ctc work packages report
DESCRIPTION
CTC work packages report. Nuria Catalan Lasheras BE/ RF 28.05.2013. Outline. Timeline and text report Work package list and contacts Warm Magnets Wigglers … Next steps. Timeline. Visual presentation of a work package separated in different tasks BLUE: Paper study Requirements - PowerPoint PPT PresentationTRANSCRIPT
CTC work packages report
Nuria Catalan Lasheras BE/RF
28.05.2013
Outline
• Timeline and text report• Work package list and contacts
• Warm Magnets• Wigglers• …
• Next steps
Timeline
• Visual presentation of a work package separated in different tasks
• BLUE: Paper study• Requirements• Design, CDR, TDR• Analysis of measurements and Optimization
• GREEN: Production• Procurement of parts• Prototype procurement• Measurement bench construction• Assembly
• ORANGE: Tests and measurements• In the lab• In the beam
Milestones and deliverables
• BLUE: Drawings, thesis, papers• GREEN: Hardware• ORANGE: Reports and final validation
2009 2010 2011 2012My favorit project
Design of piece Prototype manufacturing and assembly Laboratory tests Analysis and optimizationReport
DrawingsParts
procurement Prototype Report
2013 2014 2015 2016
Analysis and optimization Full scale model Lab tests Beam tests Analysis
Review Final product Final report
Disclaimer• Work in progress. Lots of corrections still going on in
all work packages• Time granularity is three months and some milestones
are taken from the past. Are they still valid?• Some tasks missing. Still on going?• Nevertheless allows a quick visualization of the status
and comparison between tasks• By the end of June, this “photograph” shall be
accurate for all past activities• Presented in order of accuracy. You can stop me at
any time…
List of CTC packages# Package Responsible Status of the Status
001 DR SC Wiggler P. Ferracin Draft sent for review
002 Survey and alignment H. Mainaud 1st review 50%
003 Quad Stability K. Artoos Contacted. No answer
004 TBTM G. Ridonne Contacted. No answer
005 Warm magnets M. Modena Finished
006 Beam instrumentation T. Lefevre 1st review 50%
011 Controls N. Draper Not contacted
012 RF systems S. Doebert Not contacted
013 Powering D. Aguglia Draft sent for review
014 Vacuum systems C. Garion Draft sent for review
015 Magn. stray measurements S. Russ. Not contacted
016 DR extraction system M. Barnes Draft sent for review
Warm Magnets. M. ModenaCTC-005 Warm Magnet prototypes. M. Modena
2009 2010 2011 2012 2013 2014Task 1. First optimization of magnets design for: size, weight, power consumption, estimeted cost of series production
Normal conducting magnet design catalogueEDMS 1082761 EDMS 1092991
EDMS 1097652EDMS 1139561 EDMS 1250188
Conceptual design of the anti-solenoidEDMS 1214775
Task 2. Prototype and small magnets series procurement for CLIC TBMT programFirst generation MBQ prototypes (2 for Lab)
Order Delivery
Second generation MBQ prototypes (2 Lab, 1 CLEX)Order T1 Delivery_T1
Order_T4Delivery T4
7 FBQ mock-ups for Lab Order (5) Delivery (5) Order (2) Delivery (2)
DBQ prototypes (6 lab, 1 CLEX)Order Delivery (2) Delivery (4)
MBQ steerers
Order Delivery (2)Task 3. Hybrid permanent magnet high gradient design and short prototype
QD0 Prototype MM (1) MM (2)Order Delivery
Study for a SD0Report
Task 4. Drive beam quadrupole tuneable PM prototypeHigh-Gradient prototype MM
Daresbury collaboration
Order components
Proto delivered
EDMS 1266788
Daresbury Low-Gradient prototypeOrder
componentsDelivery Report
Magnetic measurements missing?
Warm Magnets. M. ModenaCTC-005 Warm Magnet prototypes. M. Modena
2009 2010 2011 2012 2013 2014Task 1. First optimization of magnets design for: size, weight, power consumption, estimeted cost of series production
Normal conducting magnet design catalogueEDMS 1082761 EDMS 1092991
EDMS 1097652EDMS 1139561 EDMS 1250188
Conceptual design of the anti-solenoidEDMS 1214775
Task 2. Prototype and small magnets series procurement for CLIC TBMT programFirst generation MBQ prototypes (2 for Lab)
Order Delivery
Second generation MBQ prototypes (2 Lab, 1 CLEX)Order T1 Delivery_T1
Order_T4Delivery T4
7 FBQ mock-ups for Lab Order (5) Delivery (5) Order (2) Delivery (2)
DBQ prototypes (6 lab, 1 CLEX)Order Delivery (2) Delivery (4)
MBQ steerers
Order Delivery (2)Task 3. Hybrid permanent magnet high gradient design and short prototype
QD0 Prototype MM (1) MM (2)Order Delivery
Study for a SD0Report
Task 4. Drive beam quadrupole tuneable PM prototypeHigh-Gradient prototype MM
Daresbury collaboration
Order components
Proto delivered
EDMS 1266788
Daresbury Low-Gradient prototypeOrder
componentsDelivery Report
PCL magnets design?
DR SC Wigglers. P. FerracinCTC-001. Damping rings Superconductive wiggler. F. Ferracin
2012 2013 2014Task 1.Nb-Ti Superconducting wigglerKIT Short model Full magnet Bath test Cold tests Beam tests
Contract with KIT
Review of CDR 10-pole prototype
TDR Approval Delivery to KIT
Cryostat fabrication
CTC-001. Damping rings Superconductive wiggler. F. Ferracin2013 2014 2015
Task 2. Nb3Sn Superconducting wigglerSecond magnet with improved insulation Cold Tests Analysis
Final Drawings Short Prototype
Final report
First NbSn magnets? Results? Is there a report?
Beam transport equipment. M. BarnesCTC-016. DR extraction systems. M. Barnes
2011 2012 2013 2014 2015DR extraction kickers
Inductive Adder and controls Power tests 20 layers full prototype 2nd prototype Beam tests @ ATF? CLIC-Note-884 CERN-ATS-2011-
CLIC–Note–938 Parts procurement
5-layers prototype
2nd 5-layers prototype
long 20-layers prototype
2nd long prototype
IFIC Ciemat Stripline kickers Tests in CIEMAT Beam tests in Alba? Beam tests @ ATF?
CTC-016. DR extraction systems. M. Barnes2011 2012 2013 2014 2015
DR extraction kickersInductive Adder and controls Power tests 20 layers full prototype 2nd prototype Beam tests @ ATF? CLIC-Note-884 CERN-ATS-2011-
CLIC–Note–938 Parts procurement
5-layers prototype
2nd 5-layers prototype
long 20-layers prototype
2nd long prototype
IFIC Ciemat Stripline kickers Tests in CIEMAT Beam tests in Alba? Beam tests @ ATF?
Deliverables and milestones for the strip line kicker are missingActual start of the study?
Beam tests where and when?
Other tasks described in 2009?
Powering. D. Aguglia
CTC-013 Powering. D. Aguglia2012 2013 2014 2015 2016
Modulators for DB generationETHZ Full modulator 1 Small split-core model Full scale modulator
Letter of Intent
Contract Review? Mod assembled
Mod 1 delivered
LAVAL PFS High Voltage concept Monolithic transformer & active bouncer CERN PFNContract
Nothingham Charger & grid concept Small model charger Full charger constructionK contract Decision on
ChargerMod 1
delivered
• Publications mentioned?• What about the other tasks in the work
package?• CERN activities
Survey & alignment. H. Mainaud-DurandCTC-002 Survey and Alignment. H Mainaud Durand
2009 2010 2011 2012 2013 2014 2015Task 1. Development of sensor and actuators
cWPS development of absolute measurements Radiation tests CLEX validationNote? Note?
oWPS
NIKHEFF RasChain development
Lambda sensor
Linear actuators
Cam Movers Radiation tests CLEX validationNote?
Task 2.Tunnel metrologyShort range validation in TT1
Long range in TZ32
Task 3. PrealignmentPrealignment Validation in Type0 Validation in Type0
EDMS 1261487
Instrumentation development Photogrametrie Microtriangulation
Active prealignmentValidation
CERN-ATS-2012-Task 4.Active prealignment & monitoring in the MDI
QDO monitoring
Construction of measuring benches should be considered as hardware
Survey & alignment. H. Mainaud-DurandCTC-002 Survey and Alignment. H Mainaud Durand
2009 2010 2011 2012 2013 2014 2015Task 1. Development of sensor and actuators
cWPS development of absolute measurements Radiation tests CLEX validationNote? Note?
oWPS
NIKHEFF RasChain development
Lambda sensor
Linear actuators
Cam Movers Radiation tests CLEX validationNote?
Task 2.Tunnel metrologyShort range validation in TT1
Long range in TZ32
Task 3. PrealignmentPrealignment Validation in Type0 Validation in Type0
EDMS 1261487
Instrumentation development Photogrametrie Microtriangulation
Active prealignmentValidation
CERN-ATS-2012-Task 4.Active prealignment & monitoring in the MDI
QDO monitoring
Missing all milestones
Instrumentation. T. LefevreCTC-006 Instrumentation. T. Lefevre
2011 2012 2013 2014BPM development
RHUL 14 Ghz Resonant cavity Tests in CTF Second prototype Beam testsIPAC12 CERN-
ATS-2012-` Report from
tests in CTF3Final report
from RHULDB decelerator stripline BPM
Combiner loop BPM
Emittance measurementsRHUL Laser wire scanner design LWS construction Tests in Petra and ATF
RHUL UV DR monitors in CESRTA Vacum and decetor system X-range Tests in CSRTA Tests UV range?
DB decelerator imaging
Longitudinal measurementsDundee Longitudinal profile measurements using EO techniques Lab set-up Tests in CTF3
CDR Material characterizat
XFROG developmen
Experimental report
CDR bunch length monitor
BLM developmentBLM for Damping rings
Cost effective BLM Test of Cherenkov fibers in CTF3
Lots of info still missing! Should be at least 4 work packages…Reporting is always easier to find from collaborations…
What do we have now
An homogeneous way to describe the work packages• Tasks, durations, delays• Main results and decisions to be taken• Collaborations for each task• To come: Interrelations between packages.• Links, pictures? To put the CTC work into value?• What is not in the timeline. Will be in the text
• Technological challenge• Start of the art• Resources and budgets
Conclusions
• Every work package will have 1-4 pages of text introduction explaining the challenges start of the art and a short status.
• Is this ok?• Still to contact controls, RF sources,
magnetic measurements• What to do with other work packages (OP,
civil services, dumps and targets)?