current design and implementation challenges of road projects on the coastland ron rahaman chief...
TRANSCRIPT
Current Design and Implementation
Challenges of Road Projects on the
Coastland
Ron RahamanChief Roads and Bridges Officer
Ministry of Public WorksWorks Services Group
Project Life Cycle
Starting the Project
Organising & Preparing
Carrying out the works
Closing the project
Conceptualized
Feasibility,
Planning &
Design
Construct
Test & TurnoverContractor
Sponsor
Stakeholders
Consultant
Project
Team
Project
Manager
Employer
DESIGN PHASE
Design Phase (Feasibility Study and Tendering)
• Report submissions– Preliminary Assessment Report• Highlights the problems, challenges & deficiencies with
its current usage
– Environmental and Social Impact Assessment Report• Continuous engagement of stakeholders• Compliance with the regulations of the EPA
Design Phase (Feasibility Study and Tendering)
– Project Selection Report• Appropriate remedy to address problems, taking into
account stakeholders need, appropriate standards and guidelines, sound engineering principles of safety, economic benefits verses cost of implementation
– Draft and Final Design Report• Comprehensive reports, including drawings, bills of
quantities
– Pre-bidder Conference
Design Challenges
• Inadequate record Keeping• Loss of institutional Knowledge• Missing road survey plans / road reserve /
acquisition• Culture of People / poor enforcement• Inter agency coordination• Underground utilities / structures
Design Challenges
• Site Conditions – Swamp, water• Budget Constraints – availability, most
economic (design / supervision / construct)• Weight Control• Competitive pricing – Tendering stage
• Attracting new contractors – Tendering stage
• Contractor overload – Tendering stage
implementation PHASE
Construction Stage
• Reports – Project Design Review• Review of design
– Review Report of Contractor QA/QC plan• Review contractor’s submission
– Monthly Progress Reports• Captures progress of works, issues, etc
Construction Stage– Work Program• To be used by the contractor to plan & execute the
works• Initial program (First 3 months)• Accepted Programme (entire work)• Updated Programme (t least on monthly basis)
– Method Statement• Same time with programme• General description of the arrangements and methods
of construction and temporary works design• The statement should be fully cross-reference to the
activities in the programme
Implementation ChallengesOn site
• Encroachment on road reserve– Fences– Structures
Implementation ChallengesOn site
• Utility Corridor– no corridor– Inadequate planning leads to poor usage
Implementation ChallengesOn site
• Limited road reserve– Compromise road geometry– By passes
Implementation ChallengesOn site
• Change in elevation– modification to entrances– Drainage issues
Implementation ChallengesOn site
• Geological conditions– Poor soil– Buried structures
Implementation ChallengesEnvironment
• Time lapse between design and implementation
• Change in market prices• Shortage of construction material• Culture
Implementation ChallengesContractor
• Frequent down time• Inadequate human resources• Equipment fleet• Poor planning / lack of planning tools• Procurement of materials• Quality / time Control• Use of Mobilization Advances• Traffic / Safety Management• Social Engagement
Recommendations• Materials Management Unit (Government level)• Government roster with upcoming work projects
in all areas• Better contractor register – Database• Procurement / Evaluation Criteria• Improved Public Relations• Multi stakeholders Committee throughout the
project cycle
Recommendations• Common spatial database for utilities• Review and enforcement of weight control• Establishment of equipment pool – renting of
specialised equipment• Value Engineering
Thank You