cv denstar ricardo silalahi

6
CURRICULUM VITAE 1. PROPOSED POSITION : Piping Stress Engineer 2. NAME : DENSTAR RICARDO SILALAHI 3. DATE OF BIRTH : December 3 nd , 1985 4. NATIONALITY : Indonesian 5. EDUCATION : Bachelor Degree of Mechanical Engineering, Gadjah Mada University, 2009 6. OTHER QUALIFICATIONS / : TRAININGS - Pipe Stress Analysis Training on Apgreid, Nov 2010 - HSE Training (Safety for Construction), Oct 2014 7. LANGUAGE AND PROFICIENCY IN EACH : Language Speaking Writing Reading Indonesian: Fluent Fluent Fluent English: Good Good Good 8. COUNTRIES OF WORK : Indonesia EXPERIENCE 9. EMPLOYMENT RECORD : Having More than 5 years experience in Engineering and Construction Company as Piping and Piping Stress Engineer Experiences in: FEED, Detailed Engineering Design, and Construction Supervision on Oil and Gas Project. Performed in installation, testing and commissioning of Piping and Pipeline Construction. Performed in safety process and analyze Denstar Ricardo Silalahi Page 1 of 6

Upload: denstar-silalahi

Post on 31-Jul-2015

12 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: CV Denstar Ricardo Silalahi

CURRICULUM VITAE

1. PROPOSED POSITION : Piping Stress Engineer

2. NAME : DENSTAR RICARDO SILALAHI

3. DATE OF BIRTH : December 3nd, 1985

4. NATIONALITY : Indonesian

5. EDUCATION : Bachelor Degree of Mechanical Engineering, Gadjah Mada University, 2009

6. OTHER QUALIFICATIONS / :TRAININGS - Pipe Stress Analysis Training on Apgreid, Nov 2010

- HSE Training (Safety for Construction), Oct 2014

7. LANGUAGE AND PROFICIENCY IN EACH : Language Speaking Writing Reading

Indonesian: Fluent Fluent Fluent English: Good Good Good

8. COUNTRIES OF WORK : IndonesiaEXPERIENCE

9. EMPLOYMENT RECORD :Having More than 5 years experience in Engineering and Construction Company as Piping and Piping Stress Engineer

Experiences in: FEED, Detailed Engineering Design, and Construction Supervision on Oil and Gas

Project. Performed in installation, testing and commissioning of Piping and Pipeline

Construction. Performed in safety process and analyze Familiar with the applicable standard international codes of Piping engineering. Familiar with Caesar 6.1, Auto Pipe XM 9, Nozzle Pro, and Navis software.

1. PT. TRIPATRA ENGINEERING & CONSTRUCTORClient : BRITISH PETROLEUM (TANGGUH 3th TRAIN

EXPANSION PROJECT)Position : Pipe Stress EngineerDuration : April 2015 – August 2015Responsibilities :

Performed Piping Stress analysis Calculation and Report with Caesar 5.2 Build and construct loading info

Denstar Ricardo SilalahiPage 1 of 5

Page 2: CV Denstar Ricardo Silalahi

Calculation Checking Blast Analysis

2. PT. TRIPATRA ENGINEERING & CONSTRUCTORClient : Joint Operating Body, PERTAMINA – MEDCO E&P

TOMORY, SULAWESIPosition : Pipe Stress EngineerDuration : October 2014 – April 2015Responsibilities :

Performed Piping Stress analysis Calculation and Report with Caesar 5.2 Build and construct loading info Performed construction monitoring and line check for piping stress Joint commissioning team to arrange test package for piping system.

3. PT. TRIPATRA ENGINEERING & CONSTRUCTORClient : ABADI GAS FIELD DEVELOPMENT FLNG FEED,

INPEX MASELA LTD.Position : Pipe Stress EngineerDuration : July 2014 – September 2014Responsibilities :

Performed Piping Stress analysis Calculation and Report with Caesar 5.2 Build and construct loading info Calculation Checking Blast Analysis

4. PT. TRIPATRA ENGINEERING & CONSTRUCTORClient : Joint Operating Body, PERTAMINA – MEDCO E&P

TOMORY, SULAWESIPosition : Pipe Stress EngineerDuration : December 2013 – June 2014Responsibilities :

Performed Piping Stress analysis Calculation and Report with Caesar 5.2 Build and construct loading info Calculation Checking

5. PT. BINTANG PERSADA ABADIClient : PT. WIJAYA KARYA (Persero) Tbk

(Gas Pipeline, Lhoksukon A - Belawan )Position : Piping and Pipeline EngineerDuration : June 2012 – November 2013Responsibilities :

Prepare Specification and Calculation based on ASME B31.4, FEED and all related standards, Data Sheet, Requisition, and Material Take Off for Pipeline system.

Denstar Ricardo SilalahiPage 2 of 5

Page 3: CV Denstar Ricardo Silalahi

Prepare Specification and Calculation based on ASME B31.3 and FEED, Arrange Data Sheet, Requisition, Material Take Off, and Checking Isometric Drawing for all Shipping and Booster Station.

Performed Pipeline Stress analysis Calculation and Report with Auto Pipe 9. Performed Piping Stress analysis Calculation and Report with Caesar 5.2 Build and construct loading info Monitoring and Construction Supervision

6. PT. BINTANG PERSADA ABADIClient : PT. WIJAYA KARYA (Persero) Tbk (Crude Oil,

Tempino - Plaju)Position : Piping and Pipeline EngineerDuration : October 2011 – Mei 2012Responsibilities :

Prepare Specification and Calculation based on ASME B31.4, FEED and all related standards, Data Sheet, Requisition, and Material Take Off for Pipeline system.

Prepare Specification and Calculation based on ASME B31.3 and FEED, Arrange Data Sheet, Requisition, Material Take Off, and Checking Isometric Drawing for all Shipping and Booster Station.

Performed Pipeline Stress analysis Calculation and Report with Auto Pipe 9. Performed Piping Stress analysis Calculation and Report with Caesar 5.2 Build and construct loading info Monitoring and Construction Supervision

7. PT. WIJAYA KARYA (Persero) TbkClient : PT. PERTAMINA PERSERO

(Tasikmalaya - Ujung Berung for Diesel, Kerosene, Premium Pipeline)

Position : Piping and Pipeline Engineer Duration : February 2010 – September 2011Responsibilities :

Prepare Specification and Calculation based on ASME B31.4, FEED and all related standards, Data Sheet, Requisition, and Material Take Off for Pipeline system.

Prepare Specification and Calculation based on ASME B31.3, Arrange Data Sheet, Requisition, Material Take Off, and Checking Isometric Drawing for Piping System for Transporting and Receiving Station.

Prepare Specification, Calculation, Data Sheet, Requisition, Material Take Off, and General Drawing for Sump Tank.

Performed in Pipeline Stress analysis Calculation and Report with Auto Pipe 9. Performed in Piping Stress analysis Calculation and Report with Caesar 5.2 Build and construct loading info Sump Tank Design based on API 650

Denstar Ricardo SilalahiPage 3 of 5

Page 4: CV Denstar Ricardo Silalahi

Monitoring and Construction Supervision

8. PT. LIA TEKNINDO CONSULTANT Coop. GADJAH MADA UNIVERSITYClient : PT. GEO DIPA DIENG (Steam Pipeline and Piping)Position : Piping and Pipeline Engineer Duration : November 2009 – January 2010Responsibilities :

Performed in FEED documents and design analysis for Pad 30 to Pad 28 Geothermal Project

Prepare Specification and Calculation based on ASME B31.4, and all related standards, Data Sheet, Requisition, and Material Take Off for Pipeline system.

Prepare Specification and Calculation based on ASME B31.3, Arrange Data Sheet, Requisition, Material Take Off, and Checking Isometric Drawing for Piping System.

Performed in Pipeline Stress analysis Calculation and Report with Auto Pipe 9. Performed in Piping Stress analysis Calculation and Report with Caesar 5.2

9. PT. LIA TEKNINDO CONSULTANT Coop. GADJAH MADA UNIVERSITYClient : PT. GEO DIPA DIENG (Steam Pipeline and Piping)Position : Piping and Pipeline Engineer Duration : April 2009 – October 2009Responsibilities :

Performed in FEED documents and design analysis for Pad 29 to Pad 7 Geothermal Project

Prepare Specification and Calculation based on ASME B31.4, and all related standards, Data Sheet, Requisition, and Material Take Off for Pipeline system.

Prepare Specification and Calculation based on ASME B31.3, Arrange Data Sheet, Requisition, Material Take Off, and Checking Isometric Drawing for Piping System.

Performed in Pipeline Stress analysis Calculation and Report with Auto Pipe 9. Performed in Piping Stress analysis Calculation and Report with Caesar 5.2

10. PT. INDONESIA POWER UBP SEMARANGClient : PT. INDONESIA POWER SEMARANGPosition : Mechanical Enjiner (Trainer)Duration : September 2006 – November 2006Responsibilities :

Performed in maintenance Performed in analysis and study about calculation boiler efficiency consequences

excess air

Denstar Ricardo SilalahiPage 4 of 5

Page 5: CV Denstar Ricardo Silalahi

I, the undersigned, certify that to the best of my knowledge and belief, the personal data

contained in this CV correctly describes myself, my qualifications and my expertise. I,

hereby agree and commit to be assigned during the contract period to perform the Work

within the specified time frame as defined in each Service Order.

June 12th, 2014

Denstar Ricardo Silalahi

Denstar Ricardo SilalahiPage 5 of 5