For 3 months of October, November & December 2013
ProductionPerformanceofOil&NaturalGassectorforthemonthofOctober,2013
-
8/12/2019 Crude Natural Gas Production India
2/15
Company/State PlannedTarget
(TMT)
Actual Production
(TMT)
%ageachievement Surplus(+)Shortfall(-)(%age)
ONGC
Gujarat
AndhraPradesh
TamilNaduAssa
m
Offshore
2045.000
424.000
22.000
19.000
106.000
1474.000
1867.000
410.000
24.000
18.000
107.000
1308.000
91.3
96.7
109.1
94.7
100.9
88.7
-8.7
OIL
Assam
ArunachalPradesh
328.000
327.000
1.000
303.953
301.716
2.237
92.7
92.3
223.7
-7.3
PRIVATE/JVC 979.000 1008.452 103.0 3.0
TOTAL 3352.000 3179.405 94.9 -5.1
Company /
State
Reasonsforshortfall
ONGC ClosureofwellstomaintainliftGaspressureduetoengine replacementandoverhaulingofProcessGas
I. A.CRUDEOILPRODUCTIONPERFORMANCE
Month/Period Planned
Target(TMT)
Actual
Productio
n (TMT)
%ageachievement Surplus(+)Shortfall(
-
)Visvistarget
(%age)
Surplus(+)
Shortfall(overlastyear(%age
October,2013* 3352.000 3179.405 94.9 -5.1 -0.8
April-October,
2013*
22613.000 22018.083 97.4 -2.6 -1.2
April-October,
2012
22283.565
B.COMPANY-WISE ACHIEVEMENT
C.REASONSFORSHORTFALL
-
8/12/2019 Crude Natural Gas Production India
3/15
oilgainfromnewdevelopmentwellsofD-1field,delayincommissioningofB-193processplatformaffected
production.DelayinexecutionofG-1developmentproject.LesslinecondensarereceiptfromOffshore.
ONGC(Gujarat) Lessthananticipatedoil gainfromworkoverandfrequentpowershutdownaffectedproduction.Leakage incrude
oildespatchlineofGGS-III&GGS-IV,lowgasliftpressureduetofrequentGEBpowershutdown,ageingoffields
resultingdeclineinreservoirpressure&increasedwatercutaffectedproduction.
ONGC (Tamil
Nadu)
Productionaffectedduetoclosureofsomeofthewellsonaccountoflessofftakeofgasbyconsumers.
OIL(Assam)
Consequentialeffectofbandhsand blockades.
Pvt./JVCs
(Arunachal
Pradesh)Productionis lessduetounderperformanceofnew developmentofwellsand sand/wateringressissuesinolder wellsetc.
Pvt./JVCs
(Gujarat)
Lessoilproductiondueto intermittentflow.WellAsjol#7closedduetononrevivalafterwork-overjob.Oilwell
haveceasedinBhandut.Underperformanceofproducingwellsin Camby&CB-OS/2.Highwatercutinproducing
wellsinCB-ON/7.Naturaldecline.Wateringressissuesinwellbores.
Company/State PlannedTarget
(MCM)
ActualProduction
(MCM)
%ageachievement Surplus(+)Shortfall(-)(%age)
ONGCGujarat
Rajasthan
AndhraPradesh
TamilNaduAssa
m
1983.560
119.550
1.270
88.710
100.690
39.310
1962.871
129.839
1.352
94.429
115.176
38.136
99.0
108.6
106.5
106.4
114.4
97.0
-1.0
(Offshore) Compressor(PGC)atHeera,increasedwatercutinwellB-173A#2YHaffectedproduction.Lessthananticipated
AstatementshowingCrudeOilProductionduringOctober,2013andcumulativelyfortheperiodApril-October,2013vis--vis2012 -13 isatAnnexure-I.
II. A.NATURALGASPRODUCTION
Month/Period Planned Target
(MCM)
Actual
Production
(MCM)
%age
achieve-ment
Surplus(+) Shortfall(-) Vis-
-vistarget(%age)
Surplus(+) Shortfall(-) over
lastyear(%age)
October,2013* 3269.504 2960.948 90.6 -9.4 -13.6
April- October,
2013*
22308.807 20787 .129 93.2 -6.8 -16.1
April- October,
2012
24787.663
MCM:MillionCubicMetres.*:Provisional.
B.COMPANY-WISEACHIEVEMENT
-
8/12/2019 Crude Natural Gas Production India
4/15
-
8/12/2019 Crude Natural Gas Production India
5/15
Month Utilisation(%) Period
Utilisation(%)
October,2013* 102.2 April-October,2013 103.5
III.A.REFINERYPRODUCTION
(INTERMSOFCRUDETHROUGHPUT)
Month
/ Period
Planne
d
Target
(TMT)
Actual
Productio
n (TMT)
%ageachievement Surplus(+)Shortfall(-) Vis--
vis target(in%age)
Surplus(+
)
Shortfall(
-
October,2013*
19024.000 18374.949 96.6 -3.4 -4.8
April-
October
,
2013*
129906.000 130210.014 100.2 0.2 3.7
April-
October
125565.593
*:Provisional.
Note:RIL(SEZ)productionfiguresforAugust 2013arerevisedfrom3187TMT to3207TMT&Sept'2013proratedfiguresrevisedfrom3085TMT to
3089andOctober2013figuresareonprorated basis.
ThecrudethroughputinIOC(Guwahati,Digboi,Barauni&Bongaigaon),BPCL(Mumbai,Kochi),HPCL(Mumbai),NRL(Numaligarh),MRPL
(Mangalore),ONGC(Tatipaka),HMEL(Bhatinda),RIL(SEZ)&Essarrefinerieshaveexceededtheirplannedtarget.
Thecrudethroughputin IOC(Gujarat,Haldia,Mathura&Panipat),HPCL(Visakh),CPCL(Manali&Narimanam),BORL(Bina),&RIL
(Jamnagar)refinerieswaslessthantheirplannedtarget.
Company/State Reasonsforshortfall
IOCL,Gu arat Throughput islowerduetohighBlackOilinventoryonaccountoflowerBitumen
IOCL,Haldia Throu h utisinlinewithlowerHSD&Blackoildemanddurin monsoon.
IOCL Pani at
ThroughputisrestrictedduetohigherBlackOil inventory,&probleminDHDTunit.
IOCL Mathura
ThroughputislowerbecauseofshiftingofplannedshutdownfromSep'13toOct'13.
CPCL,Manali
LowcrudethroughputduetodetermentofRef-
1shutdown(MoUshutdownperiod:
16-Sep'13to15-Oct'13,Actual:27-
' '
HPCL,Visakh
LowcrudethroughputforISD(VGO)management.
CPCL,CBR
LowthruputduetoLSHSupliftmentproblem.
BORL,BinaRefineryshutdownwastakenfor12daysforreplacementofreformercatalystin
Astatementshowingrefinery-wiseproductionduringthemonthofOctober,2013andcumulativelyfortheperiodApril-October,2013 vis--vis2012-
13isatAnnexure-III.
III.REFINERYCAPACITYUTILISATION
-
8/12/2019 Crude Natural Gas Production India
6/15
October,2012 106.6 April-October,2012 100.5
Therefinery-wise detailsofthecapacityutilisationduringOctober,2013andcumulativelyfor theperiodApril-October,2013vis-a-vis
2012-13aregiveninAnnexure-IV.
ClickheretoseeAnnexure-I
ClickheretoseeAnnexure-II
ClickheretoseeAnnexure-III
ClickheretoseeAnnexure-IV
RCJ
http://pib.nic.in/archieve/others/2013/nov/d2013112601.pdfhttp://pib.nic.in/archieve/others/2013/nov/d2013112601.pdfhttp://pib.nic.in/archieve/others/2013/nov/d2013112601.pdfhttp://pib.nic.in/archieve/others/2013/nov/d2013112601.pdfhttp://pib.nic.in/archieve/others/2013/nov/d2013112602.pdfhttp://pib.nic.in/archieve/others/2013/nov/d2013112602.pdfhttp://pib.nic.in/archieve/others/2013/nov/d2013112602.pdfhttp://pib.nic.in/archieve/others/2013/nov/d2013112602.pdfhttp://pib.nic.in/archieve/others/2013/nov/d2013112603.pdfhttp://pib.nic.in/archieve/others/2013/nov/d2013112603.pdfhttp://pib.nic.in/archieve/others/2013/nov/d2013112603.pdfhttp://pib.nic.in/archieve/others/2013/nov/d2013112603.pdfhttp://pib.nic.in/archieve/others/2013/nov/d2013112604.pdfhttp://pib.nic.in/archieve/others/2013/nov/d2013112604.pdfhttp://pib.nic.in/archieve/others/2013/nov/d2013112604.pdfhttp://pib.nic.in/archieve/others/2013/nov/d2013112604.pdfhttp://pib.nic.in/archieve/others/2013/nov/d2013112604.pdfhttp://pib.nic.in/archieve/others/2013/nov/d2013112604.pdfhttp://pib.nic.in/archieve/others/2013/nov/d2013112603.pdfhttp://pib.nic.in/archieve/others/2013/nov/d2013112603.pdfhttp://pib.nic.in/archieve/others/2013/nov/d2013112602.pdfhttp://pib.nic.in/archieve/others/2013/nov/d2013112602.pdfhttp://pib.nic.in/archieve/others/2013/nov/d2013112601.pdfhttp://pib.nic.in/archieve/others/2013/nov/d2013112601.pdf -
8/12/2019 Crude Natural Gas Production India
7/15http://pib.nic.in/newsite/PrintRelease.aspx 1/4
Company/State PlannedTarget
(MCM)
ActualProduction(MCM) %ageachievement Surplus(+)Shortfall(-)
(%age)
ONGC
Gujarat
1990.050
113.820
1916.136
126.508
96.3
111.1
-3.7
PressInformationBureau
GovernmentofIndia
MinistryofPetroleum&NaturalGas23-December-201315:55IST
ProductionPerformanceofOil&NaturalGasse ctorforthemonthofNovember,2013
I. A.CRUDEOILPRODUCTIONPERFORMANCE
Month/Period Planned
Target(TMT)
Actual
Production(TMT)
%age
achievement
Surplus(+)Shortf
all(-)Vis- -
vistarget (%age)
Surplus(+) Shortfall(-)
overlastyear (%age)
November,2013* 3323.000 3141.427 94.5 -5.5 1.1
April-November,2013* 25936.000 25159.510 97.0 -3.0 -0.9
April-November,2012 25390.449
B.COMPANY-WISEACHIEVEMENT
Company/State PlannedTarget(TMT) Actual
Production
(TMT)
%age
achievement
Surplus(+)Shortfall(-)
(%age)
ONGC
Gujarat
AndhraPradesh
TamilNaduAssam
Offshore
2058.000
410.000
21.000
18.000
103.000
1506.000
1805.320
399.068
24.043
18.220
102.743
1261.246
87.7
97.3
114.5
101.2
99.8
83.7
-12.3
OIL
Assam
ArunachalPradesh
321.000
320.000
1.000
295.700
293.600
2.100
92.1
91.8
210.0
-7.9
PRIVATE/JVC 944.000 1040.407 110.2 10.2
TOTAL 3323.000 3141.427 94.5 -5.5
C.REASONSFORSHORTFALL
Company/State Reasonsforshortfall
ONGC(Offshore) ClosureofwellstomaintainliftGaspressureduetoenginereplacementandoverhaulingofProcessGasCom pressor
(PGC)atHeera,increasedwatercutinwellB-173A#2YH affected production. Lessthananticipated oilgainfrom new developmentwellsofD-
1field, delayincommissioningofB-193processplatformaffectedproduction.Delay inexecution ofG-
1developmentproject. Lessthananticipatedoilgainfrom marginalfieldsdevelopmentwells&sidetrackwells.
ONGC(Gujarat) Less than anticipated oil gain from workoverand new developmentwells affected production. Frequent GEBpower
shutdown,ageingoffieldsresultingdeclineinreservoirpressure&increasedwatercutaffectedproduction.
OIL(Assam) Consequentialeffectofbandhsandblockades.
Pvt./JVCs
(ArunachalPradesh)
Production fromKSG#46 ceasedduetosuddeni ncreaseinwatercut.Furtherpro duction from wells KSG#29,34,57,
11,29,58,65and66hasdeclinedduetosandingressandincreaseinwatercut.
Pvt./JVCs(Gujarat) NoOilproductions asthewellsareceasedinDholasan&Bhandutfield. BreakdownofpumpatONGCunloadngfacility.
HighwatercutinproducingwellsinCB-ON/7. Naturaldecline. Wateringressissuesinwellbores.
AstatementshowingCrudeOilProductionduringNovember,2013andcumulativelyfortheperiodApril-November,2013vis--vis2012-13isat
Annexure-I.
II.A. NATURALGASPRODUCTION
Month/Period PlannedTarget(MCM) Actual
Production
(MCM)
%age
achieve-ment
Surplus(+) Shortfall(-
)Vis--vis target
(%age)
Surplus(+)
Shortfall(-)over
lastyear (%age)
November,2013* 3243.060 2893.282 89.2 -10.8 -11.3
April-November,2013* 25551.867 23680.411 92.7 -7.3 -15.6
April-November,2012 28048.105
MCM:MillionCubicMetres.
B. COMPANY-WISEACHIEVEMENT
-
8/12/2019 Crude Natural Gas Production India
8/15http://pib.nic.in/newsite/PrintRelease.aspx 2/4
Company/State Reasonsforshortfall
ONGC(Offshore) DelayincommissioningofB-193&SB-14processplatform affectedproduction. Delayinexecution ofG-1developmentproject.
ONGC(Assam) Lackofconsumers.
ONGC(Tripura) Lessofftakebyconsumers.
OIL(Rajasthan) LessthanthecommittedwithdrawalofRajasthanRajyaVidyutUtpadanNigamLimited(RRVUNL).
Pvt./JVCs (WestBengal)
CBMproducedinsamllquantitiesarebeinginternallyusedandflaredasnomarketinnearvicinity.
Pvt./JVCs (Gujarat) LessoilproductionduetobreakdownofpumpatONGCunloadngfacility. Highwatercutinproducingwellsin CB-ON/7.
Naturaldecline. Wateringressissuesinwellbores.Nogasproductionfromthefieldaswells haveceasedduetowaterloadinginBoala. Gas productionwasceasedw.e.f.10.11.2012 asperGOIdirectives
priortofieldabandonmentinCB-ONN-2000/2.
Pvt./JVCs (Jharkhand) IncidentallyproducedCBMisbeing soldinsmallquantities.
Pvt./JVCs (Off-shore) Taptigasproductionis lessthanbudgetduetonondeliveryofexpectedvolumesfrominfillwellsandMTA#3earlywaterbreakthroughfollowedbyloading.Atotalof9wellsinD1,D3and2wellsinMAhaveceasedto flow
Rajasthan
AndhraPradesh
TamilNaduAssam
Tripura
MumbaiHighOffshore
1.230
83.870
97.560
38.240
72.520
1582.810
1.479
96.708
108.617
37.461
61.913
1483.450
120.2
115.3
111.3
98.0
85.4
93.7
OIL
Assam
ArunachalPradesh
Rajasthan
224.820
202.580
1.200
21.040
226.402
205.262
1.518
19.622
100.7
101.3
126.5
93.3
0.7
PRIVATE/JVC
Onshore$
Offshore
1028.190
113.103
915.087
750.744
102.293
648.451
73.0
90.4
70.9
-27.0
TOTAL 3243.060 2893.282 89.2 -10.8
$:IncludingCoalBedMethane production.
C. REASONSFORSHORTFALL
-
8/12/2019 Crude Natural Gas Production India
9/15http://pib.nic.in/newsite/PrintRelease.aspx 3/4
duetowater/sandingressinKG-SWN-98/3 field. Loadingofwells,delayedwellservicesactivities,delayed
deliveryofPJandPLinfillwellsandclosureofMAwellsduetoleakobservedintheMAriser.
AstatementshowingnaturalgasproductionduringNovember,2013andcumulativelyfortheperiodApril-November,2013vis--vis2012-13is atAnnexure-II.
III.A.REFINERYPRODUCTION
(INTERMSOFCRUDETHROUGHPUT)
Month/Period PlannedTarget(TMT) ActualProduction
(TMT)
%age
achievement
Surplus(+)
Shortfall(-)
Vis--vis
target
in%a e
Surplus(+)
Shortfall(-)
overlast year
(in
%a e November,2013* 17818.000 17802.709 99.9 -0.1 -5.0
April-November,2013* 147724.000 147968.305 100.2 0.2 2.5
April-November,2012 144303.636
Note:RIL(SEZ)productionfiguresfor Sept'2013arerevisedfrom3089 TMTto3045TMT&Oct'2013proratedfiguresrevisedfrom3151TMTto
3192andNov'2013figuresareonprorated basis.
The crude throughput in IOC (Guwahati, Hald ia,Digboi, BarauniPanipa t&Bongaigaon), BPCL (Mumbai, Kochi), HPCL (Mumbai), NRL
(Numaligarh),ONGC(Tatipaka),BORL(Bina),HMEL(Bhatinda)&RIL(SEZ) refinerieshaveexceededtheirplannedtarget.
ThecrudethroughputinIOC(Gujarat&Mathura),HPCL (Visakh),CPCL(Manali&Narimanam), MRPL(Mangalore,)
RIL(Jamnagar)&Essarrefinerieswaslessthantheirplannedtarget.
Company/State Reasonsforshortfall
IOCL,GujaratThroughput isrestrictedduetoproblem inCrudeUnitfurnace &HighBlackOilinventoryonaccountoflowerBitumen demand.
IOCL,Mathura ThroughputislowerbecauseofshiftingofplannedshutdownfromAug-Sep'13toOct-Nov'13.
-
8/12/2019 Crude Natural Gas Production India
10/15http://pib.nic.in/newsite/PrintRelease.aspx 4/4
HPCL,Visakh LowcrudethroughputforISD(VGO)management.
CPCL,Manali LowcrudethroughputduetoRef-Ishutdownbasedoneconomics.
CPCL,CBR LowthruputduetomaintainLSHSproductioninlinewithplannedofftakeandcrudemix.
MRPL,Mangalore UnitswereundershutdownduetoRefineryblackout.
Astatementshowingrefinery-wiseproductionduringthe monthofNovember,2013andcumulativelyfortheperiodApril-November,2013vis-- vis2012-13isatAnnexure-III.
III.REFINERYCAPACITYUTILISATION
Month Utilisation(%) Period Utilisation(% )
November,2013* 100.7 April-November,2013 102.9
November,2012 107.0 April-November,2012 101.3
Therefinery-wisedetailsofthecapacityutilisationduringNovember,2013andcumulativelyfortheperiodApril-November,2013vis-a- vis2012-
13aregiveninAnnexure-IV.
ClickheretoseeAnnexure
RCJ
http://pib.nic.in/archieve/others/2013/dec/d2013122301.pdfhttp://pib.nic.in/archieve/others/2013/dec/d2013122301.pdfhttp://pib.nic.in/archieve/others/2013/dec/d2013122301.pdfhttp://pib.nic.in/archieve/others/2013/dec/d2013122301.pdfhttp://pib.nic.in/archieve/others/2013/dec/d2013122301.pdfhttp://pib.nic.in/archieve/others/2013/dec/d2013122301.pdfhttp://pib.nic.in/archieve/others/2013/dec/d2013122301.pdf -
8/12/2019 Crude Natural Gas Production India
11/15http://pib.nic.in/newsite/PrintRelease.aspx 1/5
Company/State PlannedTarget
(TMT)
ActualProduction(TMT) %age
achievement
Surplus(+)Shortfall(-)(%age)
ONGC
Gujarat
AndhraPradesh
TamilNadu
AssamOffsho
re
2127.000
422.000
22.000
19.000
107.000
1557.000
1881.420
411.985
25.112
20.105
107.752
1316.466
88.5
97.6
114.1
105.8
100.7
84.6
-11.5
OIL
Assam
335.000
334.000
290.860
288.816
86.8
86.5
-13.2
PressInformationBureau
GovernmentofIndia
MinistryofPetroleum&NaturalGas24-January-2014 16:04IST
Production PerformanceofOil&NaturalGassectorforthemonthofDecember,2013
I. A.CRUDEOILPRODUCTION PERFORMANCE
Month/Period Planned
Target(TMT)
Actual
Production
(TMT)
%ageachievement Surplus(+)Shortfall(-
)Vis--vistarget
(%age)
Surplus(+)Shortfall(-)over
lastyear (%age)
December,2013* 3435.000 3256.368 94.8 -5.2 1.6
April-December,2013* 29371.000 28411.237 96.7 -3.3 -0.6
April-December,2012 28595.392
TMT:Thousand
Metric
Tonnes.. *:Provisional
Note: OilIndia LtdproductionfiguresforNov 2013figuresrevisedfrom3141.427TMTto3136.786.
B. COMPANY-WISE
ACHIEVEMET
-
8/12/2019 Crude Natural Gas Production India
12/15http://pib.nic.in/newsite/PrintRelease.aspx 2/5
Company/State PlannedTarget(MCM) ActualProduction(MCM) %ageachievement Surplus(+)Shortfall(-)(%age)
ONGCGujarat
Rajasthan
AndhraPradesh
TamilNadu
2068.620
116.330
1.270
84.860
102.100
1999.013
119.547
1.399
98.740
116.199
96.6
102.8
110.2
116.4
113.8
-3.4
ArunachalPradesh 1.000 2.044 204.4
PRIVATE/JVC 973.000 1084.088 111.4 11.4
TOTAL 3435.000 3256.368 94.8 -5.2
C.REASONSFORSHORTFALL Company/State Reasonsforshortfall
ONGC(Offshore) Closureofwellsforsafetyreasons&maintaininggas liftpressureduringstoppageof
ProcessGasCompressor(PGC) formaintenanceatHeera&lessthananticipatedgain from
developmentandsidetrackwells ofNeelamfield,increasedwatercutinwellB-
173A#2YHaffectedproduction.Lessthananticipatedoilgainfromnewdevelopmentwells ofD-1field,delay
incommissioningofB-193processplatformaffectedproduction.Delay inexecutionofG-
1developmentproject.
ONGC(Gujarat) FrequentGEBpowershutdown,ageingoffieldsresultingdeclineinreservoirpressure&
increasedwatercutaffectedproduction.
OIL(Assam)
Consequentialeffectofbandhsandblockades.
Pvt./JVCs (ArunachalPradesh) Wateringressissuesinwellbores.
Pvt./JVCs (Gujarat) NoOilproductionsasthewel lsareceasedinDhol asan&Bhandutfield . Workoverjobin3
wellsdidnotreasultintheprojectedincreaseinproductionandproductionfromCambay-
77Hyettocommenceduetodelayindrilling.Naturaldeclineandincreasingwatercutin wells.
AstatementshowingCrudeOilProductionduringDecember,2013andcumulativelyfortheperiodApril-December,2013vis--vis2012-
13isatAnnexure-I.
II. A.NATURALGASPRODUCTION
Month/Period Planned
Target
(MCM)
Actual
Production
(MCM)
%age
achieve-ment
Surplus(+)Shortfall(-)Vis- -
vistarget (%age)
Surplus(+)Shortfall(-) over last
year (%age)
December,2013* 3351.732 3001.676 89.6 -10.4 -9.9
April-December,2013* 28903.599 26682.087 92.3 -7.7 -15.0
April-December,2012 31379.915
MCM:MillionCubic Metres.*:Provisional.
B. COMPANY-WISEACHIEVEMENT
-
8/12/2019 Crude Natural Gas Production India
13/15http://pib.nic.in/newsite/PrintRelease.aspx 3/5
Assam
Tripura
MumbaiHigh
Offshore
39.860
75.060
1649.140
38.952
68.152
1556.024
97.7
90.8
94.4
OILAssa
m
ArunachalPradesh
Rajasthan
227.690
204.700
1.240
21.750
227.897
206.821
1.609
19.467
100.1
101.0
129.8
89.5
0.1
PRIVATE/JVC
Onshore$
Offshore
1055.422
120.665
934.757
774.766
102.698
672.068
73.4
85.1
71.9
-26.6
TOTAL 3351.732 3001.676 89.6 -10.4
$:IncludingCoalBedMethaneproduction.
C. REASONSFORSHORTFALL
Company/State Reasonsforshortfall
ONGC(Offshore) Delay incommissioningofB-193&SB-14processpla tformaffectedproduction. Delay inexecutionofG-1 developmen tproject.
ONGC(Assam) Lackofconsumers.
ONGC(Tripura) Lessofftakebyconsumers.
OIL(Rajasthan) Lessthanthecommi tted withdrawalofRajasthanRajyaVidyutUtpadanNigamLimited(RRVUNL).
Pvt./JVCs (WestBengal )
IncidentallyproducedCBMisbeingsoldinsmallquantitiesasthefield iscurrentlyunderdecvelopment.
Pvt./JVCs (Gujarat) Onlyonewellisprod ucingandothertwowellsareceasedduetowaterloading .NaturaldeclineinHazirafield.Nogasproductionfr
omthefieldaswellshaveceasedduetowaterloadinginBoala. Gasproduction
wasceasedw.e.f.10.11.2012asperGOIdirectivesprior tofieldabandonmentinCB-ONN-2000/2.
Pvt./JVCs (Jharkhand) IncidentallyproducedCBMisbe ingsoldinsmallqu antities.
Pvt./JVCs (Off-shore) KG-OSN-2001/3fieldisun derdevelopmen t&yettocommencecommercialproductonofgas.Well
MercuryisclosedduetowaterloadinginPY-1field.Taptigasproductionislessthanbudgetduetonondeliveryof
expectedvolumesfrominfillwellsandMTA#3earlywaterbreakthroughfollowedbyloading.Atotalof9
wellsinD1,D3and2wellsinMAhaveceasedtoflow duetowater/sandingressinKG-SWN-98/3field.
AstatementshowingnaturalgasproductionduringDecember,2013andcumulativelyfortheperiodApril-December,2013vis--vis
2012-13isatAnnexure-II.
-
8/12/2019 Crude Natural Gas Production India
14/15
2/26/2014 PrintRelease
III.A.REFINERYPRODUCTION
(INTERMSOFCRUDETHROUGHPUT)
Month/Period PlannedTarget(TMT) ActualProduction(TMT) %
ageachievement
Surplus(+)
Shortfall(-)
Vis--
vistarget
in%a e
Surplus(+)Shortfall(-
)over lastyear
(in%age)
December,2013* 18232.000 18631.188 102.2 2.2 -1.7
April- December,
2013*
165956.000 166616.968 100.4 0.4 2.1
April-December,2012 163256.153
Note:RIL(SEZ)productionfiguresforOct 132013arerevisedfrom3191.582TMTto 3206TMT&Nov'2013proratedfiguresrevisedfrom3081.476TMTto3084.533andDec'2013figuresareonproratedbasis.
ThecrudethroughputinIOC(Haldia,BarauniPanipat&Bongaigaon),BPCL(Mumbai),HPCL(Mumbai&Visakh),NRL(Numaligarh),
MRPL(Mangalore),ONGC(Tatipaka),BORL(Bina),HMEL(Bhatinda), Essar(Vadinar)&RIL(SEZ) refineries haveexceededthei r plannedtarget.
Thecrudethroughputin IOC(Guwahati,Gujarat,Digboi&Mathura),BPCL(Kochi),CPCL(Manali&Narimanam)&RIL(Jamnagar)
refinerieswaslessthantheir plannedtarget.
Company/State Reasonsforshortfall
IOCL,Mathura
ThroughputislowerbecauseofoutageinHydroCracjerUnitforhighpressuredrop.
BPCLKochi
Throughputislowerduetohigherbuildupofintermediatesthantheplanwhich
willbedepletedinthesubsequentmonths.
CPCL,Manali LowcrudethroughputduetoRef-Ishutdownbasedoneconomics.
CPCL,CBR LowthruputduetoreducedCrudeavailability.
Astatementshowingrefinery-wiseproductionduringthemonth ofDecember,2013 andcumulativelyfortheperiodApril-December,2013 vis--vis2012-
13isatAnnexure-III.
III.REFINERYCAPACITYUTILISATION
Month Utili sation(%) Period Utilisation(%)
December,2013* 102.0 April-December,2013 102.8
December,2012 104.7 April-December,2012 101.7
Therefinery-wisedetailsofthecapacityutilisation duringDecember,2013 andcumulativelyfortheperiodApril-December,2013vis-a-vis
2012-13aregiveninAnnexure-IV.
-
8/12/2019 Crude Natural Gas Production India
15/15
2/26/2014 PrintRelease
http://pib.nic.in/newsite/PrintRelease.aspx 5/5
http://pib.nic.in/newsite/PrintRelease.aspxhttp://pib.nic.in/newsite/PrintRelease.aspxhttp://pib.nic.in/newsite/PrintRelease.aspx