current status of eplan in nsw - amazon s3 status of eplan in nsw chris wilcox project manager,...
TRANSCRIPT
![Page 1: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/1.jpg)
Current Status of ePlan in NSW
Chris Wilcox Project Manager, ePlan
![Page 2: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/2.jpg)
ePlan
LandXML
Paper Plan Tiff file Land XML
Image Image Intelligent
Digital Data
File
![Page 3: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/3.jpg)
TIFF
1
TIFF
Data Capture & e-Examination
2 4
5
6
7
?
DATA
Council
VG
Authorities
Water
Other data
users
TIFF
DCDB Update
TIFF 3
DATA
= Data Capture
Current System
Req’n
Req’n
Rework
> 80% req’n rate
![Page 4: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/4.jpg)
New ePlan System
Validation Report
XML
Validation
and
rendering
utility
Council approval
Client signatures etc.
Keep 7 years
XML
Database
XM
L
DATA
![Page 5: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/5.jpg)
![Page 6: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/6.jpg)
![Page 7: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/7.jpg)
Electronic workflow Electronic Examination
XML
New ePlan System
XML Cadastral
Database
XML SIX Auto Validation
ePlan
Lodgment
page
Copy to Council
XML
Database
XM
L
√ or X
Validation Report Council
VG
Authorities
Water
Other data
users
![Page 8: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/8.jpg)
Rendering and Validation Service also in utility
page – pre lodgement
![Page 9: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/9.jpg)
XML processing system in production in LPI for past 4 years
Data captured approx 18,000 plans into XML
•6K new lodgments
•12K reference plans
![Page 10: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/10.jpg)
LPI Examiners now have Electronic
Examination Software (PlanTest)
![Page 11: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/11.jpg)
![Page 12: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/12.jpg)
Internal electronic workflow system
![Page 13: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/13.jpg)
LXML data base •18,000 captured LXML + •50,000 LXML from DCDB (dimensions data only) •LPI Cadastre 2020 Project - all existing plans > LXML
ESIR
![Page 14: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/14.jpg)
Industry Engagement
1. 24 surveyor seminars in last 2 years 2. Working with industry bodies ACS & SSSI 3. Azimuth Articles
![Page 15: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/15.jpg)
Industry Engagement
1. 24 surveyor seminars in last 2 years 2. Working with industry bodies ACS & SSSI 3. Azimuth Articles 4. Surveyor Training
• Group Classes • Individual Mentoring
5. Survey Software Workshops
![Page 16: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/16.jpg)
Industry Engagement
1. 24 surveyor seminars in last 2 years 2. Working with industry bodies ACS & SSSI 3. Azimuth Articles 4. Surveyor Training
• Group Classes • Individual Mentoring
5. Survey Software Workshops 6. Publishing info on
Govspace Website
![Page 17: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/17.jpg)
Industry Engagement
1. 24 surveyor seminars in last 2 years 2. Working with industry bodies ACS & SSSI 3. Azimuth Articles 4. Surveyor Training
• Group Classes • Individual Mentoring
5. Survey Software Workshops 6. Publishing info on Govespace Website 7. LPI Website
![Page 18: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/18.jpg)
TAFE : LXML training now in Surveying and Spatial Information Services Course in 2014, 2015
![Page 19: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/19.jpg)
LXML software training completed
![Page 20: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/20.jpg)
LXML Lodgments Per Software
![Page 21: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/21.jpg)
![Page 22: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/22.jpg)
LXML Lodgments
![Page 23: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/23.jpg)
Thank You
![Page 24: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/24.jpg)
EARL Services
Chris McAlister
![Page 25: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/25.jpg)
EARL services - online
www.business.qld.gov.au/surveying
![Page 26: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/26.jpg)
EARL Services - online
Access to Portal
Apply for a licence
User guides
Accessing services
![Page 27: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/27.jpg)
Accessing EARL Services
Survey data (LandXML
CIF)
EARL Services
Portal
Surveying Software
Department
![Page 28: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/28.jpg)
EARL Services Portal
![Page 29: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/29.jpg)
Services overview
Free Services
•Validate CIF
•Visualise CIF
• General
Charged Services
•Order Digital Survey plan
(Image & CIF)
•Order Cadastral Search
•Order Survey Control
![Page 30: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/30.jpg)
Services overview
Secure Services
•Submit Survey Plan
•Resubmit Survey Plan
•Submit Survey Control
•Allocate Survey Control Identifiers
•View available Survey Control identifiers
•Generate New plan Framework
•Visualise CIF – Titles Registration
![Page 31: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/31.jpg)
Secure Services Access
Step 3
Access!
Step 2
Licence agreement ([email protected])
Step 1
Current SBQ Registration
![Page 32: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/32.jpg)
EARL Services Portal demonstration
http://survey-portal.information.qld.gov.au/
![Page 33: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/33.jpg)
Validation report – SP261643
XML - <ValidationReport xmlns:xsd="http://www.w3.org/2001/XMLSchema"
xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"
hash="PYPmW+9qX0bjWfOe8pswiil0zS6Bhxf8WjzuOs47/ms=" id="1412139797374">
<SurveyPlan xmlns="urn:au:gov:qld:nrm:schema:sip:common:validation">SP261643</SurveyPlan>
<SurveyPlanVersion xmlns="urn:au:gov:qld:nrm:schema:sip:common:validation">0</SurveyPlanVersion>
<UserName xmlns="urn:au:gov:qld:nrm:schema:sip:common:validation"><ANONYMOUS></UserName>
<StartTime xmlns="urn:au:gov:qld:nrm:schema:sip:common:validation">2014-10-
01T15:03:17.374+10:00</StartTime>
<EndTime xmlns="urn:au:gov:qld:nrm:schema:sip:common:validation">2014-10-
01T15:03:18.1+10:00</EndTime>
<RuleServiceVersion
xmlns="urn:au:gov:qld:nrm:schema:sip:common:validation">nrm.sip.validation.ruleservice.version</RuleServic
eVersion>
<RuleSetUri
xmlns="urn:au:gov:qld:nrm:schema:sip:common:validation">au.qld.gov.nrm.business.rules.sip.test.valid.intern
al</RuleSetUri>
<RuleSetVersion xmlns="urn:au:gov:qld:nrm:schema:sip:common:validation">1.0</RuleSetVersion>
- <Rule id="VR000" xmlns="urn:au:gov:qld:nrm:schema:sip:common:validation">
<Name>VR000SuperRule</Name>
<Category>Internal</Category>
<SubCategory>General</SubCategory>
<DefinitionReference>N/A</DefinitionReference>
<ShortDescription>Check CIF against schema.</ShortDescription>
<LongDescription>Check that a CIF is valid XML, valid LandXML and conforms to the departments
requirements for a CIF file. Checks attribute values are not empty, are valid enumerations where appropriate,
checks conditional attributes, uniqueness constraints and action statement structure.</LongDescription>
<StartTime>2014-10-01T15:03:17.374+10:00</StartTime>
<EndTime>2014-10-01T15:03:17.435+10:00</EndTime>
<CompletionStatus>Passed</CompletionStatus>
<ConditionSatisfied>true</ConditionSatisfied>
</Rule>
- <Rule id="VR001" xmlns="urn:au:gov:qld:nrm:schema:sip:common:validation">
<Name>VR001PurposeOfSurvey</Name>
<Category>Internal</Category>
<SubCategory>Purpose of Survey</SubCategory>
<DefinitionReference>3.1.1.1.1</DefinitionReference>
Visualised
![Page 34: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/34.jpg)
Validation report – SP263538
XML <Rule id="VR053" xmlns="urn:au:gov:qld:nrm:schema:sip:common:validation">
<Name>VR053NewPolygons</Name>
<Category>Internal</Category>
<SubCategory>Accuracy</SubCategory>
<DefinitionReference>3.1.14.2.11</DefinitionReference>
<ShortDescription>Check new polygons.</ShortDescription>
<LongDescription>New polygons must be able to be dissolved into existing polygons.</LongDescription>
<StartTime>2014-10-01T14:57:47.562+10:00</StartTime>
<EndTime>2014-10-01T14:57:47.567+10:00</EndTime>
<CompletionStatus>Failed</CompletionStatus>
<ConditionSatisfied>true</ConditionSatisfied>
- <Error>
<Type>Exception</Type>
<Reason>The outer boundary of new lots is not concurrent with the boundary of the related cancelled lots.
(StationId: 'No station information available. Point Ref: BB').</Reason>
</Error>
- <Error>
<Type>Exception</Type>
<Reason>The outer boundary of new lots is not concurrent with the boundary of the related cancelled lots.
(StationId: 'No station information available. Point Ref: BG').</Reason>
</Error>
- <Error>
<Type>Exception</Type>
<Reason>The outer boundary of new lots is not concurrent with the boundary of the related cancelled lots.
(StationId: 'No station information available. Point Ref: BW').</Reason>
</Error>
- <Error>
<Type>Exception</Type>
<Reason>The outer boundary of new lots is not concurrent with the boundary of the related cancelled lots.
(StationId: '6-SP263538').</Reason>
</Error>
- <Error>
<Type>Exception</Type>
<Reason>The outer boundary of new lots is not concurrent with the boundary of the related cancelled lots.
(StationId: 'No station information available. Point Ref: AL').</Reason>
</Error>
</Rule>
Visualised
![Page 35: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/35.jpg)
Visualisation – SP274444
![Page 36: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/36.jpg)
Visualisation – SP259383
![Page 37: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/37.jpg)
Visualisation – SP269628
![Page 38: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/38.jpg)
Order Survey Control
Report XML - <!-- Copyright State of Queensland 2014 requested by svc_qsip. -->
- <lan:LandXML date="2014-10-03" time="07:35:03.426" version="1.2" xmlns:lan="http://www.landxml.org/schema/LandXML-1.2">
- <lan:Units>
<lan:Metric areaUnit="squareMeter" linearUnit="meter" volumeUnit="cubicMeter" temperatureUnit="celsius"
pressureUnit="milliBars" angularUnit="decimal dd.mm.ss" directionUnit="decimal dd.mm.ss" />
</lan:Units>
- <lan:Survey>
- <lan:SurveyHeader jurisdiction="Queensland" name="114741" surveyor="CAIRNS CC" desc="SHERIDAN/KENNY STS">
- <lan:Feature>
<lan:Property value="1999-02-01" label="LocationSketchDate" />
<lan:Property value="SCS114741;0" label="DocFileRef" />
</lan:Feature>
<lan:AdministrativeDate adminDateType="Install Date" adminDate="1996-06-01" />
<lan:AdministrativeDate adminDateType="Date Of Currency" adminDate="2007-07-30" />
<lan:AdministrativeDate adminDateType="Last Visit Date" adminDate="2007-07-25" />
<lan:AdministrativeArea adminAreaCode="0879" adminAreaType="Parish" adminAreaName="CAIRNS" />
<lan:AdministrativeArea adminAreaCode="0198" adminAreaType="Town" adminAreaName="CAIRNS" />
<lan:AdministrativeArea adminAreaCode="2080" adminAreaType="Local Government Area" adminAreaName="CAIRNS
REGIONAL" />
<lan:Annotation name="1" type="Cadastral Connection" desc="IS198871,2007-07-25" />
<lan:Annotation name="2" type="Cadastral Connection" desc="IS148744,2003-06-03" />
<lan:Annotation name="3" type="Cadastral Connection" desc="SP146899,2002-11-18" />
<lan:Annotation name="4" type="Cadastral Connection" desc="SP113632,1998-12-08" />
<lan:Annotation name="5" type="Cadastral Connection" desc="CP907654,1996-10-04" />
</lan:SurveyHeader>
- <lan:ObservationGroup id="OG-1">
<lan:RedHorizontalPosition horizontalDatum="GDA94" horizontalAdjustment="GDA - TRANSFORMED QLD_0900 GRID" latitude="-
16.55442671" longitude="145.46408814" horizontalFix="GPS" currencyDate="2000-10-24" class="NO CLASS" order="NO ORDER"
name="RHP-0" />
<lan:RedHorizontalPosition horizontalDatum="GDA94" horizontalAdjustment="GDA - TRANSFORMED GRID" latitude="-
16.55442673" longitude="145.46408812" horizontalFix="GPS" currencyDate="1999-12-21" class="NO CLASS" order="NO ORDER"
name="RHP-1" />
<lan:RedHorizontalPosition horizontalDatum="AGD84" horizontalAdjustment="DIGITIZED DCDB COORDS BY CAIRNS LSC"
latitude="-16.55500609" longitude="145.46367827" horizontalFix="SCALED" currencyDate="1996-05-27" class="NO CLASS"
order="NO ORDER" name="RHP-2" />
<lan:RedHorizontalPosition horizontalDatum="AGD84" horizontalAdjustment="FOR SOURCE SEE DOCUMENT" latitude="-
16.55497916" longitude="145.46369150" horizontalFix="GPS" currencyDate="1988-01-01" class="NO CLASS" order="NO ORDER"
name="RHP-3" />
</lan:ObservationGroup>
</lan:Survey>
- <lan:Monuments>
<lan:Monument type="plaque" condition="reliable" name="M-0" />
</lan:Monuments>
</lan:LandXML>
![Page 39: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/39.jpg)
Order Digital Survey Plan
•Order PDF or TIFF
•No JPG as only returns first
page
•$17.00
•Returns CIF if available
![Page 40: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/40.jpg)
Order Cadastral Search
•Returns XML file
•any current and historical
surveys conducted
•any monuments including
history
•current and historical parcels
along with their centroids,
geometry and title references
•all cadastral points
•any administrative areas
along with their geometry
•linkages between parcels.
![Page 41: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/41.jpg)
Submit Survey Plan
•Requires secure login details
to be entered
•Submit CIF & validation
report (must have same date)
•submission implies signature
of certificate
•Resubmit for amendments
![Page 42: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/42.jpg)
Submit Survey Control
•XML file
•Sketch
![Page 43: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/43.jpg)
Generate Framework CIF
•XML File
•Digital framework for new
survey plan
•Contains critical point
information (PID) to allow
correct location in DCDB
![Page 44: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/44.jpg)
Smart Services Qld
![Page 46: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/46.jpg)
EARL – the future
DNRM
•Industry training
•Currently investigating 3D
submission – BFP &
Volumetric
•Electronic sealing
•Integration with the Globe &
other services
•Tweaks to services as
needed
Industry
•Training
•Use of services
•Desktop submission
•Field collection
•Feedback on services
![Page 47: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/47.jpg)
ePlan Electronic Plans of Subdivision
24/03/2015
Hamed Olfat ePlan Coordinator, Electronic Subdivision Unit, Land Victoria
![Page 48: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/48.jpg)
Outline
• SPEAR Update
• ePlan Update
• Land Victoria 3D Digital Cadastre Investigation
![Page 49: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/49.jpg)
What is SPEAR?
• SPEAR (Surveying and Planning through Electronic Applications and Referrals) is an Australian-first, allowing subdivision and planning permit applications to be compiled, lodged, managed, referred, approved and tracked online, anytime.
• SPEAR can be used by all parties involved in the subdivision process:
- Councils - Surveyors - Referral Authorities - Victorian Civil and Administrative Tribunal (VCAT) - the public - Land Victoria - Lodging Parties
![Page 50: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/50.jpg)
SME
VIMAP
Applicants - Planners - Property Developers
Councils
Referral Authorities Eg: Melbourne Water, Yarra Valley Water, SPI PowerNet, VicRoads, CFA
State Government Land Registry - lodging plans of subdivision VicMap - to update map base and SMES
Public
Surveyor
How did the paper subdivision system work?
![Page 51: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/51.jpg)
Referral Authorities
State Government
Public
Applicants / Surveyors
SPEAR
Councils
VCAT
VICMAP
How does SPEAR work for subdivisions?
![Page 52: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/52.jpg)
How does SPEAR work?
![Page 53: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/53.jpg)
![Page 54: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/54.jpg)
SPEAR Subdivision Sign-up Progress
• 79 councils signed up (with all operational)
• 162 surveying firms (with 335 licensed surveyors)
• 53 Referral Authorities
• More than 3,500 SPEAR Subdivision users
![Page 55: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/55.jpg)
ePlan Implementation Progress
• From May 2013, ePlans have been able to be lodged in SPEAR replacing the PDF previously loaded by the surveyor
• SPEAR validates the ePlan data and creates a visualised PDF
• 6 surveying firms have submitted ePlans to SPEAR
– Geometri, Absolute Surveying, Walpole Surveying, Berry & Whyte Surveyors, Digital Land Surveys and SMEC
• 27 ePlan submissions since May 2013
– 9 have been registered
![Page 56: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/56.jpg)
Vendor Progress Update
Vic NSW Qld Other ePlan Received
AUTODESK (Civil 3D) Under Development
(release early 2015)
Under Development
(release early 2015)
Under Development
(release early 2015)
Topcon (Civilcad Magnet Office)
Geocomp International & ePlan Services
(GeoCivil + EPSALON)
Under Development Under Development
(by Vic)
Geodata Australia (2 software packages): 1. GeoSurvey (survey)
2. Geocadastre (data capture and translation to LXML)
-
MARC Computer Services (LandMark) Under Discussion
LISTech (LISCAD) SA
12D Solutions (12D) Under Development Under Development NZ
Carlson Software (Carlson) Under Development Under Development
Keays Software Under Development Under Development Under Development
Foresoft (untested)
Bentley (Microstation, GeoPak), Mapsoft
(MiniCad), Trimble and ESRI
Under Discussion Under Discussion Under Discussion
![Page 57: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/57.jpg)
ePlan Services
ePlan services are provided as part of SPEAR. They can be accessed via:
• Logging into SPEAR
• Guest access from SPEAR Web Site
• Web service from surveying software packages
Search & Download
Create & Upload
Review & Comment
View Data & Check
Visualise to PDFs
![Page 58: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/58.jpg)
View Data & Check
![Page 59: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/59.jpg)
Review & Comment
![Page 60: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/60.jpg)
Visualise to PDF Plan
![Page 61: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/61.jpg)
Visualisation Enhancements
• SPEAR used Qld visualisation web service from 2012 until mid-2014
• Land Victoria now maintains and hosts the Victorian visualisation service from mid 2014
• Released the first version in November 2014, with the following enhancements:
– Improved look and feel of the plan
– Support for new technique of capturing easements
– Support the new annotations for Crown Description
![Page 62: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/62.jpg)
Scheduled Visualisation Enhancements for 2015
• Release 2 (March)
– Support staged and compiled plans
– Support new plan templates
– Auto-generation of Owners Corporation schedule as a separate document in SPEAR
• Release 3 (May)
– Provision of a web service for software vendors
– Improve labelling and arrowing
![Page 63: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/63.jpg)
Search & Download
Polygon searching allows for digital data download in a user defined area
![Page 64: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/64.jpg)
Scheduled ePlan Enhancements for 2015
• SPEAR Release 4.1 (May) – Supporting the submission of staged and compiled plans – Pre-population of data in application wizard using uploaded
ePlan (e.g. applicant reference number, dealing type, plan number, application parcels and number of lots)
– Supporting the Owners Corporation information required by SPEAR
– Providing software vendors with validation and visualisation web services
• SPEAR Release 4.2 (October) – Supporting different occupation types (e.g. wall, building,
kerb) and offsets – Supporting plans under Section 23/24A/32B as well as
text-only plans
![Page 65: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/65.jpg)
ePlan Focus Areas in 2015 - 2016
• Visualisation (quality improvement) • Extension of ePlans
– TLA Plans, Boundary Plans, Crown Plans, 3D building format plans
• Complete Abstract of Field Records in ePlan – Sheet definition, exaggeration and enlargement – Consider full inclusion of its data in ePlan
• Auto-generation of Surveyor’s Report – Can it be generated from ePlan if all data are captured in
it?
• ePlan provision in LASSI-SPEAR – Allowing surveyors to download registered ePlans
• Enabling building subdivisions to be submitted as ePlans – e.g. with the base plan as an ePlan and the floor plans
remaining as a surveyor-supplied PDF
![Page 66: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/66.jpg)
Victorian 3D Working Party
• Its objective is to investigate the introduction of 3D digital data and its implications for Victoria relevant to cadastre
• The 3D Working Party has been formed by Land Victoria, and it has representatives from:
– the Association of Consulting Surveyors Victoria (ACSV)
– the City of Melbourne
– the University of Melbourne
– RMIT University
– SSSI, and
– Land Victoria
![Page 67: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/67.jpg)
3D Digital Cadastre Investigation
• Land Victoria 3D ePlan Prototype is under development.
Technical Aspect
Institutional Aspect
Legal
Aspect
![Page 68: Current Status of ePlan in NSW - Amazon S3 Status of ePlan in NSW Chris Wilcox Project Manager, ePlan ePlan LandXML Paper Plan Tiff file Land XML Image Image Intelligent Digital Data](https://reader030.vdocuments.us/reader030/viewer/2022020215/5b355c147f8b9abc218d2c09/html5/thumbnails/68.jpg)
Victorian ePlan Team
Dr Hamed Olfat ePlan Coordinator, Electronic Subdivision Unit, Land Victoria
Level 23, 570 Bourke Street, Melbourne, Victoria
T: 03 8636 2004 |E: [email protected]
Ashley Darvill ePlan Project Officer, Electronic Subdivision Unit, Land Victoria
Level 23, 570 Bourke Street, Melbourne, Victoria
T: 03 8636 2273 |E: [email protected]
Davood Shojaei ePlan Project Officer, Electronic Subdivision Unit, Land Victoria
Level 23, 570 Bourke Street, Melbourne, Victoria
T: 03 8636 2618 |E: [email protected]