cste objective 1
TRANSCRIPT
-
8/7/2019 CSTE Objective 1
1/7
CSTE: Paper1 Date: 2nd Dec 2006
Duration: 45 mins
1. Primary role of software testing includes
a. Producer viewb. Customer view
c. Product viewd. Both a & b
e. All a, b, c
2. Defects doesnt fall into one of the following category
a. Inadequate data
b. Wrong
c. Missing
d. Extra
3. Test Group is known by different names. Which one is not included in the list?
a. MIS testing
b. Quality Controlc. Quality Assurance
d. Inspectors
e. None of the above
4. Which one of them is not one of the four components of the software development process life
cycle?
a. Check
b. Create
c. Plan
d. Action
e. None of the above
5. Software testing accounts for what percent of software development costs?
a. 10-20
b. 40-50
c. 70-80
d. 5-10
6. The components of Testing Strategy are
a. Test Factor
b. Test Phase
c. Test Scoped. Both a&b
e. Both b&c
7. . Driver modules are used in
a. Thread Testing
b. Bottom_up Incremental testing
c. Top_down Incremenatl Testing
d. Black Box testing
-
8/7/2019 CSTE Objective 1
2/7
8. At a minimum the developer should always execute -------------- when a change is made
a. Regional
b. Unit
c. Full
d. All the above
9. Definitions of Quality includea. Meeting customers requirements
b. Conformance to requirements
c. Both the above
d. None of the above
10. Which one is not good process while giving criticism?
a. Indicate the deficiencies with products or services produced by the individual.
b. Get agreement from the individual that there is problem.
c. State the negative point first.
d. All the above
e. None of the above.
11. Which of this is comprehensive listening?
a. Directed at selecting specific pieces of information and not entire
communication.
b. Designed to get a complete message with minimal distortion.c. The listener is sympathetic to listeners point of view.
d. The listener is performing an analysis of what speaker said.
12. During a proposal presentation you should:
a. Emphasize that you have the best solution to the customers problems
b. Emphasize that your project team is well equipped to implement the
solution
c. Sell the corporate experience of your project staff and yourselfd. Sell your enthusiasm to do the project effectively, efficiently, and
economically
e. All the above
13. is a design, implementation or operation flaw that may be exploited by a
threat to cause destruction or misuse of its assets or resources?
a) Riskb) Threat
c) Vulnerabilityd) Control
14. Which one of the following is not a characteristic of Risk?
a) Inherent in every project
b) Something to fear, but not something to manage
c) Probability of Loss
d) Neither intrinsically good nor bad
-
8/7/2019 CSTE Objective 1
3/7
15. Which one of these is not a method for conducting risk analysis?
a) Cost of Quality
b) Risk Assessment Packagec) Identification and Weighting of Risk Attributes
d) Judgment & Instinct
16. Which one of these is not a Testing Risk?
a) Test Environment
b) No of Qualified Test Resource
c) New Technology
d) None of the above
17. is the process in which one or more individuals state they believe the risk is
greater than the cost of controls.
a) Consensusb) Risk Formula
c) Intuition/Judgment
d) None of the above
18. --------- details like what type of tests must be conducted, what stages of testing are required
and then outline the sequence and timing of tests
a. Test design
b. Test schedules
c. Test objectives
d. Test scope
19. Which testing is method to test all integrated components of an information system?a. Integration testing
b. System testing
c. Acceptance testing
d. None of the above
20. At what phase, test plan defines and communicates test requirements and the amount of
testing needed.
a. Design
b. Analysis
c. Codingd. Testing
21. According to IEEE standards for test documentation ------------------ is an overall document
providing direction for all testing activity.
a. Test Case Specification
b. Test Design Specification
c. Test Procedure Specification
d. Test Plan Specification
-
8/7/2019 CSTE Objective 1
4/7
22. Which of the following is not a concept of Test Plan?
a. Test Design
b. Test Environment
c. Test Case
d. Roles & Responsibilities
23. What will be covered in the test? And what will be not covered in the test? Will be specifiedat what section of the Test Plan?
a. Assumptions
b. Test Objective
c.Test Schedule
d.Test Scope
24. Which one of these tasks is not to be considered while building test plan?
a. From the Test Team
b. Understand the Project Risks
c. Build the Test Team
d. None of the above
25. Anything that tends to cause the reduction of Risk is known as
a) Control
b) Risk
c) Threatd) Vulnerability
26. ------------------------- Scripting determines unchanged portions of systems remain unchanged
when system is changed
1. Pseudoconcurrency scripting
2. Stress scripting
3. Regression scripting
4. Integration testing
27. Which of the following are not included in integration testing?
a) Test the client components
b) Test the server components
c) Test the network components
d) Test the components separately
28. Which one of the following is not a general principle of Defect Management Process?a) The Primary Goal is to prevent defects
b) Defect Management Process should be Risk Driven
c) Capture and Analysis of information should be automated
d) Defect Information should be used to improve the processe) None of the above
29. Which of the following is not a key element of Defect Management Process?
a) Defect Prevention
b) Defect Tracking
c) Defect Discovery
d) Defect Resolution
e) None of the above
-
8/7/2019 CSTE Objective 1
5/7
30. John is told to prepare a report on the most commonly occurring product defects. He reviews
the software defect reports, which categorize the defects as Coding errors, Requirement errors,
documentation errors, etc. The best tool to report this information is:
a) A Scatter plot
b) A Pareto diagramc) A Histogram
d) A Cause and Effect Diagram
31. Test Result data will include which of the following
a) Test factors
b) Business Objectives
c) Interface Objective
d) All of the above
32. While preparing the Acceptance Criteria, the user should
a) Acquire full knowledge of the application
b) Become fully acquainted with the applicationc) Understand the Risks and Benefits
d) Understand the consequences of adding new functions
e) All the above
33. ______________ is responsible for implementing the plan and for assuring that the plan's
objectives are met.
a) Tester
b) Developer
c) Acceptance Manager
d) All of the above
34. __________ is the final opportunity for the buyer to examine the software and to seek redressfrom the developer for insufficient or incorrect software
a) Acceptance Testing
b) Unit Testing.
c) System testing.
d) Integration Testing.
35. It is whose responsibility that acquired software meets the needs of
their organization.
a) Management
b) Tester c) Contractor
d) All of the above
36 . Contractor is one who
a) develop the software
b) acquire the software
c) test the software
d) none of the above
-
8/7/2019 CSTE Objective 1
6/7
37. A specific event that might cause an undesirable event to occur is a
a) Risk
b) Exposure
c) Threatd) Control
e) None of the above
38. Which controls primarily collect evidence that can be utilized in determining why a particular
problem has occurred?
a) Preventive
b) Corrective
c) Detective
d) None of the above
39. Which is not a generally accepted model for risk and internal control?
a) COSO Enterprise Risk Management Modelb) SOX Internal Control Model
c) CobiT Model.
d) COSO Internal Control Model
40. In COSO ERM Model, in which component are the policies and procedures established
a) Risk Response
b) Control Activities
c) Information and Communication
d) Monitoring
e) None of the above
41. How many components are there in the CobiT Model?
a) Four
b) Five
c) Eight
d) None of the above
42. . In Thick-Client System,
a) majority of processing is executed on the Server-sideb) majority of processing is executed on the Client-side
c) amount of processing executed on the server-side and Client-side is samed) None of the above
43. . Which of the following is not digital standard?
a) GSM
b) AMPS
c) TDMA
d) CDMA
-
8/7/2019 CSTE Objective 1
7/7
44. Testing tools can help automate tasks such as
a) product installation
b) test data creation
c) GUI interactiond) (b) & (c)
e) All of the above
45. Detail information about the specific project component can be obtained by ____
a) Summary Status report
b) Project Status report
c) Both
d) None of the above
46. By performing --------- during the early phases of software dev, the cost of testing can be
reduced because defects are found earlier in the process.
a. Dynamic Testing
b. Quality Testing
c. Static Testingd. Effective Testing
e. All the above
47. One problem condition, such as a wrong price or a program defect, causing hundreds ofsimilar errors within few minutes is called
a. Cascaded Effect
b. Mc Donalds Effect
c. Domino Effect
d. None of the above
48. Verification generally means
a. Consistencyb. Completeness
c. Correctness
d. All the above
49. Defects are least costly to correct at what stage of the development cycle?
a. Requirements
b. Analysis & Design
c. Construction
d. Implementation
50. ____________ listening type helps understand real world situations.
a. Critical
b. Comprehensive
c. Discriminative
d. Appreciative
e. Therapeutic
----------------