    Line # 1 Line # 2 Line # 3 Line # 5 Line # 6

    Brand Lux Lux Lux LB LB

    Capacity, MT/day 38 33 29 35 35

    Basis

    Lux 20% CNO

    Packed Lux 100 MT/day @ 72.5% TFM

    Lux noodle for 3P 30 MT/day @ 76.5% TFM

    Total Lux 130 MT/day

    LB 15% CNO

    Total LB 70 MT/day @ 73.5% TFM

    Equivalent Oil ( Assume 10% extra oil Handling)

    Lux (20% CNO) 111 MT/day @ 95% FA

    LB (15%CNO) 59.6 MT/day @ 95% FA

    Equivalent Base

    Lux (20% CNO) 172 MT/day @ 61% FA

    LB (15%CNO) 93 MT/day @ 61% FA

    Caustic required 47.63 MT/day @ 49% NaOH

    Oil issue per shift to PR

    Lux (20% CNO) 37 MT/day Equivalent 4 batch per Shift

    LB (15%CNO) 20 MT/day Equivalent 2 batch per Shift

    Base Required per shift to SFD

    Lux (20% CNO) 57 MT/day

    LB (15%CNO) 31 MT/day

  • 8/8/2019 Cu 15% &20%Cno (Single)

    2/28

    Tank farm Oil Receiving

    Oil bowser required 21 Nos/day

    Caustic bowser required 5 Nos/day

    Current oil bowser 16 Nos/day

    Current caustic bowser 5 Nos/day

    Increased oil bowser 5 Nos/dayIncreased caustic bowser 0 Nos/day

    Oil storage capacity 1100 MT

    Caustic storage Capacity 390 MT

    Points:

    1. No capacity issue for oil and caustic storage

    Oil & caustic issue to Panroom

    Caustic issue requiredCaustic Requirment 47.63 MT/day @ 49% Caustic

    Only A & B shift operation for caustic transferring to panroom

    Oil issue required

    Lux & LB Oil issue Required 170 MT

    Digital scale Capacity 9 MT/hr

    Digital Scale will be engage 22 Hr @ 85% Efficiency So

    2. No. of bowser to be increased. Action: C&F

    3. No C shift operation for bowser. Action : Production Store

  • 8/8/2019 Cu 15% &20%Cno (Single)

    3/28

    C shift manning required in Production Store

  • 8/8/2019 Cu 15% &20%Cno (Single)

    4/28

    Bleaching

    Digital Scale

    Capacity 9 MT/hr Oil preheater

    Lux Oil 111 MT/day

    Cycle time/Batch 1 Hr

    Capacity Utilization 88%

    Bleacher Capacity 97.2 MT oil

    Equivalent 151.38 MT base

    Equivalent Base

    Lux 172 MT/d@ 61% FA

    Lux

    Lye Neutralization & Saponification

    Oil receive 0.75 hr JET & Tank Saponification Circulation 8 hr

    Oil fl 4.6 Ton/Hr settle 1 hr

    Soa 8.09 Ton/Hr Drop 1 hr

    Sap 3 hr

    Cap 146 MT base DPU 5 hr

    Cap 100% Total cycle time 18.75 hr

    Batch size 24 MT oil

    Pan 1 nos

    Capacity 41 MT base

    Jet & tank capacity 146 MT Base Capacity Utilization 64%

  • 8/8/2019 Cu 15% &20%Cno (Single)

    5/28

    ( Blend for LUX 20% CNO)

    Bleacher # 1

    Capacity 9 MT/batches Intermediate tank

    Batch time 2 hr Capacity 20 MT

    Lux Oil 111 MT/day

    Capacity Utilization 114%

    (20% CNO) base process operations

    Fit pan operation

    DPU 1 Operation DPU operation 5 hr Preconditioning 2 hr

    DPU op 5 hr Settle 2 hr

    Total c 5 hr Conditioining 2 hr

    Batch s 24 MT oil Centrifuge 6.0 hr

    DPU no 1 nos Total cycle time 17 hr

    Capacit 144 MT base Batch size 24 MT oil

    Capacit 119% Fit pan 3 nos

    Capacity 161 MT base

    Capacity Utilzation 107%

    176

  • 8/8/2019 Cu 15% &20%Cno (Single)

    6/28

    2 nos Leaf filter

    Capacity 9 MT/hr Lux Oil Storage Tank

    Lux Oil 111 MT/day Capacity 27 MT

    Cycle time/batch 1.11 Hr

    Capacity Utilization 63%

    Centrifuge

    Capacity 7 MT base/hr

    Running hr 27 hr

    Capacity 186 MT base/day

    Capacity Utilization 93%

  • 8/8/2019 Cu 15% &20%Cno (Single)

    7/28

    Bleaching ( Blend

    Digital Scale Blea

    Capacity 9 MT/hr Oil preheater

    Capacity

    LB Oil 60 MT/day Batch time

    Cycle time/Batch 1 Hr LB Oil

    Capacity Utilization 100% Capacity Utilization

    Bleacher Capacity 73.44 MT oil

    Equivalent 114.37 MT base

    Equivalent Base

    LB (15%CNO) 93 MT/day @ 61% FA

    LB(15% CNO) basLye neutralizationSaponification

    Oil receive 0.75 hr

    Circulation 8 hr DPU 2 Operationsettle 1 hr Startup & shut down 1 hr

    Drop 1 hr DPU operation 5 hr

    Sap 3 hr Total cycle time 6 hr

    DPU 5 hr Batch size 24 MT oil

    Total cycle time 18.75 hr DPU nos 1 nos

    Batch size 24 MT oil Capacity 127 MT base

    Pan 3 nos Capacity Utilzation 73%

    Capacity 122 MT base

    Capacity Utilzation 76%

  • 8/8/2019 Cu 15% &20%Cno (Single)

    8/28

    for LB 15% CNO)

    cher # 2 Filter press

    9 MT/batches Capacity 9 MT/hr LB Oil Storage Tan

    2.5 hr LB Oil 60 MT/day Capacity 18

    60 MT/day Cycle tim 2.5 Hr

    81% Capacity 81%

    process operations

    Fit pan operation

    DPU operation 6 hr Preconditioning 2 hr Centrifuge

    Settle 2 hr Capacity 7 MT base/hr

    Conditioining 2 hr Running h 21 hr

    Centrifuge 6.0 hr Capacity 150 MT base/day

    Total cycle time 18 hr Capacity 62%

    Batch size 24 MT oil

    Fit pan 2 nos

    Capacity 100 MT base

    Capacity Utilzatio 92%

  • 8/8/2019 Cu 15% &20%Cno (Single)

    9/28

    k

    MT

  • 8/8/2019 Cu 15% &20%Cno (Single)

    10/28

    Lux 20% CNO

    Packed Lux 100 MT/day

    Lux noodle for 3P 30 MT/day

    Total Lux 130 MT/day

    Lux (20% CNO) 111 MT/day

    Lux (20% CNO) 172 MT/day

    Lux (20% CNO) 37 MT/day

    Digital Scale

    Capacity 9 MT

    Cycle time/batch 1 Hr

    Bleacher 1Capacity 9 MT

    Cycle time 2 Hr

    Inter mediate/ Buffer tank 30 min

    Leaf filter 1 & 2

    Startup 30

    1st batch 35

    2nd batch 45

    3rd batch 60

    LF washing 30

    Cycle time for 3 batch 3.33 Hr

    Storage Tank

    New Storage tank 20 MT

    T-8 9 MT

    Jet Tank

    Oil receive 4.6 Ton/Hr

    Soap transfer (54% TFM) 8.09 Ton/Hr

    Oil requirement per shift 31.28

    Oil requirement per day 93.84

    Equivalent base 146.14 Ton

    Equivalent soap tablet 121.46 Ton

    Lye Neutralization & SaponificationOil receive 0.75 hr

    Circulation 8 hr

    settle 1 hr

    Drop 1 hr

    Sap 3 hr

    DPU 5 hr

    DPU Change over time 1 Hr

    Total cycle time 19.75 hr

    Batch size 24 MT oil

    Pan 1 nos

    Capacity 39 MT base

  • 8/8/2019 Cu 15% &20%Cno (Single)

    11/28

    DPU 1

    Operation time 5 Hr

    Soap base transfer through DPU (54% TFM) 144.47Ton Base/Day

    Fitting operation

    TLT fit pan

    DPU 5 hr

    Preconditioning 2 hr

    Settle 2 hr

    Conditioining 2 hr

    Centrifuge 6

    Fitting Pan 3

    17hr

    Centrifuge capacity 26.51 hr

  • 8/8/2019 Cu 15% &20%Cno (Single)

    12/28

    @ 72.5% TFM

    @ 76.5% TFM

    @ 95% FA

    @ 95% FA

    Equivalent 4 batch per Shift

    CU

    183.6 Ton Oil/Day 88% 125.05

    97.2 Ton Oil/Day 114%

    174.96 Ton Oil/Day 63%

    118%

    85% efficiency 100% Consider 100% CU in Jet & Tank

    Equivalent Oil 93.84

    Equivalent base 146.14

    Equivalent soap tablet 121.46

    64%

  • 8/8/2019 Cu 15% &20%Cno (Single)

    13/28

    85% efficiency 119%

    161 MT Base/Day 107%

    185.57 MT Base/Day 93%

  • 8/8/2019 Cu 15% &20%Cno (Single)

    14/28

    LB 15% CNO

    Total LB 70 MT/day @ 73.5%

    LB (15%CNO) 60 MT/day @ 95%

    LB (15%CNO) Base 93 MT/day @ 95%

    LB (15%CNO) 20 MT/day Equivalent 2 batch per

    Digital Scale

    Capacity 9 MT

    Cycle time/batch 1 Hr 183.6 Ton Oil/Day

    Bleacher 2

    Capacity 9 MT

    Cycle time 2.5 Hr 73.44 Ton Oil/Day

    Filter Press

    Filtration 1 Hr

    Air blowing 1 Hr

    Filter washing 0.5 Hr

    Cycle time /batch 2.5 Hr 73.44 Ton Oil/Day

    Storage Tank

    T-9 18 MT

    Lye Neutralization & Saponification

    Oil receive 0.75 hr

    Circulation 8 hr settle 1 hr

    Drop 1 hr

    Sap 3 hr

    DPU 5 hr

    Total cycle time 18.75 hr

    Batch size 24 MT oil

    Pan 3 nos

    Capacity 122 MT base

    DPU 2

    Startup & shut down 1 hr

    DPU operation 5 hr

    Total cycle time 6 hr

    Batch size 24 MT oil

    DPU nos 1 nos

    Capacity 127 MT base

    Capacity Utilzation 73%

    Fitting operationTLT fit pan

  • 8/8/2019 Cu 15% &20%Cno (Single)

    15/28

    DPU 6 hr

    Preconditioning 2 hr

    Settle 2 hr

    Conditioining 2 hr

    Centrifuge 6

    18 hr 101 MT Base/Day

    Centrifuge capacity 21.49 hr 150.43 MT Base/Day

  • 8/8/2019 Cu 15% &20%Cno (Single)

    16/28

    TFM

    FA

    FA

    hift

    CU

    100% 60 7.84 Hr

    81%

    81%

    76%

    73%

  • 8/8/2019 Cu 15% &20%Cno (Single)

    17/28

    92%

    62%

  • 8/8/2019 Cu 15% &20%Cno (Single)

    18/28

    Glycerine left with Lux base 1.0%

    Glycerine left with LB base 1.0%

    Glycerine with lux spent lye 14%

    Glycerine with LB spent lye 14%

    Spent lye ex lux 66.65 MT/day @ 14% Glyc

    Spent lye ex LB 35.93 MT/day @ 14% Glyc

    Lux L/F 0.60

    LB L/F 0.60

    Average L/F 0.60

    Total lye 102.57 MT/day @ 14% Glyc

    Equivelent crude 17.95 MT/day @ 80% Glyc

    Equivelent Glyc 14.36 MT/day @ 100% Glyc

    1st Treatment Operati

    Treatment Operation 1.5

    Lye neutralization Settle 2

    Lye neutralization capacity 101.25 MT/day Filteration 1.5

    Lye neutralization Utilization 101% Total cycle time 5

    Batch size 12.5

    Tank nos 2

    Capacity 96

    Capacity Utilzation 107%

    Probable Solution:

    1.Jet & tank for saponification for Lux base. And

    2. Inline fitting for Lux base

    Benefits:

    1. As present practice 15 MT oil is used for 30 MT lyeneutralization. After lye neutralization 9 MT oil is used forcompleting saponification batch.

    2. Lye neutralization time is increased with increased offree alkali in sap soap

    3. Lye neutralization time is increased with decreased offree faty acid in oil blend

    1.Eliminination of soap boiling from Lux saponificationand conditioning operation.

    2. Controlled free alkali with sap soap and conditionedsoap,which altimatly help to increase lye neutralizationefficiency

    3.Eliminination of DPU startup & shutdown time, whichaltimatly increase Lux DPU capacity.

    75 % efficiency assumedbecause there could betime delayes for externalfactors

  • 8/8/2019 Cu 15% &20%Cno (Single)

    19/28

    on 2nd Treatment Operation

    hr 1st filtration 1.5 hr

    hr Treatment Operation 0.5 hr Evaporator

    hr Settle 1.5 hr Capacity 96

    hr Filteration 1.5 hr Capacity Utilzation 107%

    MT lye Total cycle time 5 hr

    nos Batch size 12.5 MT lye

    MT lye Tank nos 2 nos

    Capacity 96 MT lye

    Capacity Utilzation 107%

  • 8/8/2019 Cu 15% &20%Cno (Single)

    20/28

    Still plant

    MT lye Capacity 10 MT glyc

    Capacity Utilzation 144%

    1799 MT crude glycerine to be sell

  • 8/8/2019 Cu 15% &20%Cno (Single)

    21/28

    Bl

    Digital Scale

    Capacity 9 MT/hr Oil preheater

    Lux & LB o 162 MT/day

    Capacity U 88%

    Bleacher C 183.6MT oil

    Equivalent 285.93 MT base

    243 MT is the lowest one between bleaching, Sap, DPU

    Lux (20% CNO)

    Digital Scale

    Capacity 9 MT

    Cycle time/batch 1 Hr 172.8 Ton Oil/Day

    bleacher 1 & 2

    Capacity 9 MT

    Cycle time 2 Hr 172.8 Ton Oil/Day

    Inter mediate/ Buffer tank 30 min

    Leaf filter

    Startup 30

    1st batch 35 62

    2nd batch 45

    3rd batch 60

    LF washing 30

    Cycle time for 3 batch 3.33 Hr 155.52

    Storage Tank

    New Storage tank

    T-9

    T-8

    Jet Tank

    Oil receive 4.68 Ton/Hr

    Soap transfer 8.22 Ton/Hr 54%

    Oil requirement per shift 37.4 102%

    Oil requirement per day 112.2 102%

    DPU

  • 8/8/2019 Cu 15% &20%Cno (Single)

    22/28

    Operation time 6 Hr

    Soap base transfer through DPU 157.91

    Fitting operation

    TLT fit pan

    DPU 5 hr

    Preconditioning 2 hr

    Settle 2 hr

    Conditioining 2 hr

    Centrifuge 6

    17 hr 158 MT Base/Day

    Centrifuge capacity 23.25 hr 162.75 MT Base/Day

  • 8/8/2019 Cu 15% &20%Cno (Single)

    23/28

    aching ( Same blend for LUX & LB)

    Bleacher # 1

    Capacity 9 MT/batchesBatch time 2 hr

    Lux & LB o 81 MT/day

    Capacity U 88%

    Int

    Capacity

    Bleacher # 2

    Capacity 9 MT/batches

    Batch time 2 hr

    Lux & LB o 81 MT/dayCapacity U 88%

    nd fit/centrifuge operation

    LB (15% CNO)

    LB (15%CNO) 54 MT/day @ 95% FA

    Digital Scale

    Capacity 9 MT

    Cycle time/batch 1 Hr 172.8 Ton Oil/Day

    As per as requirement 6.0 Batch

    Required time 7.22 Hr

  • 8/8/2019 Cu 15% &20%Cno (Single)

    24/28

  • 8/8/2019 Cu 15% &20%Cno (Single)

    25/28

    Capacity

    2 nos Leaf filter

    rmediate tank Capacity 9 MT/hr

    20 MT Lux & LB o 162 MT/day

    Capacity U 88%

    Capacity

  • 8/8/2019 Cu 15% &20%Cno (Single)

    26/28

  • 8/8/2019 Cu 15% &20%Cno (Single)

    27/28

    ux Oil Tank

    27MT

    B Oil Tank

    20MT

  • 8/8/2019 Cu 15% &20%Cno (Single)

    28/28