current project update

12
Current Project Update O c t o b e r 2 5 t h 2 0 1 2 Good Evening!!!

Upload: ora

Post on 22-Feb-2016

25 views

Category:

Documents


0 download

DESCRIPTION

Current Project Update. October 25th 2012. Good Evening!!!. NW Old Tiffany Springs Road. Tiffany Ridge Elementary. Now Open!!!. Anticipating:. NW Old Tiffany Springs Road. Park Hill High School. Current Projects:. Cafeteria Expansion – Now Open! Counseling Remodel – Now Open! - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Current Project Update

Current Project Update

O c t o b e r 2 5 t h 2 0 1 2

Good Evening!!!

Page 2: Current Project Update

NW Old Tiffany Springs Road

Tiffany Ridge Elementary

Now Open!!!Anticipating:

Page 3: Current Project Update

NW Old Tiffany Springs Road

Park Hill High School

• Restroom Remodel! (13)• Electrical Upgrades• Mechanical Replacement• Roofing

Current Projects:

Future Projects:

• Cafeteria Expansion – Now Open!• Counseling Remodel – Now Open!• Conference Room – Now Open!• Classroom Addition – Dec 2012

Cafeteria Expansion

Classroom Addition

Science Casework

Page 4: Current Project Update

NW Old Tiffany Springs Road

Congress Middle School

• Interior Remodel – Now Open!• Science Labs (2)• Speech/Publications Room• Band Room

• Classroom Addition (6) – Dec 2012• Parking Lot Flow Revision – Dec 2012

Current Projects:

• Gym HVAC • Roofing

Future Projects:

Classroom Addition Rendering

Classroom Addition Construction

Classroom Addition Floor Plan

Page 5: Current Project Update

NW Old Tiffany Springs Road

English Landing Elementary

• Exterior Concrete Replacement• Roofing• Kitchen HVAC• Electrical Service Surge Protection

Current Projects:

Future Projects:

• Secure Entrance Addition – Aug 2013• Administration Addition – Aug 2013• Classroom Remodel (2) – Aug 2013

New Entrance Rendering

Addition Floor Plan

Page 6: Current Project Update

NW Old Tiffany Springs Road

Lakeview Middle School

• Exterior Concrete Replacement• Revise Parking Lot Circulation• Roofing• Carpet Replacement• Electrical Surge Protection• Upgrade the Building EMS

Current Projects:

Future Projects:

• Secure Entrance Addition – Aug 2013• Administration Addition – Aug 2013• Classroom Remodel (2) – Aug 2013

New Entrance Rendering

Addition Floor Plan

Page 7: Current Project Update

Union Chapel Elementary

• Restroom Remodel!• Flooring Replacement• Media Center Circulation Desk• Media Center Exterior Door and Windows• Electrical Upgrades• Mechanical Upgrades

Current Projects:

Future Projects:

• Secure Entrance – Aug 2013• Canopy – Aug 2013• Administration Remodel – Aug 2013

New Entrance Rendering

Addition Floor Plan

Page 8: Current Project Update

NW Old Tiffany Springs Road

Park Hill South High School

• Exterior Concrete• Bell Tower• Soccer Stadium foul ball protection• Carpet Replacement

Current Projects:

Future Projects:

• Classroom Add w/ Link – Aug 2013• Cafeteria Expansion – Aug 2013• Locker Room Addition – Aug 2013• Special Ed Addition – Aug 2013• Nurse Remodel – Aug 2013

Classroom Addition & Link Rendering

Bell Tower Rendering

Addition Floor Plan

Page 9: Current Project Update

NW Old Tiffany Springs Road

Renner Elementary

• Restroom Remodel!• Nurse’s Office Remodel• Kitchen HVAC Upgrades• Electrical Upgrades• Carpet Replacement

Current Projects:

Future Projects:

• Canopy – Aug 2013

New Entrance Canopy Rendering

Existing Entrance

Page 10: Current Project Update

NW Old Tiffany Springs Road

Plaza Middle School

• Restroom Remodel!• Electrical Upgrades• Kitchen HVAC• Replace Boiler• Roofing• Replace Carpet

Current Projects:

Future Projects:

• Parking Lot

Page 11: Current Project Update

NW Old Tiffany Springs Road

Southeast Elementary

• Restroom Remodel!• Electrical Upgrades• Kitchen HVAC • Replace Carpet• Boiler Replacement• Parking Lot Revision

Current Projects:

Future Projects:

• Parking Lot

Page 12: Current Project Update

Current Project Update

O c t o b e r 2 5 t h 2 0 1 2

Thank You!!!