cru - mount auto equip services pty ltd extra... · 2016-01-29 · cru.2i tests performed cru.2i 3...
TRANSCRIPT
![Page 1: CRU - Mount Auto Equip Services Pty Ltd extra... · 2016-01-29 · CRU.2i tests performed CRU.2i 3 eRLC: Electrical test for Ω, μH, μF LKT: Static Back leak test NOP: Nozzle Opening](https://reader034.vdocuments.us/reader034/viewer/2022042917/5f5bb631fb6cf32c5f55938b/html5/thumbnails/1.jpg)
CRU.2i
Reports
iVM Test procedure
CRICRIN
CRU.2i 1
![Page 2: CRU - Mount Auto Equip Services Pty Ltd extra... · 2016-01-29 · CRU.2i tests performed CRU.2i 3 eRLC: Electrical test for Ω, μH, μF LKT: Static Back leak test NOP: Nozzle Opening](https://reader034.vdocuments.us/reader034/viewer/2022042917/5f5bb631fb6cf32c5f55938b/html5/thumbnails/2.jpg)
CRU.2i
CRU.2i 2
Repeatable and Accurate Electronic Mass Measurement
7 minutes testing phase / injector
Multiple-injection metering capability
Up to 2450 Bar
RSP (μs) available for all injectors with database
Easy to Operate and Automatic function
MACC proven servicing of Diesel Injectors
CR Injector Coding
![Page 3: CRU - Mount Auto Equip Services Pty Ltd extra... · 2016-01-29 · CRU.2i tests performed CRU.2i 3 eRLC: Electrical test for Ω, μH, μF LKT: Static Back leak test NOP: Nozzle Opening](https://reader034.vdocuments.us/reader034/viewer/2022042917/5f5bb631fb6cf32c5f55938b/html5/thumbnails/3.jpg)
CRU.2i tests performed
CRU.2i 3
eRLC: Electrical test for Ω, μH, μF
LKT: Static Back leak test
NOP: Nozzle Opening Pressure test (Hard Start-up)
iVM: Injector Volume Measuring test (15-steps)• Full-Load Test (Performance or Smoke issues)• Medium-Load (Emissions Issues & Overall Operation)• Low-Load Test (Rough Idle, start-up issues)• Small-Injection Test (Pre/Post-Injection & knocking)
RSP: Injector Response time test(Emissions, Performance, knocking, Irregular operation)
SPR: Injector Nozzle Spray quality test
iCD: Injector Coding (where applicable)
![Page 4: CRU - Mount Auto Equip Services Pty Ltd extra... · 2016-01-29 · CRU.2i tests performed CRU.2i 3 eRLC: Electrical test for Ω, μH, μF LKT: Static Back leak test NOP: Nozzle Opening](https://reader034.vdocuments.us/reader034/viewer/2022042917/5f5bb631fb6cf32c5f55938b/html5/thumbnails/4.jpg)
CRU.2i
CRU.2i 4
ElectronicInjection Metering (IVM)
Reports & Customer filing