cut over activities - plant maintenance - sap e
DESCRIPTION
ramTRANSCRIPT
-
11/12/2014 Cut Over Activities - Plant Maintenance - SAP E... | SCN
http://scn.sap.com/community/eam/blog/2013/08/10/cut-over-activities--plant-maintenance--sap-easy-access 1/3
Getting Started Newsletters Store
Products Services & Support About SCN Downloads
Industries Training & Education Partnership Developer Center
Lines of Business University Alliances Events & Webinars Innovation
Log On Join UsHi, Guest Search the Community
Activity Communications Actions
Browse
Enterprise Asset Management (SAP EAM)
Previous
post
Next
post
0 Tweet 3
Objective: This document can guide the consultants as check list during the Cut Over Activities of SAP Plant MaintenanceImplementation.
1. Characteristics to be used in Measuring Points & Technical Objects2. Classes to be used in Technical Objects3. Cost Element Groups maintained in PM Costing Variants / Settlement Profile / Allocation Structures4. Permits
5. Strategies for Maintenance Plans6. ABAP Query Reports7. Preparation of Template & Execution of Strategy based / Multi Counter Plan scheduling8. Maintenance Notification / Order uploading template
Characteristics: All the characteristics should have been created as per the usage in Measuring Points & Technical Objects. This willavoid the duplication of master creation, errors, etc., Characteristics which will be used in Permits also should becreated accordingly. Classes: All classes should be created based on the usage either in Equipment / Functional Location / Permits (Licenses)category. Cost Element Groups: Cost Element groups should be created as per the assignment of those groups in the configuration front. Generally,cost elements will not / should not be assigned in the configuration directly as it tends to change according to client(DEV / QAS / PRD). So, its advisable to create cost element groups & assign them in the configuration. Those cost element groups should be defined as Master data before uploading Maintenance orders / schedulingMaintenance plans. Permits: During Cut Over activities / Back logs, Permit functionality may not be required as the orders are in past & they mighthave got approval in legacy system already. Once all the Back logs are uploaded, these Permit system should beactivated. Maintenance Strategies: As per the business requirement, Maintenance Strategies should have been defined before uploading Task List &Maintenance Plans. Maintenance Strategy should be defined as per Scheduling Indicator. Each scheduling indicatorshould be restricted with one or 2 (max) maintenance strategies. ABAP Query Reports: ABAP query reports should be created in the Live Production Client as per the requirement. Template for Maintenance Plan Scheduling: This template should have been shared with Power Users & the same should have been prepared as per theTechnical Object. This template is required for strategy & multi counter plan. For single cycle plan, start date can be
Cut Over Activities - Plant Maintenance - SAP EasyAccessPosted by Maheswaran KD . in Enterprise Asset Management (SAP EAM) on Aug 10, 2013 9:27:26 AM
Share 1 0Like
Search the Community
Search All of SAP
-
11/12/2014 Cut Over Activities - Plant Maintenance - SAP E... | SCN
http://scn.sap.com/community/eam/blog/2013/08/10/cut-over-activities--plant-maintenance--sap-easy-access 2/3
Site Index Contact Us SAP Help Portal
Average User Rating
(0 ratings)
0 Tweet 3
arrived easily, so this template will not be required. This template should contain details like Technical Object, Operations on that, Last date / reading happened onoperation wise, next date / reading on which that operation should fall on due, current counter reading for performancebased cycle. Template for Notifications / Orders: This Template should have been shared with the Power users & these details should be captured from cut off date.This details contain Open orders, In Process Orders with Partial Confirmation / Partial GI, etc., Completed Orderswithout Settlement, etc., Historical Orders can be captured separately using IW61. Conclusion: This document can guide you in the critical phase of Implementation Project as check list. This list may not have 100 %data, but it will give some overall idea on the Cut Over details.
1251 Views Topics: enterprise_asset_management Tags: sap, access, maintenance, -, plant, over, easy, cut
Share 1 0Like
6 Comments
Like (1)
RAKESH MANE Aug 12, 2013 1:33 PM
It is great snapshot of CutOver activities.Thanks a lot Maheswaran
Like (0)
Maheswaran KD . Aug 12, 2013 1:35 PM (in response to RAKESH MANE)
Thank you so much...
Like (1)
waqas ahmed Aug 12, 2013 2:02 PM
Great Content for Consultants Well Done Maheswaran
Like (0)
Maheswaran KD . Aug 12, 2013 2:04 PM (in response to waqas ahmed)
Thank you...
Like (1)
Rajesh Ravuri Aug 12, 2013 3:18 PM
It is very usefull information for new commers
Like (0)
Maheswaran KD . Aug 12, 2013 3:56 PM (in response to Rajesh Ravuri)
Thank you..
-
11/12/2014 Cut Over Activities - Plant Maintenance - SAP E... | SCN
http://scn.sap.com/community/eam/blog/2013/08/10/cut-over-activities--plant-maintenance--sap-easy-access 3/3
Follow SCNPrivacy Terms of Use Legal Disclosure Copyright