curriculum vitae - university of...
TRANSCRIPT
1 Yong-Woo Kim, Ph.D., Curriculum Vitae
Yong-Woo Kim, Ph.D.
Curriculum Vitae
Apr 2017
Associate Professor
Department of Construction Management
College of Built Environments
University of Washington
120H Architecture Hall, Box 351610
Seattle, WA 98195
Telephone: (206) 616-1916
Email: [email protected]
Contents:
Education and Employment Summary ………………. 2
Research and Scholarly Activities ………………. 4
Teaching ………………. 24
Service ………………. 36
2 Yong-Woo Kim, Ph.D., Curriculum Vitae
EDUCATION AND EMPLOYMENT SUMMARY
Education
Dec 2002 The University of California, Berkeley, CA.
Ph.D. in Civil Engineering, College of Engineering
Dissertation: Implications of New Production and Management Theory for
Project Cost Control
Advisors: Prof. Glenn Ballard and Prof. Iris Tommelein
Minors: (1) Production Management, (2) Cost Management
May 1999 The University of California, Berkeley, CA.
M.S. in Civil Engineering, College of Engineering
Feb 1995 Hongik University, Seoul, South Korea.
B.S. in Civil Engineering, College of Engineering
Summa Cum Laude, Grade: 4.35/4.5
Academic Experience
UNIVERSITY OF WASHINGTON Seattle, WA
2011 – Present Associate Professor, Tenured, Department of Construction Management
2010 – Present P.D. Koon Endowed Professorship of Construction Management
2007 – 2011 Assistant Professor, Tenure Track, Department of Construction
Management
KOREA UNIVERSITY Seoul, Korea
Spr. 2016 Visiting Associate Professor, Civil and Architectural Engineering
Sum. 2012 Visiting Associate Professor, Civil and Architectural Engineering
STATE UNIV. OF NEW YORK,
College of Env. Science and Forestry (ESF) Syracuse, NY
2007 – 2010 Visiting Assistant Professor
2004 – 2007 Assistant Professor, Tenure Track, Department of Construction
Management and Wood Product Engineering
3 Yong-Woo Kim, Ph.D., Curriculum Vitae
UNIVERSITY OF HOUSTON (MAIN CAMPUS) Houston, TX
2003 – 2004 Assistant Professor, Non-Tenure Track, Department of Engineering
Technology, Construction Management Program
UNIVERSITY OF CALIFORNIA, BERKELEY
2001 – 2002 Graduate Student Instructor, Instructor for Physics 8A, Mechanics for
Architecture students
Provided 9-hour lecture per week on the area of statics, basic structural
analysis, and basic fluid mechanics; Prepared and graded exams
Professional Experience
2002 – 2003 Lean Construction Institute, Oakland, CA
Associate Researcher, Developed a profit-point analysis and supervised its
application to DPR’s Sun-Micro project in Reswood city, CA.
1996 – 1998 Samwhan Corporation, Inc., Seoul, KOREA
Sr. Project Engineer, Seoul Subway Construction, Seoul, KOREA
Coordinated specialty contractors, engineers, and clients; Produced costing
reports and design change documents; Participated in quality control
education program (ISO 9001)
1995 – 1996 Samwhan Corporation, Inc., Riyadh, Kingdom of Saudi Arabia
Project Engineer, Tabuk Cement Plant Construction Project, Tabuk, Saudi
Arabia; Coordinated 5 different specialty contractors and leaded production
and technical meetings
1994 – 1995 Samwhan Corporation, Inc., Seoul, KOREA
Project Engineer, Incheon Subway Construction Project, Incheon, KOREA;
Assisted in project planning and management such as daily/weekly/monthly
reporting, scheduling, and cost control
Professional Licenses
2002 Fundamental Engineer, Civil Engineering, State of California
1994 Licensed Civil Engineer, Korea
4 Yong-Woo Kim, Ph.D., Curriculum Vitae
* Indicates graduate student advisee or post-doctoral researcher mentored
RESEARCH AND SCHOLARLY ACTIVITY
I. Published papers, books, etc.
Publication Summary Statistics:
Number of publications published / accepted as of April 28th, 2017: 94
H-Index (Google Scholar): 15
Number of Books: 2
Number of Peer-Reviewed Journal Papers: 33
Number of Peer-Reviewed Conference Papers: 49
Number of Research Reports: 5
Number of Peer-Reviewed Professional Magazine: 1
Number of Non-Referred Articles: 4
Professional Books
1. Kim, Y. (2017). Activity-Based Costing for Construction Companies,
Wiley Blackwell, Wiley-Sons, NY.
2. Schaufelberger, J., Kim, Y., Han, S., Jin, K., and Hanmi Global (2013). 턴키제도의
진실 The Truth behind the Design Build, Bomundang, Seoul, Korea
5 Yong-Woo Kim, Ph.D., Curriculum Vitae
Peer-Reviewed Journal Articles (published and accepted)
1. Yi, J., Kim, Y., Lim, J.*, and Lee, J. (2017). “Activity-based Life Cycle Analysis of
a Curtain Wall Supply for Reducing its Environmental Impact”, Energy and
Building, 138, 69-79. (Impact Factor: 2.973)
2. Park, H.*, Kim, K., Kim, Y., and Kim, H. (2017). “Stakeholder Management in
Long-Term Complex Mega Construction Projects”, Journal of Management in
Engineering, 33 (4). (Impact Factor: 1.56)
3. Shakouri, M., Lee, H, and Kim, Y. (2017). “A Probabilistic Portfolio-based Model
for Financial Valuation of Community Solar”, Applied Energy, 191, 709-726.
(Impact Factor: 5.746)
4. Kim, T*. and Kim, Y. (2016). “Process Improvement using Activity-Based
Costing”, Lean Construction Journal, 25-34, Nov 2016
5. Kim, Y. and Hochstatter, K*. (2016). “Transformational Leadership and its Impact
on Lean Construction”, Journal of Construction Engineering and Project
Management, July 2016.
6. Kim, Y., Han, S., Yi, J., Chang, S*. (2016). “Supply chain cost model for
prefabricated building material based on time-driven activity-based costing.”
Canadian Journal of Civil Engineering, 43 (4): 287 – 293. (doi: dx.doi.org/10.1139/cjce-2015-0010)
7. Azari, R*. and Kim, Y. (2016). “Integration Evaluation Framework for Integrated
Design Teams of Green Buildings: Development and Validation”, Journal of
Management in Engineering, ASCE, 32 (3): 04015053-1-14 (doi: 10.1061/(ASCE)ME.1943-5479.0000416)
8. Kim, B. and Kim, Y. (2016). “Configuration of Earthwork Equipment Considering
Environmental Impacts, Cost, and Schedule”, Journal of Civil Engineering and
Management , 22(1); 73-85. (doi: 10.3846/13923730.2014.897964)
9. Kim, T*., Kim, Y., and Cho, H. (2016). “Customer Earned Value (CEV): a
Performance Indicator from Flow and Value Generation View”, Journal of
Management in Engineering, ASCE, 32(1); 04015017-1-17 (doi: 10.1061/(ASCE)ME.1943-5479.0000377)
10. Kang, G*., Kim, T*., Kim, Y., Cho, H., and Kang, K. (2015). “Statistical Analysis
of Embodied Carbon Emission for Building Construction”, Energy and Building,
Volume 105: 326-333. (doi: http://dx.doi.org/10.1016/j.enbuild.2015.07.058)
11. Kim, S.*, Kim, Y., Park, K., and Yoo, C. (2015). “Impact of Measuring
Operational-Level Planning Reliability on Management-Level Project
Performance”, Journal of Management in Engineering, ASCE, 31 (5): 05014021-1-9
(doi: 10.1061/(ASCE)ME.1943-5479.0000326)
12. Lee, H., Anderson, S., Kim, Y., and Ballard, G. (2014). “Advancing impact of
education, training, and professional experience on integrated project delivery”
6 Yong-Woo Kim, Ph.D., Curriculum Vitae
Practice Periodical on Structural Design and Construction, ASCE, 9(1):8-14. (doi: : 10.1061/(ASCE)SC.1943-5576.0000190)
13. Kim, Y. and Kim, S*. (2014). "Computerized Integrated Project Management
System for a Material Pull Strategy", Journal of Civil Engineering and
Management, 20 (6), 849 – 863. (doi: 10.3846/13923730.2013.802743)
14. Kim, Y., Azari, R*., and Yi, J. (2013). “Environmental Impacts Comparison
between On-Site vs. Prefabricated Just-In-Time Rebar Supply in Construction
Projects”, Journal of Civil Engineering and Management, 19 (5), 647-655. (doi: 10.3846/13923730.2013.795186)
15. Kim, Y. and Kim, S*. (2012). “Workforce Information Database System to Support
Production Planning in Construction Projects”, Journal of Civil Engineering and
Management, 18 (6), 867-878. (doi: 10.3846/13923730.2012.725675)
16. Azari, R*. and Kim, Y. (2012). “Comparative Assessment of Life Cycle Impacts of
Curtain Wall Mullions”, Building and Environments, 48, 135-155.
(doi:10.1016/j.buildenv.2011.09.010)
17. Yi, J., Kim, Y., Kim, K., Koo, B. (2012). “A Suggested Color Scheme for Reducing
Perception-Related Accidents”, Journal of Accident Analysis and Prevention,
48(2012), 185-192. (doi:10.1016/j.aap.2011.04.022)
18. Kim, Y., Han, S, Shin, S., and Choi, K (2011). “A case study of activity-based
costing in allocating rebar fabrication costs to projects”, Journal of Construction
Management and Economics, 29(4), 449-461. (doi: 10.1080/01446193.2011.570354)
19. Kim, Y. and Kim, S* (2011). "Cost Analysis of Information Technology-assisted
Quality Inspection Using Activity–based costing", Journal of Construction
Management and Economics, 29(2), 163-172. (doi: 10.1080/01446193.2010.538708)
20. Kim, Y. and Dossick, C. (2011). “What makes the delivery of a project integrated? A
case study of Children’s Hospital, Bellevue, WA”, Lean Construction Journal, Special
Issue on Integrated Project Delivery, 2011, 53-66, ISSN 1555 -1369
21. Kim, S*. and Kim, Y. (2011). "Material Management System based on Daily Work",
Advanced Materials Research, 255, 1587 - 1591. (doi:
10.4028/www.scientific.net/AMR.255-260.1587)
22. Kim, Y. and Ballard, G (2010). “Management Thinking in the Earned Value Method
and the Last Planner System”, ASCE, Journal of Management in Engineering, 26 (4),
223-228; (doi: 10.1061/(ASCE)ME.1943-5479.0000026).
23. Kim, Y. and Bae, J*. (2010). “Assessing the Environmental Impacts of a Lean Supply
System: a Case Study of High-rise Condominium Construction”, ASCE, Journal of
Architectural Engineering, 16 (4), 144-150. (doi: 10.1061/(ASCE)AE.1943-
5568.0000024.
7 Yong-Woo Kim, Ph.D., Curriculum Vitae
24. Choi, K., Lee, E., Ibbs, W., and Kim, Y (2009) “Multifaceted public outreach and
cost-benefit analysis for its effectiveness validation”, Journal of Construction
Management and Economics, 27(8): 771-782. (doi: 10.1080/01446190903096591)
25. Bae, H*. and Kim, Y. (2009) “Survey on Indicators in Environmental Performance
Evaluation for Small and Medium Sized Companies”, International Journal of
Environment and Sustainable Development, 8 (2): 151- 172.
26. Choi, J*. and Kim, Y. (2009). “Community Revitalization System in New York State
and Community Involvement”, Korean Journal of Construction Engineering and
Management (in Korean), 10(3): 3-12.
27. Kim, S.*, Kim, Y., and Park, C. (2008). “Case Studies of the Mega Projects in
Applying the Lean Construction, Journal of American Institute of Constructor,
32(2): 33-40.
28. Kim, Y. and Jang, J.* (2008). “Improving Informational Transparency Using
Hierarchical Constraint Analysis”, Journal of American Institute of Constructor,
32(2): 20-27.
29. Bae, J*. and Kim, Y. (2008) “Sustainable Value on Lean Construction Projects”,
Journal of Green Building, 3(1): 156-167.
30. Kim, Y. and Kim, K (2008) “A Study on Preconstruction Process in support of Lean
Project Delivery Systems,” Journal of Korea Institute of Healthcare Architecture (in
Korean), 14(4): 47-54.
31. Kim, Y and Jang, J* (2006) “The Last Planner System on Tunneling Projects”,
Korean Journal of Construction Engineering and Management (in Korean), 7(4):
146-154.
32. Kim, Y. and Ballard, G (2005). “Profit Point Analysis: A Method of Analyzing of
Indirect Staff Costs”, Canadian Journal of Civil Engineering, 32(5): 712-718. (doi:
10.1139/L05-021)
33. Kim, Y. and Ballard, G. (2002). “Customer-Earned-Value Method”, Journal of
Construction Research, 3(1): 55-66.
Peer-Reviewed Journal Articles (under review or in preparation)
1. Kim, Y. and Kim, S. “Is there a Golden-Time in the Last Planner System?” Journal
of Management in Engineering, ASCE, submitted April 2017
2. Kim, Y. and Jang, J. “PCR (Percent Constraints Removal) to measure the
performance of make-ready process”, ASCE to be submitted May 2017
8 Yong-Woo Kim, Ph.D., Curriculum Vitae
Peer-Reviewed Conference Papers (published and accepted)
1. Kim, Y. and Bender, W. (2017). “Investigating Relationships between Admission
Criteria and Performance in a Construction Management Program”, 53rd ASC
Annual International Conference Proceedings, Associated School of Construction,
Seattle, WA., April 2017.
2. Kim, Y., Rezqallah, K*., Lee, H., and Angeley, J. (2016). "Integrated Project
Delivery in Public Projects: Limitations and Opportunity", 24th International Group
of Lean Construction, Boston, MA., July 2016.
3. Kim, T*. and Kim, Y. (2016). "Activity-Based Costing for Process Improvements",
24th International Group of Lean Construction, Boston, MA., July 2016. (Selected
for Keynote Paper)
4. Kim, Y., Rahman, A*., and Angeley, J. (2016). "Benchmarking Tool for Integrated
Design Process", 24th International Group of Lean Construction, Boston, MA., July
2016.
5. Kim, Y., Eom, R*., and Lee, W.(2015). “The Effectiveness of AR (Augmented
Reality) Technology in Acquiring Information on a Job-site Task”, 2015 ASEE
(American Society of Engineering Education) Annual Conference and Exposition,
Seattle, Washington. 10.18260/p.24862
6. Kim, Y.(2014) “Supply Chain Cost Model in Integrated Approach", ASCE
Construction Research Congress, Atlanta, GA, May 19 -21.
7. Ghadge, S*., and Kim, Y. (2014) “Testing Effectiveness of Solar PV for Public
Schools", ASCE Construction Research Congress, Atlanta, GA, May 19 -21.
8. Azari, R*., Kim, Y., Ballard, G. , and Cho, S. (2014) “Starting from Scratch: A New
Project Delivery Paradigm", ASCE Construction Research Congress, Atlanta, GA,
May 19 -21.
9. Azari, R*., and Kim, Y. (2014). “Development and Validation of a Framework for
Evaluation of Integrated Design Teams of Sustainable High-Performance (SHP)
Buildings, ASCE Construction Research Congress, Atlanta, GA, May 19 -21.
10. Azari, R*. and Kim, Y.(2013) “Evaluation of Integrated Design Process of High-
Performance Green Buildings”, 49th Annual International Conference of Associated
Schools of Construction, San Luis Obispo, CA, April 9-13.
11. Dossick. C., Azari, R*., Kim, Y., and El-Anwar, O. (2013) “IPD in Practice:
Innovation in Healthcare Design and Construction.” ASCE Architectural
Engineering conference 2013,
9 Yong-Woo Kim, Ph.D., Curriculum Vitae
12. Azari, R*. and Kim, Y. (2012) “A Comparative Study on Environmental Life Cycle
Impacts of Curtain Walls”, Construction Research Congress 2012, West Lafayette,
IN, 1610-1619
13. Jung, W*., Ballard, G., Kim, Y. and Han, S.(2012). “Understanding of Target Value
Design for Integrated Project Delivery with the Context of Game Theory”,
Construction Research Congress 2012, West Lafayette, IN, 556-563
14. Kim, Y., El-Anwar, O. and Houston, M*. (2012). “ The Relationship between
Delivery Processes and Transportation Projects' Performance “,Construction
Research Congress 2012, West Lafayette, IN, 2339-2348.
15. Oguz, C*., Kim, Y., Hutchison, J., and Han, S.(2012). “ Implementing lean six
sigma: A case study in concrete panel production”, 20th International Group of Lean
Construction, San Diego, CA., August, 2012
16. Azari, R.*, Ballard, G., Cho, S., and Kim, Y. (2011). “A Dream of Ideal Project
Delivery System”, AEI Conference Proceeding, ASCE, Oakland, CA, April, 2011,
427-436.
17. Jung, W*., Han, S., Kim, Y., and Choi, J. (2011). “Is it True that High Risk Yields
High Returns in International Construction Projects?”, The Sixth International
Structural Engineering and Construction Conference, Accepted, Zurich, Swiss, June
2011
18. Cho S., Ballard, G., Azari, R.*., Kim, Y. (2010). Development of Innovative Project
Delivery Systems for Healthcare Projects, Proceedings of International Public
Procurement Conference, South Korea, August 26-28.
19. Kim, Y. and Cooper, J. (2010) “Process-Based Approach in Sustainable Impact
Analysis of Rebar Supply System”, Proceedings of the 2010 ASCE Construction
Research Congress, Banff, Canada, May 8-10: p.1518-1527.
20. Lin, K., Kim, Y., and Dossick, C. (2010) “Repositioning the Faculty Internship
Experience in Construction Management”, Proceedings of the 2010 ASCE
Construction Research Congress, Banff, Canada, May 8-10: p.215-225.
21. El-Anwar, O. and Kim, Y. (2010) “Multi-Objective Optimization of Process Design
using Process-Based Sustainable Impact Analysis: Case Study on Rebar Supply
System in Building Construction,” Proceedings of the International Conference on
Computing in Civil and Building Engineering, Nottingham, UK, June 30 - July 2.
22. Kim, Y. and Bae, J*. (2009) “Supply Chain Costs Analysis Using Activity-Based
Costing: Case Study in Rebar Supply”, Proceedings of the 17th Annual Conference
of the International Group for Lean Construction, Taipei, Taiwan, July 15 – 17:
p.113-125.
10 Yong-Woo Kim, Ph.D., Curriculum Vitae
23. Kim, Y. and Shin, S. (2009) “Database Program for Managing Management
Resources: General Contractor’s Perspectives”, Proceedings of 3rd International
Conference of Construction Engineering and Management, Jeju, Korea, May 27 –
30: p.1100-1106.
24. Kim, Y. and Jang, J*. (2009). “Can You Predict the Production Performance using
the Make-Ready Performance?”, Proceedings of 3rd International Conference of
Construction Engineering and Management, Jeju, Korea, May 27 – 30: p.914-919.
25. Kim, Y, Kim, S*, and Park, C. (2009). ‘Workforce Information Database and RFID
Technology to track and manage workforce information”, Proceedings of 3rd
International Conference of Construction Engineering and Management, Jeju, Korea,
May 27 – 30: p.1094-1099.
26. Bae, J*. and Kim, Y. (2009) “Assessing the Environmental Impacts of Lean Supply
System: A Case Study of Rebar Supply Systems in High-Rise Condominium Projects”,
Proceedings of the 2009 ASCE Construction Research Congress, Seattle, WA, Apr 5-
7: p.1009-1018.
27. Jang, J*. and Kim, Y (2008), “The Relationship Between the Make-Ready Process
and Project Schedule Performance, 16th Annual Conference of the International
Group for Lean Construction, Manchester, UK, July 16–18, p.647-656: On-line
available at
http://www.iglc.net/conferences/2008_Manchester/Proceedings%20of%20IGLC16.p
df
28. Kim, S*., Kim, Y., and Park, C. (2008). “Introduction of Workforce Database System
for Effective Production Planning”, Proceedings of 16th Annual Conference of the
International Group for Lean Construction, Manchester, UK, July 16-18; p.833-838:
On-line available at
http://www.iglc.net/conferences/2008_Manchester/Proceedings%20of%20IGLC16.p
df
29. Bae, J*. and Kim, Y. (2008) “Environmental Impacts of Alternative Rebar Supply
Systems”, Proceedings of 16th Annual Conference of the International Group for
Lean Construction, Manchester, UK, July 16-18, p.735-742; On-line available at
http://www.iglc.net/conferences/2008_Manchester/Proceedings%20of%20IGLC16.p
df
30. Kim., Y. and Park, C. (2008). “Vertical Alliance for Lean Implementation”, 2008
United State-Korea Scientists Conference Proceedings, San Diego, CA., Aug 14 –
17.
31. Kim, Y, Jang, J*, and Ballard G. (2007) “A Subcontractor’s Lean Journey: A Case
Study on Ilyang”, Proceedings of 15th Annual Conference of the International Group
for Lean Construction, Detroit, MI, July 18 – 20: p.135-140.
32. Kim, Y, Park, C. and Ballard, G. (2007) “A Case Study on Rebar Supply Chain”,
Proceedings of 15th Annual Conference of the International Group for Lean
Construction, Detroit, MI, July 18 – 20: p.129-134.
11 Yong-Woo Kim, Ph.D., Curriculum Vitae
33. Ballard G., and Kim, Y (2007) “Implementing Lean on Capital Projects”,
Proceedings of 15th Annual Conference of the International Group for Lean
Construction, Detroit, MI. July 18 – 20: p. 88-97.
34. Jang, J*. and Kim, Y (2007, A). “Use of Percent of Constraint Removal to Measure
the Make-Ready Process”, Proceedings of 15th Annual Conference of the
International Group for Lean Construction, Detroit, MI, July 18 – 20: p.529-538.
35. Jang, J*. and Kim, Y (2007, B). “Using Kanban for Construction Production and
Safety Control”, Proceedings of 15th Annual Conference of the International Group
for Lean Construction, Detroit, MI, July 18 – 20: p.519-528.
36. Jang, J*, Kim, Y, Park, C., and Jang. W. (2007). “Importance of Partners in a
Challenging Lean Journey”, Proceedings of 15th Annual Conference of the
International Group for Lean Construction, Detroit, MI., July 18 – 20: p.465-474.
37. Bae, J*. and Kim, Y. (2007). “Sustainable Value on Construction Project and Lean
Construction”, Proceedings of 15th Annual Conference of the International Group
for Lean Construction, Detroit, MI., July 18 – 20: p. 312-321.
38. Kim, Y, and Ballard, G. (2007). “Toward Lean Construction Implementation
Theory”, 2007 United State-Korea Scientists Conference Proceedings, Washington,
DC., Aug 9 -12.
39. Jang, J*, and Kim, Y (2007, C). “Lean Construction Performance Measurement for
Process Control”, 2007 United State-Korea Scientists Conference Proceedings,
Washington, DC., Aug 9 -12.
40. Jang, J*, and Kim, Y (2007), “Visual control for production management: Case
Study in Highway Construction in Korea”, Proceedings of the 2007 United State-
Korea Scientists Conference, Washington, DC, Aug 9 -12.
41. Kim, Y and Jang, J* (2006, A) “Constraint Analysis using Organizational
Hierarchy”, Proceedings of the 14th Annual Conference of the International Group
for Lean Construction, Santiago, Chile, Aug 2-4: On-line available at
http://www.iglc.net/conferences/2006/ConferencePapers (Selected a Paper
Presenting Innovative Idea)
42. Kim, Y and Jang, J* (2006, B) “Production planning using Organizational
Hierarchy”, Proceedings of the 6th International Symposium on Architectural
Interchanges in Asia, Taegu, Korea, Oct 25 – 28.
43. Kim, Y , Jang, J*, Bae, J*. (2006). “Assessment of Lean Project Delivery: Benefits
and Barriers of Lean Construction, Proceedings of the 2006 United State-Korea
Scientists Conference, Fort Lee, NJ, Aug 10 -13.
44. Jang, J* and Kim, Y (2006). “The Last Planner system: Applying Organizational
Hierarchy Constraint Analysis”, Proceedings of the 2006 United State-Korea
Scientists Conference, Fort Lee, NJ, Aug 10-13.
12 Yong-Woo Kim, Ph.D., Curriculum Vitae
45. Kim, Y. and Jang, J*. (2005). “Application of Last Planner to Heavy Construction
in Korea” Proceedings of the 13th Annual Conference of the International Group for
Lean Construction, Sydney, Australia, p.405-411; On-line available at
http://www.iglc.net/conferences/2005/papers/session09
46. Kim, Y. and Ballard, G. (2005). “Management Thinking Behind Project Control
Tools” Proceedings of the 1st International Conference of Construction
Engineering and Management, Seoul, Korea, Oct 16 – 19.
47. Kim, Y. and Ballard, G (2002). “Case Study – Overhead Cost Analysis”,
Proceedings of the 10th Annual Conference of the International Group for Lean
Construction, Gramado, Brazil, Aug 6-8: On-line available at
http://www.iglc.net/conferences/2002/Papers/PERFORMANCEMEASUREMENT/
48. Kim, Y. and Ballard, G. (2001). “Activity-Based Costing and Its Application to
Lean Construction”, Proceedings of the 9th Annual Conference of the International
Group for Lean Construction, Singapore, Aug 6 – 9; On-line available at
http://www.iglc.net/conferences/2001/Papers/ProjectManagement
49. Kim, Y. and Ballard, G. (2000). “Is Earned-Value Method an Enemy of Work
Flow?”, Proceedings of the 8th Annual Conference of the International Group for
Lean Construction, Brighton, England, July 17 – 19; On-line available at
http://www.iglc.net/conferences/2000/Papers/KimBallard.pdf
Technical Research Reports
1. Kim, Y. and Pi, C.J*. (2014). Application of NFC-based AR-System on Lean
Construction: Reliable Planning, Research Report to Sungkyunkwan University and
Department of Small and Mid-Sized Business (Federal Agency), Korea. June 2014.
2. Ballard, G, Kim, Y., Azari*, R., and Cho, S. (2012) Start from Scratch: Innovative
Project Delivery System, Research Team (RT)-271, Construction Industry Institute,
Austin, TX, September, 2012, On-line available at www.construction-instittue.org
3. Kim, Y. and Mo*, J. (2009) Investigate Opportunities and Barriers of the Lean
Project Delivery System (LPDS) to the Electrical Contractors - A Pilot Study in a
Healthcare Project in CA., ELECTRI International, Bethesda, MD., On-line
available at www.electri.org/research/investigate-opportunities-and-barriers-lean-
project-delivery-systems-lpds-electrical
4. Kim, Y. and Jang, J*. (2008) Improving the Make-Ready Process and Forecasting
Project Performance, Ilyang Construction Inc, April 2008
5. Ballard, G, Kim, Y., Jan, J.*, and Min, L. (2007) Lean Implementation at the
Project Level, Research Team (RT)-234, Construction Industry Institute, Austin,
TX, September, 2007, On-line available at www.construction-instittue.org
13 Yong-Woo Kim, Ph.D., Curriculum Vitae
Peer-Reviewed Professional Magazine
1. Kwak, Y., Ibbs, C. and Kim, Y. (1999) “A System Approach to Evaluate
Quantitative Impacts of Project Management ”, PROMAT (Project Management &
Technology) Magazine, Summer, pp.12-18. (in Korean).
Non-Referred Articles (Published)
1. Kim, Y. (2014). “더나은 인재산출을 위한 대학교육의 개선방안” How to
Improve our Construction Management Education to better respond to Changing
Industry Environments?’, Journal of Construction Engineering and Management,
Apr 2014.
2. Kim, Y. (2006). “Green Building Trends in the United States”, Korean Wood
Construction and Product News, May 2006.
3. Kim, Y. (2006). “Lean Project Management and Customer Focus”, Korean Wood
Construction and Product News, Jan 2006.
4. Kim, Y. (2005). “Construction Management Curriculum in the United States”,
Korean Journal of Construction Engineering and Management, Dec 2005
II. Proposal Writing and Grants
Proposal Writing and Grants Summary
Number of Research Grant Proposals Submitted: 41
Total Amount of Grants Requested: $3,872,389
Number of Research Grant Proposals Funded: 17
Total Amount of Grants Awarded: $1,058,596 (Dr.Kim's Share: $800,333)
Funded Research Projects
2016 – 2018 Integrating Lean Construction Metrics with Earned Value Analysis for
Project Control
Funded by: Korea National Science Foundation
Role: Participant
Budget: $15,000
2014 – 2015 Lean Application to UW ARCF (Animal Research and Care Facility)
Project: Benchmarking of Integrated Design Process at UW ARCF
Funded by: UW CPD (Capital Planning and Development)
Role: PI
14 Yong-Woo Kim, Ph.D., Curriculum Vitae
Budget: $15,360
2012 – 2014 Augmented Reality (AR) system using NFC (Near Field
Communication) Technology for Lean Project Planning
Funded by: Korea Ministry of Small Business (Federal Agency)
Role: PI of UW
Budget: $210,000 (PI’s Share: $66,217)
2012-2013 Implementing Green Construction in Highway Design and
Construction
Funded by: Korea Expressway Corporation
Role: PI
Budget: $12,000 (Gift)
2011-2012 Lean Implementation for Seoul Metropolitan Government
Funded by: Seoul Metropolitan Government, Korea
Role: PI
Budget: $10,000
2011-2012 Comparison Analysis of Design-Build in US and Korea
Funded by: Hanmi Global, Korea
Role: PI
Budget: $15,000
2010 – 2011 Designing the Project Delivery Process for Green Infrastructure
Projects
Funded by: TransNow (U.S. Department of Transportation)
Role: PI
Budget: $104,265 including matching funds
2010 – 2011 Developing the Life Cycle Assessment Model for Selecting Construction
Materials in the Design Phase
Funded by: Korea National Science Foundation (through Ewha
Womens University, Korea)
Role: PI at Univ. of Washington
Budget: $27,000 (PI’s Share: $10,022)
2009 – 2012 Developing an Innovative Project Delivery Process
Funded by: Construction Industry Institute
Role: PI at Univ. of Washington (Collaborative project with the
University of California, Berkeley)
15 Yong-Woo Kim, Ph.D., Curriculum Vitae
Budget: $207,174 (PI’s Share: $109,672)
2009 – 2010 Applying Lean principles to Design and Engineering Phase in
Engineering-Procurement-Construction (EPC) projects
Funded by: Domyung Engineering, Inc.
Role: PI
Budget: $12,299
2009 – 2010 Dean’s Development Award: Investigating a Contractor’s Behavior for
Green Procurement
Funded by: University of Washington, College of Built Environments
Role: PI
Budget: $5,000
2008 – 2009 Validating a Process-Based Approach in Investigating Sustainable
Impacts in the Construction Domain: A Pilot Study on Rebar Supply
Systems in Building Construction
Funded by: University of Washington, Royalty Research Fund
Role: PI
Budget: $37,500
2008 – 2009 Lean Implementation from Electrical Contractors’ Perspective
Funded by: ELECTRI International (EI) research programs and
National Electrical Contractors Association (NECA)
Role: PI
Budget: $10,000
2008 – 2010 Lean Construction Research General
Funded by: Lean Construction Institute (LCI)
Role: PI
Budget: $10,000 (Gift)
2005 – 2007 Implementing Lean Principles at the Project Level
Funded by: Construction Industry Institute (CII)
Role: PI at SUNY-ESF (Collaborative project with the University
of California, Berkeley)
Budget: $214,000
16 Yong-Woo Kim, Ph.D., Curriculum Vitae
2005 – 2007 Performance Measurements for Lean Construction
Funded by: Ilyang Construction Inc.
Role: PI
Budget: $149,998
2007 Sustainable Construction
Funded by: SUNY Research Foundation Incentive Fund
Role: PI
Budget: $7,500
Grant Proposals Pending
Development of Construction Specification to Implement Lean Principles
Sponsor: UW Capital Planning and Development
Role: PI
Budget: $12,000
Duration: 2017 – 2018
Grant Proposals Not Selected for Funding
Developing Strategy for Modular Construction at Overseas Industrial Projects
Sponsor: Construction Industry Institute
Role: PI
Duration: 2017 – 2019
Bridging a Gap between Operational Strategy and Performance Metric
Sponsor: National Science Foundation (CMMI)
Role: PI
Budget: $180,066
Duration: 2016 – 2018
Integrated Project Delivery for Industrial Projects (Statement of Qualification)
Sponsor: Construction Industry Institute
Role: PI
Duration: 2016 – 2018
Just-In-Time Delivery for Effective Supply Chain Management
Sponsor: Construction Industry Institute
Role: PI
Duration: 2016 – 2018
Lean Transformation Strategy for Electrical Contractors
17 Yong-Woo Kim, Ph.D., Curriculum Vitae
Sponsor: ELECTRI International (Foundation of Electrical Contractors)
Role: PI
Budget: $45,000
Duration: 2016 – 2017
Investigating Relations between Project Control and its Metric System
Sponsor: National Science Foundation (CMMI)
Role: PI
Budget: $238,330
Duration: 2014 – 2016
Developing a Roadmap for Lean Implementation for Electrical Construction
Sponsor: ELECTRI International (Foundation of Electrical Contractors)
Role: PI
Budget: $40,000
Duration: 2014 – 2015
Brining the Relevance Back to Project Performance Metric (Statement of Qualification)
Sponsor: Construction Industry Institute
Role: PI
Budget: $175,000
Duration: 2014 – 2016
A Closer Look at Material Planning; a New Look at Jobsite Inventory Strategies
Sponsor: Construction Industry Institute
Role: PI
Budget: $150,000
Duration: 2013 – 2015
Are you measuring the Right Thing? Value-Based Multi-factor Productivity Measurement
Sponsor: ELECTRI International (Foundation of Electrical Contractors)
Role: PI
Budget: $38,000
Duration: 2013 – 2014
Measuring Unintended Waste through Process-Based Costing
Sponsor: Construction Industry Institute
Role: PI
Budget: $170,000
Duration: 2012 – 2014
18 Yong-Woo Kim, Ph.D., Curriculum Vitae
Program Learning over Projects for Reducing Project Risks
Sponsor: Project Management Institute
Role: PI
Budget: $49.966
Duration: 2012 – 2014
Note: This proposal was selected to the final round
Global Supply Chain Management Strategy for Overseas EPC Projects
Sponsor: Korea National Science Foundation
Role: Co-PI (PI at the University of Washington)
Budget: $280,000
Duration: 2011 – 2013
Managing Overhead Costs for Electrical Contractors
Sponsor: ELECTRI International (Foundation of Electrical Contractors)
Role: PI
Budget: $39,000
Duration: 2011 – 2012
Supporting the AEC (Architecture, Engineering, and Construction) Sector in Making Green
Purchasing Decisions: Through Improved Acquisition of Green Product and Supplier
Information
Sponsor: National Science Foundation
Role: Co-PI (PI: Dr. Ken-Yu Lin)
Budget: $187,636
Duration: 2010 – 2012
Improving Performance of EPC Projects through a New Production Paradigm and Supply
Chain Physics: A Holistic View
Sponsor: Korea National Science Foundation
Role: Co-PI (PI at the University of Washington)
Budget: $300,000
Duration: 2008 – 2011
Developing a MTAM (Manufacturing Technology Application Matrix) for Enhancing
Construction Project Performance
Sponsor: Construction Industry Institute
Role: PI
19 Yong-Woo Kim, Ph.D., Curriculum Vitae
Budget: $211,077
Duration: 2008 – 2010
Developing a Lean Readiness Assessment Tool
Sponsor: Construction Industry Institute
Role: Co-PI (PI at the University of Washington)
Budget: $69,100
Duration: 2008 – 2010
Uncovering the Secrets of Success of International Lean Construction Companies in Safety
Management
Sponsor: ASSE (American Society of Safety Engineers)
Role: PI
Budget: $19,665
Duration: 2008 – 2009
A Simulation Approach to Minimizing Safety Accidents in Construction Earth Work
Sponsor: ASSE (American Society of Safety Engineers)
Role: PI
Budget: $18,936
Duration: 2005 – 2006
Activity-Based Life-Cycle Assessment of Alternative Building Materials in Central New
York
Sponsor: Mcintire-Stennis Research Program
Role: PI
Budget: $67,355
Duration: 2005 – 2007
Construction Process Control: Built-In Safety Control Method
Sponsor: ASSE (American Society of Safety Engineers)
Role: PI
Budget: $9,998
Duration: 2004
Performance Measurement during Construction Execution
Sponsor: Construction Industry Institute (CII)
Role: PI
Budget: $164,664
Duration: 2004 – 2006
20 Yong-Woo Kim, Ph.D., Curriculum Vitae
III. Invited Lectures and Talks
2016 How IPD is different than GC-CM and Design Build?
Joint Seminar (Yonsei University, Choongang Univ, and Sejong Univ), Yonsei
University, Seoul, Korea, July
Integrated Design Process for Health Care Projects: Case Study
Korea Institute of Construction Engineering and Management, Seoul, Korea, Aug
2015 Lean Supply Chain Management in the AEC (Architecture, Engineering, and
Construction) industry
Hanbat National University, Daejon, Korea, Oct
Performance Metrics in the Lean Construction and its Relation with
Traditional Metrics
CDM Smiths, Denver, CO.
Activity-Based Costing in Managing Supply Chains in EPC projects
Joint Seminar, UW Lean Construction Group and Yonsei University Construction
Management Group, Seattle, WA, June
How Lean Can be Adopted in Engineering Discipline?: A case of Canadian
EPC Engineers using an One-Piece Flow and Pull mechanism in managing
drawing documents
Hanmi Foundation + Oteck Engineering, Kirkland, WA. April
2014 Integrated Design and its Measurement
UW, CPD (Capital Project Development), Seattle, March
Lean Cost Management: Activity-Based Costing and its Application in the
Construction Industry
Depart of Architectural Engineering, Sungkyunkwan University, On-Line Seminar
GC-CM Contract vs. Integrated Project Delivery System: Alternative Way to
Implement IPD in a traditional contract setting
Korea Institute of Construction Technology (Government Agency), Aug
2013 Applying Activity-Based Costing in Construction Projects
21 Yong-Woo Kim, Ph.D., Curriculum Vitae
KICEM (Korea Institute of Construction Engineering and Management), Seoul,
Korea, Aug
Relationship between the Earned Value Method and the Last Planner System
Dept of Civil Engineering, Choongang University, Seoul, Korea, Aug
Lean Principles and its Application in Engineering Process: Case Study on
Design Flow
Otek Engineering, Inc., Kirkland, WA. June
2012 How to Apply Lean Construction Principles from the Mechanical Contractors'
Perspectives
Mechanical Contractors Association, Seattle, WA, Feb
Green Construction in Infrastructure System
Dept of Civil Engineering, Yonsei University, Seoul, Korea, Aug
Customer Earned Value Metrics: Metrics for Lean Construction Principles
GS E&C, Seoul, Korea, August
Preferred Supplier Relationship: Kirby vs. Indy
Engineering Project Management Program, Seoul National University, June
Missing Link: Look-ahead Planning for Reliable Workflow, Principles and
Cases for Electrical Contractors
Superintendent Course, National Electrical Contractors Association, Seattle, WA,
March, March
2011 Supply Chain Management Case Study: Intel
Civil Engineering Department, Yonsei University, Seoul National University, June
The Last Planner System and its Relations with Project Performances
Department of Architecture, Seoul National University, Seoul, July
How to Implement Lean Construction
Special six-hour lecture on lean construction, Pacific Northwest Construction
Education and Research Center, Seattle, WA, Oct.
Lean Construction and Its Implementation in Electrical Contractors
National Electrical Contractors Association, Seattle, WA, March
22 Yong-Woo Kim, Ph.D., Curriculum Vitae
2010 Lean Construction and Its Implementation in Electrical Contractors
Superintendent Courses, National Electrical Contractors Association, Seattle, WA,
March 9th, 11th, 16th, and 18th
Earned Value Method and Last Planner System
Department of Civil Engineering, Yonsei University, Seoul, December
Sustainable Highway (Seminar)
Special Seminar on green infrastructure, Korea Department of Transportation
(Highway Express Corporation), Kyunggi, Korea, December
Integrated Project Delivery System in Public Infrastructure Projects
Department of Civil Engineering, Hanbat National University, Korea, December
Engineering Project Management Program
Strategic Procurement (EPC Plant Projects), Seoul National University, December
2009 Lean Construction and Last Planner System and its Implementation for
General Contractor and Specialty Contractors (with hands-on exercises)
Children’s Hospital Project Team (Sellen and subcontractors), Sellen Construction,
Seattle, WA, May 15th
What is Lean Construction?
Lean Construction Institute Cascade Chapter Meeting, Seattle, WA, July
How to improve our project delivery system?
Korea Institute of Construction Technology (Government Agency), Ilsan, Korea,
July 24th
Lean Approach to Supply Chain Management: Process-Based Cost Analysis
School of Civil Engineering, Yonsei Unviersity, Seoul, Korea, July 8th
Lean Supply System in Rebar Supply Chain
Rebar Research Group, Korea Institute of Construction Technology, Ilsan, Korea,
July 14th
How Lean can be Applied to Design and Engineering Process?
Construction Management Group, Choongang University, Seoul, Korea, July 28th
23 Yong-Woo Kim, Ph.D., Curriculum Vitae
2008 Lean Principles and its Application to Healthcare Projects: Electrical
Contractors' Perspectives
National Meeting, NECA (National Electrical Contractors Association), Chicago,
IL, July
Research Deliverables at UW-Lean Construction Lab (P2SL): Review of Past
Research Projects at UW-Lean Construction Lab
Lean Construction Institute Cascade Chapter Meeting, Seattle, WA, Dec 12th
How Lean Principles can Implemented in Construction Industry?
Lean Construction Institute Cascade Chapter Meeting, Seattle, WA, Jan 17th
Lean Supply Chain System
Ph.D. Colloquium, College of Architecture, Univ of Washington, Seattle, WA,
March
2007 Project and Production Scheduling using Last Planner: Lessons Learned from
Ilyang’s Lean Journey
Project Management Group and Board of Directors, Ilyang Construction Inc., Seoul,
Korea, June
Customer Earned Value to Align EVM System with Lean Construction
Lean Construction Team, GS E&C, Seoul, July
2006 Different Pictures of Lean Implementation in Construction Projects
Construction Industry Institute Lean Construction Task Force Team, San Diego, CA,
July 28th
Last Planner System in Construction Projects: General Contractor’s
Perspectives
GS Engineering and Construction Inc., Seoul, Korea, June
Project Performance Prediction using Your Make-Ready Process
Lean Construction Task Force Group, Ilyang Construction, Seoul, Korea, June
2005 Lean Construction Implementation in Korea
Department of Architectural Engineering, Dankook University, Seoul, Korea, July
2005
Where to Start for Lean Implementation?
Korea Institute of Construction Technology, Il-San, Korea, July 2005
Management Thinking Behind Project Control
24 Yong-Woo Kim, Ph.D., Curriculum Vitae
Department of Civil Eng., Yonsei University, Seoul, Korea, July 2005
Can We Tolerate the Earned Value Method?
Ewha Womens University, Seoul, Korea, July 2005
How to Implement Lean Construction?
GS E&C, Seoul, Korea, June 2005
Impacts of Lean Construction on Project Performances
Il-Yang Construction Company, Seoul, Korea, June 2005
2004 New Overhead Cost Control in Project-Based Production System
Faculty Research Seminar, Univ. of Houston, Houston, TX, May 2004
Are You Measuring the Right Things?
Research Innovation Group, College of Architecture, Texas A&M, College Station,
TX, Jan 2004
2003 Profit Point Analysis: ABC in Construction
Department of Architecture, Kwangwoon University, Seoul, Korea, April
2002 What is Wrong with Our Accounting System in Managing Project Overhead?
Project Management Group, DPR, Inc., Redwood City, CA, Jan
IV. Professional Practice and Consulting
2005.7 – 2008.7 GS Engineering and Construction Inc. (#1 General
Contractor in Korea; #32 General Contractor in the World
based on annual revenue, ENR 2008)
Consulted lean construction software development and
supervised lean implementation (the Last Planner System)
working with a company’s task force team; See Kim, S., Kim,
Y., and Park, C. (2008), Kim, Y, Park, C. and Ballard, G. (2007),
2005.5 – 2007.8 Ilyang Construction Inc. (#5 Earthwork Contractor in Korea
based on annual revenue, 2007)
Consulted their Last Planner System (lean construction
planning method) on 22 projects; See Kim, Y, Jang, J, and
Ballard G. (2007), Kim, Y and Jang, J (2006), Jang, J, and Kim, Y
(2007)
2005.6 – 2005. 10 Poonglim Industry Inc. (#22 General Contractor in Korea
based on annual revenue, 2005)
25 Yong-Woo Kim, Ph.D., Curriculum Vitae
Consulted their pilot lean project (high-rise condominium in
Seoul)
26 Yong-Woo Kim, Ph.D., Curriculum Vitae
TEACHING
I. Teaching Assignments
Current Teaching Assignments, the University of Washington
CM 343 Lean Construction
3 Credits / 50 ~ 70 students
CM 518 Lean Construction (Graduate)
3 Credits / 20 ~ 30 students
CM 520 Construction Procurement Systems
3 Credits / 20 ~ 30 students
CM 525 Cost Analysis and Management (Graduate, Distance-Learning)
3 Credits / 17 ~ 25 students
Courses Taught in Previous Academic Years, the University of Washington
CM 421 Project Management I
3 Credits / 35 ~ 70 students / Winter 2009, Winter 2010, Winter 2011
CM 312 Construction Accounting
3 Credits / 20 ~ 60 students/ Autumn 2007, 2008, 2009, 2010, 2011, 2012, 2013, 2014,
and 2015
Courses Taught at State Univ. of New York, College of Environmental Science
and Forestry (ESF), Syracuse, NY.
2007 WPE 455 Construction Contracts and Specification (Undergraduate)
2004-2006 WPE 335 Construction Cost Engineering (Undergraduate)
2005-2006 WPE 343 Construction Estimating (Undergraduate)
2005-2007 ERE 796 Production and Operation Management (Graduate)
2004-2006 ERE 596 Lean Construction (Graduate)
• Course descriptions: http://www.esf.edu/catalog/courses/default.asp?Prefix=CME
27 Yong-Woo Kim, Ph.D., Curriculum Vitae
Courses Taught at University of Houston, Houston, TX (Main Campus)
2004 CNST 4361 Project Scheduling (Undergraduate)
2003 CNST 4351 Construction Estimating (Undergraduate)
2004 CNST 6330 Project Planning and Management (Graduate)
2004 CNST 6397 Special Topic: Lean Project Management (Graduate)
2003 CNST 6320 Cost Analysis and Bidding (Graduate)
2003 CNST 6303 Construction Quality Control and Methods (Graduate)
• Course descriptions: http://www.uh.edu/grad_catalog/tec/cnst_course.html
Courses Taught at Korea University as a Visiting Faculty
2014, SUM GCLASS Lean Construction (Graduate School)
2016, SUM GCLASS Lean Construction (Graduate School)
II. Graduate Students & Post-Doctoral Researchers Advising & Mentoring
Mentoring Post-Doctoral Researchers
2012~2014 Taehoon Kim, Ph.D.
Current Position: Assistant Professor, Chosun University, Korea
2007~2008 Sang-Chul Kim, Ph.D.
Current Position: Associate Professor, Hankyung National University,
Korea
Ph.D. Committee Chair
Active Chung Thi Thu Ho, University of Washington
Topic: Improving Production Scheduling for Reliable Workflow using
Agent-Based Modeling
2013 Rahman Azari, University of Washington
Thesis Title: An Evaluation Framework for Integrated Design
Process of Sustainable High-Performance Buildings
Current Position: Assistant Professor, College of Architecture,
University of Texas, San Antonio
28 Yong-Woo Kim, Ph.D., Curriculum Vitae
2008 Jinwoo Jang, SUNY-ESF
Thesis Title: Improving the Make-Ready Process and Forecasting
Project Performance using Performance of the Make-Ready Process
Current Position: Operational Manager, Ilyang Construction, Inc.
Inactive Khalid Abklhair, University of Washington
Topic: Decision Making System for Alternative Project Delivery
Inactive Jinwoo Bae, University of Washington
Topic: Green Supply Chain Management
Current Position: Senior Engineer, Construction Management
Department, Kunwon Engineering, Inc.
Ph.D. Committee Members
Active Hyungbae Park, Department of Civil Engineering, Yonsei University,
Seoul, Korea
Topic: Stakeholder Management for Mega Projects
Active Goun Kang, Department of Architectural Engineering, Korea
University, Korea
Topic: Statistical Analysis of Embodied Carbon Emission for Building
Construction
2009 Hyunkee Bae, SUNY-ESF
Thesis Title: Measuring the Effect of the Voluntary Disclosure of
Environmental Management Performance based on the US Stock
Market
M.S. Thesis Committee Chair
2013 Kirk Hochstatter, University of Washington
Thesis Title: Transformational Leadership and Lean Construction
Implementation
2012 Charusheela Ghadge, University of Washington
29 Yong-Woo Kim, Ph.D., Curriculum Vitae
Thesis Title: Analysis of Life Cycle Costs and Social Acceptance of
Solar Photovoltaic Systems Implementation in Washington State
Public Schools
2011 John Marcus, University of Washington
Thesis Title: Investigating Impacts of Specialty Contractor’s Early
Involvement on LEED
2011 Allan Monroe, University of Washington
Thesis Title: Qualitative Analysis of the Impact of Green Building on
Tenants’ Productivity
2010 Jessica Mo, University of Washington
Thesis Title: Case Studies on Lean Implementation in Healthcare
Projects from the Electrical Contractor’s Perspective
2010 Jongbo Kim, University of Washington
Thesis Title: Specialty Contractors’ Involvement in the Design Phase:
Architect’s and General Contractor’s View
2004 Allison Bell, University of Houston
Thesis Title: Investigating Factors that have Influence on
Subcontractors Involvement in Early Design
2004 Srujan Veeranki, University of Houston
Thesis Title: Safety in Lean Construction
M.S. Thesis Committee Member
2017 Shen-Hua Wu, University of Washington
Thesis Title: Use of BIM and Prefabrication to Reduce Construction
Waste
2017 Devarshi Patel, University of Washington
Thesis Title: Virtual Reality as a Training Tool for Building
Operations
2017 Nishant Bordia, University of Washington
30 Yong-Woo Kim, Ph.D., Curriculum Vitae
Thesis Title: Role of Technological Leadership in Supporting
Collaboration and Communication in Globally Distributed Virtual
Teams
2013 Jiyeon Lim, Ewha Women’s University
Thesis Title: Curtain-wall Supply Chain Management and its
Environmental Impacts using Activity-Based Life Cycle Analysis
2012 Sanghyun Lee, Ewha Women’s University
Thesis Title: Highrise Building Constructio using Takt-Time Planning
2011 Steve Kennerd, University of Washington
Thesis Title: Property Management Case Study
2010 Robert Shwed, University of Washington
Thesis Title: Lean Development Process for Developers
2010 Anne Timmermans, University of Washington
Thesis Title: Evaluation of the Washington State RCW 39.50D High
Performance Building Act Requirements in Public K-12 Construction
Projects
2008 Basem Banabilah, University of Washington
Thesis Title: Building Information Modeling: A Better Way to Achieve
Sustainable Design?
M.S. Paper or Professional Project Committee Chair
Active Madhusudan Dhoot, University of Washington
SWOT Analysis for LPS in India
Active Israa Alseadi, University of Washington
Target Value Design Case Studies: Comparative Analysis
Active Yanqung Lou, University of Washington
Design Build: Comparison Analysis China vs. US.
Active Wenting Zhang, University of Washington
Activity-Based Costing in Safety Management on Sites
31 Yong-Woo Kim, Ph.D., Curriculum Vitae
2017 Mary Cheruvathur, University of Washington
The Use of Drone for Construction Material Management
2017 Hamza Nasif, University of Washington
Improving the Integrated Design Process with the Last Planner
System
2017 Matthew Reed, University of Washington
Comparison Analysis between General Contractor’s Lean
Implementation Strategy vs. Specialty Contractor’s Lean
Implementation Strategy
2016 Korlaji Peerupally, University of Washington
Case Study: Local Contractors’ Lean Material Management
2016 Yu Ming Jimmy Au, University of Washington
Prefabrication Case Study in SR520 project
2016 Mohnish Selvakumar, University of Washington
Life Cycle Assessment Comparative Study
2016 Amar Abudawood, University of Washington
Investigating the Impact of Employee Empowerment in the Last
Planner System
2016 Khaled Rezquliah, University of Washington
Integrated Project Delivery in Public Projects
2015 Aniruth Gupta, University of Washington
Contractual Strategy for Lean Project Delivery: Case Studies for UW
Capital Project Office
2015 Khalid Abklhair, University of Washington
SWOT Analysis: GC-CM Delivery Strategy in Saudi Arabia
2015 Haotian Zao, University of Washington
Empowerment of Frontline Manager and its impact on Workflow
Reliability
2015 Haoduo Yang, University of Washington
32 Yong-Woo Kim, Ph.D., Curriculum Vitae
Automation of Production Management for Safety
2015 Lin Yang, University of Washington
A Study on the Relationship between Planning Reliability and Make-
Ready Process
2015 Yu Ye, University of Washington
Case Study: Lean Assembly at Hermanson
2015 Mattew Luery, University of Washington
SWOT Analysis: Lean for High-rise Multi-Housing Contractors
2015 Lin Yang, University of Washington
Relationship between Look-Ahead Planning and Project
Performances
2015 Haotian Zao, University of Washington
Empowerment of Frontline Manager and its impact on Workflow
Reliability
2014 Yansen Lambono, University of Washington
Integrated Design Process Assessment: Case Study
2014 Ya-Chu (April) Chang, University of Washington
Case Study of Lean Design: CBA (Choose-by-Advantage) at UW-
ARCF (Animal Research and Care Facility)
2014 Preeti Pustake, University of Washington
Social Responsibility Assessment in Capital Projects: Case Studies
2013 Jeanie Natta, University of Washington
Small Projects for Integrated Project Delivery: UW Capital Project
Office Case
2013 Michael Banks, University of Washington
Historical Reservation in Sustainable Construction
2012 Christopher Merimee, University of Washington
33 Yong-Woo Kim, Ph.D., Curriculum Vitae
Supplier Evaluation in Lean Supply Chain Management through Case
Studies
2012 William Sigman, University of Washington
Contractual Flexibility in Implementing Lean Construction:
University of Washington Capital Office Perspectives
2012 Fuju Wu, University of Washington
Benefits and Obstacles in Just-in-Time Strategy in Construction
Material Management
2009 Oguz Celep, University of Washington
Lean Six Sigma in the Construction Industry: Case Studies and
Implementation Model (Published and Presented in 2010
International Group of Lean Construction Conference)
2009 Manuel Bararaza, University of Washington
Case Study of a Kanban Strategy in Lean Material Management:
Reducing Inventory of Structural Steel Construction Projects
2009 Shalini Priyadarshini, University of Washington
Comparative Analysis of Sustainable Building Practices in the United
States and India: Leadership in Energy and Environmental Design
(LEED) 3.0 vs. Green Rating for Integrated Habitat Assessment
III. Courses Proposed, Developed, and Modified
New Courses Developed and Taught
CM 518 Lean Construction
Taught: Winter 2012, Spring 2013, 2014, 2015, and 2016, Winter 2017
CM 528 Advanced Construction Cost Management
Taught: Summer 2014, 2015, and 2016
CM 434 Lean Project Planning
Taught: Spring 2017
34 Yong-Woo Kim, Ph.D., Curriculum Vitae
Courses Modified
CM 312 Construction Accounting
Taught: Autumn 2007, 2008, 2009, 2010, 2011, 2012, 2013, and 2014
Description: Lecture course providing an introduction to accounting for
construction contractors, placing emphasis on the analysis and use of
financial statements and a project cost accounting system.
Innovations: Introduced a system of overhead cost management; Incorporated a
concept of activity-based costing, a new accounting method in
managing overhead costs, with real world examples where an
activity-based costing was employed on construction projects;
Developed five case studies from industries so that students develop
problem-solving skills as well as realize real-life issues; Used a
format of in-class exercise and five-minute papers to encourage
students to participate in the class; In-class exercise also used to
improve students’ hands-on experience.
CM421 Project Management I
Taught: Winter 2009, 2010, and 2011
Description: Lecture course addressing a holistic approach to the topic of project
management – this course seeks to bring together the concepts of
planning and control throughout the life cycle of a project.
Innovations: Introduced a concept of a production system and supply chain
management. Students are given opportunity to develop crew-level
planning using in-class exercises; Developed several case studies for
this project management class from my faculty internship experience
with Sellen construction, Inc.
35 Yong-Woo Kim, Ph.D., Curriculum Vitae
IV. Teaching Effectiveness
Undergraduate Course, Student Evaluation of Teaching Effectiveness
University of Washington
Course
Number
Course
Title
Credit
Hours
Quarter Responses/
Enrolled
Mean
Act./Adj.
CM 343 Lean Project
Planning
3 Spring
2017
N/A
CM 312 Construction
Accounting
3 Autumn
2014
11/20 3.9/3.6
CM 312 Construction
Accounting
3 Autumn
2013
32/43 2.5/2.6
CM 312 Construction
Accounting
3 Autumn
2012
15/20 3.6/3.6
CM 312 Construction
Accounting
3 Autumn
2011
18/31 3.9/3.9
CM 312 Construction
Accounting
3 Autumn
2010
15/23 3.9/3.6
CM 312 Construction
Accounting
3 Autumn
2009
17/28 3.9/3.7
CM 312 Construction
Accounting
3 Autumn
2008
15/35 3.5/3.3
CM 312 Construction
Accounting
3 Autumn
2007
33/51 2.9/2.8
CM421 Project
Management I
3 Winter
2011
7/35 4.5/4.7
CM421 Project
Management I
3 Winter
2010
14/36 3.5/3.3
CM421 Project
Management I
3 Winter
2009
36/71 3.1/3.2
36 Yong-Woo Kim, Ph.D., Curriculum Vitae
Graduate Course, Student Evaluation of Teaching Effectiveness
University of Washington
Course
Number
Course
Title
Credit
Hours
Quarter Responses/
Enrolled
Median
Act./Adj.
CM 518 Lean
Construction
3 Winter
2017
19/24 4.8/4.6
CM 518 Lean
Construction
3 Spring
2016
22/26 4.5/4.2
CM 518
Lean
Construction
3 Spring
2015
22/26 3.9/3.5
CM 518 Lean
Construction
3 Spring
2014
19/26 3.7/3.4
CM 518 Lean
Construction
3 Winter
2013
11/12 4.1/3.7
CM 518 Lean
Construction
3 Winter
2012
21/30 3.9/3.9
CM 520
Construction
Procurement
3 Autumn
2016
20/29 4.9/4.4
CM 520
Construction
Procurement
3 Autumn
2014
12/20 4.3/3.8
CM 520
Construction
Procurement
3 Autumn
2013
19/22 4.1/3.8
CM 520
Construction
Procurement
3 Autumn
2012
7/10 4.3/3.8
CM 528 Advanced Cost
Management
3 Summer
2016
13/19 4.1/3.6
CM 598
(528)
Advanced Cost
Management
3 Summer
2014
16/22 3.5/3.3
CM 525
(On-Line)
Cost Analysis
& Mgt
3 Winter
2017
10/17 3.6/3.7
CM 525
(On-Line)
Cost Analysis
& Mgt
3 Winter
2016
14/19 3.4/3.3
CM 525
(On-Line)
Cost Analysis
& Mgt
3 Winter
2015
11/17 4.0/4.0
CM 525
(On-Line)
Cost Analysis
& Mgt
3 Winter
2014
N/A
CM 525
(On-Line)
Cost Analysis
& Mgt
3 Winter
2013
N/A
CM 525
(On-Line)
Cost Analysis
& Mgt
3 Winter
2012
N/A
CM 525
(On-Line)
Cost Analysis
& Mgt
3 Winter
2011
N/A
CM 525 Cost Analysis 3 Winter N/A
37 Yong-Woo Kim, Ph.D., Curriculum Vitae
(On-Line) & Mgt 2010
CM 525
(On-Line)
Cost Analysis
& Mgt
3 Winter
2009
2/15 3.5
CM 525
(On-Line)
Cost Analysis
& Mgt
3 Winter
2008
0/18 N/A
Undergraduate Course, Student Evaluation of Teaching Effectiveness
State University of New York, College of Environmental Science and Forestry
(SUNY-EFF)
Course
Number
Course
Title
Credit
Hours
Semester Responses/
Enrolled
Score
(1~5)
WPE 455 Construction
Contract &
Specification
3 Spring
2007
20/28 4.2
WPE 335 Construction
Cost Engineering
3 Fall
2006
20/25 3.2
WPE 343 Construction
Estimating
3 Spring
2006
20/25 3.9
Graduate Course, Student Evaluation of Teaching Effectiveness
State University of New York, College of Environmental Science and Forestry
(SUNY-EFF)
Course
Number
Course
Title
Credit
Hours
Semester Responses/
Enrolled
Score
(1~5)
ERE 596 Lean Project
Management
3 Spring
2007
8/12 4.3
ERE 596 Operation
Management
3 Fall
2006
8/8 4.3
ERE 596 Lean Project
Management
3 Spring
2005
22/29 4.7
ERE 796 Operation
Management
3 Spring
2005
2/5 4.5
Other Evidence of Teaching Effectiveness
38 Yong-Woo Kim, Ph.D., Curriculum Vitae
2015 External Advisor (Invited), Curriculum Innovation Committee,
Department of Architectural Engineering, Ewha Women's University,
Seoul, Korea
2010 Presented a poster titled "Assessing Program Learning Outcomes: An
Outcome-Oriented Approach" at 2010 UW Teaching and Learning
Symposium.
2008 Faculty Internship at Sellen, Inc. where case studies on cost
accounting and lean construction were developed to be used for class
materials
2007 Attended a Teaching Academy Workshop (Faculty Fellow)
39 Yong-Woo Kim, Ph.D., Curriculum Vitae
SERVICE
I. Contributions to the University of Washington
2016 – 2017 Leading Role, Curriculum Committee, CIAC
2017 Graduate Admission Committee
2017 Spring College Council Department Representative
2013 - 2016 College Council, Department Representative
2015 Department Coordinator for visiting doctoral student from Korea
University
2015 Chair Search Committee of Architecture, College Council
Representative
2015 GSR (Graduate School Representative), Doctoral Exam, Ms. Juno Lee,
Department of Music
2014 Chair Review Committee of Landscape Architecture, College Council
Representative
2014 GSR (Graduate School Representative), Doctoral Exam, Ms. Monica
Yoon, Department of Music
2011 - 2013 College-wide CBE Strategic Planning Committee, Department
Representative
2010 - 2015 Department Representative, Research Collaboration MOU
(Memorandum of Understanding) with KICT (Korea Institute of
Construction Technology)
2015 Host and Advisor, Visiting Scholar Mr. Hyungbae Pak, a Secretary of
Construction and Transportation, Chullado (a Province of S. Korea)
2012 Host and Advisor, Visiting Scholar Dr. Myung Chang, a Professor of
Jeju National University
2011 Host and Advisor, Visiting Scholar Mr. Seokhyun Cheon, a Program
Manager, Seoul Metropolitan Government
2010 Department Coordinator (Host and Advisor) for visiting doctoral
student (Dr. Woo Jeong) from Yonsei University
40 Yong-Woo Kim, Ph.D., Curriculum Vitae
Host and Advisor, Visiting Scholar Dr. Junseing Yi, a Professor of
Ewha Women’s University
Graduate Admission Committee (M.S.), Department of Construction
Management
Reviewer, Ph.D. in Built Environments Admission (every year)
Grievance Committee, Department of Construction Management
(every)
Academic advisor for undergraduate students, Department of
Construction Management
Academic advisor for graduate students, Department of Construction
Management
Council Member – Construction Industry Advisory Council of the
Department of Construction Management
2009 Department Representative, FIATECH (consortium of construction
firms and academic institutions)
Department Coordinator (Host and Advisor) for visiting undergraduate
student, Women’s Engineer Program, Yonsei University, Korea
Host and Advisor, Visiting Scholar Dr. Byungsoo Kim, a Professor of
Kyungbook National University
Final Project Juror, Cost Estimating II (CM410), Autumn
Graduate Admission Committee (M.S.), Department of Construction
Management
Reviewer, Ph.D. in Built Environments Admission
Grievance Committee, Department of Construction Management
Academic advisor for undergraduate students, Department of
Construction Management
Academic advisor for graduate students, Department of Construction
Management
41 Yong-Woo Kim, Ph.D., Curriculum Vitae
Council Member – Construction Industry Advisory Council of the
Department of Construction Management
2008 Department Representative, FIATECH (consortium of construction
firms and academic institutions)
Host and Advisor, Visiting Scholar Dr. Hansu Kim, a Professor of
Sejong University
Graduate Admission Committee (M.S.), Department of Construction
Management
Reviewer, Ph.D. in Built Environments Admission
Academic advisor for undergraduate students, Department of
Construction Management
Council Member – Construction Industry Advisory Council of the
Department of Construction Management
2007 Academic advisor for undergraduate students, Department of
Construction Management
Council Member – Construction Industry Advisory Council of the
Department of Construction Management
II. Contributions to the Profession
2016 Vice Chair, International Affair Committee, Korea Institute of Building
Construction
Committee Member, Committee of Construction Technology Review
Committee, Gyenggi Province, South Korea
Associate Editor, Korean Journal of Civil Engineering (English), SCI-
E Indexed Journal
Associate Editor, Journal of Construction Engineering and Project
Management
Journal Paper Reviewer, Journal of Construction Engineering and
Management
Journal Paper Reviewer, Journal of Management in Engineering
42 Yong-Woo Kim, Ph.D., Curriculum Vitae
Journal Paper Reviewer, Korean Journal of Civil Engineering
IGLC Board of Reviewers, Proceedings of the 24th Annual Conference
of the International Group of Lean Construction, Boston, MA, July 20-
22.
ASC Board of Reviewers, International Proceedings of the 52nd Annual
Conference, Associated School of Construction, Provo, Utah, April 13-
16.
2015 Vice Chair, International Affair Committee, Korea Institute of Building
Construction
Secretary, Korean-American Construction Engineering and Project
Management Association, http://www.kacepma.org
Associate Editor, Korean Journal of Civil Engineering (English), SCI-
E Indexed Journal
Technical Committee Member, The 6th International Conference on
Construction and Project Management, Busan, Korea, Oct 11-14.
Academic Advisor & Advisory Board Member, LCI (Lean
Construction Institute) Cascade Chapter
Committee Member, Research Advisory Committee, Korea Institute of
Construction Technology
Committee Member, Committee of Construction Technology Review
Committee, Gyenggi Province, South Korea
Curriculum Innovation Committee, Department of Architectural
Engineering, Ewha Women's University, Seoul, Korea
Journal Paper Reviewer, Journal of Construction Engineering and
Management
Journal Paper Reviewer, Journal of Management in Engineering
Journal Paper Reviewer, Korean Journal of Civil Engineering
Journal Paper Reviewer, Journal of Built Environments
IGLC Board of Reviewers, Proceedings of the 23rd Annual Conference
of the International Group of Lean Construction, Perth, Australia, MA.
43 Yong-Woo Kim, Ph.D., Curriculum Vitae
ASC Board of Reviewers, International Proceedings of the 51st Annual
Conference, Associated School of Construction, College Station, TX.
2014 Secretary, Korean-American Construction Engineering and Project
Management Association, http://www.kacepma.org
Associate Editor, Korean Journal of Civil Engineering (English), SCI-
E Indexed Journal
Academic Advisor & Advisory Board Member, LCI (Lean
Construction Institute) Cascade Chapter
Committee Member, Research Advisory Committee, Korea Institute of
Construction Technology
Journal Paper Reviewer, Journal of Construction Engineering and
Management
Journal Paper Reviewer, Journal of Management in Engineering
Journal Paper Reviewer, Korean Journal of Civil Engineering
Journal Paper Reviewer, Journal of Green Building
Journal Paper Reviewer, Journal of Built Environments
IGLC Board of Reviewers, Proceedings of the 22nd Annual Conference
of the International Group of Lean Construction, Oslo, Norway.
ASC Board of Reviewers, International Proceedings of the 50th Annual
Conference, Associated School of Construction, Blacksburg, VA.
2013 Associate Editor, Korean Journal of Civil Engineering (English), SCI-
E Indexed
Academic Advisor & Advisory Board Member, LCI (Lean
Construction Institute) Cascade Chapter
Committee Member, Research Advisory Committee, Korea Institute of
Construction Technology
Committee Member, Academic Committee, Construction Industry
Institute
44 Yong-Woo Kim, Ph.D., Curriculum Vitae
Journal Paper Reviewer, Journal of Construction Engineering and
Management
Journal Paper Reviewer, Journal of Management in Engineering
Journal Paper Reviewer, Korean Journal of Civil Engineering
IGLC Board of Reviewers, Proceedings of the 21st Annual Conference
of the International Group of Lean Construction, Fortaleza, Brazil.
ASC Board of Reviewers, International Proceedings of the 49th Annual
Conference, Associated School of Construction, San Luis Obispo, CA.
2012 Associate Editor, Korean Journal of Civil Engineering (English), SCI-
E Indexed
Academic Advisor & Advisory Board Member, LCI (Lean
Construction Institute) Cascade Chapter
Committee Member, Research Advisory Committee, Korea Institute of
Construction Technology
Committee Member, Academic Committee, Construction Industry
Institute
Journal Paper Reviewer, Journal of Management in Engineering
Journal Paper Reviewer, Journal of Architectural Engineering
IGLC Board of Reviewers, Proceedings of the 20th Annual Conference
of the International Group of Lean Construction, San Diego, CA.
ASC Board of Reviewers, International Proceedings of the 48th Annual
Conference, Associated School of Construction, Birminghan, U.K.
2011 Academic Advisor & Advisory Board Member, LCI (Lean
Construction Institute) Cascade Chapter
Committee Member, Research Advisory Committee, Korea Institute of
Construction Technology
Committee Member, Academic Committee, Construction Industry
Institute
45 Yong-Woo Kim, Ph.D., Curriculum Vitae
Journal Paper Reviewer, Journal of Construction Engineering
Management
Journal Paper Reviewer, Journal of Management in Engineering
Journal Paper Reviewer, Journal of Construction Management and
Economics
IGLC Board of Reviewers, Proceedings of the 19th Annual Conference
of the International Group of Lean Construction, Lima, Peru.
ASC Board of Reviewers, International Proceedings of the 47th Annual
Conference, Associated School of Construction, Omaha, NE.
2010 Conference Science Committee Member, International Public
Procurement Conference, Seoul, Korea, Aug 24-26.
Academic Advisor & Advisory Board Member, LCI (Lean
Construction Institute) Cascade Chapter
Committee Member, Research Advisory Committee, Korea Institute of
Construction Technology
Committee Member, Academic Committee, Construction Industry
Institute
Journal Paper Reviewer, Journal of Construction Engineering
Management
Journal Paper Reviewer, Journal of Management in Engineering
Journal Paper Reviewer, Journal of Automation in Construction
Journal Paper Reviewer, Korea Journal of Civil Engineering
IGLC Board of Reviewers, Proceedings of the 18th Annual Conference
of the International Group of Lean Construction, Haifa, Israel, July 14-
16.
2009 Conference Technical Committee Member, Construction Research
Congress, ASCE, Seattle, WA, April 5-7.
Session Moderator, Construction Research Congress, ASCE, Seattle,
WA, April 5-7.
46 Yong-Woo Kim, Ph.D., Curriculum Vitae
International Program Committee, The 3rd International Conference of
Construction Engineering and Project Management, Jeju, Korea, May
27-30.
Session Chair, The 3rd International Conference of Construction
Engineering and Project, Jeju, Korea, May 27-30.
Academic Advisor & Advisory Board Member, LCI (Lean
Construction Institute) Cascade Chapter
Committee Member, Academic Committee, Construction Industry
Institute
Journal Paper Reviewer, Journal of Construction Engineering
Management
Journal Paper Reviewer, Journal of Management in Engineering
Journal Paper Reviewer, Korea Journal of Civil Engineering
IGLC Board of Reviewers, Proceedings of the 17th Annual Conference
of the International Group of Lean Construction, Taipei, Taiwan, July
15-17.
2008 Organization Committee, Lean Design Forum (158 professionals
attended), Lean Construction Institute, Cascade Chapter, Seattle, WA,
Sept 15-16.
Session Moderator, Lean Design Forum (158 professionals attended),
Lean Construction Institute, Cascade Chapter, Seattle, WA, Sept 15-16.
International Program Committee, The 3rd International Conference of
Construction Engineering and Project Management, Jeju, Korea, May
27-30.
Board Member, the Cascade Chapter of Lean Construction Institute,
Seattle, WA.
(Invited) Ad-hoc Committee, Participated in the Construction Industry
Institute (CII) Future Research Needs Workshop, Houston, TX, Jan 10-
11.
Advisory Committee, Lean Construction Research Group, Korea.
47 Yong-Woo Kim, Ph.D., Curriculum Vitae
Journal Paper Reviewer, Journal of Construction Engineering
Management
Journal Paper Reviewer, Journal of Lean Construction Journal
Journal Paper Reviewer, Korea Journal of Civil Engineering
IGLC Board of Reviewers, Proceedings of the 16th Annual Conference
of the International Group of Lean Construction, Manchester, UK.
2007 Co-Founding Member, The Cascade Chapter of Lean Construction
Institute. Note: The Cascade Chapter is the first regional professional
community to promote lean construction in the US.
Committee Member, Academic Committee, Construction Industry
Institute
Advisory Committee, Lean Construction Research Group, Korea.
Journal Paper Reviewer, Journal of Construction Engineering
Management
Journal Paper Reviewer, Journal of Lean Construction Journal
Journal Paper Reviewer, Canadian Journal of Civil Engineering
IGLC Board of Reviewers, Proceedings of the 15th Annual Conference
of the International Group of Lean Construction, East Lansing, MI.
2006 Committee Member, Academic Committee, Construction Industry
Institute
Journal Paper Reviewer, Journal of Construction Engineering
Management
Journal Paper Reviewer, Journal of Lean Construction Journal
Journal Paper Reviewer, Korean Journal of Civil Engineering
IGLC Board of Reviewers, Proceedings of the 14th Annual Conference
of the International Group of Lean Construction, Santiago, Chile.
2005 International Program Committee, The 1st International Conference of
Construction Engineering and Project Management, Seoul, Korea, Oct
16-19.
48 Yong-Woo Kim, Ph.D., Curriculum Vitae
Session Chair, The 1st International Conference of Construction
Engineering and Project, Seoul, Korea, Oct 16-19.
External Reviewer, GEAR (Grants to Enhance and Advance Research),
University of Houston, TX.
Committee Member, Academic Committee, Construction Industry
Institute
Journal Paper Reviewer, Journal of Construction Engineering
Management
Journal Paper Reviewer, Journal of Lean Construction Journal
Journal Paper Reviewer, Korean Journal of Civil Engineering
IGLC Board of Reviewers, Proceedings of the 13th Annual Conference
of the International Group of Lean Construction, Sydney, Australia.
2004 Journal Paper Reviewer, Journal of Construction Engineering
Management
Journal Paper Reviewer, Korean Journal of Civil Engineering
IGLC Board of Reviewers, Proceedings of the 12th Annual Conference
of the International Group of Lean Construction, Helsingor, Denmark.