cube testing register - hpcltenders.hpcl.co.in/tenders/tender_prog/tenderfiles/4960...cube testing...
TRANSCRIPT
BOOK NO. :
Cube Testing Register
THIS IS TO CERTIFY THAT THIS REGISTERCONTAINS PAGES SERIAL NUMBER FROM
TO AND IS ISSUED TO SITE FOR USING FROM NOW.
AUTHENTICATED BY(SR. MANAGER - E & P)
.■••■•••■■Tre.wrommewp....,.......af
Hindustan Petroleum Corporation LimitedCUBE TESTING REGISTER
SI. No.ate oraeD of
CastingG d ofConcrete
Location whereConcrete is
used
Total Qty. ofconcreting
done duringthe day in
bags
Age of rcube indays
......_
Weight ofcube in
Kg.
oion
_ .. ______-4.
I-st TestResult7 days
__ Averageof FirstTest
Results
1-Final testResults28 days
Averageof FinalResults
Lab Ref.
k
ActTaken
__ ____ _ _ . _. ._.
Signature
HPCL Contracto
alli _
/1111111•
- - '''''
IIIIIIIIIIIMMIIIIIII - El IM-- = _____
ME •
_ . ..-M-- 11-111111- IIIIMIIIIIIIIIIIIMIIIII
, _ ,
Steel Register Consumption Statement
THIS IS TO CERTIFY THAT THIS REGISTERCONTAINS PAGES SERIAL NUMBER FROMTO AND IS ISSUED TO
SITE FOR USING FROM NOW.
AUTHENTICATED BY(SR. MANAGER - E & P)
HINDUSTAN PETROLEUM CORPORATION LTD.STEEL REGISTER/CONSUMPTION STATEMENT I
DATE OFRECEIPT
SOURCE &INVOICE REF
QTY RECEIVED QTY CONSUMED AS PER RA BILL NO. REMARKS
6MM 8MM 10MM 12MM 16MM 20MM 25MM 32MM 6MM 8MM 10MM 12MM 16MM 20MM 25MM 32MM
CARRIED FORWARD FROM
RA BILL NO
TOTAL (MT)
BALANCE QTY AS PER RA BILL NO.
6MM 8MM 10MM 12MM 16MM 20MM 25MM 32MM
(.t4T)P • .evious R. A. bills receipt and consumption io be recorded cs tarried forward
Hindrance Register
THIS IS TO CERTIFY THAT THIS REGISTERCONTAINS PAGES SERIAL NUMBER FROM
TO AND IS ISSUED TO SITE FOR USING FROM NOW.
AUTHENTICATED BY(SR. MANAGER - E & P)
Hindustan Petroleum Corporation LimitedHINDRANCE REGISTER 1
SI. No.
1
Nature of Hindrance
2
Date ofOccurrence
3
...Date ofRemoval
4
PeriodHindrance
5
OverlappingPeriod
6
NetExtention
7
ExtentionReccommended
8
Remarks
9
• •
$Ii
BOOK NO. :
Material Test Register
THIS IS TO CERTIFY THAT THIS REGISTERCONTAINS PAGES SERIAL NUMBER FROM
TO AND IS ISSUED TO SITE FOR USING FROM NOW.
AUTHENTICATED BY(SR. MANAGER - E & P)
Hindustan Petroleum Corporation LimitedMATERIAL TEST REGISTER I
>I. No. Material Description
2
Date Sentto Lab
3
Date ofTesting
4
Lab ReportRef.
5
Result
6
Remarks
7
Signature ofSite-Engineer
8
Periodical CheckingSignature of HPCL Office'
EIC9a
HQO-IC9b
Level Book
THIS IS TO CERTIFY THAT THIS REGISTERCONTAINS PAGES SERIAL NUMBER FROM
TO AND IS ISSUED TO SITE FOR USING FROM NOW.
AUTHENTICATED BY(SR. MANAGER - E & P)