1 Combined Sewer System Permit and Long Term Control Plan Update CSS Stakeholder Group Meeting #2 November 20, 2017 City of Alexandria - Department of Transportation and Environmental Services Alexandria Renew Enterprises

Upload: others

Post on 14-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

1

Combined Sewer System Permit and Long Term

Control Plan Update

CSS Stakeholder Group

Meeting #2

November 20, 2017

City of Alexandria - Department of Transportation and Environmental Services

Alexandria Renew Enterprises

Page 2: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

2

PRESENTATION OUTLINE

Purpose and Goals

CSO Program Options

Evaluation Criteria

Green Infrastructure Recap and Discussion

Public Comment

Wrap-Up

Page 3: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

3

Purpose and Goals

Page 4: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

4

Public Participation Goals

Increase stakeholder

awareness of the City’s

combined sewer

system and the Long Term

Control Plan Update program.

Develop basic

understanding of the

Long Term Control

Plan Update

recommended

strategies.

Awareness,

consideration and

responsiveness on the

Long Term Control Plan.

Solicit feedback on

the combined sewer

control strategy

recommendations.

Page 5: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

5

Provide recommendations on how a primary combined sewer system

control strategy can accomplish the City’s goals and permit

requirements while minimizing impacts to the community

Review and monitor the preparation of the Long Term Control Plan

Permit and regulatory issues

Engineering and analysis of infrastructure alternatives

Implementation plan schedule and funding strategy

Serve as a central information receiving/dissemination body related

to the Long Term Control Plan

Additional engagement opportunities following submission of the

plan (working groups, implementation groups)

Stakeholder Group Charge(Resolution No. 2781)

Page 6: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

6

Alexandria’s Goals for the

CSO Program

WATER QUALITY Enhance local infrastructure to improve the water quality of Alexandria’s

waterways.

INVESTMENT STEWARDSHIPBe good stewards of the rate payers’ investments in both the short term

and long term.

COMMUNITY BENEFITS AND CONSTRUCTION IMPACTS

Engage the community, explore opportunities, and be a good neighbor.

LEGISLATIVE MANDATEImplement the CSO Program to meet the legislative mandate.

Page 7: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

7

Recent State Legislation Drivers

7CSO 003

CSO 004

CSO 001

CSO 002

HUNTING CREEK

TMDL

99% REDUCTION

PRESUMPTION

APPROACH

HUNTING CREEK

TMDL

80% REDUCTION

Page 8: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

8

Defined under the EPA CSO Control Policy

“A program that meets any of the criteria listed below would be presumed

to provide an adequate level of control to meet the water quality-based

requirements of the CWA [Clean Water Act]…

1. No more than an average of four overflow events per year, provided that the

permitting authority may allow up to two additional overflow events per year

2. The elimination or the capture for treatment of no less than 85% by volume of

the combined sewage

3. The elimination or removal of no less than the mass of pollutants…for the

volumes that would be eliminated or captured for treatment under paragraph

[2] above

Recent State Legislation Drivers

Presumption Approach

Page 9: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

9

CSO Performance

VDEQ approval of approach by July 1, 2018

Completion of construction activities at all outfalls by July 1, 2025

Leverage capabilities of the AlexRenew facility

Schedule

Consider alternative delivery methods

Collaborative approach to design and construction

Retain flexibility in the approach, size, and location

Simultaneous solutions/construction, may result in higher costs

Recent State Legislation Drivers

Page 10: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

10

Timeline

2018-2019 2019-20252017

VA House Bill 2383 Milestone

Page 11: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

11

CSO Program Alternatives

Page 12: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

12

City – AlexRenew Partnership

CLEAN WATERWAYS

1995:

Initiated Separate

Sanitary Sewer

(SSS) Wet

Weather Studies

1999:

SSS Wet

Weather

Flow Reduction

Strategy and

Implementation

2007:

SSS Wet

Weather

Flow Model

Update

2015:

Permit

Requirement

Issued to

Remediate

Constructed

Sanitary Sewer

Overflow (SSO)

2010:

SSS Wet

Weather

Strategy

Presented

1990s:

National CSO

Policy and First

CSS Permit 1999:

Approved

Long Term

Control Plan

2010:

Hunting

Creek

TMDL

2016:

Long Term

Control Plan

Update

2017:

CSO

Legislation

2025:

CSO Program

Implemented

Page 13: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

13

Store and treat: build CSO storage and send to AlexRenew after

CSO event for high level of treatment (basis of 2016 LTCPU)

Underground storage tanks

Deep tunnels

Convey, store, and treat: leverage the AlexRenew wastewater

treatment facility to treat the flow during a CSO event

Convey additional flows to AlexRenew through deep storage tunnels

and pumping

May require upsizing of certain processes for additional capacity

including building a separate wet weather treatment facility (i.e.

disinfection)

Major Components

Page 14: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

14

Storage and Conveyance

Tunnels

DC Water:

10-ft Diameter Tunnel Boring

Machine and Finished Tunnel

Page 15: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

15

Storage and Conveyance

Tunnels

DC Water: During Shaft Construction

Page 16: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

16

Storage and Conveyance

Tunnels

DC Water: After Shaft Construction

Page 17: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

17

Storage Tanks

AlexRenew:

Nutrient Management Facility Tank

Tysons Corner:

4.5 MG Underground Tanks

Pump

Station

4.5 MG

Storage

Page 18: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

18

Storage Tanks

City of Duluth:

3 MG storage capacity

Page 19: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

19

Maximize Flow to the Plant

Page 20: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

20

Disinfection

AlexRenew:

UV Disinfection Facility

NEORSD Easterly Plant:

Chlorine Contact Tank

Page 21: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

21

Existing CSO System

CSO-002

Combined

Sewer

Area

CSO-001

AlexRenew

WRRF

Ho

off

s R

un

Hunting Creek

Po

tom

ac

Riv

er

Cameron Run

Oronoco

Bay

AlexRenew

Plant Outfall

CSO-003

CSO-004

(to be relocated)

Conveyance Piping

Final Effluent Outfall

Existing CSO

Page 22: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

22

Pre-Legislation CSO PlanTunnels/Tanks Dewatered After the Storm

(2016 Plan for Outfalls 002/003/004)

AlexRenew

WRRF

CSO-002

CSO-001

CSO-003

CSO-004

(to be relocated)

Sto

rag

e T

un

nel

Storage

Tank

Storage

Tank

Relocated CSO-004

Ho

off

s R

un

Hunting Creek

Po

tom

ac

Riv

er

Cameron Run

Oronoco

Bay

AlexRenew

Plant Outfall

Conveyance Piping

Final Effluent Outfall

Existing CSO

Page 23: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

23

Option ASeparate Tunnels with Disinfection

AlexRenew

WRRF

CSO-002

Sto

rag

e T

un

nel

Wet Weather

Disinfection

Sto

rag

e T

un

nel

AlexRenew

Treated CSO 004

CSO-003

CSO-004

(to be relocated)

CSO-001

Ho

off

s R

un

Hunting Creek

Po

tom

ac

Riv

er

Cameron Run

Oronoco

Bay

AlexRenew

Plant Outfall

Conveyance Piping

Final Effluent Outfall

Existing CSO

Page 24: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

24

Option BUnified Storage Tunnel

Ho

off

s R

un

Po

tom

ac

Riv

er

Cameron Run

AlexRenew

WRRF

CSO-002

2.2

MG

Sto

rage

Tu

nn

el

Storage Tunnel

Relocated CSO-004

CSO-003

CSO-004

(to be relocated)

AlexRenew

Plant Outfall

CSO-001

Hunting Creek

Oronoco

Bay

Sto

rag

e T

un

nel

Conveyance Piping

Final Effluent Outfall

Existing CSO

Page 25: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

25

Option CTunnel for 003/004 with disinfection

Tanks for 001/002

Ho

off

s R

un

Po

tom

ac

Riv

er

Cameron Run

AlexRenew

WRRF

CSO-002

CSO-001

CSO-003

CSO-004

(to be relocated)

Sto

rag

e T

un

nel

Storage

Tank

Storage

Tank

AlexRenew

Plant Outfall

Wet Weather

Disinfection

Treated Wet

Weather Outfall and

Relocated CSO 004Hunting Creek

Oronoco

Bay

Conveyance Piping

Final Effluent Outfall

Existing CSO

Page 26: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

26

15 Minute Break

to Review Options

Page 27: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

27

Goals and Evaluation Criteria

Page 28: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

28

Alexandria’s Goals for the

CSO Program

WATER QUALITY Enhance local infrastructure to improve the water quality of Alexandria’s

waterways.

INVESTMENT STEWARDSHIPBe good stewards of the rate payers’ investments in both the short term

and long term.

COMMUNITY BENEFITS AND CONSTRUCTION IMPACTS

Engage the community, explore opportunities, and be a good neighbor.

LEGISLATIVE MANDATEImplement the CSO Program to meet the legislative mandate.

Page 29: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

29

Evaluation Criteria

O&M Complexity and Reliability

Maximizes reliability of meeting VPDES permit

Combined Sewer System Permit

AlexRenew Wastewater Treatment Facility Permits

Minimizes location and number of facilities to operate and

maintain

WATER QUALITY Enhance local infrastructure to improve the water quality of Alexandria’s

waterways.

Page 30: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

30

Evaluation Criteria

Adaptability

WATER QUALITY Enhance local infrastructure to improve the water quality of Alexandria’s

waterways.

Ability for future expansion to meet future capacity,

environmental, or regulatory needs

Provides for opportunities for adaptive management and

resiliency

Page 31: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

31

Optimize the solution to minimize the impact to rate payers

Capital costs: planning, design, and construction

Annual Operation and Maintenance Costs

Integrate other mitigation project needs if feasible

Evaluation Criteria

Life Cycle Costs

INVESTMENT STEWARDSHIPBe good stewards of the rate payers’ investments in both the short term

and long term.

Page 32: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

32

Minimize disruption to the community during construction

Minimize disruption to the community caused by regular

operation and maintenance activities

Maximize opportunities to incorporate community benefits

Evaluation Criteria

Community Acceptance

COMMUNITY BENEFITS AND CONSTRUCTION IMPACTSEngage the community, explore opportunities, and be a good neighbor.

Page 33: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

33

Risk of compliance with the mandated schedule

Ability to secure necessary construction permits in a timely

manner from local, state, and federal agencies

Virginia Department of Environmental Quality

Virginia Marine Resources Commission

U.S. Army Corps of Engineers

National Park Service

Historical and Cultural Resources

Evaluation Criteria

Schedule

LEGISLATIVE MANDATEImplement the CSO Program to meet the legislative mandate.

Page 34: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

34

1. Do the goals and evaluation criteria reasonably represent the

diverse interests of the CSS Stakeholder Group?

2. What is missing?

Discussion Questions

Page 35: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

35

Green Infrastructure Recap

and Discussion

Page 36: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

36

Green Infrastructure

CSO Evaluation

Implement GI on all City right-of-way (streets, sidewalks, alleys, parking lots, etc.)

Implement on all City buildings

Implement on all City green space

Capture 1st inch of rain

Results: 20-30% reduction in combined

sewer overflow volume

2016 Plan: Complementary Strategy

Will not achieve regulatory compliance

Full implementation of green infrastructure not achievable by 2025

Page 37: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

37

Requires reductions in pollution from

nitrogen, phosphorous and sediment

Targets reductions in City’s MS4

(stormwater) permit cycle

Green Infrastructure one strategy to meet

Bay TMDL requirements

Chesapeake Bay TMDL

Reduction Permit CycleApprox.

Equivalent (ac)*

5% 2013 – 2018 120 – 330

35% 2018 – 2023 660

60% 2023 – 2028 1,440

100% By 2028 2,220 – 2,400

Page 38: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

38

Green Infrastructure Recently

Completed or Under Construction

Four Mile Run

Page 39: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

39

Green Infrastructure

Planned Projects

Second Street Green Infrastructure Project

EXISTING

PROPOSED

Page 40: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

40

City support of Green Infrastructure

Help meet Chesapeake Bay Total Maximum

Daily Load (TMDL)

Provides green spaces

Creates environmental education

opportunities

Other ancillary benefits (heat island effect,

flood mitigation, etc.)

Will not meet CSO General Assembly

Legislative mandate – gray infrastructure is

required

Green Infrastructure

Page 41: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

41

Next Steps

Page 42: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

42

CSS Stakeholder

Meeting Schedule

Introduction/

Background

Evaluation

Criteria and

Shortlist of

Alternatives

(all four outfalls)

Water Quality

Benefits/

Level of

Control

Preferred

Alternative Implementation Wrap-Up

Discuss the

CSS/WW Plan

history, the 2016

LTCPU

submission, and

the new

legislation.

Introduce the

technologies

under

consideration.

Introduce the

shortlist of

alternatives.

Review and

discuss the

evaluation criteria

and process

Discuss

benefits and

challenges

of the

alternatives.

Present and

discuss the

preferred

alternative.

Discuss the

potential

impacts to the

community.

Discussion

implementation,

costs, rate

impacts and

schedules.

Wrap and

present draft

plan.

OCTOBER

2017

NOVEMBER

2017

JANUARY

2018

FEB/MAR

2018

MARCH

2018

FEBRUARY

2018

Page 43: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

43

For more information, contact:

[email protected]

703.746.4065

[email protected]

703.746.4154

www.alexandriava.gov/CleanWaterways

Questions/Suggestions/Comments

Page 44: CSS 2017 Stakeholder Meeting 2 Presentation€¦ · 20-11-2017  · CSS Stakeholder Meeting Schedule Introduction/ Background Evaluation Criteria and Shortlist of Alternatives (all

44

Thank You