '.-.r: .:~/ ) j, ,

.. M.~chinerY. .·-;> ·')·~~· I ...

~ ... ~ ' . . ~ _•'

Crawler 1iiill4.5" IOOmm dia Atlascapco/ cp !.Breaking 450cfm/3nos

Loader/Excavator 3no. 2.Loading

Tippers 25-tonner, 5nos 2.Haulage

Tractor type 2no 4. Water tanker

a) Conceptual Mine Planning: The worked out pit will occupy an area of

76000 m2 or 7.6000Hectares to a depth of 12 m reaching 108m (FRL) at the

Western portion of the quarry lease area. The area occupied by internal roads

would be 0.095 Hectares, while plantation will be occupying an area of

0.1875Hectares on the Southern side of the applied QL Area. The Conceptual

plan with Sections is enclosed as Plates 6.

(b) UNDERGROUND MINING: NOT APPLICABLE

4.0 MINE DRAINAGE

a) The QL applied area is over an elevated mound to a height of 8.0m

above ground level. Rain water constitutes the drainage system of the area.

Nonnal course of drainage is a sheet wash over lower reaches and flows

through the seasonal nala located on south of applied QL Area. Groundwater

level is observed to be ranging in depth from 55-60 m bgl in the nearby

agricultural fields.

b) The maximum height of the working level is 40 m while the minimum

level of working would be 12 m.

c) Quantity and Quality of Water: The quality and quantity of water cannot

be estimated as the mine workings are at much higher levels of the

23

Page 26: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

,~ L- /;i::::·: - ::t:-:~,·:~; 2~~1 groundwater table. Howevir/'~h~;-.~~t~r.,~i~:t~si~<(\idfje nearby agricultural field

\(" :\ ~ .. ~,; .. .: . ·,: '"' -:~~.:.·· / '..,;.:,: ;:· ...... ) 1

and the quality of water is f'ound;~tc>:·be,:po"tati1e'?../1/7 • ./ \\, • 4 ' ·.,,:, ' -_ , • _" I~'. :. . • "' ... ~Jo"~,\~."'-;~~

d) The entire applied QL area :k.qy~r -~: ~\6Jiii!Jfierrain and only sheet wash is ~. ;-~· ... :!'. !..!.~ .. ':'1:~ .. :;~ ... r~·

anticipated during monsoon in the applied QL area. Regional drainage pattern

is observed to be dendritic to sub-dendritic in nature.

5.0 STACKING OF MINERAL REJECTS, SUB-GRADE & DISPOSAL OF WASTE

There is no mineral reject or sub-grade mineral in this quarry. However, about

10% interstitial voids and intercalated waste is anticipated which is computed

separately. This will be utilized for the formation of internal roads and balance

utilized to form a barrier all along the 7.5m buffer zone of the QL applied area

to a height of 1 O.Om.

""" 6.0 USE OF MINERAL & MINERAL REJECTS

'""' The ROM will be fed in to the crusher established outside the applied QL area

where it will be crushed to desired sizes and utilized for the State Highway

projects. Entire ROM is intended for captive consumption.

7.0 PROCESSING OF ROM & MINERAL REJECTS

In this area ROM will be sized and sorted in crusher for road metal and input

to hot mix plant. There is no Mineral Reject from this Quarry.

8.0 OTHERS

a) SITE SERVICES: Site services such as office Room cum First Aid,

Separate Shelter and toilets for Gents & Ladies will be provided at the applied

QL area.

24

Page 27: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

' J, 4 o •' .. \\- .. :\ .. ,- ;".t.r.. , ·.:: t. :~· .. • • : .:.

!' ~~)i ,, ' :t. (/ ;-..,~ .. . ,_.., .Jf'"" ~.rr'·~~-r;;·~~~· [;toiSTAN s. VILLAGE -:~ ;}'. '·{ · Dfr.~~~~t ;. POPULATI , ....... :' , ·,,.~, ! 1..- '.. • !."--"\'

No. "·: t -· ... :·r-a-00"-1"!'-'- ''I': ).. ;..~ ON i~ r ., j •-, : ~ ~-". : ;-~,J~;# CE ·-... ·:...~~-~! . -

1 Somayajulapuram South-West 1.4 950

2 Gudembai Tanda North- East 1.6 800

3 Husainapuram North-West 4.6 900

4 Chinnam Chettipalli South-West 2.6 840

C) Public buildings, places of Workship and Monuments: No buildings or

places and Monuments are witnessed in the applied QL Area.

d) Indicate any Sanctuary is located in the vicinity of the leasehold :

No Sanctuary, ceo-sensitive areas etc. are located in the vicinity of the

leasehold.

2. ENVIRONMENTAL IMP ACT ASSESSMENT:

a) Land Area Degraded : An area of about 76000 m2 will be degraded for the

working pit; and Roads .095 m2 •

b) Air Quality: Road metal & Gravel mining do to some extent generates dust

during drilling and blasting. This would be minimized by usage of moist clay,

sprinkling of water at blasting site and haulage roads. Masks, earplugs and safety

goggles will be provided to the workmen at mine to avoid the negative impacts of

dust arising.

c) Water Quality: The subject area is far from industries and as such water is not

polluted. The water drawn from bore wells will be supplied to workmen for

drinking

d) Noise Levels: The applied QL Area is quite far from the habitation area

situated. Noise is anticipated from drilling, blasting and movement of vehicles. As

the quantum of mining is on a small scale the noise generation would be well

within the limits. Therefore, the noise pollution is expected to be negligible in the

area. However, the applicant will take all precautions during drilling and blasting

by providing mufflers.

26

Page 28: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

f) Water Regime: Mining of road metal will be carried out on top portion of

the mound in the applied QL area to a depth of 45.0m and in a closed environment

limited to working pit. The mining activity proposed would not intersect water

table of the area. The water table is observed to be 48-58 m in the adjacent

boreholes of agricultural lands.

g) Acid Mine Drainage: Not applicable.

h) Surface subsidence: There will not be any surface subsidence as all the

benches and ramp ways will be thoroughly rolled for hard surface.

i) Socio Economics: Mining of road metal and Gravel will create some

employment opportunities to local villagers thereby generating income and

improvement in livelihood of local villagers and revenue to Government by way of

paying royalty. J) Historical Monuments: No Historical monuments are located near and

around the applied ML area.

(k) Bio-diversity: The slopes of the subject area consist of scattered bushes.

There is no report of existence of wild animals in this region.

3. Progressive Reclamation Plan: Mining activity will be carried out till the

completion of state highway project and the worked out pit will be protected

with barbed wire and the mined out pit will be used as storage water pit.

Hence, Progressive reclamation is not studied and will be planned in the first

scheme of mining.

4. Mined out Land: No mined out land will be fonned during this Plan

period as mineral is existing much below the proposed workings during this

plan period.

5. Top Soil Management: There is no top soil generation from the applied

Q L area as such management does not arise.

6. Tailing Dam Management: No tailing dam is required.

27

Page 29: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

-

>: .:.: .•. ,,.:i .. ; .- · ;:.•\:;,,\ \I..- · l , •.'. : 1 -:, , ,, : . ; ' •• f-'_, .~ f' f .;,," I

7. Disaster Managerpe~.i ;~~d . .J#~.~~:~~~,Cfl,~ent: In this area mining does

not involve disaster of'·{~h,ii;~~ct~~~-;~(e'~~dation of land. No flooding, •, ~·< . ~.~ .......... , ,~ ::~r..t.~~~·;~\ / . : :;"

subsidence, land slide occur'·in1::tb_e.;:~.~,gJ6If .The Mines Manager will take the

responsibility in the event of any unto ward incident.

In event of any emergency the Contact person is:

M/s JRC KCVR Projects ,

Partner: KCVR Infra Projects Pvt Ltd,

Rep.by Director:Sri K.V.Jagan Mohan Reddy,

H.No:1 0-96, B.C. Gureddy Complex,

Near Old Bus stand,

Banaganapalli Village & Mandai,

Kurnool Dist.

8.Care and Maintenance during temporary discontinuance: An emergency plan to deal with the situation of temporary discontinuance or

incomplete programme due to court order I due to statutory requirements or

any other unforeseen circumstance will be drawn by the technical and

managerial person to suit the specific situation of this mine. This would be

reviewed and modified to suit changing conditions and needs. This would take

care of preventing of access to dangerous places, pits and prevent accidental

fall in to the water logged pit of animals and men. Security is also to be looked

in to the safety measures placed at various places like firefighting equipment,

main switches etc. Security to be deployed at Explosive storage.

The mining is yet to commence. As mining continues till then the question of

discontinuance does not arise. However, any untoward incidence happens the

safety of the mining area will not be disturbed. Security I Watchmen will be

posted at the mine site for watch and ward.

Items Details Proposed Actual Remarks

Area afforested (Hect.)No. of About SOmts About SOmts Small

Dump Saplings planted cumulative length and length and dumping

28

Page 30: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

Management

.. -.~~·: .. . • . , .... f

number ~Jplants .\<.'~'/);·-' .. :).- Ji>~J~ i; l ~~z,smts width ( ,·.,:.>',.. v:,·,{'!_"l'r;./1..~-·~- ~ l'l

Cost incfud.llfi,-1:\ w .-. -.'iJ. ' ~-·1875Ha) of r; \ ,. j...... /- '

-# - ·. ~--~-~· f'. r J during the ye~r ' .•. /: ·: i··: ~ :\ ... ·~/\-~..f.:.J buffer zone on

. ·~ ·-·-=·- ....... • J., ... ·,__ . · : .-., · / '0· Eastern side.

~"-.... : ...... ~ .. .:,. ..... :.:....·-·~ Neem & Teak

plants will be

planted, per

year about 33

plants at 2

mts. Grid

7.5mts width area on

(0.1875Ha) of Eastern

buffer zone on side .

Eastern side.

Neem & Teak

plants will be

planted, per

year about 33

plants at 2

mts. Grid

interval. Cost of interval. Cost of

plantation,

watch and

care is

Rs.24000

Area available for rehabilitation About 33

Management (specify) No. of saplings planted in Saplings of

of work out the year

benches Cumulative number of Plants

Any other method of

rehabilitation ( Specify) cost

including watch and care during

the year.

Neem, Teak

will be planted

per year

Void available for back filling In rainy

Reclamation (LXBXD ) pit wise/slope wise seasons the

and Void filled by waste/ trailings seepage water

Rehabilitation Afforestation on the back filled from working

by b k pit is being ac area

pumped out to filling Rehabilitation by making water

Schemetation reservoir

of the lease Any other means (Specify) area.

plantation,

watch and

care is

Rs.24000

About 33

Saplings of

Neem, Teak

will be planted

per year

In rainy

seasons the

seepage water

from working

pit is being

pumped out to

Schemetation

of the lease

area.

No other

mineral is

being

worked

from the

benches.

proposals

are made

as the

worked out

pit will be

utilized as

water

harvesting

pit

29

Page 31: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

8. Financial Assura N.A

9. Afforestation: In ~'"""'K'L.I&l_,,~~~~r?J .•. f!l'l,.,"''· of buffer zone will be

··of the area. About 33 Saplings planted along the

consisting of N eem, T

at 3m grid interval. Year wise plantation area is shown in Plate No.5

10. Certificate :

Certified that the above mentioned points will be taken care in the Mining

Plan for Road Metal and Gravel over an extent of 21.999 Hectares in Sy.

Nos.408/P,409/P &410/P of Pinnapuram Village, Panyam Mandai, Kumool

District, Andhra Pradesh.

All statutory organizations, courts etc. have been taken into consideration

and wherever any specific permission is required the applicant will approach

the concerned authorities.

All the measures proposed in this Mining Plan will be implemented in a

time bound manner as proposed.

9.1 Plan, Section etc,

Plans and sections are submitted along with Mining Plan.

Date : 12-07-2017

Place :Kurnool.

Mlt!l var.J~ PROJECT~

For ~-...

~.v~ (" Authorised Signatory

(M/s JRC KCVR Projects , Partner: KCVR Infra Projects Pvt Ltd, Rep.by Director:Sri K.V.Jagan Mohan Reddy)

... lltis M m:n~ r:::m IS A:>proved sUJ• •• ConditJOr:s/SnpwaticlllSm~1,. M ... "' .

PlanApprova~ Letkr N~411.£;;~L\ \} Oatfd ...... . .;;:Q-;-~l :r

SIGNATURE OF RQP.

-P (P.VEERAN GOUD)

AppJOted

P. RAJA BAIIU Depary Director of Mines a C Sit,

KUilNOOL,

30

Page 32: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

t"')

v"""' \ .,......

~

~

PHOTO SHOWS THE SHEET ROCK OF APPLIED Q.L. AREA

32

Page 33: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

-

.,. . ~pri--:=::-... .. -7: ...... ,'d l._ \ ~f!'>o~. · .. . .... ~ .. ~.,_~ . •.;) { ~

·:~· ·· ,., ..... I'" .· .a,._..,, r ·f(.' .. ,•: .· . .. . . ,_~""", . ,,

:: ;::'.. :': ~ . .:;~: > :\:~\ : . ! . ; ·~. . . .. .. . . ,

'.. . ' .. ~-- <~--~ ~.)_:·:-; . ,:.·>~/ '-: .j,~ ~~;;l ~~~-f·"'"'~·':l . ······ ,.•!o]?J'/ttf •• ?Jl-11.~ 'r·

• - I • ,•t .... ~.· ,;.· • , _. 'lt-7·"' · GOVER,Nf1E;~;· .Of."ANJ?.., ..-.p, SH • r.

. DEPARTMEN'f.~.c;>F ,MlR~~ . . LOGY . PROCE.EDINGS OF THE ASST.DIR ECTQR OF_..MJ;tjES·~~b; Ol..OGY (FA<;), BANA~AN.APAL~E

(Present:: Sri T.'Nataraja/ M.S(;;/ 'Asst. Geologist) \: :"~:; ·, • ..,· . ~ · ~ ·· : : • . _ proceedings No:1132/0LI2G16 • . ..,. .. :.'~- _._.. Pate; W]t.'io~i6· ·

ORDER;

Sub: Mines and Quarries - Quarry lease for Road Metal & Gravel over an extent · of 21.999 Hectares In Sy.Nos.408/P, 409/.P & 410/P of Plnnapuram

(V), Panyam (M), Kurnool District- Granted in favour of M/s JRC KCVR Projects, Partner: K.C.V.R. Infra Projects Pvt Ltd, Rep.by Director: Sri K.V. lagan Mohan Reddy for a period of 10 years - Work order -Issued- Reg. · ·

Ref: 1. Proceedings No.1645/Q2/2016, dated:20-06-2016 of the Deputy Director of Mines and Geology, Kurnool .

2. Letter dated:OS.07.2016 of M/s JRC KCVR Projects, Partner: K.C.V.R. :Infra Projects - Pvt Ltd, Rep.by Director: Sri ~.v. lagan Mohan Reddy.

@@@@ .

Through the reference 1st cited the Dy. Director of Mines and Geology, Kurnool has d

granted a Quarry Lease for Road Metal & Gravel over an extent of 21.999, Hectares in

Sy.Nos.408/P, 409/P & 410/P of Plnnapuram Village, Panyam Mandai, Kurnool

District for a period of 10 years In favour of M/s JRC KCVR Projects, Partner:

K.C.V.R. Infra Proje~ Pvt Ltd, Rep.by Director: Sr~ K.V. Jagan l...,ohan Reddy.

In the reference 2"d cited, the grantee M/s JRC KCVR Projects, Partner: K.C.V.R.

Infra Projects Pvt Ltd, Rep.by Director: Sri K.V. lagan Mohan Reddy has submitted

required documents and requested to execute the Quarry lease deed.

In the light of the circumstances stated above, the lease deed is executed in favour

of M/ s JRC KCVR Projects, Partner: K.C. V.R. Infra Projects Pvt Ltd, Rep.by

Director: Sri K.V. lagan M~han Reddy on QS:.07.2016 and hereby : permitted to

commence the quarrying operations for Road Metal & Gravel over an ext~nt of 21.999

Hectares In Sy.Nos.408/P, 409/P & 410/P of Plnnapuram Village, Panyam Manda.l,

Kurnool District for a period ~f 10 years I.e. from 0'5:07.2016 to () ll-,07.2026, !

subject to the provisions of Andhra Pradesh Minor Mineral Concession Rules 1966 and also

subject to conditions specified In the appendix enclosed to the lease deed. Subject to the

satisfaction of Government orders issued from time to time.

The lessee should maintain all the records and accounts in the prescribed forms

specified by the Government and submit necessary quarterly returns in Form-e so as to

reach the Director of Mines and Geology., Hyderapa9, Dy. Director of Mines and Geology,

Kurnool and Asst. Director of Mines. and Geology, Banaganapalle for each and every

quarter as per Rules.

1 \.. /\,.., \ r-.:s,.J. ,·j \~ -/

Asst. Director of Mines & Geology (FAC), Banaganapa~e, Kurnool-2.

Page 34: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

:: 2 ::

~~~~~ Z~·c.:·~ . · ... , .... 1····~ .. ) ' . .;:. ;.\-.. ... !·'''

., .; ... '' · :. ·· tt::~·t·.;];:.·. .. .;;._SPECIAL CONDITIONS ~· ::~_!r·::~~~~t;h'~i; . 2,';,;;t~~·:, ·.. I'"'\

· :~·~~'1e'S~:~~~i~all ·not work within 4s meters of any railway ·une or of any public works .or of

any public rOads or buildings or of other permanent structures· as per· Regulation 109 of ·

Metalliterous Mines Regulations 1961. Horizontal distance of 15 meters from either bank of

a River or Canal or from the boundaries of Lake, Tank or other surface reservoirs as per

Regulations 127 of M.M. Regulations 1961 and also with regard to the safety margins to be

left to the highway and other Villages roads.

I2 M/s JRC KCVR Projects,

Asst. Director of Mines & Geology (FAC), Banaganapalle, Kumool-2.

Partner: K.C.V.R. Infra Projects Pvt Ltd, Rep.by Director: Sri K.V. Jag.:m Mohan Reddy, S/o K.C. Venkata Reddy, H.No.l0-96, B.C. Gureddy ~omplex, Near Old Bus Stand, Banaganapalle Vg & Mdl, Kurnool Dist.

Cooy Submitted to

*The Director of Mines and Geology, Hyderabad for favour of information.

*The Deputy Director of Mines and Geology, Kurnool for favour of information.

* Copy to the Tahsildar, Panyam (Mandai) for Information.

-

Page 35: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

, .....

(

.C'

I'

r

UNDER RULE 14(3) OF GRANITE CONSERVATION AND DEVELOPMENT RULES 1999

... * * * -.;' SRI. P. Veeran Goud, 5/o. Late P.Basavan Goud, R/o. 4-261-2,

Kalyanadurg Road, Behind Raja Hotel, Anantapur is hereby granted

renewal of recognition under Rule 14(3) of the Granite Conservation

and Development Rules 1999 for further period as a Qualified person

to prepare Mining Plans.

Registration Number is: §P I DI'1G I HYD I 060 I 2002

This renewal of Recognition is valid uoto 30.06.2022

Place : ~J;.J~~~~-~ "'- . ~,. -"l \ \ l\ I -~/

Date: / fi.6':-:" ~ , .f(..,\~, k\t,. Y. - I { "" ' ,o ,\ ~

~ ~ \ . \ ~ i 7) DIRECTdR 6F MINES & GEOLOGY ~ *".... ~ ~-:

~ ~

60v. ' - -· •' ' ~ ·, / ~ .~rnm·· · -y

'....;.. ...,._, ,

il ,, 'j

I

I .I j ! I I

I· i' II

31

Page 36: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

-'

f/

I

''

-0- 4 !", ........ -·--· ,,., ___ ,..__,.._ ..... _ .. __________ .,._.,_, ____ -_ .. __________ ---------------------·---=-'------3-_________ ..,. 9 20 i ~~!~~-~~~~--------------------------------

\ 368

\

For : JRC .. ~t\CVR Projects

SignatuFe:mtlm applicant. (K. V.Jaga n Mohan Reddy) (File No: 1132/QL/2016)

..

L-___ ,. ·-

410

Pinnapuram (V) PANYAM(M)

409

409/P

HILL

1 I. 92p

J.,--

l.

r / I

t . l f 1

lj It "' "'

• I

-----------------------------------------The Gee Co Ordinates af. follows. Datum: W.G.S- 84, Units: De.cimal Qegrees. ------------··----------------------------10 : N 15.58776 E 78.18770 11 : N 15.58800 E 78.18810 12 : N 15.58894 E 78.18852 13 : N 15.58934 E 78.18856 14 : N 15.59030 E 78.18869 15 : N 15.58980 E 78.18980 17 : N 15.59394 E 78.19279 18 : N 15.59353 E 78.1~~442

-----------------------------------··-----H.T.L Tower- 1

N 15.58610 E 78.19290 H.T.L. Tower- 2

I N 15.58862 E 78.19556 -.L. Tower ·· 3

N 15.59059 E 78.19690

r .• , ..

--------------------------------------

Asst. . Director of Mines & Geology, Banagana pall e.

File No: - 1132/ QL/2016. Quarry Lease application filed in Mee Seva Centre on 13.05.2016. ----------------------------------------------Surveyed on : 16.05.2016, Scale: - 1 C.m:- 400 Links. -----------------------··---------------------- . District Mandai :­\1illage :-sv No'c ·-t. . .. .

Kurnool, Panyam, Pinnapuram, 408/P, 409/.P, 410/P.

----------------------------------------------. Name of the applicant:-

Sri K.V.Jagan Mohar:l Reddy, S/o K.Chinna Venkata Reddy; Director of M/ s J.R.C & K.C.V.R. Projects. ,

. ~ . -------- __ .;,.. -·· ---------·-.l·--~---------------:-·---Mfneral: ·Road Metal and· Gravel, -----~--------------------------~---~---------' . ,--., Sv No·· 175 of SOI"""·~"~; , ,i :i l':'::llla ~ ' ' 1 I • _ • : · • J: .-~ -J\oo4•'• t-"" •:<. t'-'

U Village,' Orvakal Mandc; Deleted Area: 1. 96 Acres.

-----··---------------------------------______ ... Tie Lines:- 17- M:1088, i8- rv1:1007 and :18 - N: i865 Links. -----··----------------------------------------

I I i PROV:D

Note: F.M.B.Sheets of Sy.No:.~~t-~Q~ .~ : and 410 of pini~apuram Yi~_!.;r~~~y-.~: t"~· -) :~ ~=- l enclosed. :· l~~/'-..,:.~ ... ... -····-~:: ~~ ··, · · \ l

! i~ /!. / ,. ·:--:- '::~. ~-.. :. '<r.', ,-~ - --- - -------- ----------------- ... ~-'lit.-,. """"'_:.:"'--.- 4. _ .. _.'\... L ..,""f. .. -~ ' ir { ~ . .,.,. J1 '· • -+'<' - u -. ,,-J ...... , .... ~

Survey Number wise e~~as foU'6ws:-~_:;:· ~ .' . .ri"):-;i 408/Part is 08.30 Ac \}0~~\t. ~:. ·~.> .o-;~;l ~; ~lfJq,~ 409/Part is 37.58 Ac \~~~;;> _--~~.;~.-~.;~ ·:~ ~:~/.l1 410/p

. 0 '-.f),,.._. , . - '-~· /...41 1

art JS 8.48 Ac -~ ~-:t~}f.;·~~,:: -:: -. / ! Total Extent: 54.36 Acres or ~~:-<,~' · ~· ': ~ · : . --~~ .... {,..... (

21.999 hectares. · ~---------------------------------------------

0' Surveyed for Grant of

Quarry Lease 21.999 hectares.

-----------------·-----------------------------

Page 37: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

P.VE GEOLOGI

RQP/DMG/HY-0/ F'lllrly

..

Index . ·. . ,,.·, .. .,. ·, ,. ~ ;-~~;( ... ··:;.s·;, .""·1 ..... ' • • . .~. •-to ......... ~\

D C>

, ~ . . .. ,... .. , ' .. ~ \

Lease Bounda~·r;:~}:·/~> ~:.~ <\~~\;\\ : \ ••• ~ \_.r \ Contour · .. ·-!,',: , ... '·; .' .. _,_:,.,·-,!, · ... -.... :.~.

LOCATION CUM KEY PLAN TOPO SHEET N0:57 I/2

., A . L

N

.;L ··ca

\ c(. ;. ::··. .''··:··::.. . . ·. ::·: J:...~~/i Road " . \':'"', ·,_ PlaJ1 -shcwing ·QJ:~";Area Granted to M/S JRC KCVR Projects, Partner KCVR Infra Porjects Pvt Ltd.,

St ' /C I -..,··.~· ~, :~···p;-~::~---~-.:.:_.·;;·~ep, by Director Sri K:v.Jagan Mohan Reddy1 H.No :10-961

BC Gureddy Complex . ream ~na · ··.):_.:;·.: :~.~·::: ., .:~:.···. ·' Banganapalli Villege & Mandai Kurnool District.

V'll · .' t'"Sy-No:<J·.d6/P.409/PI410/P in Pinnapuram Villegel I Panyam Mandalam 1 Kurnool District for :21.999 Hectares. 1 age /.

:0 s ~m Radius ,,. ··4 -.·· Hiiis

WIND DIRECTION: EAST- WEST TOPO SHEET NO: 57 I/ 2

>

c

c

Page 38: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

INDEX WEATHERED GRANITE

120 110 100 090 080 070 060 050

120 110 100 090 080 070 060 050

120 110 100 090 080 070 060 050

A

B

c

r- 120

----------------------~l~110 1- 100

---- ------ --------------~--..;;;r;-----

~~ 090 8._ 080 0:::

-- ~..._ 070 ~~ 060

-----------------------------------------~A1 050

r- 120

---------------------------------------~j_~110 100

-------------~- -- -------

- - - - - - - - - - - - - - - - - - - - - - - - - - -

~~ 090 0 ~~ 080 ~- 070

- - - ~ - - - - ----=-= 15-co~ 060 ... ---- ---------

-------------------------------~~050

r- 120

------------------------------------~L~110 t- 100

- - -- - - - - - - - - - - - - - - - - - - - - - - - -- - -

~~--- 090 0 ~~ 080 w lt r- 070 D co~ 060

------------------------------------~cLo5o

APPROVED

MINING PLAN FOR ROAD METAL AND GRAVEL

For UIS· JRC KCVR PROJECTS

. ML Area applied in Sy No.408/P 409/P,410/P in Pinnapuram V1llege,Panyam Mandalam, Kurnool District for :21.999 Hectares.

GEOLOGICAL CROSS SECTIONS k.~-~ SOIL COVER

COLOUR GRANITE P. VEE RAN GO UD PROVED ZONE GEOLOGIST M.Sc., APPL.IC.a.t.wthorised Signatory M/S JRC KCVR Projects, Partner KCVR Infra Porjects Pvt Ltd., PROBABLE ZONE P.Q' J OMG 1 HYOl060 /200:~ P\n·a Rep, by Director Sri K. V.Jagan Mohan Reddy,H.No: 10-96, BC Gureddy POSSIBLE ZONE Complex Banganapalli Villege & Mandai Kurnool District.

~======================~=========================================================-============================~========~S~C~AL~E~~1~:2~0~0~0======~C~O~N~T~O~U~R~I~N~T~ER~V~A~L~-2~.~0~M~======u

Page 39: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

I

I

I

I

I

I

, ,

, ,

1 DRY LAND

I )C)C

DRY· LAND

' '

' '

, , ,

GRAZING LAND

GRAZING LAND

- - -

DRY LAND

.... - - - - -APPROVED

INDEX 0 ASSUMED BENCH MARK

LEASE BOUNDARY CONTOURS

ULTIVATION LAND OM BUFFER ZONE OOM BUFFER ZONE

P. VEERAN G GEOlOGIST

P.QP I OM G 1 HY0/1)60/200:7 -~

- - - - - - -- - ---DRY LAND D~LAND

HILLS

GRAZING LAND

, I

.... - - -M

--

' -

- - -

~

I

I

- -DF.Y LAND

' ' ' ' ' '

DRffiND

GRAZING LAND

DRY tAliiD

\

\

DRY LAND I

I

)C)( ,

Ii)RY LAND ,

, , H!I.'.S ,

)C)( , . . . . "' " -• ; :;.r-

---

MINING PLAN FOR ROAD METAL AND GRAVEL

For MJS. JRC KCVR PROJECT

(' Jvv-~ ENVIRONMENT PLAN

ML Area appl ied in Sy No.408/P 409/P,410/P in Pinnapuram Villege,Panyam Mandalam , Kurnool District for :21.999 Hectares.

A Pp LI~Iilmised S ignat:Of..,...----:M:-:/:::-S~J~RC::-:K;::::cv:::R::-::-Pr-oj:-e-:ct:-s-:, P::-a-:rt:-n...:er~K::-:C:::-V:::R-:I...:nf:-ra-:P::-o-:rj:-ects-:-::-Pv:-t -:-Lt-:d-. ,--~ g,.IT'I Rep, by Director Sri K.V.Jagan Mohan Reddy,H.No:l0-96, BC Gureddy

Complex Banganapa lli Villege & Mandai Kurnool District.

SCALE : 1: 10000 CONTOUR INT_ERVAL-2 .0 M

Page 40: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

N X IIlJ ASSUMEO IIENCH HAAl<

!2J LEASE IIOUIIDAAY

E:l COIITDUR

li2J PIT

i!I ROAO ICI BUf FER ZDII!

!iii secnoo UNe 6i) SOIL COVBI

Q COlOUR GIWim: D DUMPYAAD

I

I I

I, I

I

I

N60~----------r----------+----------~----------+----------4----------~-----/ + + + + + + + + + + + + +

+ + + + + + + + +

+ + +

N 550•r---------~-----------r----------+---------_,-----------r----------+-~

+ + ' + + + +

+ + +

N45or----------~----------~----------+-----------+-----------~--~

N40Gr----------+---------_, __________ -r----------+----------4~

N35or----------~----------~----------+-----------+-------~

N30or----------~----------~----------+-----------+-~

I I

I I

I

• I

I

N20~~------~~--------~----~~ I

+ ... + .... +

.... "'+ .... + + "'+ .... "'+ +

+ -i7"'-t.-"" + + + ................ + +

4 ........ + + + + + ........ .t ?.(. + + +

+ + +.,."' + + + +

+ + + +

+ + + + + +

+ + + + + +

+ + + + +

+ + + + + +

+ + + + + + +

+

+ + +

+ +

+ + + + + + +

+ + + + + + + + +

+ + + + + + + +

+

+ + + +

+

+

+

+ + + + + + +

+ + -f + +

+ + + + + + + + + +

+ + + + + + + + + + +

+ + +

+ +

+ + +

+

+

+ + + + + + + + + + + +

+ + +

+ -f +

+ + +

+ + + +

+ +

+ + + + + +

+ + + + + + + +

+ + + + +

+ + + + + + +

+ + + + + + + + + +

+ + + + + + + +

+ +

+ + + +

+ + + + + + + + + + + + +

+ + + + + + + + +

+ + + + + + +

+ + +

+ + + +

+ + + ~ .... + + + + +

+ + .. +---1- j--'+ + _+_,..-4 f---f

+- - :f. +- - -f I

I

~ 150

+ + + 7"' + + + + +_- 4- -

+ + + A + + + + + + + .... ....~ + + + +

+ + + + + .... ~ .... ~ + + + .... .... + + + + .... + .... + + +

+ .. -- +--+_ +-- -+- - ... - ,r /-.;'l~-.J.-"/

.... - -+ + + + y 1'"' + + -l:. - + +_ - + + + + + .,.-¥ .,.+' + -!_:. - -+- +_- +- +

+ + + .... 4 .... + - .....,. + - .r- + + + 1 1 N 1oo+----t

+ + + ....... + .... "'+ - A" - .r- - + + + + + + .... .... + .... "'-+" - + .:f'- + + + + + + --' L ____ _

... ------ ----+- - ~ _... + .. + ;1-- - + + + + +

+ · + .;r--+ + + + + --+-+ + + + + +

+ + + + +

+ + + + +

+ +

E 100 E 150 E 200 E 250 E 300 E 350 E 400 E 450 E 500

+ + + +

+ + + +

+ + + +

+ + + +

+ +

+ + +

+ + + + + +

+ + + + + + +

+ + + + + + + +

+ + + + + + + +

+ + + +

+ + + + +

+ + + +

+ + +

+ + +

+ + + + +

+ + + + + +

+ + + + +

+ + + +

+ + + + +

+ +

E 550 E 600 E 650 E 700

APPROVED

~- . ;~ c'.;;( . ..,/ , ...-r~, .... \jc_ .l ,..:..,.

~\:.r" '-;/.." ... ~ -- ..,. •. .' <./ <(~ ;.; /........ ,.. ' . '" I.e-~--.. . .. , ,.__' It'§· . . .... ·- ···. ·,) ) \ ,_-, .\. fC . ..• . ; ",.\ c.. 1' , •• . - . ,. \ _,.I

I .. .. . -· .•. , IJ{ t .. · . ~. ~ r 1 I-· t 1'"" 'f' J

I ,.. • I ~ I ;• ... •• 1 .. ' ~ ~J

\- I .· ' t . , . . . . rr -. ' .... ... )')., 2 •"'\• ~ .; . . , ,' .., ·)'

· ' r - , .'/J :;·- . >· ~- . . -2. < '/)I '-"" ·., .. · .. " , J~V• . " .'l.~ / ' - "' ··- " :\ · . ·- • ~ ; ,_ . . '· I '')'--- . . . . . '"• ...J •••.. _:-;-, . .. ~ .. ·. -'·

''..Jt • ' '··-l · '' \ .. ... ,.·::!.! \..~ --.:~ ... /

P.VEERAN GOUD GEOLOGIST M.sc.,

P.QP I DMG/ HYD/Ob0/ 200]

APPLICANl

STATION LATITUDE I 15 35' 16.8" J 15 35' 20.2" K 15 35' 38.2" l 15 35' 38. 7" M 15 35' 36.2" N 15 35' 39.6" 0 15 35' 36.8" p 15 35' 28.6" Q 15 35' 26.5" s 15 35' 19.1" T 15 35' 19.4" u 15 35' 18.9" v 15 35' 18.4" w 15 35' 18.6" X 15 35' 17.9" y 15 35' 17.8" z 15 35' 15.9"

LONGITUDE

78 11' 17.2" 78 11 ' 18.7" 78 11 ' 20.6" 78 11' 30.4" 78 11' 40.4" 78 11 ' 22.8" 78 11' 20.6" 78 11' 18.3" 78 11' 20.8" 78 11' 18.1" 78 11' 18.3" 78 11' 17.8" 78 11 ' 17.5" 78 11' 17.8" 78 11' 17.1" 78 11 ' 16.9" 78 11' 15.7"

PLATE-3

MINING PLAN FOR ROAD METAL AND GRAVEL Ml Area applied in Sy No.408/ P 409/P.410/P in Pinnapuram

Villege,Panyam Mandalam , Kurnool Distnct foc :21.999 Hectares.

SURFACE GEOLOGICAL PLAN M/ S JRC KCVR Projects, Partner KCVR Infra Pol)ects Pvt Ltd .,

Rep, by Director Sri K.V.Jagan Mohan Reddy,H.No:l0-96, BC Gureddy Complex Banganapaiii Vii lege & Mandai Kumool Dist rict.

SCALE : 1:2000 CONTOUR INTERVAL·3.0 M

Page 41: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

Y.\ · c ;o z 0 CD r

t ~

' A)

IND

;o 0 )> ' 0

I

[CJ ASSUM(O BENCH KAIU(

!l!l lEASf IIOUNIWIY

e:::l COH10U!<

li2lm i!!!I OOAD a IUfflOZOH'

Iii) SfCTION UH. EJ SOil<XMJI

CJcot.ou•-0 DUM•YAAD

I I

IT

N60~----------r----------+----------~----------r----------+----------+-----~

NSSO·r-----------r----------;-----------+-----------+----------~----------~~

N SO

N 4S

N40ar-----------+-----------+----------~------------r-----------+4

N3S~----------;-----------+-----------r---------~r-----~

I

I

I I

I I

N 30

N 2S

I

N12o

I I

I

I I I

I

I I

1 N 1 oo,+------t L _ __ _ _

I

+ + + + +

+ + + + + + +

+ + + + + + + .J

+ + + + +

; -- ~ ----...., + + + +

+ + +

E SO E 100 E 1SO E 200 E 2SO E 300

+

1~

+

+ +

E 3SO

130 120 110 100 090 080 070

----------------- - - -

Worldng PlantatiOn

0 1stYEAR 0 0 2ndYEAR 0 D 3 rdYEAR D e:J 4 th YEAR D D Sth YEAR D

P. VEERAN GOuu GEOlOGIST M.Sc.,

P.QP I DMG 1 HYD/'060 /2007

'

+ + + + + +

i!l

+ + + + + +

+ + + + +

+ +

+

E 400

-----------

+ +

+ +

+

E 4SO

+

+

+ +

+ + + + + + +

+ + + + + + +

+ + + + + + +

+ +

E SOO E SSO

APPROVED

+ +

+ + +

+

+

+ +

+ +

E 600

+ + +

+ +

+ + +

+ + +

+ + +

+ + +

+ + +

+ + +

+ + +

+ + +

II

-$-

+

+ + +

+ + + +

+ + +

+ + + + +

+

E 6SO E 700

PLATE-6

MINING PLAN FOR ROAD METAL AND GRAVEL

ML Area applied In Sy No.408/ P 409/P,410/P In Plnnap<Jram Vlllege,Panyam Mandalam, Kumool District for :21.999 Hectares.

CONCEPTUAL PLAN M/S JRC KCVR Projects, Partner KCVR Infra Porjects Pvt Ltd.,

Rep, by Director Sri K.V.Jagan Mohan Reddy,H.No:l0-96, BC Gureddy Complex Banganapalll Villege & Mandai Kumool DistriCt.

SCALE : 1:1000 CONTOUR INTERVAL-2.0 M

Page 42: C.V - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · GOVERNMENT 0F ANDHRA PRADESH DEPARTMENT OF MINES AND GEOLOGY From P. Raja Babu, M.Sc (Tech),

INDEX IIlJ ASSuoiEO I!EHOt .......

1!11 L£ASE """""""" E:l COHTO<JO.

!a orr

E!!l """" a BUFFtR ZOHf

(iiJ SEcnOH UNE

EJ SOILCOYt.R

c::Jc:owu• ...,.m CJ DUN, YARD

'? ICM 'f ' 'II

N 650

N60Gr----------4-----------+-----------~---------4~---------4-----------+------l

_ ...J

I

I

I I

I

I

'

I I

I

I

N55o,r---------~------~--~----------~---------+----------4-----------~

N50Gr----------4-----------+-----------~---------4~---------4---------4

N45Gr-----------+-----------+-----------4----------~~----------~---4

N40Gr-----------+-----------+-----------4----------~~----------rl

N 30

N 25

I

N12o

'

I I

I

I I

I

I I

I

I

I

+ + + +

+ + + + +

+ + + J

+ + + 1 N loo+------t L ____ _ + + .. , ..... + ____ _.,.,.

+ + + + +

+ +

E 100 E 150 E 200 E 250 E 300 E 350 E 400

+ + + +

+ + + + + + + + + +

+ + + + + + + + + + +

+ + + + + + + + + + +

E 450 E 500

+

+ +

+

+

+

+ + +

+ +

E 550 E 600

+

+ + +

+ + +

+ + + +

+ + + +

+ + + +

+ + + +

+ + + +

+ +

+ +

+

+

+

+ +

+

+

E 650

130 120

E 700

130 120 110 100 090 080 070

---- ...,-----~---______ [110

~-=-~-------~-=-=-=-~-~-=-~-=-~---------------~----~~-~-~-~-~-~---1 ~~~

Working Plantation

0 l stYEAR 0 0 2ndYEAR 0 0 3 rdYEAR 0 D 4thYEAR D D Sth YEAR D

080 ~x~----------------------~~--------------------------------------------------------------------------------------~yo7o

For MJS. JRC KCVR PROJECTS

}(. \J ~~ r; APPLICA.Nll>rised Signatory

~. P.VEERAN GO

GEOLOGIST tt1

P.Q~ I oMG/ HYD/060/ 200] APPR~:7ED

PLATE-S

MINING PLAN FOR ROAD METAL AN D GRAVEL

ML Area applied In Sy No.408/ P 409/ P,410/ P In Pinnapuram Villege,Panyam Mandalam, Kumool District for :21.999 Hectares.

Five YEARS WORKING PLAN M/5 JRC KCVR Projects, Partner KCVR In ra Porjects Pvt Ud.,

Rep, by Director S ri K.V.Jagan Mohan Reddy,H.No: l 0-96, BC Gureddy Complex Banganapalll Villege & Mandai Kumool District.

SCALf : 1:1000 CONTOUR INTERVAL·2.0 M