STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 CUMBERLAND COUNTY SCHOOLS DATE INITIAL DATE INITIAL CCS CONTRACTOR MEASUREMENTS MEASUREMENTS DIV SEC ITEM units $/unit 7 1 7.1 10 100 sf $0.42 7.1 10 200 sf $2.01 7.1 10 300 sf $2.94 7.1 10 400 sf $2.81 7.1 10 500 sf $3.34 7.1 10 600 sf $1.53 7.1 10 700 sf $2.24 7.1 20 100 sf $0.48 7.1 20 300 lf $5.05 7.1 20 400 lf $5.48 7.1 20 500 lf $5.96 7.1 30 100 lf $0.72 7.1 30 200 lf $0.76 7.1 30 300 lf $0.78 7.1 40 100 lf $0.27 7.1 40 200 lf $0.85 7.1 50 100 sf $1.71 7.2 7.2 10 100 sf $0.42 7.2 10 200 sf $0.48 7.2 30 100 sf $0.90 7.2 30 200 sf $1.06 7.2 30 300 sf $1.04 7 2 30 400 sf $1.20 BUDGET COST BUDGET COST STATEMENT OF ROOFING PROJECT SCOPE SCHOOL Anne Chesnutt Middle School _______ _____LEA 260- ________________ ADDRESS _____________________________________________________________ _____________________________________________________________ BUILDING NO's ____________________ROOF PLAN NO._____________________ TASK ORDER NO. _____________________________________________________ lnsul. 1.5" lso mech fast lnsul. 1" iso mech fast lnsuL 1.5" lso In type Ill lnsul. 1" Iso in type III Dem. lightwt. per 1" Dem. of roof insul 1" INSULATION Caulk poly 1 compound 1/2 x 1/2 Vapor retarder or base sheet 1 ply Build. red rosin Build. paper15# felt Backer rod 3/4" DESCRIPTION Pressure Cleaning WATERPROOFING & DAMPROOFING WP - acrylic brush applied textured WP - acrylic brush applied smooth WP-non-pigmented, Silane 1 coat vertical Backer rod 1/2" Backer rod 1/4" Caulk silicone 1/4x1/2 WP-rubberized ctg brush applied WP-asphalt emulsion brush grade Caulk polyurethane 1 component 1/4 x 1/4 Remove caulking WP- non-pigmenting, Silane 1 coat horizontal

Upload: lamxuyen

Post on 30-Jan-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

7 17.1 10 100 sf $0.427.1 10 200 sf $2.017.1 10 300 sf $2.947.1 10 400 sf $2.817.1 10 500 sf $3.347.1 10 600 sf $1.537.1 10 700 sf $2.247.1 20 100 sf $0.487.1 20 300 lf $5.057.1 20 400 lf $5.487.1 20 500 lf $5.967.1 30 100 lf $0.727.1 30 200 lf $0.767.1 30 300 lf $0.787.1 40 100 lf $0.277.1 40 200 lf $0.857.1 50 100 sf $1.71

7.27.2 10 100 sf $0.427.2 10 200 sf $0.48 7.2 30 100 sf $0.907.2 30 200 sf $1.06 7.2 30 300 sf $1.047 2 30 400 sf $1.20

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL Anne Chesnutt Middle School____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

lnsul. 1.5" lso mech fastlnsul. 1" iso mech fastlnsuL 1.5" lso In type Illlnsul. 1" Iso in type IIIDem. lightwt. per 1"Dem. of roof insul 1"INSULATION

Caulk poly 1 compound 1/2 x 1/2

Vapor retarder or base sheet 1 plyBuild. red rosinBuild. paper15# feltBacker rod 3/4"

DESCRIPTION

Pressure CleaningWATERPROOFING & DAMPROOFING

WP - acrylic brush applied texturedWP - acrylic brush applied smooth

WP-non-pigmented, Silane 1 coat vertical

Backer rod 1/2"Backer rod 1/4"Caulk silicone 1/4x1/2

WP-rubberized ctg brush appliedWP-asphalt emulsion brush grade

Caulk polyurethane 1 component 1/4 x 1/4Remove caulkingWP- non-pigmenting, Silane 1 coat horizontal

Page 2: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 2 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL Anne Chesnutt Middle School____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

7.2 40 100 sf $0.737.2 40 200 sf $1.057.2 40 300 sf $0.877.2 50 400 sf $1.237.2 50 100 sf $1.707.2 60 200 sf $1.79

7.37.3 10 100 sf $0.477.3 20 200 sf $1.92

7.47.4 10 100 sf $0.827.4 10 120 sf $0.287.4 10 110 sf $0.547.4 10 130 sf $0.337.4 10 200 sf $0.717.4 10 210 sf $0.377.4 10 220 sf $0.867.4 20 100 sf $1.957.4 30 200 sf $2.537.4 30 400 sf $4.117.4 30 500 sf $3.417.4 30 600 sf $3.53 7.4 35 100 sf $2.447.4 35 200 sf $1.82

BUR 3 ply G2 in cold adhesive over 500 sf BUR 3 ply G2 in cold adhesive 1-500BUR 4 ply type VI in Premium III 3 ply Type IV in Premium III

BUR surface emulsion BUR surface with cold process adhesive BUR 2 ply type IV, 1 ply mod. Bit in type III

Remove single ply mech fast membraneRemove single ply membrane adheredRemove single ply ballast and membraneWet vac roof membrane Spud embedded gravel Sweep loose aggregate Remove BUR ROOFING & RESTORATION

Shingles 260/300 lb. Remove comp. shingles

SHINGLES & ROOF TILES

Insul. Tapered 1/4" Iso in type III

Insul. 1" fiberbd. mech fastInsul. 1/2" fiberbd. mech fast

Insul. Lightweight cellular per 1" depth

lnsul. 1" fiberboard intype IIIlnsul. 1/2" fiberboard in type III

Page 3: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 3 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL Anne Chesnutt Middle School____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

7.4 35 300 sf $2.577.4 35 400 sf $2.697.4 35 500 sf $1.247.4 35 600 sf $2.47 60 Squares7.4 40 100 sf $4.727.4 40 300 sf $4.707.4 40 400 sf $7.977.4 50 100 sf $0.847.4 50 200 sf $2.147.4 50 300 sf $2.337.4 60 100 sf $4.227.4 60 300 sf $4.737.4 80 400 sf $4.937.4 80 500 sf $6.197.4 90 200 sf $13.747.4 90 300 sf $18.50

7.57.5 10 200 sf $19.527.5 10 400 lf $10.60 7.5 10 500 sf $40.47Coping stone remove and reset

Bell tile coping remove and reset Remove brick and reset 50 sq. ft. minimum MASONRY

Copper 16 oz. flat seam Copper 16 oz. standing seam Flashing CSPE Flashing membrane, 2 ply, composite ply Single ply elvaloy 60 mil, fully adheredSingle ply elvaloy 60 mil, mechanically fast.BUR restoration odorless BUR restoration pitch BUR restoration asphalt PRIMER BUR repair elast. w/ mesh BUR repair pitch base w/ mesh BUR repairs fib. Asph. Mastic w/ meshBUR surface with white elastomeric

BUR surface emulsion & 1 ply poly membraneBUR surface with aluminum

BUR surface emulsion and aluminum ST

S

Page 4: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 4 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL Anne Chesnutt Middle School____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

7.67.6 10 100 sf $0.927.6 10 200 sf $5.607.6 20 100 lf $0.707.6 20 200 lf $2.977.6 20 300 lf $3.367.6 30 100 lf $4.027.6 30 200 lf $26.39 7.6 30 210 lf $27.547.6 30 220 ea $57.827.6 30 230 ea $69.287.6 30 240 lf $5.027.6 40 100 lf $1.437.6 40 200 lf $5.207.6 40 300 lf $5.447.6 50 100 lf $0.467.6 50 200 lf $3.687.6 60 400 sf $3.617.6 60 500 ea $75.047.6 60 600 sf $4.477.6 70 100 lf $5.36

Counterflashing .040 alum 6" wide Counterflashing 16 oz. 6" wide

METAL WORK

Remove counter flashing

Resolder joints in sheet metal Metal coping alum. .040 std. seam paintedMetal storm collar Metal trim .032 painted Downspouts alum. .024 3x4 paintedRemove downspouts Gutter .050 painted 5" OG/box

Remove metal decking Install metal decking

Gutter .050 5" MF OG/box Remove metal gutterGravel stop .040 painted 4"-6"Metal pre-formed corner painted Metal edge pre-formed MF Metal edge free floating painted 4"-8"Metal edge free floating MF 4"-8"Remove metal edge

ST

Page 5: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 5 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL Anne Chesnutt Middle School____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

7.77.7 10 100 sf $0.66 7.7 10 200 sf $0.73 7.7 20 100 sf $1.397.7 20 200 sf $1.637.7 20 300 sf $1.90 7.7 20 400 sf $5.067.7 20 500 sf $6.46 7.7 30 100 lf $0.897.7 30 200 lf $1.677.7 40 100 lf $0.747.7 40 200 lf $0.877.7 40 300 lf $1.39 7.7 50 100 lf $4.20 7.7 60 100 lf $4.207.7 60 200 lf $4.44

7.87.8 10 100 ea $154.067.8 10 200 ea $869.557.8 10 300 sf $108.807.8 20 100 ea $387.00

ROOF SPECIALTIES & ACCESSORIES

Curbing treated 2x12Nailer treated 2x6

Nailer treated 1x4Cants treated wood

Nailer treated 2x4

Cants woodfiber

Plywood decking CDX 5/8"Plywood decking CDX 1/2"Dem of std. 2x6 t & g decking Dem of plywood or 1x6 decking WOODWORK

Remove existing roof drain Roof hatch alum larger sizesRoof hatch alum. 2.5x3Remove roof hatch

Joist fir 2x10 Joist fir 2x6

Standard 2x6 decking t & gStandard 1x6 decking Plywood decking CDX 3/4"

Page 6: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 6 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL Anne Chesnutt Middle School____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

7.8 20 200 ea $520.007.8 20 300 ea $172.357.8 20 400 ea $75.767.8 20 500 ea $108.387.8 30 100 sf $0.387.8 30 200 sf $3.957.8 40 100 ea $535.847.8 50 100 lf $65.037.8 50 200 lf $166.88 7.8 50 300 sf $43.35 7.8 60 100 lf $5.787.8 70 100 ea $88.547.8 70 200 ea $120.12 7.8 70 300 ea $7.057.8 80 100 lf $27.22 7.8 80 200 lf $39.027.8 80 300 ea $37.62

7.97.9 10 100 sf $1.85

7.107.10 10 100 ea $1100.007.10 10 200 sf $0.167.10 20 100 sfGuarantee - Contractors 3-year guarantee

Warranty re-roof 10 yr over 10,000 s.f. Warranty re-roof 10 yr less 10,000 s.f. ROOF WARRANTY & GUARANTEES

FLUID APPLIED ROOFING HydroStop Premium Coat System (HSPCS)

PVC SupportExp. Jt. CSPE reinforced Expansion joint butyl/neoprene 16 oz. Pitch pocket resurface only Pitch pocket, 16 oz. 8x8Pitch pocket, 16 oz. 4x4

Roof ladder, security ladder guard Roof laddder, 20 ft up w/ cage Roof ladder, 20 ft & up w/o cage Roof ventilators Walkway, BUR

Plumbing stack #4 leadReflash existing roof drain Install new roof drain

Termination bar

Remove existing walkways Scupper 16 oz. match existing

Page 7: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 7 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL Anne Chesnutt Middle School____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

TASK ORDER # _______________________________________________

PURCHASE ORDER #____________________________________________

CONTRACTOR'S SIGNATURE ___________________________________

DATE: ___________________________________

ATTACHMENTS:1. PROPERTY ACCOUNTING ROOF PLAN, AREA WITHIN PROJECT SCOPE MARKED AND DATED ___________________________________2. ADDITIONAL CONDITIONS OR COMMENTS3. CUMBERLAND COUNTY SCHOOLS LINE ITEM / PERFORMANCE SPECIFICATION DATED _________________________ IS INCLUDED BY REFERENCE. THIS PROJECT IS NOT AUTHORIZED UNTIL A PURCHASE ORDER NUMBER IS ENTERED ABOVE AND PURCHASE ORDER IS RECEIVED BY CONTRACTOR.TOTAL PAGES IN THIS STATEMENT OF PROJECT SCOPE__________________________

TOTAL LABOR & MATERIALS $_____________________________________________________________

Page 8: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

7 17.1 10 100 sf $0.427.1 10 200 sf $2.017.1 10 300 sf $2.947.1 10 400 sf $2.817.1 10 500 sf $3.347.1 10 600 sf $1.537.1 10 700 sf $2.247.1 20 100 sf $0.487.1 20 300 lf $5.057.1 20 400 lf $5.487.1 20 500 lf $5.967.1 30 100 lf $0.727.1 30 200 lf $0.767.1 30 300 lf $0.787.1 40 100 lf $0.277.1 40 200 lf $0.857.1 50 100 sf $1.71

7.27.2 10 100 sf $0.427.2 10 200 sf $0.48 7.2 30 100 sf $0.907.2 30 200 sf $1.06 7.2 30 300 sf $1.047 2 30 400 sf $1.20

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Miller Elementary School_____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

lnsul. 1.5" lso mech fastlnsul. 1" iso mech fastlnsuL 1.5" lso In type Illlnsul. 1" Iso in type IIIDem. lightwt. per 1"Dem. of roof insul 1"INSULATION

Caulk poly 1 compound 1/2 x 1/2

Vapor retarder or base sheet 1 plyBuild. red rosinBuild. paper15# feltBacker rod 3/4"

DESCRIPTION

Pressure CleaningWATERPROOFING & DAMPROOFING

WP - acrylic brush applied texturedWP - acrylic brush applied smooth

WP-non-pigmented, Silane 1 coat vertical

Backer rod 1/2"Backer rod 1/4"Caulk silicone 1/4x1/2

WP-rubberized ctg brush appliedWP-asphalt emulsion brush grade

Caulk polyurethane 1 component 1/4 x 1/4Remove caulkingWP- non-pigmenting, Silane 1 coat horizontal

Page 9: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 2 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Miller Elementary School_____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

7.2 40 100 sf $0.737.2 40 200 sf $1.057.2 40 300 sf $0.877.2 50 400 sf $1.237.2 50 100 sf $1.707.2 60 200 sf $1.79

7.37.3 10 100 sf $0.477.3 20 200 sf $1.92

7.47.4 10 100 sf $0.827.4 10 120 sf $0.287.4 10 110 sf $0.547.4 10 130 sf $0.337.4 10 200 sf $0.717.4 10 210 sf $0.377.4 10 220 sf $0.867.4 20 100 sf $1.957.4 30 200 sf $2.537.4 30 400 sf $4.117.4 30 500 sf $3.417.4 30 600 sf $3.53 7.4 35 100 sf $2.447.4 35 200 sf $1.82

BUR 3 ply G2 in cold adhesive over 500 sf BUR 3 ply G2 in cold adhesive 1-500BUR 4 ply type VI in Premium III 3 ply Type IV in Premium III

BUR surface emulsion BUR surface with cold process adhesive BUR 2 ply type IV, 1 ply mod. Bit in type III

Remove single ply mech fast membraneRemove single ply membrane adheredRemove single ply ballast and membraneWet vac roof membrane Spud embedded gravel Sweep loose aggregate Remove BUR ROOFING & RESTORATION

Shingles 260/300 lb. Remove comp. shingles

SHINGLES & ROOF TILES

Insul. Tapered 1/4" Iso in type III

Insul. 1" fiberbd. mech fastInsul. 1/2" fiberbd. mech fast

Insul. Lightweight cellular per 1" depth

lnsul. 1" fiberboard intype IIIlnsul. 1/2" fiberboard in type III

Page 10: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 3 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Miller Elementary School_____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

7.4 35 300 sf $2.577.4 35 400 sf $2.697.4 35 500 sf $1.247.4 35 600 sf $2.477.4 40 100 sf $4.727.4 40 300 sf $4.707.4 40 400 sf $7.977.4 50 100 sf $0.847.4 50 200 sf $2.147.4 50 300 sf $2.337.4 60 100 sf $4.227.4 60 300 sf $4.737.4 80 400 sf $4.937.4 80 500 sf $6.197.4 90 200 sf $13.747.4 90 300 sf $18.50

7.57.5 10 200 sf $19.527.5 10 400 lf $10.60 7.5 10 500 sf $40.47Coping stone remove and reset

Bell tile coping remove and reset Remove brick and reset 50 sq. ft. minimum MASONRY

Copper 16 oz. flat seam Copper 16 oz. standing seam Flashing CSPE Flashing membrane, 2 ply, composite ply Single ply elvaloy 60 mil, fully adheredSingle ply elvaloy 60 mil, mechanically fast.BUR restoration odorless BUR restoration pitch BUR restoration asphalt PRIMER BUR repair elast. w/ mesh BUR repair pitch base w/ mesh BUR repairs fib. Asph. Mastic w/ meshBUR surface with white elastomeric

BUR surface emulsion & 1 ply poly membraneBUR surface with aluminum

BUR surface emulsion and aluminum ST

S

Page 11: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 4 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Miller Elementary School_____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

7.67.6 10 100 sf $0.927.6 10 200 sf $5.607.6 20 100 lf $0.707.6 20 200 lf $2.977.6 20 300 lf $3.367.6 30 100 lf $4.027.6 30 200 lf $26.39 7.6 30 210 lf $27.547.6 30 220 ea $57.827.6 30 230 ea $69.287.6 30 240 lf $5.027.6 40 100 lf $1.437.6 40 200 lf $5.207.6 40 300 lf $5.447.6 50 100 lf $0.467.6 50 200 lf $3.687.6 60 400 sf $3.617.6 60 500 ea $75.047.6 60 600 sf $4.477.6 70 100 lf $5.36

Counterflashing .040 alum 6" wide Counterflashing 16 oz. 6" wide

METAL WORK

Remove counter flashing

Resolder joints in sheet metal Metal coping alum. .040 std. seam paintedMetal storm collar Metal trim .032 painted Downspouts alum. .024 3x4 paintedRemove downspouts Gutter .050 painted 5" OG/box

Remove metal decking Install metal decking

Gutter .050 5" MF OG/box Remove metal gutterGravel stop .040 painted 4"-6"Metal pre-formed corner painted Metal edge pre-formed MF Metal edge free floating painted 4"-8"Metal edge free floating MF 4"-8"Remove metal edge

ST

Page 12: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 5 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Miller Elementary School_____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

7.77.7 10 100 sf $0.66 7.7 10 200 sf $0.73 7.7 20 100 sf $1.397.7 20 200 sf $1.637.7 20 300 sf $1.90 7.7 20 400 sf $5.067.7 20 500 sf $6.46 7.7 30 100 lf $0.897.7 30 200 lf $1.677.7 40 100 lf $0.747.7 40 200 lf $0.877.7 40 300 lf $1.39 7.7 50 100 lf $4.20 7.7 60 100 lf $4.207.7 60 200 lf $4.44

7.87.8 10 100 ea $154.067.8 10 200 ea $869.557.8 10 300 sf $108.807.8 20 100 ea $387.00

ROOF SPECIALTIES & ACCESSORIES

Curbing treated 2x12Nailer treated 2x6

Nailer treated 1x4Cants treated wood

Nailer treated 2x4

Cants woodfiber

Plywood decking CDX 5/8"Plywood decking CDX 1/2"Dem of std. 2x6 t & g decking Dem of plywood or 1x6 decking WOODWORK

Remove existing roof drain Roof hatch alum larger sizesRoof hatch alum. 2.5x3Remove roof hatch

Joist fir 2x10 Joist fir 2x6

Standard 2x6 decking t & gStandard 1x6 decking Plywood decking CDX 3/4"

Page 13: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 6 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Miller Elementary School_____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

7.8 20 200 ea $520.007.8 20 300 ea $172.357.8 20 400 ea $75.767.8 20 500 ea $108.387.8 30 100 sf $0.387.8 30 200 sf $3.957.8 40 100 ea $535.847.8 50 100 lf $65.037.8 50 200 lf $166.88 7.8 50 300 sf $43.35 7.8 60 100 lf $5.787.8 70 100 ea $88.547.8 70 200 ea $120.12 7.8 70 300 ea $7.057.8 80 100 lf $27.22 1,185 Linear Ft.7.8 80 200 lf $39.027.8 80 300 ea $37.62

7.97.9 10 100 sf $1.85

7.107.10 10 100 ea $1100.007.10 10 200 sf $0.167.10 20 100 sfGuarantee - Contractors 3-year guarantee

Warranty re-roof 10 yr over 10,000 s.f. Warranty re-roof 10 yr less 10,000 s.f. ROOF WARRANTY & GUARANTEES

FLUID APPLIED ROOFING HydroStop Premium Coat System (HSPCS)

PVC SupportExp. Jt. CSPE reinforced Expansion joint butyl/neoprene 16 oz. Pitch pocket resurface only Pitch pocket, 16 oz. 8x8Pitch pocket, 16 oz. 4x4

Roof ladder, security ladder guard Roof laddder, 20 ft up w/ cage Roof ladder, 20 ft & up w/o cage Roof ventilators Walkway, BUR

Plumbing stack #4 leadReflash existing roof drain Install new roof drain

Termination bar

Remove existing walkways Scupper 16 oz. match existing

Page 14: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 7 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Miller Elementary School_____________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

TASK ORDER # _______________________________________________

PURCHASE ORDER #____________________________________________

CONTRACTOR'S SIGNATURE ___________________________________

DATE: ___________________________________

ATTACHMENTS:1. PROPERTY ACCOUNTING ROOF PLAN, AREA WITHIN PROJECT SCOPE MARKED AND DATED ___________________________________2. ADDITIONAL CONDITIONS OR COMMENTS3. CUMBERLAND COUNTY SCHOOLS LINE ITEM / PERFORMANCE SPECIFICATION DATED _________________________ IS INCLUDED BY REFERENCE. THIS PROJECT IS NOT AUTHORIZED UNTIL A PURCHASE ORDER NUMBER IS ENTERED ABOVE AND PURCHASE ORDER IS RECEIVED BY CONTRACTOR.TOTAL PAGES IN THIS STATEMENT OF PROJECT SCOPE__________________________

TOTAL LABOR & MATERIALS $_____________________________________________________________

Page 15: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

7 17.1 10 100 sf $0.427.1 10 200 sf $2.017.1 10 300 sf $2.947.1 10 400 sf $2.817.1 10 500 sf $3.347.1 10 600 sf $1.537.1 10 700 sf $2.247.1 20 100 sf $0.487.1 20 300 lf $5.057.1 20 400 lf $5.487.1 20 500 lf $5.967.1 30 100 lf $0.727.1 30 200 lf $0.767.1 30 300 lf $0.787.1 40 100 lf $0.277.1 40 200 lf $0.857.1 50 100 sf $1.71

7.27.2 10 100 sf $0.427.2 10 200 sf $0.48 7.2 30 100 sf $0.907.2 30 200 sf $1.06 7.2 30 300 sf $1.047 2 30 400 sf $1.20

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Smith High School__________ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

lnsul. 1.5" lso mech fastlnsul. 1" iso mech fastlnsuL 1.5" lso In type Illlnsul. 1" Iso in type IIIDem. lightwt. per 1"Dem. of roof insul 1"INSULATION

Caulk poly 1 compound 1/2 x 1/2

Vapor retarder or base sheet 1 plyBuild. red rosinBuild. paper15# feltBacker rod 3/4"

DESCRIPTION

Pressure CleaningWATERPROOFING & DAMPROOFING

WP - acrylic brush applied texturedWP - acrylic brush applied smooth

WP-non-pigmented, Silane 1 coat vertical

Backer rod 1/2"Backer rod 1/4"Caulk silicone 1/4x1/2

WP-rubberized ctg brush appliedWP-asphalt emulsion brush grade

Caulk polyurethane 1 component 1/4 x 1/4Remove caulkingWP- non-pigmenting, Silane 1 coat horizontal

Page 16: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 2 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Smith High School__________ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

7.2 40 100 sf $0.737.2 40 200 sf $1.057.2 40 300 sf $0.877.2 50 400 sf $1.237.2 50 100 sf $1.707.2 60 200 sf $1.79

7.37.3 10 100 sf $0.477.3 20 200 sf $1.92

7.47.4 10 100 sf $0.827.4 10 120 sf $0.287.4 10 110 sf $0.547.4 10 130 sf $0.337.4 10 200 sf $0.717.4 10 210 sf $0.377.4 10 220 sf $0.867.4 20 100 sf $1.957.4 30 200 sf $2.537.4 30 400 sf $4.117.4 30 500 sf $3.417.4 30 600 sf $3.53 7.4 35 100 sf $2.447.4 35 200 sf $1.82

BUR 3 ply G2 in cold adhesive over 500 sf BUR 3 ply G2 in cold adhesive 1-500BUR 4 ply type VI in Premium III 3 ply Type IV in Premium III

BUR surface emulsion BUR surface with cold process adhesive BUR 2 ply type IV, 1 ply mod. Bit in type III

Remove single ply mech fast membraneRemove single ply membrane adheredRemove single ply ballast and membraneWet vac roof membrane Spud embedded gravel Sweep loose aggregate Remove BUR ROOFING & RESTORATION

Shingles 260/300 lb. Remove comp. shingles

SHINGLES & ROOF TILES

Insul. Tapered 1/4" Iso in type III

Insul. 1" fiberbd. mech fastInsul. 1/2" fiberbd. mech fast

Insul. Lightweight cellular per 1" depth

lnsul. 1" fiberboard intype IIIlnsul. 1/2" fiberboard in type III

Page 17: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 3 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Smith High School__________ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

7.4 35 300 sf $2.577.4 35 400 sf $2.697.4 35 500 sf $1.247.4 35 600 sf $2.477.4 40 100 sf $4.727.4 40 300 sf $4.707.4 40 400 sf $7.977.4 50 100 sf $0.847.4 50 200 sf $2.147.4 50 300 sf $2.337.4 60 100 sf $4.227.4 60 300 sf $4.737.4 80 400 sf $4.937.4 80 500 sf $6.197.4 90 200 sf $13.747.4 90 300 sf $18.50

7.57.5 10 200 sf $19.527.5 10 400 lf $10.60 7.5 10 500 sf $40.47Coping stone remove and reset

Bell tile coping remove and reset Remove brick and reset 50 sq. ft. minimum MASONRY

Copper 16 oz. flat seam Copper 16 oz. standing seam Flashing CSPE Flashing membrane, 2 ply, composite ply Single ply elvaloy 60 mil, fully adheredSingle ply elvaloy 60 mil, mechanically fast.BUR restoration odorless BUR restoration pitch BUR restoration asphalt PRIMER BUR repair elast. w/ mesh BUR repair pitch base w/ mesh BUR repairs fib. Asph. Mastic w/ meshBUR surface with white elastomeric

BUR surface emulsion & 1 ply poly membraneBUR surface with aluminum

BUR surface emulsion and aluminum ST

S

Page 18: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 4 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Smith High School__________ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

7.67.6 10 100 sf $0.927.6 10 200 sf $5.60 1,600 Sq.Ft.7.6 20 100 lf $0.707.6 20 200 lf $2.977.6 20 300 lf $3.367.6 30 100 lf $4.027.6 30 200 lf $26.39 7.6 30 210 lf $27.547.6 30 220 ea $57.827.6 30 230 ea $69.287.6 30 240 lf $5.027.6 40 100 lf $1.437.6 40 200 lf $5.207.6 40 300 lf $5.447.6 50 100 lf $0.467.6 50 200 lf $3.687.6 60 400 sf $3.617.6 60 500 ea $75.047.6 60 600 sf $4.477.6 70 100 lf $5.36

Counterflashing .040 alum 6" wide Counterflashing 16 oz. 6" wide

METAL WORK

Remove counter flashing

Resolder joints in sheet metal Metal coping alum. .040 std. seam paintedMetal storm collar Metal trim .032 painted Downspouts alum. .024 3x4 paintedRemove downspouts Gutter .050 painted 5" OG/box

Remove metal decking Install metal decking

Gutter .050 5" MF OG/box Remove metal gutterGravel stop .040 painted 4"-6"Metal pre-formed corner painted Metal edge pre-formed MF Metal edge free floating painted 4"-8"Metal edge free floating MF 4"-8"Remove metal edge

ST

Page 19: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 5 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Smith High School__________ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

7.77.7 10 100 sf $0.66 7.7 10 200 sf $0.73 7.7 20 100 sf $1.397.7 20 200 sf $1.637.7 20 300 sf $1.90 7.7 20 400 sf $5.067.7 20 500 sf $6.46 7.7 30 100 lf $0.897.7 30 200 lf $1.677.7 40 100 lf $0.747.7 40 200 lf $0.877.7 40 300 lf $1.39 7.7 50 100 lf $4.20 7.7 60 100 lf $4.207.7 60 200 lf $4.44

7.87.8 10 100 ea $154.067.8 10 200 ea $869.557.8 10 300 sf $108.807.8 20 100 ea $387.00

ROOF SPECIALTIES & ACCESSORIES

Curbing treated 2x12Nailer treated 2x6

Nailer treated 1x4Cants treated wood

Nailer treated 2x4

Cants woodfiber

Plywood decking CDX 5/8"Plywood decking CDX 1/2"Dem of std. 2x6 t & g decking Dem of plywood or 1x6 decking WOODWORK

Remove existing roof drain Roof hatch alum larger sizesRoof hatch alum. 2.5x3Remove roof hatch

Joist fir 2x10 Joist fir 2x6

Standard 2x6 decking t & gStandard 1x6 decking Plywood decking CDX 3/4"

Page 20: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 6 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Smith High School__________ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

7.8 20 200 ea $520.007.8 20 300 ea $172.357.8 20 400 ea $75.767.8 20 500 ea $108.387.8 30 100 sf $0.387.8 30 200 sf $3.957.8 40 100 ea $535.847.8 50 100 lf $65.037.8 50 200 lf $166.88 7.8 50 300 sf $43.35 7.8 60 100 lf $5.787.8 70 100 ea $88.547.8 70 200 ea $120.12 7.8 70 300 ea $7.057.8 80 100 lf $27.22 7.8 80 200 lf $39.027.8 80 300 ea $37.62

7.97.9 10 100 sf $1.85

7.107.10 10 100 ea $1100.007.10 10 200 sf $0.167.10 20 100 sfGuarantee - Contractors 3-year guarantee

Warranty re-roof 10 yr over 10,000 s.f. Warranty re-roof 10 yr less 10,000 s.f. ROOF WARRANTY & GUARANTEES

FLUID APPLIED ROOFING HydroStop Premium Coat System (HSPCS)

PVC SupportExp. Jt. CSPE reinforced Expansion joint butyl/neoprene 16 oz. Pitch pocket resurface only Pitch pocket, 16 oz. 8x8Pitch pocket, 16 oz. 4x4

Roof ladder, security ladder guard Roof laddder, 20 ft up w/ cage Roof ladder, 20 ft & up w/o cage Roof ventilators Walkway, BUR

Plumbing stack #4 leadReflash existing roof drain Install new roof drain

Termination bar

Remove existing walkways Scupper 16 oz. match existing

Page 21: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 7 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL EE Smith High School__________ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

TASK ORDER # _______________________________________________

PURCHASE ORDER #____________________________________________

CONTRACTOR'S SIGNATURE ___________________________________

DATE: ___________________________________

ATTACHMENTS:1. PROPERTY ACCOUNTING ROOF PLAN, AREA WITHIN PROJECT SCOPE MARKED AND DATED ___________________________________2. ADDITIONAL CONDITIONS OR COMMENTS3. CUMBERLAND COUNTY SCHOOLS LINE ITEM / PERFORMANCE SPECIFICATION DATED _________________________ IS INCLUDED BY REFERENCE. THIS PROJECT IS NOT AUTHORIZED UNTIL A PURCHASE ORDER NUMBER IS ENTERED ABOVE AND PURCHASE ORDER IS RECEIVED BY CONTRACTOR.TOTAL PAGES IN THIS STATEMENT OF PROJECT SCOPE__________________________

TOTAL LABOR & MATERIALS $_____________________________________________________________

Page 22: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

7 17.1 10 100 sf $0.427.1 10 200 sf $2.017.1 10 300 sf $2.947.1 10 400 sf $2.817.1 10 500 sf $3.347.1 10 600 sf $1.537.1 10 700 sf $2.247.1 20 100 sf $0.487.1 20 300 lf $5.057.1 20 400 lf $5.487.1 20 500 lf $5.967.1 30 100 lf $0.727.1 30 200 lf $0.767.1 30 300 lf $0.787.1 40 100 lf $0.277.1 40 200 lf $0.857.1 50 100 sf $1.71

7.27.2 10 100 sf $0.427.2 10 200 sf $0.48 7.2 30 100 sf $0.907.2 30 200 sf $1.06 7.2 30 300 sf $1.047 2 30 400 sf $1.20

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL Max Abbott Middle School______ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

lnsul. 1.5" lso mech fastlnsul. 1" iso mech fastlnsuL 1.5" lso In type Illlnsul. 1" Iso in type IIIDem. lightwt. per 1"Dem. of roof insul 1"INSULATION

Caulk poly 1 compound 1/2 x 1/2

Vapor retarder or base sheet 1 plyBuild. red rosinBuild. paper15# feltBacker rod 3/4"

DESCRIPTION

Pressure CleaningWATERPROOFING & DAMPROOFING

WP - acrylic brush applied texturedWP - acrylic brush applied smooth

WP-non-pigmented, Silane 1 coat vertical

Backer rod 1/2"Backer rod 1/4"Caulk silicone 1/4x1/2

WP-rubberized ctg brush appliedWP-asphalt emulsion brush grade

Caulk polyurethane 1 component 1/4 x 1/4Remove caulkingWP- non-pigmenting, Silane 1 coat horizontal

Page 23: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 2 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL Max Abbott Middle School______ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

7.2 40 100 sf $0.737.2 40 200 sf $1.057.2 40 300 sf $0.877.2 50 400 sf $1.237.2 50 100 sf $1.707.2 60 200 sf $1.79

7.37.3 10 100 sf $0.47 18 Squares7.3 20 200 sf $1.92 18 Squares

7.47.4 10 100 sf $0.827.4 10 120 sf $0.287.4 10 110 sf $0.547.4 10 130 sf $0.337.4 10 200 sf $0.717.4 10 210 sf $0.377.4 10 220 sf $0.867.4 20 100 sf $1.957.4 30 200 sf $2.537.4 30 400 sf $4.117.4 30 500 sf $3.417.4 30 600 sf $3.53 7.4 35 100 sf $2.447.4 35 200 sf $1.82

BUR 3 ply G2 in cold adhesive over 500 sf BUR 3 ply G2 in cold adhesive 1-500BUR 4 ply type VI in Premium III 3 ply Type IV in Premium III

BUR surface emulsion BUR surface with cold process adhesive BUR 2 ply type IV, 1 ply mod. Bit in type III

Remove single ply mech fast membraneRemove single ply membrane adheredRemove single ply ballast and membraneWet vac roof membrane Spud embedded gravel Sweep loose aggregate Remove BUR ROOFING & RESTORATION

Shingles 260/300 lb. Remove comp. shingles

SHINGLES & ROOF TILES

Insul. Tapered 1/4" Iso in type III

Insul. 1" fiberbd. mech fastInsul. 1/2" fiberbd. mech fast

Insul. Lightweight cellular per 1" depth

lnsul. 1" fiberboard intype IIIlnsul. 1/2" fiberboard in type III

Page 24: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 3 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL Max Abbott Middle School______ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

7.4 35 300 sf $2.577.4 35 400 sf $2.697.4 35 500 sf $1.247.4 35 600 sf $2.47 39 Squares7.4 40 100 sf $4.727.4 40 300 sf $4.707.4 40 400 sf $7.977.4 50 100 sf $0.847.4 50 200 sf $2.147.4 50 300 sf $2.337.4 60 100 sf $4.227.4 60 300 sf $4.737.4 80 400 sf $4.937.4 80 500 sf $6.197.4 90 200 sf $13.747.4 90 300 sf $18.50

7.57.5 10 200 sf $19.527.5 10 400 lf $10.60 7.5 10 500 sf $40.47Coping stone remove and reset

Bell tile coping remove and reset Remove brick and reset 50 sq. ft. minimum MASONRY

Copper 16 oz. flat seam Copper 16 oz. standing seam Flashing CSPE Flashing membrane, 2 ply, composite ply Single ply elvaloy 60 mil, fully adheredSingle ply elvaloy 60 mil, mechanically fast.BUR restoration odorless BUR restoration pitch BUR restoration asphalt PRIMER BUR repair elast. w/ mesh BUR repair pitch base w/ mesh BUR repairs fib. Asph. Mastic w/ meshBUR surface with white elastomeric

BUR surface emulsion & 1 ply poly membraneBUR surface with aluminum

BUR surface emulsion and aluminum ST

S

Page 25: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 4 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL Max Abbott Middle School______ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

7.67.6 10 100 sf $0.927.6 10 200 sf $5.60 1,600 Sq.Ft.7.6 20 100 lf $0.707.6 20 200 lf $2.977.6 20 300 lf $3.367.6 30 100 lf $4.027.6 30 200 lf $26.39 7.6 30 210 lf $27.547.6 30 220 ea $57.827.6 30 230 ea $69.287.6 30 240 lf $5.027.6 40 100 lf $1.437.6 40 200 lf $5.207.6 40 300 lf $5.447.6 50 100 lf $0.467.6 50 200 lf $3.687.6 60 400 sf $3.617.6 60 500 ea $75.047.6 60 600 sf $4.477.6 70 100 lf $5.36

Counterflashing .040 alum 6" wide Counterflashing 16 oz. 6" wide

METAL WORK

Remove counter flashing

Resolder joints in sheet metal Metal coping alum. .040 std. seam paintedMetal storm collar Metal trim .032 painted Downspouts alum. .024 3x4 paintedRemove downspouts Gutter .050 painted 5" OG/box

Remove metal decking Install metal decking

Gutter .050 5" MF OG/box Remove metal gutterGravel stop .040 painted 4"-6"Metal pre-formed corner painted Metal edge pre-formed MF Metal edge free floating painted 4"-8"Metal edge free floating MF 4"-8"Remove metal edge

ST

Page 26: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 5 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL Max Abbott Middle School______ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

7.77.7 10 100 sf $0.66 7.7 10 200 sf $0.73 7.7 20 100 sf $1.397.7 20 200 sf $1.637.7 20 300 sf $1.90 7.7 20 400 sf $5.067.7 20 500 sf $6.46 7.7 30 100 lf $0.897.7 30 200 lf $1.677.7 40 100 lf $0.747.7 40 200 lf $0.877.7 40 300 lf $1.39 7.7 50 100 lf $4.20 7.7 60 100 lf $4.207.7 60 200 lf $4.44

7.87.8 10 100 ea $154.067.8 10 200 ea $869.557.8 10 300 sf $108.807.8 20 100 ea $387.00

ROOF SPECIALTIES & ACCESSORIES

Curbing treated 2x12Nailer treated 2x6

Nailer treated 1x4Cants treated wood

Nailer treated 2x4

Cants woodfiber

Plywood decking CDX 5/8"Plywood decking CDX 1/2"Dem of std. 2x6 t & g decking Dem of plywood or 1x6 decking WOODWORK

Remove existing roof drain Roof hatch alum larger sizesRoof hatch alum. 2.5x3Remove roof hatch

Joist fir 2x10 Joist fir 2x6

Standard 2x6 decking t & gStandard 1x6 decking Plywood decking CDX 3/4"

Page 27: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 6 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL Max Abbott Middle School______ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

7.8 20 200 ea $520.007.8 20 300 ea $172.357.8 20 400 ea $75.767.8 20 500 ea $108.387.8 30 100 sf $0.387.8 30 200 sf $3.957.8 40 100 ea $535.847.8 50 100 lf $65.037.8 50 200 lf $166.88 7.8 50 300 sf $43.35 7.8 60 100 lf $5.787.8 70 100 ea $88.547.8 70 200 ea $120.12 7.8 70 300 ea $7.057.8 80 100 lf $27.22 7.8 80 200 lf $39.027.8 80 300 ea $37.62

7.97.9 10 100 sf $1.85

7.107.10 10 100 ea $1100.007.10 10 200 sf $0.167.10 20 100 sfGuarantee - Contractors 3-year guarantee

Warranty re-roof 10 yr over 10,000 s.f. Warranty re-roof 10 yr less 10,000 s.f. ROOF WARRANTY & GUARANTEES

FLUID APPLIED ROOFING HydroStop Premium Coat System (HSPCS)

PVC SupportExp. Jt. CSPE reinforced Expansion joint butyl/neoprene 16 oz. Pitch pocket resurface only Pitch pocket, 16 oz. 8x8Pitch pocket, 16 oz. 4x4

Roof ladder, security ladder guard Roof laddder, 20 ft up w/ cage Roof ladder, 20 ft & up w/o cage Roof ventilators Walkway, BUR

Plumbing stack #4 leadReflash existing roof drain Install new roof drain

Termination bar

Remove existing walkways Scupper 16 oz. match existing

Page 28: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 7 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL Max Abbott Middle School______ ______LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

TASK ORDER # _______________________________________________

PURCHASE ORDER #____________________________________________

CONTRACTOR'S SIGNATURE ___________________________________

DATE: ___________________________________

ATTACHMENTS:1. PROPERTY ACCOUNTING ROOF PLAN, AREA WITHIN PROJECT SCOPE MARKED AND DATED ___________________________________2. ADDITIONAL CONDITIONS OR COMMENTS3. CUMBERLAND COUNTY SCHOOLS LINE ITEM / PERFORMANCE SPECIFICATION DATED _________________________ IS INCLUDED BY REFERENCE. THIS PROJECT IS NOT AUTHORIZED UNTIL A PURCHASE ORDER NUMBER IS ENTERED ABOVE AND PURCHASE ORDER IS RECEIVED BY CONTRACTOR.TOTAL PAGES IN THIS STATEMENT OF PROJECT SCOPE__________________________

TOTAL LABOR & MATERIALS $_____________________________________________________________

Page 29: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

7 17.1 10 100 sf $0.427.1 10 200 sf $2.017.1 10 300 sf $2.947.1 10 400 sf $2.817.1 10 500 sf $3.347.1 10 600 sf $1.537.1 10 700 sf $2.247.1 20 100 sf $0.487.1 20 300 lf $5.057.1 20 400 lf $5.487.1 20 500 lf $5.967.1 30 100 lf $0.727.1 30 200 lf $0.767.1 30 300 lf $0.787.1 40 100 lf $0.277.1 40 200 lf $0.857.1 50 100 sf $1.71

7.27.2 10 100 sf $0.427.2 10 200 sf $0.48 7.2 30 100 sf $0.907.2 30 200 sf $1.06 7.2 30 300 sf $1.047 2 30 400 sf $1.20

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL W.T. Brown Elementary School___________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

lnsul. 1.5" lso mech fastlnsul. 1" iso mech fastlnsuL 1.5" lso In type Illlnsul. 1" Iso in type IIIDem. lightwt. per 1"Dem. of roof insul 1"INSULATION

Caulk poly 1 compound 1/2 x 1/2

Vapor retarder or base sheet 1 plyBuild. red rosinBuild. paper15# feltBacker rod 3/4"

DESCRIPTION

Pressure CleaningWATERPROOFING & DAMPROOFING

WP - acrylic brush applied texturedWP - acrylic brush applied smooth

WP-non-pigmented, Silane 1 coat vertical

Backer rod 1/2"Backer rod 1/4"Caulk silicone 1/4x1/2

WP-rubberized ctg brush appliedWP-asphalt emulsion brush grade

Caulk polyurethane 1 component 1/4 x 1/4Remove caulkingWP- non-pigmenting, Silane 1 coat horizontal

Page 30: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 2 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL W.T. Brown Elementary School___________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

7.2 40 100 sf $0.737.2 40 200 sf $1.057.2 40 300 sf $0.877.2 50 400 sf $1.237.2 50 100 sf $1.707.2 60 200 sf $1.79

7.37.3 10 100 sf $0.477.3 20 200 sf $1.92

7.47.4 10 100 sf $0.827.4 10 120 sf $0.287.4 10 110 sf $0.547.4 10 130 sf $0.337.4 10 200 sf $0.717.4 10 210 sf $0.377.4 10 220 sf $0.867.4 20 100 sf $1.957.4 30 200 sf $2.537.4 30 400 sf $4.117.4 30 500 sf $3.417.4 30 600 sf $3.53 7.4 35 100 sf $2.447.4 35 200 sf $1.82

BUR 3 ply G2 in cold adhesive over 500 sf BUR 3 ply G2 in cold adhesive 1-500BUR 4 ply type VI in Premium III 3 ply Type IV in Premium III

BUR surface emulsion BUR surface with cold process adhesive BUR 2 ply type IV, 1 ply mod. Bit in type III

Remove single ply mech fast membraneRemove single ply membrane adheredRemove single ply ballast and membraneWet vac roof membrane Spud embedded gravel Sweep loose aggregate Remove BUR ROOFING & RESTORATION

Shingles 260/300 lb. Remove comp. shingles

SHINGLES & ROOF TILES

Insul. Tapered 1/4" Iso in type III

Insul. 1" fiberbd. mech fastInsul. 1/2" fiberbd. mech fast

Insul. Lightweight cellular per 1" depth

lnsul. 1" fiberboard intype IIIlnsul. 1/2" fiberboard in type III

Page 31: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 3 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL W.T. Brown Elementary School___________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

7.4 35 300 sf $2.577.4 35 400 sf $2.697.4 35 500 sf $1.24 304 Squares7.4 35 600 sf $2.477.4 40 100 sf $4.727.4 40 300 sf $4.707.4 40 400 sf $7.977.4 50 100 sf $0.847.4 50 200 sf $2.147.4 50 300 sf $2.337.4 60 100 sf $4.227.4 60 300 sf $4.737.4 80 400 sf $4.937.4 80 500 sf $6.197.4 90 200 sf $13.747.4 90 300 sf $18.50

7.57.5 10 200 sf $19.527.5 10 400 lf $10.60 7.5 10 500 sf $40.47Coping stone remove and reset

Bell tile coping remove and reset Remove brick and reset 50 sq. ft. minimum MASONRY

Copper 16 oz. flat seam Copper 16 oz. standing seam Flashing CSPE Flashing membrane, 2 ply, composite ply Single ply elvaloy 60 mil, fully adheredSingle ply elvaloy 60 mil, mechanically fast.BUR restoration odorless BUR restoration pitch BUR restoration asphalt PRIMER BUR repair elast. w/ mesh BUR repair pitch base w/ mesh BUR repairs fib. Asph. Mastic w/ meshBUR surface with white elastomeric

BUR surface emulsion & 1 ply poly membraneBUR surface with aluminum

BUR surface emulsion and aluminum ST

S

Page 32: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 4 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL W.T. Brown Elementary School___________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

7.67.6 10 100 sf $0.927.6 10 200 sf $5.607.6 20 100 lf $0.707.6 20 200 lf $2.977.6 20 300 lf $3.367.6 30 100 lf $4.027.6 30 200 lf $26.39 1,403 Linear Ft.7.6 30 210 lf $27.547.6 30 220 ea $57.827.6 30 230 ea $69.287.6 30 240 lf $5.027.6 40 100 lf $1.43 1,403 Linear Ft.7.6 40 200 lf $5.207.6 40 300 lf $5.447.6 50 100 lf $0.467.6 50 200 lf $3.687.6 60 400 sf $3.617.6 60 500 ea $75.047.6 60 600 sf $4.477.6 70 100 lf $5.36

Counterflashing .040 alum 6" wide Counterflashing 16 oz. 6" wide

METAL WORK

Remove counter flashing

Resolder joints in sheet metal Metal coping alum. .040 std. seam paintedMetal storm collar Metal trim .032 painted Downspouts alum. .024 3x4 paintedRemove downspouts Gutter .050 painted 5" OG/box

Remove metal decking Install metal decking

Gutter .050 5" MF OG/box Remove metal gutterGravel stop .040 painted 4"-6"Metal pre-formed corner painted Metal edge pre-formed MF Metal edge free floating painted 4"-8"Metal edge free floating MF 4"-8"Remove metal edge

ST

Page 33: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 5 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL W.T. Brown Elementary School___________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

7.77.7 10 100 sf $0.66 7.7 10 200 sf $0.73 7.7 20 100 sf $1.397.7 20 200 sf $1.637.7 20 300 sf $1.90 7.7 20 400 sf $5.067.7 20 500 sf $6.46 7.7 30 100 lf $0.897.7 30 200 lf $1.677.7 40 100 lf $0.747.7 40 200 lf $0.877.7 40 300 lf $1.39 7.7 50 100 lf $4.20 7.7 60 100 lf $4.207.7 60 200 lf $4.44

7.87.8 10 100 ea $154.067.8 10 200 ea $869.557.8 10 300 sf $108.807.8 20 100 ea $387.00

ROOF SPECIALTIES & ACCESSORIES

Curbing treated 2x12Nailer treated 2x6

Nailer treated 1x4Cants treated wood

Nailer treated 2x4

Cants woodfiber

Plywood decking CDX 5/8"Plywood decking CDX 1/2"Dem of std. 2x6 t & g decking Dem of plywood or 1x6 decking WOODWORK

Remove existing roof drain Roof hatch alum larger sizesRoof hatch alum. 2.5x3Remove roof hatch

Joist fir 2x10 Joist fir 2x6

Standard 2x6 decking t & gStandard 1x6 decking Plywood decking CDX 3/4"

Page 34: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 6 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL W.T. Brown Elementary School___________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

7.8 20 200 ea $520.007.8 20 300 ea $172.357.8 20 400 ea $75.767.8 20 500 ea $108.387.8 30 100 sf $0.387.8 30 200 sf $3.957.8 40 100 ea $535.847.8 50 100 lf $65.037.8 50 200 lf $166.88 7.8 50 300 sf $43.35 7.8 60 100 lf $5.787.8 70 100 ea $88.547.8 70 200 ea $120.12 7.8 70 300 ea $7.057.8 80 100 lf $27.22 7.8 80 200 lf $39.027.8 80 300 ea $37.62

7.97.9 10 100 sf $1.85

7.107.10 10 100 ea $1100.007.10 10 200 sf $0.167.10 20 100 sfGuarantee - Contractors 3-year guarantee

Warranty re-roof 10 yr over 10,000 s.f. Warranty re-roof 10 yr less 10,000 s.f. ROOF WARRANTY & GUARANTEES

FLUID APPLIED ROOFING HydroStop Premium Coat System (HSPCS)

PVC SupportExp. Jt. CSPE reinforced Expansion joint butyl/neoprene 16 oz. Pitch pocket resurface only Pitch pocket, 16 oz. 8x8Pitch pocket, 16 oz. 4x4

Roof ladder, security ladder guard Roof laddder, 20 ft up w/ cage Roof ladder, 20 ft & up w/o cage Roof ventilators Walkway, BUR

Plumbing stack #4 leadReflash existing roof drain Install new roof drain

Termination bar

Remove existing walkways Scupper 16 oz. match existing

Page 35: CUMBERLAND COUNTY SCHOOLS STATEMENT OF ROOFING PROJECT SCOPEoperations.ccs.k12.nc.us/files/2014/11/5-Sample-Task-Order... · STATEMENT OF ROOFING PROJECT SCOPE Page 1 of 7 ... Vapor

STATEMENT OF ROOFING PROJECT SCOPE Page 7 of 7

CUMBERLAND COUNTY SCHOOLS

DATE INITIAL DATE INITIALCCS CONTRACTOR

MEASUREMENTS MEASUREMENTS

DIV SEC ITEM units $/unit

BUDGET COST

BUDGET COST

STATEMENT OF ROOFING PROJECT SCOPESCHOOL W.T. Brown Elementary School___________LEA 260- ________________ADDRESS _____________________________________________________________ _____________________________________________________________

BUILDING NO's ____________________ROOF PLAN NO._____________________TASK ORDER NO. _____________________________________________________

DESCRIPTION

TASK ORDER # _______________________________________________

PURCHASE ORDER #____________________________________________

CONTRACTOR'S SIGNATURE ___________________________________

DATE: ___________________________________

ATTACHMENTS:1. PROPERTY ACCOUNTING ROOF PLAN, AREA WITHIN PROJECT SCOPE MARKED AND DATED ___________________________________2. ADDITIONAL CONDITIONS OR COMMENTS3. CUMBERLAND COUNTY SCHOOLS LINE ITEM / PERFORMANCE SPECIFICATION DATED _________________________ IS INCLUDED BY REFERENCE. THIS PROJECT IS NOT AUTHORIZED UNTIL A PURCHASE ORDER NUMBER IS ENTERED ABOVE AND PURCHASE ORDER IS RECEIVED BY CONTRACTOR.TOTAL PAGES IN THIS STATEMENT OF PROJECT SCOPE__________________________

TOTAL LABOR & MATERIALS $_____________________________________________________________