8/8/2019 Cu 15% &20%Cno (Single)
1/28
Line # 1 Line # 2 Line # 3 Line # 5 Line # 6
Brand Lux Lux Lux LB LB
Capacity, MT/day 38 33 29 35 35
Basis
Lux 20% CNO
Packed Lux 100 MT/day @ 72.5% TFM
Lux noodle for 3P 30 MT/day @ 76.5% TFM
Total Lux 130 MT/day
LB 15% CNO
Total LB 70 MT/day @ 73.5% TFM
Equivalent Oil ( Assume 10% extra oil Handling)
Lux (20% CNO) 111 MT/day @ 95% FA
LB (15%CNO) 59.6 MT/day @ 95% FA
Equivalent Base
Lux (20% CNO) 172 MT/day @ 61% FA
LB (15%CNO) 93 MT/day @ 61% FA
Caustic required 47.63 MT/day @ 49% NaOH
Oil issue per shift to PR
Lux (20% CNO) 37 MT/day Equivalent 4 batch per Shift
LB (15%CNO) 20 MT/day Equivalent 2 batch per Shift
Base Required per shift to SFD
Lux (20% CNO) 57 MT/day
LB (15%CNO) 31 MT/day
-
8/8/2019 Cu 15% &20%Cno (Single)
2/28
Tank farm Oil Receiving
Oil bowser required 21 Nos/day
Caustic bowser required 5 Nos/day
Current oil bowser 16 Nos/day
Current caustic bowser 5 Nos/day
Increased oil bowser 5 Nos/dayIncreased caustic bowser 0 Nos/day
Oil storage capacity 1100 MT
Caustic storage Capacity 390 MT
Points:
1. No capacity issue for oil and caustic storage
Oil & caustic issue to Panroom
Caustic issue requiredCaustic Requirment 47.63 MT/day @ 49% Caustic
Only A & B shift operation for caustic transferring to panroom
Oil issue required
Lux & LB Oil issue Required 170 MT
Digital scale Capacity 9 MT/hr
Digital Scale will be engage 22 Hr @ 85% Efficiency So
2. No. of bowser to be increased. Action: C&F
3. No C shift operation for bowser. Action : Production Store
-
8/8/2019 Cu 15% &20%Cno (Single)
3/28
C shift manning required in Production Store
-
8/8/2019 Cu 15% &20%Cno (Single)
4/28
Bleaching
Digital Scale
Capacity 9 MT/hr Oil preheater
Lux Oil 111 MT/day
Cycle time/Batch 1 Hr
Capacity Utilization 88%
Bleacher Capacity 97.2 MT oil
Equivalent 151.38 MT base
Equivalent Base
Lux 172 MT/d@ 61% FA
Lux
Lye Neutralization & Saponification
Oil receive 0.75 hr JET & Tank Saponification Circulation 8 hr
Oil fl 4.6 Ton/Hr settle 1 hr
Soa 8.09 Ton/Hr Drop 1 hr
Sap 3 hr
Cap 146 MT base DPU 5 hr
Cap 100% Total cycle time 18.75 hr
Batch size 24 MT oil
Pan 1 nos
Capacity 41 MT base
Jet & tank capacity 146 MT Base Capacity Utilization 64%
-
8/8/2019 Cu 15% &20%Cno (Single)
5/28
( Blend for LUX 20% CNO)
Bleacher # 1
Capacity 9 MT/batches Intermediate tank
Batch time 2 hr Capacity 20 MT
Lux Oil 111 MT/day
Capacity Utilization 114%
(20% CNO) base process operations
Fit pan operation
DPU 1 Operation DPU operation 5 hr Preconditioning 2 hr
DPU op 5 hr Settle 2 hr
Total c 5 hr Conditioining 2 hr
Batch s 24 MT oil Centrifuge 6.0 hr
DPU no 1 nos Total cycle time 17 hr
Capacit 144 MT base Batch size 24 MT oil
Capacit 119% Fit pan 3 nos
Capacity 161 MT base
Capacity Utilzation 107%
176
-
8/8/2019 Cu 15% &20%Cno (Single)
6/28
2 nos Leaf filter
Capacity 9 MT/hr Lux Oil Storage Tank
Lux Oil 111 MT/day Capacity 27 MT
Cycle time/batch 1.11 Hr
Capacity Utilization 63%
Centrifuge
Capacity 7 MT base/hr
Running hr 27 hr
Capacity 186 MT base/day
Capacity Utilization 93%
-
8/8/2019 Cu 15% &20%Cno (Single)
7/28
Bleaching ( Blend
Digital Scale Blea
Capacity 9 MT/hr Oil preheater
Capacity
LB Oil 60 MT/day Batch time
Cycle time/Batch 1 Hr LB Oil
Capacity Utilization 100% Capacity Utilization
Bleacher Capacity 73.44 MT oil
Equivalent 114.37 MT base
Equivalent Base
LB (15%CNO) 93 MT/day @ 61% FA
LB(15% CNO) basLye neutralizationSaponification
Oil receive 0.75 hr
Circulation 8 hr DPU 2 Operationsettle 1 hr Startup & shut down 1 hr
Drop 1 hr DPU operation 5 hr
Sap 3 hr Total cycle time 6 hr
DPU 5 hr Batch size 24 MT oil
Total cycle time 18.75 hr DPU nos 1 nos
Batch size 24 MT oil Capacity 127 MT base
Pan 3 nos Capacity Utilzation 73%
Capacity 122 MT base
Capacity Utilzation 76%
-
8/8/2019 Cu 15% &20%Cno (Single)
8/28
for LB 15% CNO)
cher # 2 Filter press
9 MT/batches Capacity 9 MT/hr LB Oil Storage Tan
2.5 hr LB Oil 60 MT/day Capacity 18
60 MT/day Cycle tim 2.5 Hr
81% Capacity 81%
process operations
Fit pan operation
DPU operation 6 hr Preconditioning 2 hr Centrifuge
Settle 2 hr Capacity 7 MT base/hr
Conditioining 2 hr Running h 21 hr
Centrifuge 6.0 hr Capacity 150 MT base/day
Total cycle time 18 hr Capacity 62%
Batch size 24 MT oil
Fit pan 2 nos
Capacity 100 MT base
Capacity Utilzatio 92%
-
8/8/2019 Cu 15% &20%Cno (Single)
9/28
k
MT
-
8/8/2019 Cu 15% &20%Cno (Single)
10/28
Lux 20% CNO
Packed Lux 100 MT/day
Lux noodle for 3P 30 MT/day
Total Lux 130 MT/day
Lux (20% CNO) 111 MT/day
Lux (20% CNO) 172 MT/day
Lux (20% CNO) 37 MT/day
Digital Scale
Capacity 9 MT
Cycle time/batch 1 Hr
Bleacher 1Capacity 9 MT
Cycle time 2 Hr
Inter mediate/ Buffer tank 30 min
Leaf filter 1 & 2
Startup 30
1st batch 35
2nd batch 45
3rd batch 60
LF washing 30
Cycle time for 3 batch 3.33 Hr
Storage Tank
New Storage tank 20 MT
T-8 9 MT
Jet Tank
Oil receive 4.6 Ton/Hr
Soap transfer (54% TFM) 8.09 Ton/Hr
Oil requirement per shift 31.28
Oil requirement per day 93.84
Equivalent base 146.14 Ton
Equivalent soap tablet 121.46 Ton
Lye Neutralization & SaponificationOil receive 0.75 hr
Circulation 8 hr
settle 1 hr
Drop 1 hr
Sap 3 hr
DPU 5 hr
DPU Change over time 1 Hr
Total cycle time 19.75 hr
Batch size 24 MT oil
Pan 1 nos
Capacity 39 MT base
-
8/8/2019 Cu 15% &20%Cno (Single)
11/28
DPU 1
Operation time 5 Hr
Soap base transfer through DPU (54% TFM) 144.47Ton Base/Day
Fitting operation
TLT fit pan
DPU 5 hr
Preconditioning 2 hr
Settle 2 hr
Conditioining 2 hr
Centrifuge 6
Fitting Pan 3
17hr
Centrifuge capacity 26.51 hr
-
8/8/2019 Cu 15% &20%Cno (Single)
12/28
@ 72.5% TFM
@ 76.5% TFM
@ 95% FA
@ 95% FA
Equivalent 4 batch per Shift
CU
183.6 Ton Oil/Day 88% 125.05
97.2 Ton Oil/Day 114%
174.96 Ton Oil/Day 63%
118%
85% efficiency 100% Consider 100% CU in Jet & Tank
Equivalent Oil 93.84
Equivalent base 146.14
Equivalent soap tablet 121.46
64%
-
8/8/2019 Cu 15% &20%Cno (Single)
13/28
85% efficiency 119%
161 MT Base/Day 107%
185.57 MT Base/Day 93%
-
8/8/2019 Cu 15% &20%Cno (Single)
14/28
LB 15% CNO
Total LB 70 MT/day @ 73.5%
LB (15%CNO) 60 MT/day @ 95%
LB (15%CNO) Base 93 MT/day @ 95%
LB (15%CNO) 20 MT/day Equivalent 2 batch per
Digital Scale
Capacity 9 MT
Cycle time/batch 1 Hr 183.6 Ton Oil/Day
Bleacher 2
Capacity 9 MT
Cycle time 2.5 Hr 73.44 Ton Oil/Day
Filter Press
Filtration 1 Hr
Air blowing 1 Hr
Filter washing 0.5 Hr
Cycle time /batch 2.5 Hr 73.44 Ton Oil/Day
Storage Tank
T-9 18 MT
Lye Neutralization & Saponification
Oil receive 0.75 hr
Circulation 8 hr settle 1 hr
Drop 1 hr
Sap 3 hr
DPU 5 hr
Total cycle time 18.75 hr
Batch size 24 MT oil
Pan 3 nos
Capacity 122 MT base
DPU 2
Startup & shut down 1 hr
DPU operation 5 hr
Total cycle time 6 hr
Batch size 24 MT oil
DPU nos 1 nos
Capacity 127 MT base
Capacity Utilzation 73%
Fitting operationTLT fit pan
-
8/8/2019 Cu 15% &20%Cno (Single)
15/28
DPU 6 hr
Preconditioning 2 hr
Settle 2 hr
Conditioining 2 hr
Centrifuge 6
18 hr 101 MT Base/Day
Centrifuge capacity 21.49 hr 150.43 MT Base/Day
-
8/8/2019 Cu 15% &20%Cno (Single)
16/28
TFM
FA
FA
hift
CU
100% 60 7.84 Hr
81%
81%
76%
73%
-
8/8/2019 Cu 15% &20%Cno (Single)
17/28
92%
62%
-
8/8/2019 Cu 15% &20%Cno (Single)
18/28
Glycerine left with Lux base 1.0%
Glycerine left with LB base 1.0%
Glycerine with lux spent lye 14%
Glycerine with LB spent lye 14%
Spent lye ex lux 66.65 MT/day @ 14% Glyc
Spent lye ex LB 35.93 MT/day @ 14% Glyc
Lux L/F 0.60
LB L/F 0.60
Average L/F 0.60
Total lye 102.57 MT/day @ 14% Glyc
Equivelent crude 17.95 MT/day @ 80% Glyc
Equivelent Glyc 14.36 MT/day @ 100% Glyc
1st Treatment Operati
Treatment Operation 1.5
Lye neutralization Settle 2
Lye neutralization capacity 101.25 MT/day Filteration 1.5
Lye neutralization Utilization 101% Total cycle time 5
Batch size 12.5
Tank nos 2
Capacity 96
Capacity Utilzation 107%
Probable Solution:
1.Jet & tank for saponification for Lux base. And
2. Inline fitting for Lux base
Benefits:
1. As present practice 15 MT oil is used for 30 MT lyeneutralization. After lye neutralization 9 MT oil is used forcompleting saponification batch.
2. Lye neutralization time is increased with increased offree alkali in sap soap
3. Lye neutralization time is increased with decreased offree faty acid in oil blend
1.Eliminination of soap boiling from Lux saponificationand conditioning operation.
2. Controlled free alkali with sap soap and conditionedsoap,which altimatly help to increase lye neutralizationefficiency
3.Eliminination of DPU startup & shutdown time, whichaltimatly increase Lux DPU capacity.
75 % efficiency assumedbecause there could betime delayes for externalfactors
-
8/8/2019 Cu 15% &20%Cno (Single)
19/28
on 2nd Treatment Operation
hr 1st filtration 1.5 hr
hr Treatment Operation 0.5 hr Evaporator
hr Settle 1.5 hr Capacity 96
hr Filteration 1.5 hr Capacity Utilzation 107%
MT lye Total cycle time 5 hr
nos Batch size 12.5 MT lye
MT lye Tank nos 2 nos
Capacity 96 MT lye
Capacity Utilzation 107%
-
8/8/2019 Cu 15% &20%Cno (Single)
20/28
Still plant
MT lye Capacity 10 MT glyc
Capacity Utilzation 144%
1799 MT crude glycerine to be sell
-
8/8/2019 Cu 15% &20%Cno (Single)
21/28
Bl
Digital Scale
Capacity 9 MT/hr Oil preheater
Lux & LB o 162 MT/day
Capacity U 88%
Bleacher C 183.6MT oil
Equivalent 285.93 MT base
243 MT is the lowest one between bleaching, Sap, DPU
Lux (20% CNO)
Digital Scale
Capacity 9 MT
Cycle time/batch 1 Hr 172.8 Ton Oil/Day
bleacher 1 & 2
Capacity 9 MT
Cycle time 2 Hr 172.8 Ton Oil/Day
Inter mediate/ Buffer tank 30 min
Leaf filter
Startup 30
1st batch 35 62
2nd batch 45
3rd batch 60
LF washing 30
Cycle time for 3 batch 3.33 Hr 155.52
Storage Tank
New Storage tank
T-9
T-8
Jet Tank
Oil receive 4.68 Ton/Hr
Soap transfer 8.22 Ton/Hr 54%
Oil requirement per shift 37.4 102%
Oil requirement per day 112.2 102%
DPU
-
8/8/2019 Cu 15% &20%Cno (Single)
22/28
Operation time 6 Hr
Soap base transfer through DPU 157.91
Fitting operation
TLT fit pan
DPU 5 hr
Preconditioning 2 hr
Settle 2 hr
Conditioining 2 hr
Centrifuge 6
17 hr 158 MT Base/Day
Centrifuge capacity 23.25 hr 162.75 MT Base/Day
-
8/8/2019 Cu 15% &20%Cno (Single)
23/28
aching ( Same blend for LUX & LB)
Bleacher # 1
Capacity 9 MT/batchesBatch time 2 hr
Lux & LB o 81 MT/day
Capacity U 88%
Int
Capacity
Bleacher # 2
Capacity 9 MT/batches
Batch time 2 hr
Lux & LB o 81 MT/dayCapacity U 88%
nd fit/centrifuge operation
LB (15% CNO)
LB (15%CNO) 54 MT/day @ 95% FA
Digital Scale
Capacity 9 MT
Cycle time/batch 1 Hr 172.8 Ton Oil/Day
As per as requirement 6.0 Batch
Required time 7.22 Hr
-
8/8/2019 Cu 15% &20%Cno (Single)
24/28
-
8/8/2019 Cu 15% &20%Cno (Single)
25/28
Capacity
2 nos Leaf filter
rmediate tank Capacity 9 MT/hr
20 MT Lux & LB o 162 MT/day
Capacity U 88%
Capacity
-
8/8/2019 Cu 15% &20%Cno (Single)
26/28
-
8/8/2019 Cu 15% &20%Cno (Single)
27/28
ux Oil Tank
27MT
B Oil Tank
20MT
-
8/8/2019 Cu 15% &20%Cno (Single)
28/28