curriculum vitae
TRANSCRIPT
![Page 1: CURRICULUM VITAE](https://reader030.vdocuments.us/reader030/viewer/2022020307/55cb4cfcbb61eb53448b4625/html5/thumbnails/1.jpg)
Tirta Eka Bahtera Resume
CURRICULUM VITAE
PERSONAL DATA Name : Tirta Eka Bahtera
Date of Birth : Jakarta, March 21st 1984
Address : JL. H.Iming No. 48 RT 004/02 Beji
Depok – Jawa Barat16421
Gender : Male
Nationality : Indonesian
Marital Status : Married with 1 Child
Passport Number : A 2369530
Email Address : [email protected]
Mobile Phone : +6287821570638
EDUCATION Mechanical Engineering, Pancasila University– Jakarta, graduated in 2008
SUMMARY OF EXPERIENCES
I have worked than 7(seven) years where experiences was gained from OIL & GAS construction project as
Inspection engineer, RBI Engineer and Facilitator, QA/QC, and Pipeline Integrity.
Experienced for both offshore and Onshore projects as Inspection and RBI Engineer and be able to do
define Equipment Criticality Assessment, Equipment strategy, Corrosion monitoring for field inspection
activities for pressurized equipment, structures equipment as well as steel pipe rack, equipment foundation,
concrete structures, stanchion, pipe support, culvert box, and other for onshore project and also at the
subsea assets.
All of responsibility had one vision for give good plants asset quality and performance and also as a part of
Integrity Department to developed Asset Integrity Management. I’m familiar with oil and gas facilities to
developed inspection strategy of each of item that need more attention and necessary, Had average
knowledge about design drawing of P&ID and PFD; Isometric Drawing; Equipment and Structural, Average
knowledge on fabricated; inspection; testing; NDT requirements accordance with International Code and
Standards. And all of this is to give good quality of result and production which mean match with the
Standard and client requirements.
![Page 2: CURRICULUM VITAE](https://reader030.vdocuments.us/reader030/viewer/2022020307/55cb4cfcbb61eb53448b4625/html5/thumbnails/2.jpg)
Tirta Eka Bahtera Resume
ANALYSIS CAPABILITY Main Analysis: - Criticality Assessment
- Risk Factor and Analysis
- Risk modeling and criteria
- Probability of failure
- Consequence of failure
- Failure analysis
- Inspection Method
- Material specifications Analysis
- Process Analysis
- Thickness and Corrosion
- Pipeline Risk Assessment and Integrity
- Corrosion Loops identifications
- Corrosion assessment and protection
Miscellaneous Analysis: - Joint Check
- Grinding and Welding
- Flange and Mechanical joint
- Pressure and Leak testing
- Piping Special Support
- Structural member
- Corrosion protection
- Cathodic protection
- Material Selection
- Inspection Procedure and work tasks
- NDT requirements
- Equipment strategy
- Maintenance and Repair technique
- Inspection personnel qualifications
- Inspection Plan and method
TRAINING - Meridium Asset Integrity Management System. – SGS Indonesia - Meridium APM
- Piping and Pipeline Integrity Management System Comply with ASME B31. – Handal Training Consulting
- In House Risk workshop for FPSO Process – Premier Oil Natuna Sea BV cooperate with TSS Matrix
- Hysys Process Engineering Course – Ap-Greid Oil & Gas Design Course
- In House Training Independent Verification Body – PT. EJJV Engineering cooperate ABSG Consulting
- In House training TSS Matrix system, RBI and Risk Assessment Workshop – PT. Amoco Mitsui Indonesia
cooperate with TSS Matrix
- In House training Internal Audit KAN 17020 – PT. Gamma BuanaPersada
- Magnetic Particle Inspection and Dye Penetrant Inspection – Welding Study Center
- Welding Inspector – Welding Study Center cooperates with Indonesian Welding Society and support by
Indonesian Oil and Gas Community
- PDMS Piping & Mechanical Draftsman – Ap-Greid Oil & Gas Design courses
- AUTOCAD Piping and Mechanical Drafter – Rekayasa Engineering Drafting School
A. COMPUTER LITERATE - Asset Integrity Management (Meridium APM, TSS Matrix, Riskwise)
- PDMS
- AutoCAD R14/2000
![Page 3: CURRICULUM VITAE](https://reader030.vdocuments.us/reader030/viewer/2022020307/55cb4cfcbb61eb53448b4625/html5/thumbnails/3.jpg)
Tirta Eka Bahtera Resume
B. DESIGN CODES - API 510, API 570, API RP 576, API 580, API 581, ASME B31.1, ASME B31.3, ASME B31.4, ASME B31.8, ASME VIII,
ASME IX
C. EMPLOYMENT RECORD PT SGS Indonesia Company Description : Inspection, Testing, Certification, Audit and Verification
Position : RBI Engineer & Trainer
Joining period : February 2014 - Present
Job locations : Indonesia
Clients : Exxon Mobile Cepu LTD
Job description: - QA/QC the Equipment list supplied by ExxonMobil SAP team and upload to Meridium Asset Integrity Management
System
- Facilitate Equipment Criticality Assessment and Equipment Strategy workshops for the type of equipment’s such as:
Pressure Equipment, Structure, Machinery, Instruments, Electrical System, Crane & Lifting, Communication System,
Firefighting system and Safety/PPE.
- Understand the operating context of equipment’s from the workshop representative and determine system boundary.
Suggest possible failure scenarios and applicable failure modes
- Determine the failure consequence based on the worst case failure scenarios and identify the critically of a system
- Determine the applicable degradation modes in various operating context (environment, material, service fluid, mode
of operation, spare logic, insulation, weather, etc.)
- Complete Critically Assessment (CA) of equipment’s/systems based on the above in Meridium
- Identify the credible risks (SHE and Business related) applicable to equipment’s along with workshop representative
- Identify the risk number (Probability of Failure and Consequence of Failure) based on Customer Risk Metrics along with
workshops representative
- Identify the mitigating actions in a workshop based on the Customer’s maintenance and inspection best
practices/procedures and re-use and re-apply in future workshops
- Develop Equipment Strategy (ES) using Meridium’s Asset Strategy Management (ASM, Risk Based Inspection (RBI),
Reliability Centered Maintenance (RCM) base on the above
- Maintain consolidated list of equipment’s for which Critically Assessment and Equipment Strategy is Completed/to be
completed
- Print and generate stewardship reports from Meridium
- Publish workshop progress reports to Customers as per their requirement
- Throughout the project execution (during and outside workshop), demonstrate expertise in Meridium software usage
- Use excel for all reporting/tracking
List of held project:
Mobil Cepu Asset Strategy Facilitation – Mobil Cepu Limited Mobil Cepu Limited or former we know as ExxonMobil Indonesia had 5 EPC were doing different scope of work at their
Cepu Field such as Central Processing Facilities, Onshore Pipeline, Offshore Mooring, FSO, and Infrastructure. PT SGS
Indonesia as an service provider for Facilitator with Meridium Asset Strategy Management scope of work are conduct
the maintain of every information from each of EPC and manage the information with using Meridium Software Asset
Management System to generate Equipment Criticality Assessment and develop Equipment Strategy, Asset Strategy
Management, RBI, RCM based from information that got from each of EPC and generate workshop to clarify with EPC
and FIMS(Facilities Integrity Management System) teams and make sure about information collected, Risk Analysis,
Prevention, and Risk Level based from Company standard and requirements.
PT Institute De Soudure Company Description : Inspection, Testing, Expertise and Design
Position : QC Specialist and RBI Engineer
Joining period : October 2012 – February 2013
Job locations : Indonesia, Myanmar
Clients : PT. SPIE Oil and Gas Services
![Page 4: CURRICULUM VITAE](https://reader030.vdocuments.us/reader030/viewer/2022020307/55cb4cfcbb61eb53448b4625/html5/thumbnails/4.jpg)
Tirta Eka Bahtera Resume Job description:
- Inspect ability review
- Assess design of the equipment following the expected inspection tasks and techniques as defined in the written
scheme of examination
- Provide draw up a complete list of all equipment with corresponding purchase orders, sub-orders and contract in order
to provide a clear and complete view of the equipment for which inspection is required
- Asset register & Inspection documentation
- Provide a manual giving the main characteristics and references of the associated documentation and drawings for all
concerned equipment
- Verify the asset register as required by the general specifications from clients
- Recover from the project/classification authority/society
- Complete register of all equipment and structures including associated documentation in order to provide a clear and
complete view of the equipment and structures for which inspection will be required
- Ensures the completeness of documentation for all equipment and structures required for inspection and maintenance
purposes
- Provide the detail inspection strategy and the Inspection plan for each of individual equipment
- Responsibility of all inspection and integrity technical issues and act as an integrity & inspection engineering advisor
- To define and implement Maintenance and Inspection Engineering good practices, standards and procedures
List of held project:
Yadana Subsidence Project EPSCC 1 & EPSC 2 – TOTAL E&P Myanmar Yadana Subsidence Project is a brand new offshore platform and with includes one of modification Flare Platform and
bridge with including jackets and structural beside pipe component, piping system, and the most important are
pressurized equipment. PT INSTITUTE De SOUDURE scope of work is to be a part of SPIE Oil and Gas Service as an RBI and
QC in MIEC (Maintenance Inspection Engineering Contractor) to support PT. Gunanusa Utama Fabricator as an main
contractor to developed and assist design of worktask inspection, inspection route, work instruction, inspection
procedure to be an update on their established asset integrity management system.
TSS Matrix Company Description : Inspection, Corrosion and Risk Management Software System
Position : RBI Engineer
Joining period : March 2011 – June 2012
Job locations : Indonesia
Clients : Premier Oil Indonesia, Amoco Mitsui Indonesia
Job description:
- Screening and gathering data history of all platform assets facilities
- Review all platform assets data there was registered in TSS Matrix system
- Entry data to the TSS matrix system for Pipeline Integrity Management system such as ROV Inspection report, As Built
drawing, Procedures and Regulations
- Review ROV Inspection Report
- Review and attach in the TSS Matrix system all isometric drawing and P&ID document to completed data for Pipeline
Integrity Management System
- Review data in TSS Matrix system for risk assessment prepare
- Created tag number identifications for piping and equipment based from engineering and others historical documents
- Review specifications of piping and equipment based from equipment data, isometric drawing, P&ID, PFD, Inspection
report, and other support documents
- Scoring system each of statistic equipment and piping based from RBI methodology and discuss with static group
- Generate risk factor and confirm with department were had related with point of risk factor
- Identified line and equipment based from corrosion loops identification
- Identified of prevention of failure
- Generated inspection checklist to developed ROV inspection workplan for all structure platform
List of held project:
Gajah Baru Platform Assets Facilities Management – Premier Oil Natuna Sea BV On 2011, Gajah Baru Platform is a brand new platform own by Premier Oil Natuna Sea BV at Natuna Sea, TSS Matrix
scope of work are gathering all information each of item of equipment and piping for Central Processing and Wellhead
Platform including material specifications, inspection result after fabrication, specifications of all equipment and piping
including special item and pipe support, service of piping, ISO Drawing and P&ID, Corrosion Rate information and
coupon, tag number, and other information to be manage in TSS Matrix system were already established at Premier Oil
Natuna Sea BV server to developed and defined RBI and Assets Integrity Management which include inspection plan for
each of equipment and piping.
![Page 5: CURRICULUM VITAE](https://reader030.vdocuments.us/reader030/viewer/2022020307/55cb4cfcbb61eb53448b4625/html5/thumbnails/5.jpg)
Tirta Eka Bahtera Resume
Anoa Platform Assets Facilities Management and RBI – Premier Oil Natuna Sea BV Anoa Platform is an old platform own by Premier Oil Natuna Sea BV at Natuna Sea, TSS Matrix scope of work are
gathering all information each of item of equipment and piping including material specifications, inspection history and
result from last inspection, specifications of all equipment and piping including special item and pipe support, ISO
Drawing and P&ID, service of piping, Corrosion Rate information and coupon, tag number, and other information to be
manage and update in TSS Matrix system were already established at Premier Oil Natuna Sea BV server to do Assets
Integrity Management which include next Inspection Plan for each of equipment and piping were gives Inspection
worktask, method of inspection, and remaining life of piece of equipment and piping starting from high risk condition of
equipment and piping based from RBI result.
RBI for FPSO Process – Premier Oil Natuna Sea BV FPSO that own by Premier Oil Natuna Sea BV at Natuna Sea, TSS Matrix scope of work are grouping equipment and
piping based on information from corrosion loops identifications and continue to gathering all information each of item
of equipment and piping including material specifications, inspection history and result from last inspection,
specifications of all equipment and piping including special item and pipe support, ISO Drawing and P&ID, Corrosion
Rate information and coupon, tag number, and other information to be manage and update in TSS Matrix system were
already established at Premier Oil Natuna Sea BV server to do RBI and also arrange RBI meeting with Premier Oil integrity
department which include from Inspection, maintenance, corrosion, process, HSE, production, to make sure about
generate high risk of each items, risk factor, probability of failure, and prevention that shall be agree by integrity
department so can be carry on to develop Inspection plan as output of RBI result.
Pipeline Integrity Management System (PIMS) – Premier Oil Natuna Sea BV Premier Oil Natuna Sea BV had long pipeline were already installed underwater at Natuna Sea, TSS Matrix scope of work
are Gathering information about pipeline specifications including material specifications, joint, pipe support and
component, debris, CP stab, Anodic protection, last ROV inspection result and procedure, others area subsea
information to do the RBI for known about remaining life of pipeline material and inspection next plan that should be
agree by Integrity department and discuss about Subsea Inspection plan with subsea department about next ROV
Inspection execution date, worktaskand checklist which including structure member underwater, and qualifications of
subsea inspection personnel.
RBI Petrochemical plant – Amoco Mitsui Indonesia PT. Amoco Mitsui Indonesia had petrochemical plant were already established for a long time, TSS Matrix scope of work
are gathering information about material specifications for each of items equipment and piping, steam number,
chemical compositions of what flow inside piping, and what is process of piping, ISO Drawing and PFD, Equipment and
piping services, last inspection result, previous corrosion monitoring to generate the risk factor, probability of failure, and
prevention to defined remaining life of material as developed Inspection Plan includes next inspection plan, and
inspection method.
Sava group Company Description : NDT, Inspection, Training service, and Heat Treatment Industry
Position : Inspector, Technical Engineer and Manager Representative
Joining period : June 2009 – March 2010
Job locations : Indonesia
Clients : PT Balfour Beatty Sakti Indonesia, PT BangunBejana Baja, PT Indobarat Rayon, PT Pauwels
Trafo Asia, PT Cilegon Fabricator
Job description:
- Inspection Visual, verification, and weld quality
- Hardness Tester Inspector
- Prepared for visual Inspection reporting
- Prepared Quality Manual with ISO team based from Standard KAN 17020 for accreditation
- Review and make sure all company document and form are according to standard KAN 17020
- Arranged Quality Management Meeting and review Quality Manual Implementation
- Arranged and supervised Internal Audit progress
- Technical Engineer to estimated how long work and how much technician and tools to be needed
- Review PWHT procedure with code and standard
- Project coordinator and controller to make sure all technician doing wok based from procedure
- Prepared PWHT reporting system
![Page 6: CURRICULUM VITAE](https://reader030.vdocuments.us/reader030/viewer/2022020307/55cb4cfcbb61eb53448b4625/html5/thumbnails/6.jpg)
Tirta Eka Bahtera Resume List of held project:
Hardness Test – PT Cilegon Fabricator PT Cilegon Fabricator had 3 piece of long pipeline that should be delivered to their client, PT Gamma Buanapersada as
a part of Sava Group had scope of work are doing hardness test and provided procedure of hardness test to give
proven from result about hardness of weld joint after PWHT including heat affective zone (HAZ) area that should in range
of requirement of hardness value from their client.
PWHT and Hardness test – Jakarta Tank Terminal Jakarta Tank Terminal is a big project to build many big size of storage tank and own by Vopax from Netherland. PT
Gamma BuanaPersadaa part of Sava Group as sub-contractor for PT BangunBejana Baja had scope of work to do
PWHT after welding at joint of shell and reinforcement pad in storage tank including nozzle joint to reduce all hydrogen
trap after welding process and execute the hardness test after NDT exam using Dye Penetrant Test to check the
hardness of weld area, HAZ, and shell are still in requirement after PWHT.
WPS Design – PT PerdanaMakmur Jaya PT. PMJ had requirement to develop Welding Procedure Standard for their client, PT Gamma BuanaPersadaas a part of
Sava Group scope of work are define and generate about essential variable of WPS such as consumables of weld,
Electricity, Material, Weld speed, and design code. And release WPS Design which included Inspection NDT
recommendations, PQR, Welder qualifications, and result of Destructive test of material.
Hardness Test – IndoBarat Rayon Karawang PT Indo Barat Rayon is an International Manufacture of textile had one storage tank that using for chemical processing,
PT Gamma BuanaPersadaas a part of Sava Group scope of work is doing hardness test to known about material of
storage tank are still required or not based on ability of material and hardness requirement of material that after using for
chemical process.
Visual Inspection for welder qualifications – PJB MuaraTawar PT Balfour Beatty Sakti Indonesiawant to recertification their welder as an update information for prepared their new
project construction at PJB MuaraTawar, PT Gamma BuanaPersadaSava Group scope of work is witness of running weld,
check joint before weld, visual test of weld to defined weld defect and indications, and give recommendations about
what is NDT requirements for weld result after visual.
Verification Inspection – PauwelsTrafo Asia
PT. PauwelsTrafo Asia had produce many Trafo for their client in Oil and Gas Company, PT Gamma
BuanaPersadaas a part Sava Group scope of work are make sure, defined, and witness every fabrication
process that required from their client including welding process, NDT exam, Destructive test for material,
leak test, load test, vibration test, and generate report which had information of all of the result of every
test, all documentation and record of test, all NCR issued, and recommendations about inspection
continuity date and method.
PT. Damai Columbus International (Internship Program) Company Description : Manufacture Company
Position : R&D staff
Joining period : August 2008 – October 2008
Job locations : Indonesia
Clients : BMW, Korindo
Job description: - Generate Mechanical Drawing
- Check and review quality product
![Page 7: CURRICULUM VITAE](https://reader030.vdocuments.us/reader030/viewer/2022020307/55cb4cfcbb61eb53448b4625/html5/thumbnails/7.jpg)
Tirta Eka Bahtera Resume
D. REFERENCES
1. Rohit Baranwal
Company : Meridium
Position : ASM Consultant
Contact : [email protected], +917829055800
2. Guy Escarfail
Company : SGS Indonesia
Position : Country Manager
Contact : [email protected], +62811986872
3. Berth J.Rako
Company : Institute De Soudure Indonesia
Position : Director Contact : [email protected], +628111848183
4. Nizar Saputra
Company : Petronas Carigali Indonesia
Position : Sr. Technical Integrity Engineer
Contact : [email protected] +628129202672
5. Zona Machmud
Company : Premier Oil Natuna Sea BV
Position : Asset Integrity Engineer – Supervisor
Contact : [email protected], +6281934151807
6. Daniel Mulcahy
Company : TSS Matrix
Position : Technical Director Contact : [email protected], +61451102158
7. Sabandi Ismadi
Company : Sava Group
Position : Board of Director
Contact : [email protected], +62812872200262