cummins mexico iad - firm demand changes outside of frozen fence

Upload: sanjeevan-vohra

Post on 07-Aug-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/21/2019 Cummins Mexico IAD - Firm Demand Changes Outside of Frozen Fence

    1/10

    1.1 Firm Demand Changes (Increases, Decreases, Reschedules) Outside of frozen fence

    1.1.1 Firm Demand Changes Increases

    IAD Release ManagementRelease Management Workbench

    As the Firm Demand is to be increased outside the frozen fence so the required change will take place.

    Firm Demand Changes - Increases

    Navigation: IAD Release Management Release Management orkbench

    !he "cenario of R#M orkbench beforethe changes has been applied$ looks likeas shown.

    !he arrow pointer shows that in the ne%tfile this record will be increased.

  • 8/21/2019 Cummins Mexico IAD - Firm Demand Changes Outside of Frozen Fence

    2/10

    Navigation: IAD &rder Management "'&rders$ Returns"ales &rders

    !he "cenario of "ales &rder #ines beforethe changes has been applied$ looks likeas shown.

    (ote: !he quantit) will be coming as amultiple of *$ as the standard pack for thatitem +,**-,/01 is set to *.

  • 8/21/2019 Cummins Mexico IAD - Firm Demand Changes Outside of Frozen Fence

    3/10

    After this the new file with increaseddemand outside the frozen fence areuploaded and the 2rocess Inbound!ransaction is e%ecuted.

    Ad3acent screen shows the

    (ow the #ine 4 quantit) is 55 instead of theearlier figure of ,4.

  • 8/21/2019 Cummins Mexico IAD - Firm Demand Changes Outside of Frozen Fence

    4/10

    !hen the Demand !ransaction is e%ecutedand the increased change is reflected inthe "ales &rder #ine le6el as shown.

    (ote: !he quantit) will be coming as amultiple of *$ as the standard pack for thatitem +,**-,/01 is set to *.

  • 8/21/2019 Cummins Mexico IAD - Firm Demand Changes Outside of Frozen Fence

    5/10

    1.1.2 Firm Demand Changes Decreases

    IAD Release ManagementRelease Management Workbench

    As the Firm Demand is to be decreased outside the frozen fence so the required change will take place.

    Firm Demand Changes - Decreases

    Navigation: IAD &rder Management "'&rders$ Returns"ales &rders

    !he "cenario of "ales &rder #ines beforethe changes has been applied$ looks likeas shown.

  • 8/21/2019 Cummins Mexico IAD - Firm Demand Changes Outside of Frozen Fence

    6/10

    After this the new file with decreaseddemand outside the frozen fence areuploaded and the 2rocess Inbound!ransaction is e%ecuted.

    Ad3acent screen shows the 7"cheduleaiting to 2rocess8 screen in the R#M

    orkbench.

    (ow the #ine 4 quantit) is 9* instead of theearlier figure of ,4.

  • 8/21/2019 Cummins Mexico IAD - Firm Demand Changes Outside of Frozen Fence

    7/10

    !hen the Demand !ransaction is e%ecutedand the decreased change is reflected inthe "ales &rder #ine le6el as shown.

    (ote: !he quantit) will be coming as amultiple of *$ as the standard pack for that

    item +,**-,/01 is set to *.

  • 8/21/2019 Cummins Mexico IAD - Firm Demand Changes Outside of Frozen Fence

    8/10

    1.1.! Firm Demand Changes Reschedules

    IAD Release ManagementRelease Management Workbench

    As the Firm Demand is to be rescheduled outside the frozen fence so the required change will take place.

    Firm Demand Changes - Reschedules

    Navigation: IAD &rder Management "'&rders$ Returns"ales &rders

    !he "cenario of "ales &rder #inesbefore the changes has been applied$looks like as shown.

  • 8/21/2019 Cummins Mexico IAD - Firm Demand Changes Outside of Frozen Fence

    9/10

    After this the new file with rescheduleddemand outside the frozen fence areuploaded and the 2rocess Inbound!ransaction is e%ecuted.

    Ad3acent screen shows the 7"cheduleaiting to 2rocess8 screen in the R#M

    orkbench.

    (ow the #ine 4 "tart date is 0*;'#9

  • 8/21/2019 Cummins Mexico IAD - Firm Demand Changes Outside of Frozen Fence

    10/10