ctr-transformer explosion prevention and fire extinguishing system
DESCRIPTION
CTR-Transformer Explosion Prevention and Fire Extinguishing SystemTRANSCRIPT
-
INCREDIBLE SOLUTIONS
CTR MANUFACTURING INDUSTRIES LTD
CTR
TRANSFORMER EXPLOSION PREVENTION AND FIRE EXTINGUISHING SYSTEM
-
FOR TRANSFORMER TANK PROTECTION
FOR HIGHER RATING TRANSFORMER TANK PROTECTION WITH PLC, MIMIC AND SCADA
FOR TRANSFORMER TANK, OLTC / CABLE BOX PROTECTION
-
l Reliable Dedicated system Saved over 4000 MVA of transformers from explosion
System can be installed on existing transformers at site with minimal outage period.
System can be tested on energised transformers, unlike the other systems.
Multi signal activation, eliminates possibility of mal-operation Patented in over 80 countries.
Low investment compared to other systems. Minimal post-fire and no secondary damage.
Low maintenance and running cost compared to other systems.
Fool proof design to avoid ingress of nitrogen due to climatic changes into energised transformer.
Suitable for indoor,outdoor and unmanned substations. Models available to protect OLTC and cable box. Extinguishes external fire in bushing and/or radiator also.
Back up provision ensures nitrogen injection for fail safe operation.
Suitable for oil filled generator / furnace / rectifier / power transformers and reactors.
Approved by leading transformer manufacturers and utilities worldwide.
On receipt of required activating signals, depressurizing commences by draining of a predetermined quantity of oil. Simultaneously Nitrogen is injected under pressure at a pre-detemined flow rate to create a stirring action thereby bringing the temperature of top oil surface below ignition point. Additionally in case of fire, extinguishes within 30 seconds maximum. Nitrogen gas occupies the space created by oil drain and acts as an insulating layer between the top layer of oil in the transformer tank and oxygen in the atmosphere. Transformer Conservator Isolation Valve blocks the passage of oil and isolates conservator oil thereby preventing escalation of fire.
l l
l
l
l l
l l
l
l
l l
l
l
l
l
TYPICAL INSTALLATION
-
Iecomposition of oil due to arcing
oil surge / turbulance in Rapid
pressure rise relay
is achieved
nternal arcing results in insulation failure and consequent imbalance of input and output currents
leading to operation of differential relay. D results in generation
of gases and consequent transformer tank leading to operation of
and/or buchholz relay and / or pressure release valve (PRV). Immediate
reduction of pressure by partially draining oil from the top side of transformer tank.
Conservator oil is isolated simultaneously due to operation of TCIV. The drained oil is collected in
TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV)
BUCHHOLZ RELAY
FIRE DETECTOR
OIL DRAIN
TRANSFORMER
OPERATINGSIGNALSFROMCONTROLROOM /RELAYPANEL
CUBICLE
CONTROLBOX
N2
N2 RELEASEDEVICE
PRESSURE RELIEF VALVE(PRV)
CIVIL WORK
DIFFERENTIAL RELAY
BUCHHOLZ / OIL SURGE RELAY
PRESSURE RELIEF VALVE
RAPID PRESSURE RISE RELAY
CONSERVATOR OIL ISOLATION BY TRANSFORMER CONSERVATOR
ISOLATION VALVE (TCIV)OIL DRAIN
MASTER TRIP / HV+LV CB TRIP
NITROGEN INJECTION
NITROGENINJECTION
RAPIDPRESSURERISE RELAY
(RPRR)
COVEREDOIL PIT/TANK
QUICK DEPRESSURISATION VALVE ASSEMBLY
EXHIBIT 1A
AUTO EXPLOSION PREVENTION MODE
-
AUTO EXTINCTION MODE
5
FIRE DETECTOR
BUCHHOLZ /OIL SURGE RELAY
OIL DRAIN
MASTER TRIP / HV+LV CB TRIP
NITROGEN INJECTION
CONSERVATOR OIL ISOLATION BY TRANSFORMER CONSERVATOR
ISOLATION VALVE (TCIV)
PRESSURE RELIEF VALVE
RAPID PRESSURE RISE RELAY
Simultaneous with oil drain injection of nitrogen gas at a predetermined flow rate and pressure
from the bottom side valves of the transformer tank. Stirring action by the nitrogen gas of the
transformer oil reduces the temperature of the top layer of the oil eliminating the possibility of fire
on the top surface of the oil. Continuous nitrogen injection for upto 45 minutes cools the oil to
ambient temperature. Refer to exhibit 1B.
BUCHHOLZ RELAY
FIRE DETECTOR
OIL DRAIN
OPERATINGSIGNALSFROMCONTROLROOM /RELAYPANEL
CUBICLE
CONTROLBOX
N2
N2 RELEASEDEVICE
PRESSURE RELIEF VALVE(PRV)
TRANSFORMER
NITROGENINJECTION
RAPIDPRESSURERISE RELAY
(RPRR)
COVEREDOIL PIT/TANK
CIVIL WORK
QUICK DEPRESSURISATION VALVE ASSEMBLY
EXHIBIT 1B
TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV)
-
EXHIBIT 2A
TYPICAL LOGIC 1
Upon receipt of system activation signals, immediate draining of top layer of oil in the transformer tank commences reducing any p ressure in the transformer tank, the t op layer of oil being drained and collected in a covered oil pit / tank . Refer to exhibit 2B.
TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV)
BUCHHOLZ RELAY
FIRE DETECTOR
OIL DRAIN
TRANSFORMER
OPERATINGSIGNALSFROMCONTROLROOM /RELAYPANEL
CUBICLE
CONTROLBOX
N2
N2 RELEASEDEVICE
PRESSURE RELIEF VALVE(PRV)
NITROGENINJECTION
COVEREDOIL PIT/TANK
TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV)
BUCHHOLZ RELAY
FIRE DETECTOR
OIL DRAIN
TRANSFORMER
OPERATINGSIGNALSFROMCONTROLROOM /RELAYPANEL
CUBICLE
CONTROLBOX
N2
N2 RELEASEDEVICE
PRESSURE RELIEF VALVE(PRV)
NITROGENINJECTION
System will also operate in case of bushing failure or transformer tank rupture, since oil from conservator will flow at an abnormal rate resulting in operation of TCIV, which isolates the conservator oil preventing aggravation and spread of fire. Consequently buchholz relay operates due to non availability of oil in the relay. Refer to exhibit 2A.
RAPIDPRESSURERISE RELAY
(RPRR)
COVEREDOIL PIT/TANK
CIVIL WORK
CIVIL WORK
RAPIDPRESSURERISE RELAY
(RPRR)
QUICK DEPRESSURISATION VALVE ASSEMBLY
QUICK DEPRESSURISATION VALVE ASSEMBLY
EXHIBIT 2B
-
EXHIBIT 2C
TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV)
BUCHHOLZ RELAY
FIRE DETECTOR
OIL DRAIN
OPERATINGSIGNALSFROMCONTROLROOM /RELAYPANEL
CUBICLE
CONTROLBOX
N2
N2 RELEASEDEVICE
PRESSURE RELIEF VALVE(PRV)
NITROGENINJECTION
TRANSFORMER
Simultaneous with oil drain, nitrogen gas is injected at a predetermined flow rate and pressure
from the bottom side valves of the transformer tank. Stirring action by the nitrogen gas of the
transformer oil reduces the temperature of the top layer of the oil extinguishing any fire on the top
surface of the oil. Continuous nitrogen injection for upto 45 minutes cools the oil to ambient
temperature. Refer to exhibit 2C.
COVEREDOIL PIT/TANK
RAPIDPRESSURERISE RELAY
(RPRR)
REMOTE MANUAL MODE
EXTINGUISHING RELEASE SWITCH ON
CONSERVATOR OIL ISOLATION BY TRANSFORMER CONSERVATOR ISOLATION
VALVE (TCIV)
OIL DRAIN
MASTER TRIP / HV+LV CB TRIP
NITROGEN INJECTION
QUICK DEPRESSURISATION VALVE ASSEMBLY
In case of an emergency, the system can also be operated in remote manual mode by breaking the
glass window provided on the control box and by turning on extinguishing release switch to 'ON'
position.
CIVIL WORK
-
LOCAL MANUAL MODE
In case of an unlikely event of failure of power source, the system can be still be operated manually from the cubicle.
OPERATE ANOTHER LEVER FOR NITROGEN INJECTION
CONSERVATOR OIL ISOLATION BY TRANSFORMER CONSERVATOR ISOLATION
VALVE (TCIV)
OPERATE FIRST LEVER FOR OIL DRAIN
FIRE DETECTORBUCHHOLZ RELAY
TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV)
OIL DRAIN
NITROGENINJECTION
RAPIDPRESSURERISE RELAY
(RPRR)TRANSFORMER
OPERATINGSIGNALSFROMCONTROLROOM /RELAYPANEL
CUBICLE
CONTROLBOX
N2
N2 RELEASEDEVICE
COVEREDOIL PIT/TANK
PRESSURE RELIEF VALVE(PRV)
OLTC
TYPICAL LAYOUT OPTIONAL FOR OLTC PROTECTION
QUICK DEPRESSURISATION VALVE ASSEMBLY
CIVIL WORK
-
TYPICAL LAYOUT FOR OPTIONAL CABLE BOX
FIRE DETECTORBUCHHOLZ RELAY
TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV)
OIL DRAIN
NITROGENINJECTION
RAPIDPRESSURERISE RELAY
(RPRR) TRANSFORMER
OPERATINGSIGNALSFROMCONTROLROOM /RELAYPANEL
CUBICLE
CONTROLBOX
N2N2
N2 RELEASEDEVICE
COVEREDOIL PIT/TANK
PRESSURE RELIEF VALVE(PRV)
QUICK DEPRESSURISATIONVALVE ASSEMBLY
Service engineers are available for supervision of system installation, commissioning and
training. CTR warranty is valid, if system is commissioned by CTR representative
authorised in writing. Worldwide representatives are available for spares and service.
Marketing enquiry questionnaire form PTFS 1005 should be entered completely for
prompt response and offering of most appropriate model. Operation and maintenance
manual is supplied in English language, unless specifically requested for otherwise.
Please also specify number of copies required both in digital and hard format and to
whom these should be delivered.
INSTALLATION AND COMMISSIONING
CIVIL WORK
-
TESTIMONIALS
-
SOME INTERNATIONAL PATENTS
-
Depressurisation : Commences before pressure build up and
consequent explosion
Fire Extinguishing period : Maximum 30 seconds from commencement of
N2 injection
Fire detector heat : 141 C
sensing temperature
Transformer conservator : Settable between 60 and 100 litre per minute,
isolation valve depending upon transformer and conservator size.
Control Box : 110 V DC / 125V DC/220 V DC and 110 V AC/230 V AC
Cubicle : 110 V AC / 230 V AC
Cubicle :
Dimensions in mm
L B H
250 MVA and above 1600 600 1900 600
10 MVA to 249 MVA 1200 500 1900 500 2 MVA to 10 MVA 1200 500 1700 450
Below 2 MVA 1200 500 1200 350
Height includes 100 mm for Base
Control Box : Dimensions in mm
L B H
0
TECHNICAL HIGHLIGHTS
Transformer rating
Types Weight in Kgs
Weight in Kgs
-
DMJ:fpPTFS.1005.D.0412.R2 TURNOVER
Conservator pipe angle :mmConservator pipe dia :
dg
d=0g=0
No
Type DType C
Yes
Dimension :
If yes : Arrangement
Builtin onload Tapchanger :
ca
Type B
Type A
B =
Main Dimensions of tank :
Oil temp.indicator trip1 Nr. NOpotential free
HV circuit breakers &LV circuit breakertrip, 1 Nr Each, NCpotential free
Restricted Earthfault relay trip1 Nr. Nopotential free
1 Nr. NO potential free
Buchholz TripPRV Trip
125 V 110 V 48 V 24 V
230 V230 V
110 V 50 Hz 60 Hz110 V 50 Hz 60 Hz
Lts Oil Qty in Cable box : Lts
Trs. Sr. Nr. :
Voltage Ratio :Top cover Drg Nr.:(Enclosed)
Enquiry Ref :
Quantity :
Oil Qty in tank :
(Enclosed)
Rating : MVA/MVARG.A. Drg Nr. :
D.C. Supply available in Control Room :
A.C. Supply available near Transformer :A.C. Supply available in Control Room :
Customer :
Work Order Nr/Tender Nr :
End User :
Manufacturer :
MK ENQUIRY QUESTIONAIRE FORMSR.NR.
POONACTR FIRE SYSTEMS DIVISION
Oil Qty in Conservator :
Confirm availability of spare contacts in relay panel :Differentialrelay trip1 Nr. NOpotential free
1 Nr. NOpotential free
Winding temp.indicator trip1 Nr. NOpotential free
Master relay(86) Trip1 Nr. NOpotential free
If numeric relay for Differential relay :Remarks :
Self reset Manual reset
H =
a =
c =
mm
mm
mm
mm
B L
H
H
B L
d =
g =
mm
mm
Degree
L = mm
OLTC oil surgerelay trip1 Nr. NOpotential free
Rapid Pressurerise relay trip1 Nr. NOpotential free
Lts
Tank
Cable box
Tank
Cable box
Tank
Cable box
Tank
Cable box
Tank
Cable box
Tank Cable box Tank Cable box
220 V
-
Arrangement of Bushing :
a) HV
LV
TV
others
HV
LV
TV
others
HV
LV
TV
others
p p
b) c)
p = mm p = mm
d)
p
HV
LV
TV
others
e)
p
HV
LV
TV
othersp = mm p = mm
f)
p
p = mm
HV
LV
TV
others
g) HV
LV
TV
others
HV
LV
TV
others
h)
Cooling details :if OF type, NR. OF PUMPS :
KW/HP :HEAD :FLOW :
Installation : New Post
Dist. from Trs. to Control Room through Cable Trench :Dist. from Relay panel to Control Room through Cable Trench : mtrs
Valve Schedule Drawing to be attached : Drg. Nr :
Availability of valves :Between Conservator and Buchholz Relay :Between Buchhloz Relay and Transformer :
** If valve not available enclose detailed pipe drawing for Tank and conservator along with buchholzvalve flange details.
Available
Available
Not Available
Not Available**
**
Oil pit/tank :Available Not Available Dist from Trs : mtrs
Capacity : LtsDimensions ( L X B X D ) mm :
mmSize of pipe connecting Trs. to Oil pit :
Site Details :Sub-station layout drawing to be attachedSub-station foundation drawing to be attachedSub-station cable trence drawing to be attached
Drg. Nr.Drg. Nr.Drg. Nr.
Manuals : Nrs. Language : English Other ............
Packing : Export DomesticInstructions required for packing :
NAME :
DESIGNATION :
FOR CTR USE Quotation Nr. :
SIGNATURE :
DATE :
STAMPORSEAL
PTFS.1005.D.0412.R2DMJ:fp
mtrs
Tank Cable box
Tank Cable box
Tank Cable box
Tank Cable box**
**
Qty
-
CTR : System : Cubicle /
Depressurisation Equipment
: Control box
: Transformer conservator
isolation valve (TCIV)
: Required number of fire
detectors
: Signal box
Other : Fire survival cable
: Fire resistant low smoke
(FRLS) cables
: Pipe connections between
Transformer and Cubicle
: Pipe connections between
cubicle and oil pit
TRANSFORMER On transformer : Oil drain opening.
MANUFACTURER / : Nitrogen injection openings
BUYER : : Brackets for Fire detector
fixing
: TCIV fixing arrangement.
: Signal box fixing
arrangement.
USER : Other : Civil work for plinth for
Cubicle and supports. Oil pit/OGST
: Potential free contacts in relay
panel.
: Power supply.
: Topping up of transformer oil if
SCOPE OF SUPPLY / WORK
-
FIRE SYSTEMS DIVISION CTR MANUFACTURING INDUSTRIES LTD
NAGAR ROAD, PUNE 411014, INDIA.
PHONE : 91 20 26633402/3/4/5. FAX : 91 20 [email protected] / [email protected]