Page 1: CTC Global Presentation Partner Meet May 2015

Steve Jackman CTC Global Corporation

May 2015

Page 2: CTC Global Presentation Partner Meet May 2015

Overview

•  Utilities have historically used steel cores for their transmission lines, a technology that is over 100 years old. CTC’s advanced composite cores are lighter weight, incorporate additional conductive aluminum that allows for the transmission of electricity more efficiently.

•  CTC received key patents between 2006 and 2007 (patents registered in over 70 countries)

•  Commercial production of ACCC transmission line began in 2006 and there are now 25,000+ km being used at over 325 locations in 30 countries. Strong ACCC® brand recognition.

2 ctcglobal.com | All rights reserved.

28%  more  Aluminum  Composite  Core  Steel  

Core  

Aluminum

28%  more  Aluminum  

Composite  Core  ACCC® Conductor  Tradi7onal  ACSR  

Steel  Core  

Aluminum

•  CTC Global (“CTC”) manufactures leading edge conductor core and ancillary parts used in electrical transmission lines. ACCC ® Brand.

•  Privately held Delaware corporation with headquarters in Irvine, CA USA.

•  CTC’s Irvine, CA production facility has 100 employees and is ISO 9001:2008 certified

•  World Market

•  Over 67 million kilometers of transmission and distribution wires installed globally

•  ~$10B annual demand for new and reconductor transmission lines. Distribution lines are nearly 3X that amount

Page 3: CTC Global Presentation Partner Meet May 2015

Unmatched Global Experience 25,000+ km at over 325 project sites

Over 35,000 Dead-Ends & Splices in Use

Countries:

•  USA •  China •  France •  UK •  Poland •  Spain •  Portugal •  Mexico •  Chile •  Qatar •  Indonesia •  Belgium •  Brazil •  Germany •  South Africa •  South Korea •  Russia •  India •  Costa Rica •  Columbia •  Congo •  Mozambique •  Netherlands •  Nigeria •  Vietnam •  Malaysia

US Utilities:

•  AEP •  APS •  PacifiCorp •  NV Energy •  Austin Energy •  Xcel Energy •  MI PUD •  KS PUD •  KAMO •  OG&E •  Ozark Electric •  WAPA •  STEC •  Entergy •  Riverside PUD •  Florida Power & Light •  Keys Energy •  Progress Energy •  Mohave Electric •  SCANA •  National Grid •  Alexandria (LA) PUD •  Duke Energy •  Oncor •  CIPCO •  Black Hills Power •  Com Ed •  TECO •  Leesville Gas

3 ctcglobal.com | All rights reserved.

Page 4: CTC Global Presentation Partner Meet May 2015

Challenges Facing Transmission Owners

•  Sag violations and Increasing capacity requirements

•  Tower replacement

•  Right of Way, Community opposition

•  Shortening Construction Schedules

•  Meeting Environmental Goals and Access to Renewable Energy

•  Increasing capacity requirements (load growth)

•  Reliability Improvement – Adequate capacity in N-1 scenarios

•  Cost and finance of projects

•  Efficiency and losses – Impact on Generation

5/11/15

Page 5: CTC Global Presentation Partner Meet May 2015

Greater Strength & Reduced Sag

Higher Ampacity Limits at Cooler Temperatures

Able to Tolerate N-1 Conditions

Increased Spans on Fewer / Shorter Structures

Proven Reliability with Reduced Line Losses

Selected as the Most Cost Effective Solution

ACCC has been installed by over 130 utilities worldwide

10 years of Installation & Operating Experience

ACCC Conductor Attributes

Page 6: CTC Global Presentation Partner Meet May 2015

  AEP has commissioned the largest energized reconductor project ever – for any conductor type

  The project is 386 circuit Km (240 circuit miles) in length double bundled 345kV – total conductor length over 2300 Km

  The transmission line is a critical link to South Texas and is so heavily loaded it cannot be taken out of service to replace the conductor in a conventional manner

  Energized reconductoring with ACCC® conductor provides an immediate increase in capacity to relieve congestion without new construction

  No tower replacements, minimal crossarm replacements due to corrosion – line is 30 years old

  Multi-year project started in September 2012 and will complete in 2015

World’s  Largest  Energized  Reconductor  Project  

AEP   is  one  of   the   largest   electric  u3li3es   in   the  U.S.,   delivering  electricity   to  more   than  5  million   consumers   in  11   states.   The  u3lity  has  extensive  experience  building   extra-­‐high-­‐voltage   765-­‐kV   transmission   lines   and   owns   the   na3on’s   largest   electricity   transmission   system,   a   nearly   62,000-­‐kilometer   network   that  includes  3,360  of  765-­‐kV  transmission  lines,  more  than  all  other  U.S.  transmission  systems  combined  

Designed  Specifically  to  Use  ACCC®  Conductor  

Page 7: CTC Global Presentation Partner Meet May 2015

24x7 power to every Indian by 2019

•  “The Prime Minister’s vision for 24/7 quality power for all depends on the transmission and distribution sector to reach the bottom of the pyramid. With the new technologies we are bringing in, we will now create an ambitious grid programme which will meet the country’s demand,” – Mr Piyush Goyal, Power Minister at 5th International Exhibition and Conference Gridtech 2015

•  Country's power sector is set for $250 billion investment across different segments which includes $50 billion for T&D over next 5 years (13th Five Year Plan).

•  According to Government of India’s report (draft) “Perspective Transmission Plan for Twenty Years (2014-2034)”, in view of the increasing constraint in getting Right-of-Way for transmission lines, efforts need to be put to build these corridors only with high capacity transmission lines viz. HVDC, 765kV D/c line, 400kV D/c with high capacity conductor, etc.

ctcglobal.com | All rights reserved. 7

Page 8: CTC Global Presentation Partner Meet May 2015

Co-creating Values for Indian Power Transmission Network Providers

•  Grid Efficiency & Right of Way; India’s biggest T&D hurdles. ACCC acceptance helping utilities to tackle with these problems.

•  Efficiency benefits; conductor loss reductions up to 35% expected thereby offering unmatched ROIs. (Reducing line losses also frees-up generation capacity that is otherwise lost)

•  From 33kV to 220kV; power transmission capacity enhancements done for private utilities and customers like Tata Power, Torrent Power, Cairn Energy

•  State owned transmission utilities of Karnataka, Uttar Pradesh, West Bengal and Maharashtra also adopt ACCC for higher power transfer needs.

•  Playing vital role in de-congestion of Delhi’s transmission lines through ACCC; selected by Powergrid Corporation of India Ltd.

•  Jointly developing training programs and expert agencies for smooth deployment of the technology through skilled/semi skilled linesman.

•  Distribution segment still bleeds most of the country’s aggregated T&D losses which is today at around 25% level. ACCC through its unmatched efficiency benefits can not only decongest the overloaded lower voltage lines but can significantly reduce I2R losses.

ctcglobal.com | All rights reserved. 8

Page 9: CTC Global Presentation Partner Meet May 2015

ACCC Installations in India

ctcglobal.com | All rights reserved. 9

Page 10: CTC Global Presentation Partner Meet May 2015

Worldwide ACCC Installations

ctcglobal.com | All rights reserved. 10

Page 11: CTC Global Presentation Partner Meet May 2015

“ACCC conductor receives wide acceptance as a solution to decongest overloaded lines in urban/semi urban areas of India”

Page 12: CTC Global Presentation Partner Meet May 2015

Torrent Power – 132 kV – ACCC™ Lisbon

First ACCC™ project Commissioned over urban hutments and railway crossing for the critical sections at Ahmedabad

Page 13: CTC Global Presentation Partner Meet May 2015

Torrent Power’s Second Project – 220 kV – ACCC™ Drake

Second project commissioned for Torrent Power; 220kV line in Ahmedabad

Page 14: CTC Global Presentation Partner Meet May 2015

TATA Power IIT-SAKI-ACCC Helsinki

ACCC™ was Commissioned by Sterlite under CTC supervision amidst heavy Hutments, Dense Slums in Suburban Mumbai

Page 15: CTC Global Presentation Partner Meet May 2015

ACCC™ Conductor was Commissioned by Sterlite under CTC supervision amidst urban colonies and crop fields in Nashik, Maharashtra

MSETCL Nashik Line-132KV-ACCC Casablanca

Page 16: CTC Global Presentation Partner Meet May 2015

CTC Global at a Glance •  CTC  is  the  inventor  and      manufacturer  of  ACCC,    the  most  advanced  composite    core  used  in  power  transmission  lines    transmission  lines  

•  Headquarters  and  manufacturing  facility  in  Irvine,  CA;    

•  85  employees  

•  Installed  base  of  over  225  sites  and,  17,000  +  KM  

•  Currently,  serving  24  countries  on  Iive  continents.  

Examples of CTC Blue Chip Customers

16 ctcglobal.com | All rights reserved.

Page 17: CTC Global Presentation Partner Meet May 2015

ACCC® Conductor Improving the Efficiency, Reliability

and Capacity of the Grid

CTC Global 2026 McGaw Avenue Irvine, California 92614 USA +1 (949) 428-8500 www.ctcglobal.com

Page 18: CTC Global Presentation Partner Meet May 2015

Thank You